Attachment 3 QASP_MOTT_2025_12MAR2026.docx
DOCX document 75 KB Posted
- Attached to
- Mobile Ordnance Training Team (MOTT)
- Solicitation number
- N0024426R3104
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the Mobile Ordnance Training Team (MOTT) task order under a Naval Air Forces contract. The document establishes the Government's systematic quality assurance methods and performance monitoring framework for the Performance Based Service Contract (PBSC) to ensure the contractor delivers services meeting contractual standards and that the Government only pays for acceptable performance levels.
The QASP identifies five primary surveillance areas with specific performance metrics and rating scales. Area 1 (Quality) comprises five Contractor Deliverable Requirements Lists (CDRLs) including monthly financial statements, monthly status reports, trip reports, curriculum copies, and training lectures, each requiring 0% error rates and 0% timeliness deviations with 20% weighting. Area 2 (Schedule) monitors projected training and travel schedules with 100% weighting for accuracy and timeliness compliance. Area 3 (Cost Control) reviews invoices and expense reports to ensure costs remain within contract funding limits and comply with Joint Travel Regulations, with 100% weighting. Area 4 (Business Management) tracks support equipment licenses per NAVSUP Publication 538 with 100% weighting. Area 5 (Customer Satisfaction) comprises three components: student evaluations via Class Critique Forms (50% weight), supervisor evaluations via Supervisor Critique Forms assessing job performance improvement (25% weight), and customer complaint monitoring (25% weight). The COR conducts surveillance through customer feedback analysis, periodic monthly inspections, and random monitoring of documentation from ship's force and NAVAIR program offices. Non-conformance remedies include Performance Assessment Reports (PARs) for minor discrepancies requiring 10-day correction timelines, and Corrective Action Reports (CARs) for serious issues allowing up to 30 calendar days or six months maximum for correction depending on complexity. Annual CPARS reporting documents contractor performance, with contract failure potentially resulting in termination and loss of future Government contracts. The document includes enclosures containing Class Critique Forms, Supervisor Critique Forms, Technical Data Customer Satisfaction Survey, Customer Complaint Record forms, Corrective Action Reports, Performance Assessment Reports, and a Class Critique Score Tracker for monitoring performance across multiple training classes throughout the fiscal year.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
COMNAVAIRPAC N46
TASK ORDER
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
For
Mobile Ordnance Training Team (MOTT)
21 October 2025
Prepared by:
Joseph Shea PO Box 357051 San Diego CA, 92135 619-545-2794 joseph.j.shea2.civ@us.navy.mil
Table of Contents
| 1.Background | 3. |
| 2. QASP Purpose | 3. |
| 3. Authority | 3. |
| 4. Scope | 3. |
| 5. Roles and Responsibilities | 4. |
| Government Personnel | 4. |
| Contracting Officer (CO) | 4. |
| Contracting Officer’s Representative (COR) | 4. |
| Contractor Personnel | 4. |
| 6. Method of Surveillance | 4. |
| Customer feedback | 6. |
| Periodic Inspection | 6. |
| Random monitoring | 6. |
| 7. Documentation | 6. |
| 8. Identified QA Areas | 6. |
| AREA 1: Quality of Product or Service | 6. |
| AREA 2: Cost Control | 7. |
| AREA 3 Business Relations | 7. |
| AREA 4 Customer Satisfaction | 7. |
| 9. Performance Rating Definitions | 8. |
| Performance Rating Sumary | 9. |
| 10. Performance Reporting | 10. |
| 11. Attachments | 10. |
| Enclosure (1) – Student/Supervisor Critique form | 11. |
| Enclosure (2) – Custome Satisfaction Survey | 12. |
| Enclosure (3) – Customer Complaint Record (CCR) | 13. |
| Enclosure (4) – Corrective Action Report (CAR) | 14. |
| Enclosure (5) – Performance Assessment Report (PAR) | 15. |
| Enclosure (6) – Critique Score Log form | 16. |
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
MOBILE ORDNANCE TRAINING TEAM (MOTT) CONTRACT
1. BACKGROUND
The MOTT effort entails fleet readiness at the intermediate maintenance level as detailed in the Naval Ordnance Maintenance Management Program (NOMMP), (OPNAVINST 8000.16). Evaluation of explosives safety, technical data, procedures, life cycle criteria and material support evolve through intermediate level maintenance.
MOTT’s focus is exporting to the user, ordnance support keyed to providing initial ordnance training in support of OPNAVINST 8020.14 Series and updates for new equipment procedures and policies. This is a continuing task, due to personnel changes, readiness cycles and ordnance evolution/upgrades.
The MOTT analyzes the intermediate level maintenance process for potential shortfalls in personnel certification, equipment and material, recommending solutions and providing technical assistance during readiness reviews.
2. QASP PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued thereunder. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
3. AUTHORITY
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in task orders to be accomplished by the Contracting Officer or his duly authorized representative.
4. SCOPE
The Quality Assurance Surveillance Plan (QASP) is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan.
5. ROLES AND RESPONSIBILITIES
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.
The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
The COR is responsible for technical administration of the project and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.
Contractor Personnel The following employees of the contractor serve as the contractor’s Program Manager (PM) and Task Manager for this contract: (Complete this section after the contract award)
Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Key Contract Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
6. METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this QASP.
Customer Feedback – Customer feedback may be obtained from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR. The COR shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file.
Periodic Inspection – The COR will conduct periodic inspections by verifying documentation from ship’s force and NAVAIR program offices. For the potential tasks identified in the Performance Work Statement (PWS), the COR typically performs the periodic inspection on a monthly basis.
Random Monitoring - The COR will conduct random monitoring by verifying documentation from ship’s force and NAVAIR program offices. For the potential tasks identified in the Performance Work Statement (PWS), the random monitoring shall be performed by the COR.
7. DOCUMENTATION
The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract. Information in the Quality Assurance file will be considered when completing the annual CPARS report.
The COR makes an annual report on Contractor Performance (CPARS). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
8. IDENTIFIED QA SURVEILLANCE AREAS
The following areas are identified in section 7.0 of the PWS. Each area is made up of items that are identified within the PWS and CDRLS listed in Section XX of the solicitation as Attachments and are to be monitored under this QASP.
AREA 1: QUALITY (Comprised of 5 items)
CDRL – Data Item A001, Monthly Financial Statement Measurement/Metric – Accuracy and timeliness Performance Standard – Accuracy – no rejected reports due to major discrepancy Timeliness – within 5 days (defined as working days) after the due date of the last day of the first week of the month.
Maximum Error Rate – 0% Timeliness – 0% Weight – 20% if all above requirements are met. 0% if there are any un-resolved deficiencies.
CDRL – Data Item A002, Monthly Status Report Measurement/Metric – Accuracy and timeliness Performance Standard –Accuracy – no rejected reports due to major discrepancy Timeliness – within 5 days after the due date of the last day of the first full week of the month.
Maximum Error Rate – 0% Timeliness – 0% Weight – 20% if all above requirements are met. 0% if there are any un-resolved deficiencies.
CDRL – Data Item A004, Trip Reports Measurement/Metric – Accuracy and timeliness Performance Standard – Accuracy – all required data points covered (re: 6.2), content correct.
Timeliness – within 5 days of the conclusion of travel as per customer requirements.
Maximum Error Rate – 0% Timeliness – 0% Weight – 20% if all above requirements are met. 0% if there are any un-resolved deficiencies.
CDRL – Data Item A006, Copies of Curriculum Measurement/Metric – Accuracy and timeliness Performance Standard – Accuracy – relevant to publications identified in section 4.0 Timeliness – Upon completion of initial or updated training material.
Maximum Error Rate – 0% Timeliness – 0% Weight – 20% if all above requirements are met. 0% if there are any un-resolved deficiencies.
CDRL – Data Item A007, Copies of Training Lectures Measurement/Metric – Accuracy and timeliness Performance Standard – Accuracy – relevant to publications identified in section 4.0 Timeliness – Upon completion of initial or updated training material.
Maximum Error Rate – 0% Timeliness – 0% Weight – 20% if all above requirements are met. 0% if there are any un-resolved deficiencies.
Area 1 Rating Calculation
Failure to submit any CDRL item identified above will result in an overall rating of unsatisfactory
Exceptional Performance Rating: 90-100% Very Good Performance Rating: 80-90% Satisfactory Performance Rating: 70-80% Marginal Performance Rating: 60-70% Unsatisfactory Performance Rating: 60% or below
AREA 2: SCHEDULE (Comprised of 1 item)
CDRL – Data Item A003, Projected Training/Travel Schedule Measurement/Metric – Accuracy and timeliness Performance Standard – Accuracy – content correct Timeliness – within 5 days of scheduling training/travel as per customer requirements.
Maximum Error Rate – 0% Timeliness – 0% Weight – 100% if all above requirements are met. 0% if there are any un-resolved deficiencies.
AREA 3: COST CONTROL (Comprised of 1 item)
REVIEW OF INVOICES/EXPENSE REPORTS
Measurement/Metric – Contract Funding limits Performance Standard – Meets service and schedule requirements while keeping direct and indirect costs within awarded contract value, and within reason using the Joint Travel Regulation (JTR) as a guideline.
Maximum Error Rate – 0% Weight – 100%
AREA 4: BUSINESS MANAGEMENT (Comprised of 1 item)
CDRL – Data Item A005, Copies of Support Equipment Licenses Measurement/Metric – Accuracy and timeliness Performance Standard – Accuracy – IAW NAVSUP Publication 538 Timeliness – After completion of licensing requirements and whenever license is renewed.
Maximum Error Rate – 0% Timeliness – 0% Weight – 100%
AREA 5: CUSTOMER SATISFACTION (Comprised of 3 Items)
STUDENT EVALUATION
Measurement/Metric – Student’s evaluation of course /instructor effectiveness Performance Standard – Class Critique Form Timeliness – 5 days after the completion of training or returning from a training trip.
Maximum Error Rate – Weight – 50%
JOB PERFORMANCE EVALUATION
Measurement/Metric – Student’s supervisor’s evaluation of weather the course helped the student in the actual performance of his/her duties related to the material taught.
Performance Standard – Supervisor Critique Form Timeliness – N/A Maximum Error Rate – N/A Weight – 25%
CNAP/CNAL CUSTOMER SATISFACTION
Measurement/Metric – Monitoring of CNAP/CNAL Customer complaints/resolutions Performance Standard – Customer Complaint Record Timeliness – N/A Maximum Error Rate – N/A Weight – 25%
Area 5 Rating – Excellent Performance Rating: 90-100% Very Good Performance Rating: 80-90% Satisfactory Performance Rating: 70-80% Marginal Performance Rating: 60-70% Unsatisfactory Performance Rating: 60% or below
9. Performance Rating Definitions
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
| Performance Rating |
| Criteria |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
| AREA |
| PERFORMANCE REQUIREMENT |
| PERFORMANCE MEASURE |
| Inspection |
| Calculation / Ratings |
| Freq/When |
| Method |
| What |
| Quality |
| CDRL # A001 |
| Review financial statement |
| Monthly/Last day of the first full week of the month |
| 100% Assessment |
| COR will ensure items have been submitted and contain all required data elements. |
| All requirements must be submitted. |
If completed and there are unresolved deficiencies, each will be assigned a weight value:
Complete:
100%/6=16.66%.
Not complete:
0%
| CDRL # A002 |
| Review MSR |
| Monthly/Last day of the first full week of the month |
| CDRL # A004 |
| Review trip reports |
| As required by mission/ 5 days after completion of training |
| CDRL # A006 |
| Review curriculum |
| Initial development and upon update |
| CDRL # A007 |
| Review training lectures |
| Annually |
| Schedule |
| CDRL # A003 |
| Meets contract and ship’s schedule requirements IAW the CNAFINST 3500.20 series |
| Monthly and as required |
| 100% Assessment |
| Review of contractor regular/sea hour expenditures compared to remaining funding balance and known ship’s schedule |
| Rating will be excellent if requirements of CNAF 3500.20 series are met, marginal if not met. |
Cost Control
| Within the limits of contract funding and travel expenditures conforms to the joint Travel Regulation (JTR) |
| Review of invoices and expense reports |
| Monthly |
| 100% Assessment |
| COR will review all invoices and expense reports as required |
| Rating will be excellent if complete or unsatisfactory if not complete. |
| Business Management |
| CDRL # A005 |
| Forklift License |
| Initial issue and renewal |
| 100% Assessment |
| COR will monitor license expiration/deliverable |
| Rating will be excellent if complete or unsatisfactory if not complete. |
| Customer Satisfaction |
| Course is relevant to the student’s success. |
| Student completes the Class Critique form |
| Conclusion of each class |
| 100% Assessment |
| Contractor will request all students complete a class critique form. |
| Each critique question is assigned a point value. Max points: 50 |
| Course improves the student’s job performance. |
| Supervisor completes the Supervisor Critique form |
| Approximately two months after completion of a training visit. Once annually per CIN # and after update/development of new courseware. |
| Random sampling |
| COR will coordinate completion of the critique form. |
| Each critique question is assigned a point value. Max points: 25 |
| Provide technical data support. |
| Customer completes survey |
| Continuous |
| Random sampling |
| Monitor daily interaction. |
| Each survey is assigned a point value. Max: 25 |
10. Performance Reporting
Remedies for Non-Conformance If inspections indicate unacceptable performance, the COR will notify the contractor’s POC of the deficiencies for correction. Use the remedy the government is going to use per what is stated in the Services Summary (SS). If deficiencies are not corrected within the required time frame, the COR should notify the CO for action. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the CO shall be notified for a final decision
Performance Assessment Report (PAR) PARs will be used to report ALL minor discrepancies and will be generated by the COR and sent to the contractor for corrective action. Contractors will be given 10 days to correct PARs unless they have requested an extension. If 3 minor discrepancies are found, combine them and process a CAR.
Customer Complaint Form The COR must furnish instructions to the customer receiving the contractor’s service. The customer must retain supporting evidence of complaint or feedback. After the COR validates feedback or complaint demonstrating contractor noncompliance, the COR processes a Performance Assessment Report (PAR) or Corrective Action Report (CAR) to the CO. ALL Customer Complaint forms WILL be validated by the COR prior to notifying the contractor.
Corrective Action Report (CAR) The CAR will be forwarded to the Chief COR for review. The COR will forward the CAR to the CO for action. A copy will be provided to the contractor’s representative by the CO. Most CARs will be corrected within 30 calendar days depending on the complexity of the finding, the contractor may be allowed up to six months (maximum) correcting a CAR. The contractor will be asked the status of the CAR on a monthly basis. The COR will keep an electronic log of all CARs and will keep a hard copy of CARs in the contract oversight file.
Contract Performance Assessment Reporting System (CPARS) CPARS will be initiated annually, documenting contractor performance for this specific contract. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance.
Disputes Every attempt will be made to resolve all disputes arising under this contact/plan using the Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. If no resolution can be made under ADR, the CO will render a Contracting Officer’s final decision.
11. ENCLOSURES
Enclosure (1) – Class Critique form Enclosure (2) – Supervisor Critique form Enclosure (3) – Technical Data Survey form Enclosure (4) – Customer Complaint Record (CCR) Enclosure (5) – Corrective Action Report (CAR) Enclosure (6) – Performance Assessment Report (PAR) Enclosure (7) – Class Critique Score Tracker
Enclosure (1)
COMNAVAIRPAC/LANT CLASS CRITIQUE FORM
Please provide an explanation for each item NOT checked at the bottom of this form. Any recommendations for improvement may also be provided below or on the back of the form.
If item is not applicable (N/A), leave blank or write N/A. If N/A, full points will be allowed. Use the following check boxes to agree or disagree.
1. Evaluate the effectiveness of the instructor/operator. (2.5 Points checked, 0 if not) MAX POINTS: 12.5
☐ A. Was prepared to conduct the training session.
☐ B. Provided me with the necessary guidance during the training.
☐ C. Exhibited professionalism at all times.
☐ D. Critique of team performance was adequate in identifying team and individual problems. (N/A if AMMO Sentencing class) ☐ E. Effectively reviewed the material to ensure comprehension.
2. The following questions refer to security/safety (2.5 Points checked, 0 if not) MAX POINTS: 12.5 of the team training session. (N/A if AMMO Sentencing class)
☐ A. All equipment was safe for use.
☐ B. Safety precautions were explained prior to beginning training.
☐ C. My understanding of safety precautions was verified immediately prior to the training session.
☐ D. Safety precautions were reemphasized during training as needed.
☐ E. Security procedures were explained prior to the training session.
3. The following questions refer to overall training experience. (2.5 Points checked, 0 if not) MAX POINTS: 12.5 overall training.
☐ A. The training was relevant to operational needs and covered the right mix of sentencing scenarios and/or weapons.
☐ B. The training materials were adequate to provide a realistic learning experience with a minimum of simulations.
☐ C. The training equipment (tools, protective gear, etc.) was in good condition.
☐ D. The training was delivered in a logical sequence.
☐ E. The training was valuable in preparing me to do my job.
4. The following questions refer to team training effectiveness. (2.5 Points checked, 0 if not) MAX POINTS: 12.5 (N/A if AMMO sentencing class)
☐ A. Instructors/operators were helpful in providing the assistance needed to effectively train the team.
☐ B. The scenario selection was appropriate to meet the needs of the team.
☐ C. Training was necessary to prepare the team to function effectively.
☐ D. Training provided was presented at the appropriate level for the team.
☐ E. You were overall satisfied with services provided by the MOTT?
Please provide input on items that found to be particularly useful or you feel could be a possible area of improvement.
Name (optional):_____________________________ Command:_________________________________________________ Class: (circle one) MOTT / QUICKSTRIKE / SENTENCING / VERTREP Instructor:________________ Date:__________
Enclosure (1) Enclosure (1)
COMNAVAIRPAC/LANT SUPERVISOR MOTT CRITIQUE FORM
SUPERVISORS ONLY (12.5 points each if checked, No = 0) MAX POINTS: 25 For Weapons Department supervisor: LPO/LCPO, please provide your inputs on the following items:
1. The course was too long/short to easily incorporate into the ship/activity’s schedule?
☐ Yes ☐No If yes, please specify
2. The training provided enabled subordinate personnel to better accomplish their jobs.
☐ Yes ☐No If no, please provide details
3. Please comment on any additional topics that you feel would increase your department’s personnel job performance.
Name (optional):_______________________________________ Command:________________________________________ Class: (circle one) MOTT / QUICKSTRIKE / SENTENCING / VERTREP Instructor:________________ Date:__________
Enclosure (2) Enclosure (4)
COMNAVAIRPAC/LANT TECHNICAL DATA CUSTOMER SATISFACTION SURVEY
Please provide an explanation for each item marked C. or D. on the back of this form. Any recommendations for improvement may also be provided on the back of the form. Points scale is A=5, B=4, C=3, D=2
1. Was the MOTT staff courteous and helpful? Points_____MAX: 5
☐ A. Strongly agree ☐ B. Agree ☐ C. Disagree ☐ D. Strongly disagree
2. Staff provided complete, accurate information to you. Points_____MAX: 5
☐ A. Strongly agree ☐ B. Agree
3. A timely response was provided. Points_____MAX: 5
☐ B. Agree
4. My overall experience was positive. Points_____MAX: 5
☐ B. Agree
5. I would recommend MOTT services to a co-worker. Points_____MAX: 5
☐ B. Agree
Enclosure (3) Enclosure (3)
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Enclosure (4)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Enclosure (5)
Enclosure (7)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Enclosure (6)
CNAF MOTT CLASS CRITIQUE SCORES (20XX)
| CLASS |
| INSTRUCTOR |
| JUL |
| AUG |
| SEP |
| OCT |
| NOV |
| DEC |
| JAN |
| FEB |
| MAR |
| APR |
| MAY |
| JUN |
MOTT D-500-2007
MOTT E-500-2007
AMMO SENT D-500-2012
AMMO SENT E-500-2012
QUICKSTRIKE D-500-2014
QUICKSTRIKE E-500-2014
VERTREP E-500-2026 (30MU)
VERTREP E-500-2026 (29MS)
LPD MOTT D-500-2050
File details come from the government source that posted it. Updated .