ATTACHMENT 3_ PRICE COMPONENT CONFIRMATION TABLES.xlsx

XLSX spreadsheet 145 KB Posted

Attached to
FY26 GSA Streamlined Retail Electric Solicitation
Solicitation number
47PA0826R0001
Issued by
Not on record

About this file

This file is a Price Component Confirmation Table that establishes the pricing structure and cost treatment for electricity supply bids across three regional transmission organizations: PJM, MISO, and NYISO.

For all three regions, the tables specify which cost components must be included as fixed prices in bid proposals and which require economic price adjustments or pass-through billing. Fixed-price components included in all bids across all regions comprise: energy commodity costs, ancillary services and ISO costs, scheduling, line losses, transmission-related charges, and renewable energy certificates (RECs) compliant with the solicitation requirements. All fixed components carry a minimum bandwidth of ±20% annual adjustment based on aggregated usage of each pricing group. Additional fixed components specific to certain regions include balancing and congestion costs (PJM and NYISO), capacity charges (MISO and NYISO), fuel costs (MISO and NYISO), and supplier margin (NYISO only). Economic price adjustment treatment applies to capacity, transmission costs, auction revenue rights, reliability must-run costs, and various region-specific compliance programs such as offshore wind RECs (PJM), New York Renewable Energy Standards, Clean Energy Standard compliance with zero emission credits, and transmission-related charges (NYISO). Applicable taxes are treated as pass-through costs requiring individual line item billing in all regions. The Enel X Inc. fee of $0.0007 per kWh is consistently treated as a fixed component across all regions and included in bid pricing without separate line item billing.

View the file

Other files

File Type Posted
Amendment 0008 ATTACHMENT 3_ PRICE COMPONENT CONFIRMATION TABLES.xlsx XLSX spreadsheet
SF30 47PA0826R0001_0008.pdf PDF
Amendment 0007 Attachment 13_ Exhibit 1 NYISO Accounts.xlsx XLSX spreadsheet
SF30 47PA0826R0001_0007.pdf PDF
Amendment 0007 ATTACHMENT 3_ PRICE COMPONENT CONFIRMATION TABLES.xlsx XLSX spreadsheet
47PA0826R0001_0006.pdf PDF
Amendment 0006 ATTACHMENT 3_ PRICE COMPONENT CONFIRMATION TABLES.xlsx XLSX spreadsheet
Amendment 0006 Attachment 13_ Exhibit 1 NYISO Accounts.xlsx XLSX spreadsheet
47PA0826R0001_0005.pdf PDF
47PA0826R0001_0005.pdf PDF
Amendment 0005 ATTACHMENT 13_ PRELIMINARY EXHIBIT 1.xlsx XLSX spreadsheet
47PA0826R0001_0004.pdf PDF
Amendment 0004 ATTACHMENT 4_ PRICE COMPONENT CONFIRMATION TABLES.xlsx XLSX spreadsheet
Amendment 0004 Attachment 13 Final Exhibit 1 PJM Accounts.xlsx XLSX spreadsheet
Amendment 0003 ATTACHMENT 3_ PRICE COMPONENT CONFIRMATION TABLES.xlsx XLSX spreadsheet
Solicitation Amendment 47PA0826R0001_0003.pdf PDF
Amendment 0003 Attachment 13 Final Exhibit 1 PJM Accounts.xlsx XLSX spreadsheet
Solicitation Amendment 47PA0826R0001_0002.pdf PDF
Amendment 0002 Attachment 13 Final Exhibit 1 PJM Accounts.xlsx XLSX spreadsheet
Amendment 0002 ATTACHMENT 3_ PRICE COMPONENT CONFIRMATION TABLES.xlsx XLSX spreadsheet
Amendment 0001 ATTACHMENT 13_ PRELIMINARY EXHIBIT 1.xlsx XLSX spreadsheet
Solicitation Amendment 47PA0826R0001_0001.pdf PDF
47PA0826R0001 FY26 Electric Solicitation.pdf PDF
ATTACHMENT 13_ PRELIMINARY EXHIBIT 1 .xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PJM

PRICE COMPONENT CONFIRMATION TABLE - PJM
Price ComponentTreatmentInclude In Bid Prices?Requires Individual Line Item Billing?Notes
Energy Commodity CostsFixedYesNo - Included in Bid Price
Minimum of +/- 20 % Annual Bandwidth Based on the Aggregated Usage of Each Pricing GroupFixedYesNo - Included in Bid Price
Ancillary Services and other ISO Costs (Including but not limited to OATT Tariff, Operating Reserves, ISO Administrative Fees, Public Service Commission and/or Public Utility Commission fees, Reactive Services, Black Start, Reactive Supply and Voltage Control)FixedYesNo - Included in Bid Price
SchedulingFixedYesNo - Included in Bid Price
Balancing and Congestion CostsFixedYesNo - Included in Bid Price
Line Losses including Distribution Losses to the End-use MeterFixedYesNo - Included in Bid Price
State Renewable Portfolio Standards (RPS) Compliance Costs (other than ORECs) for States where the Supplier is Responsible (not the utility)FixedYesNo - Included in Bid PriceOffers are instructed to include known costs at time of award, any future changes after the date of award will be handled under Section A.14 Electric Regulatory Changes
Transmission Loss Credits (TLCs)FixedYesNo - Included in Bid Price
Ohio Commercial Activity Tax (Only for accounts in Ohio)No - Included in Bid Price
Enel X Inc. Fee of $.0007 per kWhFixedYesNo - Included in Bid Price
Renewable Energy Certificates (RECs) that Comply with Section A.12 of this Solicitation (as applicable)FixedYesNo - Included in Bid Price
Capacity (ICAP & UCAP)Economic Price AdjustmentNoNo
Transmission Costs (including Network Integration Transmission Service [NITS], Regional Transmission Expansion Planning [RTEP], Financial Transmission Right [FTR], Transmission Reallocation Costs [TEAC], and Transmission Enhancement [TEC])Economic Price AdjustmentNoNo
Auction Revenue Rights (ARRs)Economic Price AdjustmentNoNo
Reliability Must Run (RMR)Economic Price AdjustmentNoNo
FERC Order 745 and FERC 494 / EL05-121-009 Compliance CostsEconomic Price AdjustmentNoNo
Offshore Wind RECs (ORECs)Economic Price AdjustmentNoNo
Applicable Taxes including PA Gross Receipts Taxes (GRT) (but not including OH Commercial Activity Tax)Pass-Through at CostNoYes

000000 INTERNAL#_x000D_

MISO

PRICE COMPONENT CONFIRMATION TABLE - MISO
ComponentTreatmentInclude in Bid Price?Requires Individual Line Item Billing?Notes
Energy Commodity CostsFixedYesNo - Included in Bid Price
Minimum of +/- 20% annual bandwidth based on the aggregated usage of pricing groupFixedYesNo - Included in Bid Price
Ancillary Services and other ISO Costs (OATT Tariff, Operating Reserves, Administrative Fees)FixedYesNo - Included in Bid Price
Line Losses including distribution losses to the end-use meterFixedYesNo - Included in Bid Price
Enel X Fee @ $.0007 per kWhFixedYesNo - Included in Bid Price
Renewable Energy Certificates (RECs) that Comply with Section A.12 of this Solicitation (as applicable)FixedYesNo - Included in Bid Price
Auction Revenue Rights (ARRs)FixedYesNo - Included in Bid Price
Marginal Loss Credits (MLCs)FixedYesNo - Included in Bid Price
Transmission Loss Credits (TLCs)FixedYesNo - Included in Bid Price
Capacity (ICAP & UCAP)FixedYesNo - Included in Bid Price
Transmission (NSPL)FixedYesNo - Included in Bid Price
Transmission Costs (including Network Integration Transmission Service [NITS], Regional Transmission Expansion Planning [RTEP], Financial Transmission Right [FTR], Transmission Reallocation Costs [TEAC], and Transmission Enhancement [TEC])FixedYesNo - Included in Bid Price
System Support Resource (SSR)FixedYesNo - Included in Bid Price
SchedulingFixedYesNo - Included in Bid Price
Fuel CostsFixedYesNo - Included in Bid Price

NYISO

PRICE COMPONENT CONFIRMATION TABLE - NYISO
Price ComponentTreatmentInclude in Bid Price?Requires Individual Line Item Billing?Notes
Energy Commodity CostsFixedYesNo - Included in Bid Price
Minimum of +/- 20% annual bandwidth based on aggregated use of pricing groupFixedYesNo - Included in Bid Price
CapacityFixedYesNo - Included in Bid Price
Ancillary Services & Independent System Operator (ISO) costs, operating reserves and ISO administrative feesFixedYesNo - Included in Bid Price
Balancing & Congestion CostsFixedYesNo - Included in Bid Price
Line Losses (including distribution losses to the end use meter)FixedYesNo - Included in Bid Price
Enel X Fee of $0.0007 per kWh addressed in Section A.17 of this solicitationFixedYesNo - Included in Bid Price
Renewable Energy Certificates(RECs) that comply with Section A.12 of this solicitationFixedYesNo - Included in Bid Price
SchedulingFixedYesNo - Included in Bid Price
Fuel CostsFixedYesNo - Included in Bid Price
Supplier MarginFixedYesNo - Included in Bid Price
New York Renewable Energy Standards (RES) compliance costsEconomic Price AdjustmentNoNo
Clean Energy Standard Compliance Costs including Zero Emission Credits (ZECs)Economic Price AdjustmentNoNo
Public Policy Transmission (PPT) costsEconomic Price AdjustmentNoNo
Transmission Owner Transmission Solutions (TOTS)Economic Price AdjustmentNoNo
NYPA Transmission Adjustment Charges (NTAC)Economic Price AdjustmentNoNo
Applicable taxes including NY Gross Receipts Taxes (GRT)Pass Through At CostNoYes