Attachment 3 - Mission Essential Plan.docx

DOCX document 37 KB Posted

Attached to
Stevedoring Services for Port of Bremerhaven, Germany
Solicitation number
HTC71126QE156
Issued by

About this file

This is a Mission Essential Plan submission template for RFP HTC71126QE156, which is a solicitation for stevedoring and vessel handling services at the Port of Bremerhaven, Germany issued by the Department of Defense United States Transportation Command. The template requires quoters to submit a plan not exceeding five pages that demonstrates compliance with DFARS 252.237-7024 regarding continuation of essential contractor services during crisis periods.

The submission must address five specific elements: (1) provisions for acquiring essential personnel and resources to maintain operations for up to 30 days or until normal operations resume; (2) challenges associated with maintaining services during extended events such as pandemics occurring in repeated waves; (3) timeframes for acquiring and deploying essential personnel and resources on-site; (4) components, processes, and requirements for identifying, training, and preparing personnel capable of relocating to alternate facilities or working remotely; and (5) established alert and notification procedures for mobilizing essential personnel along with communication strategies for clarifying employee roles and responsibilities during crises. Proposals receiving an "unacceptable" rating on any question will result in overall rejection of the proposal, making completion of all sections mandatory for award eligibility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP HTC71126QE156 – Attachment 3 Source Selection Information – See FAR 2.101 and 3.104 (When Filled-in, this Document becomes CUI//SP-SSEL)

Attachment 3: Mission Essential Plan

Request for Proposal: HTC71126QE156

** Submission Rules & Instructions: **

1. To comply with DFARS 252.237-7024, Notice of Continuation of Essential Contractor Services, Quoters are required to submit a plan that describes how they will continue performing the essential contractor services detailed in Attachment 1 (Performance Work Statement), Section 4.26, during a crisis.

2. Quoters shall be specific in describing how support will be provided for the particular port(s) for this requirement to ensure continuity of operations during periods of crisis.

3. The Quoter’s written response shall not exceed 5 pages. This limit applies to all narrative and descriptive content provided for evaluation, including any appendices, annexes, figures, and tables directly supporting the written response. Content exceeding this 5-page limit will be removed before evaluation.

NOTE** Failure to complete this document in its entirety may result in an Quoter being ineligible for award.

RATINGS:

ACCEPTABLE
Proposal clearly meets the minimum requirements of the solicitation
UNACCEPTABLE
Proposal does not clearly meet the minimum requirements of the solicitation

*An “unacceptable” rating on any question below will result in an overall “unacceptable” subfactor rating.

The Government will evaluate whether the Quoter’s plan is sound and addresses the elements of DFARS 252.237-7024 as identified on the following page.

Quoter Name:

Please describe how your company will continue performance of essential contractor services listed in the PWS during periods of crisis.

(1) Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

Click here to enter text.

(2) Address in the plan, at a minimum—

(i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves; Click here to enter text.

(ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site; Click here to enter text.

(iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home; Click here to enter text.

(iv) Any established alert and notification procedures for mobilizing identified “essential contractor service” personnel; and Click here to enter text.

(v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis. Click here to enter text.

File details come from the government source that posted it. Updated .