Attachment 2 - Schedule of Rates.xlsx

XLSX spreadsheet 99 KB Posted

Attached to
Stevedoring Services for Port of Bremerhaven, Germany
Solicitation number
HTC71126QE156
Issued by

About this file

This is a pricing schedule template (Attachment 2) for RFQ HTC71126QE156, a stevedoring and terminal services solicitation for the Port of Bremerhaven, Germany. Quoters are required to input unit rates across multiple service categories for a five-year performance period from May 1, 2027, through October 31, 2032, with an optional six-month extension. The contract is issued by the Department of Defense United States Transportation Command.

The pricing schedule encompasses seven primary service categories: lashing/tiedown services; unlashing services; extra labor (straight time); overtime rates; shift differentials; equipment rental (including forklifts and container handlers with operators); and lumber/dunnage materials and miscellaneous supplies. Within each category, quoters must provide unit rates for various commodity types and handling methods, including aircraft, breakbulk cargo, ISO containers, and vehicles categorized by weight class (light, medium, and heavy). The schedule specifies estimated quantities for each service line item across all performance years. All proposed unit rates are stated to apply to the entire period of performance, including any options and extensions upon award. The template indicates a total estimated value of $231,000 for the five-year base period plus six-month extension, with an estimated ceiling of 25 percent ($57,750), resulting in a total estimated price plus ceiling of $288,750. Currently, the template shows all pricing cells populated with zero values except for miscellaneous out-of-pocket expenses at $3,500 per unit, suggesting this is an unfilled template awaiting quoter responses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

RFQ HTC71126QE156 - Attachment 2
QUOTER NAME:YOUR ORG NAME HERE
INSTRUCTIONS TO QUOTER:
- Input Quoter Name in cell C1 above.
- Input unit rates in ALL yellow highlighted cells in the "Schedule" sheet (enter 0 if you do not wish to quote a price).
- Quoter should consider that all proposed unit rates will apply to the entire period of performance, to include options and extensions, upon award.
- This spreadsheet will populate the Total Evaluated Price based upon unit prices input in the highlighted cells of the "Schedule" sheet.
SUMMARY for all Port LocationsSource Selection Sensitive Information - See FAR 2.1.1 and 3.104
(When Filled-In, this document becomes CUI/ / SP-SSEL)
Year 1Year 2Year 3Year 4Year 56mo Extension
Port of Bremerhaven, Germany$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 21,000.00

TOTAL $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00

TOTAL ESTIMATED VALUE OF 5 YEAR PLUS EXTENSION PERIOD FOR Port of Bremerhaven, Germany $ 231,000.00

TOTAL EVALUATED VALUE OF ALL YEARS COMBINED FOR ALL PORT LOCATIONS $ 231,000.00

25% ESTIMATED CEILING TOTAL$ 57,750.00
TOTAL OF ALL PORTS ESTIMATED PRICE PLUS ESTIMATED CEILING INCREASE$ 288,750.00
↓↓↓ PORT(S) SUMMARYS BELOW ↓↓↓
Source Selection Sensitive Information - See FAR 2.1.1 and 3.104
SUMMARY Port of Bremerhaven, Germany(When Filled- In, this document becomes CUI/ / SP-SSEL)
Year 1Year 2Year 3Year 4Year 56mo Extension
Schedule1A1aLASHING ONLY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Schedule 1A2a UNLASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 2A Extra Labor (XL) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 2B OVERTIME $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 2C SHIFT DIFFERENTIAL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 4 EQUIPMENT $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 7 LUMBER/DUNNAGE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 8 MISCELLANEOUS $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00

TOTAL $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00

SUMMARY Port of Bremerhaven, Germany $ 231,000.00

CUI

Definitions

RFQ HTC71126QE156 - Attachment 2
Controlled Unclassified Information – CUI / JUN 26
UNITS OF MEASURE
MTONMeasurement Tons (measure of volume)1 MTON = 40 cubic feet (1.13 cubic meters)
HRHour = 1 HR = 60 minutes
DYDay = 1 DY = 24 hours
WKWeek= 1 WK = 7 Days
MTHMonth = 1 MTH = 30 days
EAEach
SQFTSquare Feet (measure of area)1' SQFT = 144'' inches dimensions 12''x12''
SQMTSquare Meter (measure of area)1 SQFT = 0.0929 square meters
BAG2 LBS Granules (Spill Absorbent)1 CFT = 1,728 cubic inches 12"x12"x12"
BDL(Bundle) Absorbent Packets
PCPiece (one each)
ROLLRoll (roll of wire)
MIMile (measure of distance) = 1 Mile = 5280 feet (1,609.34 meters)
TRIPSTrip = 1 Trip, as described in the PWS (if applicable)
LTLong Ton = 1 LT = 2,240 pounds (1,016.05 kilograms)
LBSUS. Pounds = 1 LBS = 0.45 kilograms
KGkg = 1 kg = 2.204 pounds
MTONMTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container.

COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)

LO/LOLift On / Lift Off - includes all standard lashing,( a ) LO/LO - PORT CRANE (QUAR, GANTRY, PEDESTAL CRANE)
& Unlashing, blocking and bracing cargo( b ) LO/LO - SHIPS GEAR OR SHIPS CRANE
RO/RORoll On / Roll Off - includes all standard lashing,( c ) RO/RO - VEHICLE RUNNING AND MOVING UNDER ITS OWN POWER, BY RAMP
& Unlashing, blocking and bracing cargo
TO/TOTow On / Tow Off - includes all standard lashing,( d ) TO/TO - TRAILERS ONLY TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT
& Unlashing, blocking and bracing cargo( e ) TO/TO - INOPERABLE VEHICLE ONLY TOWED ONBOARD VESSEL BY CONTRACTOR EQUIPMENT

RO/RO Containers, loaded by contractor trailer RO/RO - LOADED ONBOARD VESSEL BY CFE TRUCK/TRAILER, FORKLIFT, BY RAMP loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed

CONTAINER - BREAK BULK DEFINITIONS
20Explosives, in crates, boxes, tubs, tubes
25Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers.
40Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators,
crates, 463L pallets,
44Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU
45Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo,
ISO 20' stackable flat racks, ISO FPU/BOH
VEHICLE CATEGORY DEFINITIONS
60 - MEDIUM VEHICLE25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT
60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001 lbs. to 60,000 lbs. per unit Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders, rock crushers, busses, boats (trailered/cradled).60aVEHICLES & TRAILERS - MEDIUM WEIGHT CLASS - 25,000-60,000 LBS
60cVEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000 - 60,000 LBS
60dTRAILERS ONLY - MEDIUM WEIGHT CLASS - 25,000 - 60,000 LBS
60eVEHICLES ONLY - MEDIUM WEIGHT CLASS - 25,000 - 60,000 LBS
61 - LIGHT VEHICLE25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons
61aVEHICLES & TRAILERS - LIGHT WEIGHT CLASS - LESS THAN 25,000 LBS
61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000 lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment, personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled).61cVEHICLES ONLY - LIGHT WEIGHT CLASS - LESS THAN 25,000 LBS
61dTRAILERS ONLY - LIGHT WEIGHT - LESS THAN 25,000 LBS
61eVEHICLES ONLY - LIGHT WEIGHT - LESS THAN 25,000 LBS
67 - HEAVY VEHICLE60,001 pounds or more 27,216 kg. or more 26.786 LT or more
67aVEHICLES & TRAILERS - HEAVY WEIGHT CLASS - OVER 60,000 LBS
67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000 lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes, tracked or wheeled engineer construction equipment, and boats (trailered/cradled).67cVEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000 LBS
67dTRAILERS ONLY - HEAVY WEIGHT CLASS - OVER 60,000 LBS
67eVEHICLES ONLY - HEAVY WEIGHT CLASS - OVER 60,000 LBS

Bremerhaven Stevedoring

RFQ HTC71126QE156 - Attachment 2
Source Selection Sensitive Information - See FAR 2.101 and 3.104 (When Filled-In, this document becomes CUI//SP-SSEL)Input the expected proposed rate percentage for each year
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:1 May 2027through31 Oct 2032(including 6 mo extension, if applicable)
LOCATION:Port of Bremerhaven, Germanyinput start dateinput final end dateTotal *.5
Attachment #TOTAL COST ALL SCHEDULES PORT 1$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 21,000.00$ 231,000.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureYear 1 PriceYear 2 PriceYear 3 PriceYear 4 PriceYear 5 Price6 Mo. Ext. PriceUnit QuantityY1 TotalY2 TotalY3 TotalY4 TotalY5 Total6 Mo. Ext. Total
1Commodity1A1aLASHING - TIEDOWN ONLY35AIRCRAFTROTARY OR FIXED WINGEA$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2Commodity1A1aLASHING - TIEDOWN ONLY40BREAKBULKGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS)MTON$ - 0$ - 0$ - 0$ - 0$ - 013000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3Commodity1A1aLASHING - TIEDOWN ONLY44ISO CONTAINERS (LESS THAN TEU CONFIGURED) - SINGLECONEX, QUADCONS,TRICONS, BICONSEA$ - 0$ - 0$ - 0$ - 0$ - 01250$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4Commodity1A1aLASHING - TIEDOWN ONLY45ISO CONTAINER 20' - 40' (TEU CONFIGURED)NON-EXPLOSIVES - EMPTY OR FULLEA$ - 0$ - 0$ - 0$ - 0$ - 0700$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5Commodity1A1aLASHING - TIEDOWN ONLY60VEHICLES OR TRAILERS MEDIUM WEIGHT CLASS - 25,000 - 60,000 LBSMEDIUM VEHICLES OR TRAILERSEA$ - 0$ - 0$ - 0$ - 0$ - 01250$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6Commodity1A1aLASHING - TIEDOWN ONLY61VEHICLES OR TRAILERS LIGHT WEIGHT CLASS - LESS THAN 25,000 LBSLIGHT VEHICLES OR TRAILERSEA$ - 0$ - 0$ - 0$ - 0$ - 04550$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7Commodity1A1aLASHING - TIEDOWN ONLY67VEHICLES OR TRAILERS HEAVY WEIGHT CLASS - OVER 60,000 LBSHEAVY VEHICLES OR TRAILERSEA$ - 0$ - 0$ - 0$ - 0$ - 0300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL 1A1a - Lashing Only$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8Commodity1A2aUNLASHING ONLY35AIRCRAFTROTARY OR FIXED WINGEA$ - 0$ - 0$ - 0$ - 0$ - 05$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9Commodity1A2aUNLASHING ONLY40BREAKBULKGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS)MTON$ - 0$ - 0$ - 0$ - 0$ - 010000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
10Commodity1A2aUNLASHING ONLY44ISO CONTAINERS (LESS THAN TEU CONFIGURED) - SINGLECONEX, QUADCONS,TRICONS, BICONSEA$ - 0$ - 0$ - 0$ - 0$ - 0400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
11Commodity1A2aUNLASHING ONLY45ISO CONTAINER 20' - 40' (TEU CONFIGURED)NON-EXPLOSIVES - EMPTY OR FULLEA$ - 0$ - 0$ - 0$ - 0$ - 0500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
12Commodity1A2aUNLASHING ONLY60MEDIUM VEHICLES OR TRAILERS - 25,000 - 60,000 LBSMEDIUM VEHICLES OR TRAILERSEA$ - 0$ - 0$ - 0$ - 0$ - 01500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
13Commodity1A2aUNLASHING ONLY61LIGHT VEHICLES OR TRAILERS - LESS THAN 25,000 LBSLIGHT VEHICLES OR TRAILERSEA$ - 0$ - 0$ - 0$ - 0$ - 03000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
14Commodity1A2aUNLASHING ONLY67HEAVY VEHICLES OR TRAILERS - OVER 60,000 LBSHEAVY VEHICLES OR TRAILERSEA$ - 0$ - 0$ - 0$ - 0$ - 0200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL 1A2a Unlashing only$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
15Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - WORKDAY - DAY SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
16Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - WORKDAY - FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - WORKDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
18Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - WORKDAY - THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 030$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
19Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - SATURDAY - FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - SATURDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
21Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - SATURDAY - THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 020$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - SUNDAY - HOLIDAY - FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0130$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
23Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - SUNDAY - HOLIDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0130$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
24Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - SUNDAY- HOLIDAY - THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 015$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
25Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - SUNDAY- HOLIDAY - FOURTH SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 01$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26Manhours2AEXTRA LABOR (XL)STRAIGHT TIMEBASE HOURLY RATE - PRE-FEAST DAY - FIRST SHIFT/SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 01$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL 2A Extra Labor (XL)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
27Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - WORKDAY - DAY SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 013$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
28Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - WORKDAY - FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 013$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
29Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - WORKDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 013$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - WORKDAY - THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
31Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - SATURDAY - FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
32Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - SATURDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
33Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - SATURDAY - THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 07$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
34Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - SUNDAY - HOLIDAY- FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 07$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
35Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - SUNDAY - HOLIDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 07$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
36Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - SUNDAY - HOLIDAY - THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 05$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
37Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - SUNDAY - HOLIDAY - FOURTH SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 01$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
38Manhours2BOVERTIMEOVERTIME RATEOVERTIME RATE - PRE-FEAST DAY - FIRST SHIFT/SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 01$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL 2B Overtime$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
39Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - WORKDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 03600$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
40Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - WORKDAY - THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 035$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
41Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - SATURDAY- FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 01400$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
42Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - SATURDAY- SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0500$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
43Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - SATURDAY- THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
44Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - SUNDAY - HOLIDAY - FIRST SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0650$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
45Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES- SUNDAY - HOLIDAY - SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 0650$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
46Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - SUNDAY - HOLIDAY -THIRD SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 035$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
47Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - SUNDAY - HOLIDAY - FOURTH SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 015$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
48Manhours2CSHIFTSHIFT RATEDIFFERENTIAL RATES - PRE-FEAST DAY - FIRST SHIFT/SECOND SHIFTPER LABORERHR$ - 0$ - 0$ - 0$ - 0$ - 01$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL 2C Shift Differential$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
49Manhours4EQUIPMENT RENTAL (EQR)CFE - INCLUDES OPERATORFORKLIFT, 3.01 LT - 7 LT CAPACITYHR1EA$ - 0$ - 0$ - 0$ - 0$ - 020$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
50Manhours4EQUIPMENT RENTAL (EQR)CFE - INCLUDES OPERATORFORKLIFT, 7.01 LT - 10 LT CAPACITYHR1EA$ - 0$ - 0$ - 0$ - 0$ - 020$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
51Manhours4EQUIPMENT RENTAL (EQR)CFE - INCLUDES OPERATORFORKLIFT, 10.01 LT - 15 LT CAPACITYHR1EA$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
52Manhours4EQUIPMENT RENTAL (EQR)CFE - INCLUDES OPERATORFORKLIFT, 15.01 LT - 25 LT CAPACITYHR1EA$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
53Manhours4EQUIPMENT RENTAL (EQR)CFE - INCLUDES OPERATORCONTAINER HANDLER / top lift, 80,000 LB lifting CAPACITYHR1EA$ - 0$ - 0$ - 0$ - 0$ - 05$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL 4 Equipment Rental$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
54Miscellaneous7LUMBER / DUNNAGELashing Belt, Webbing Strap, Ratchet Strap - breaking load 2.5 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
55Miscellaneous7LUMBER / DUNNAGELashing Belt, Webbing Strap, Ratchet Strap - breaking load 5 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
56Miscellaneous7LUMBER / DUNNAGELashing Belt, Webbing Strap, Ratchet Strap - breaking load 10 tonsEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
57Miscellaneous7LUMBER / DUNNAGELashing Chain (complete set - chain, hook, tensioner, ratchet) - 5 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
58Miscellaneous7LUMBER / DUNNAGELashing Chain (complete set - chain, hook, tensioner, ratchet) - 7.5 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
59Miscellaneous7LUMBER / DUNNAGELashing Chain (complete set - chain, hook, tensioner, ratchet) - 10 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
60Miscellaneous7LUMBER / DUNNAGELashing Chain (complete set - chain, hook, tensioner, ratchet) - 15 ton or moreEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
61Miscellaneous7LUMBER / DUNNAGEShackle, Breaking Load: 5 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
62Miscellaneous7LUMBER / DUNNAGEShackle, Breaking Load: 10 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
63Miscellaneous7LUMBER / DUNNAGEShackle, Breaking Load: 15 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
64Miscellaneous7LUMBER / DUNNAGEShackle, Breaking Load: 20 tonEA$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
65Miscellaneous7LUMBER / DUNNAGELumber 10cmx10cmMETER$ - 0$ - 0$ - 0$ - 0$ - 0200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
66Miscellaneous7LUMBER / DUNNAGELumber 20cmx20cmMETER$ - 0$ - 0$ - 0$ - 0$ - 0150$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
67Miscellaneous7LUMBER / DUNNAGEChock blocks Wood 35cm,5x11cm,5x17 cmEA$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
68Miscellaneous7LUMBER / DUNNAGEOil absorbentKG$ - 0$ - 0$ - 0$ - 0$ - 0200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
69Miscellaneous7LUMBER / DUNNAGEChock blocks rubberEA$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
70Miscellaneous7LUMBER / DUNNAGEStrip IronMETER$ - 0$ - 0$ - 0$ - 0$ - 050$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
71Miscellaneous7LUMBER / DUNNAGESweeper, vessel Area CleaningDAY$ - 0$ - 0$ - 0$ - 0$ - 060$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
72Miscellaneous7LUMBER / DUNNAGENails, 5.5cm x 160KG$ - 0$ - 0$ - 0$ - 0$ - 010$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL 7 LUMBER/DUNNAGE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
73Miscellaneous8MISCELLANEOUSOUT-OF-POCKET EXPENSEEA1USD$ 3,500.00$ 3,500.00$ 3,500.00$ 3,500.00$ 3,500.00$ 3,500.0012$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00
Total 8 Miscellaneous$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00

image1.png

File details come from the government source that posted it. Updated .