Attachment 3_List of Deliverables.pdf
PDF 291 KB Posted
- Attached to
- Request for Quotation: Special Purpose Craft – Ice Rescue Transport Second Generation (SPC-IRT II)
- Solicitation number
- 70Z02326Q93250001
About this file
This is a List of Deliverables for RFQ No. 70Z02326Q93250001, detailing all contractual deliverables required for the Special Purpose Craft–Ice Rescue Transport Second Generation (SPC-IRT II) program.
The deliverables encompass 24 items spanning pre-award, award, and post-award phases through boat delivery and acceptance. Pre-award and award deliverables include formal meeting documentation, contractor-formatted drawings and repair instructions, calculations, OEM technical manuals, and boat information books, with delivery timelines ranging from 30 to 60 days after award and including Government review periods of 30 days with 14-day revision periods. Per-boat deliverables, delivered at various milestones including open hull inspection, acceptance testing, and final delivery, include warranty books, hull construction documentation, safety data sheets, commercial parts catalogs, maintenance requirement lists and kits, master equipment lists, serial number reports, special tools and test equipment lists, shipping inventory lists, crew familiarization syllabi and materials, test panels, acceptance test procedures and reports, EPA certifications, and trailer titles. Documentation delivery requirements specify soft copy submissions 7 to 60 days prior to boat delivery and hard copies delivered with each boat. Configuration change reports are required from boat two onward, and audit resolution reports must be submitted 30 days after configuration audits. All deliverables are designated for delivery to the Contracting Officer (KO) and/or the Boat recipient, with specific formatting and timing requirements clearly delineated for each item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5_Q and A Form_Government Response_08312026.xlsx | XLSX spreadsheet | |
| Attachment 5_Q and A Form.xlsx | XLSX spreadsheet | |
| SPC_IRT_II_RFQ.pdf | ||
| Attachment 1_Statement of Work.pdf | ||
| Attachment 2_Specification.pdf | ||
| Attachment 4_Pricing Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PURPOSE CRAFT- ICE RESCUE TRANSPORT SECOND GENERATION (SPC-IRT II)
ATTACHMENT 3 – LIST OF DELIVERABLES
RFQ No.: 70Z02326Q93250001
SPC-IRT II
List of Deliverables
# SOW / (SPEC) Ref. Deliverable Description Milestone To Required Delivery
001 040-2
Formal Meeting Agenda Post Award Conference Delivery and Acceptance
KO Formal meeting agenda seven days prior to the formal meeting
002 040-2
Formal Meeting Minutes Post Award Conference Delivery and Acceptance
KO Formal meeting minutes two days after conclusion of the formal meeting
003 040-4.2 Configuration Change Report
From boat two onward KO Soft copy with boat delivery
004 040-5.6 Audit Resolution Report Configuration Audit KO Soft copy 30 days after Configuration Audit report is submitted
005 041-1.6 Warranty Book listing warranty provided by the contractor and all commercial component warranties
With each boat delivery KO Boat
Soft copy 14 days prior Hard copy with Boat
006 068-1.3 Hull Construction Documentation
Open Hull Inspection KO Soft copy 30 days prior to the Open Hull Inspection
007 077-2.1 Safety Data Sheet (SDS) With each boat delivery KO Boat
Soft copy 14 days prior Hard copy with Boat
008 083-1.2 Commercial Parts Catalog With each boat delivery KO Soft copy 14 days prior
009 083-2.1 150 Hr. Maintenance Requirement List (MRL)
With each boat delivery KO Boat
Soft copy 14 days prior Hard copy with Boat
010 083-2.4 MRL Kit (150 Hr. Parts & Tools) Inventory List
With each boat delivery KO Boat
Soft copy 14 days prior Hard copy with Boat
011 083-3 Master Equipment List (MEL)
With each boat delivery KO Boat
Soft copy 14 days prior Hard copy with Boat
012 083-4 Serial Number Report (SNR) With each boat delivery KO Boat
Soft copy 14 days prior Hard copy with Boat
013 083-5 List of Special Tools & Test Equipment
With each boat delivery KO Soft 14 days prior
014 084-1.6 Shipping Inventory List With each boat delivery KO Boat
Soft copy 7 days prior Hard copy with Boat
# SOW / (SPEC) Ref. Deliverable Description Milestone To Required Delivery
015 085-1.1 Contractor’s Formatted Drawings and Repair Instructions
Award KO 30 days after award Provide 30 days for Government review Provide revised deliverable 14 days after Government review comments received
016 085-2.1 Calculations Award KO 30 days after award Provide 30 days for Government review Provide revised deliverable 14 days after Government review comments received
017 086-1 086-2
OEM Technical Manuals and Publications
Award KO
Soft copy 30 days after award
018 086-3 Boat Information Book
With first boat delivery KO
Boat
Soft copy 60 days prior Provide 30 days for Government review Provide revised deliverable 14 days after Government review comments received
Provide hard copy with each boat delivery
019 089 Crew FAM Syllabus & FAM Material
At acceptance for each boat KO Boat
Soft copy 14 days prior to delivery
Hard copy with Boats 020 090-1.1 Test Panel With each boat delivery KO With each boat delivery 021 092-2.2.2 Acceptance Test Procedures Acceptance Testing KO
Boat Soft copy 30 days prior Hard copy with Boats
022 092-1.7 Acceptance Test Reports With each boat delivery KO Boat
Soft copy 7 days prior
Hard copy with Boats
# SOW / (SPEC) Ref. Deliverable Description Milestone To Required Delivery
023 (200) EPA Certification With each boat delivery KO Boat
Soft copy 7 days prior
Hard copy with Boats 024 (910) Trailer Title With each trailer delivery Trailer Hard copy with trailer delivery
File details come from the government source that posted it. Updated .