Attachment 5_Q and A Form_Government Response_08312026.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Request for Quotation: Special Purpose Craft – Ice Rescue Transport Second Generation (SPC-IRT II)
Solicitation number
70Z02326Q93250001
Issued by

About this file

This is a Questions and Answers Form containing government responses to inquiries submitted by potential offerors regarding the RFQ for Special Purpose Craft – Ice Rescue Transport Second Generation (SPC-IRT II).

The document serves as a clarification mechanism for the solicitation and does not independently specify products, services, pricing, or award details. Rather, it addresses questions raised by vendors regarding the requirements outlined in the Statement of Work, Specification, Pricing Worksheet, and other solicitation attachments. The Q&A responses provide official government clarifications on technical specifications, compliance requirements, delivery expectations, and other solicitation-related matters to ensure all potential bidders have consistent understanding of the procurement requirements. Offerors should review these responses in conjunction with the primary solicitation documents to ensure their quotations accurately address the government's stated needs for the ice rescue craft under this total small business set-aside IDIQ contract.

View the file

Other files

File Type Posted
Attachment 2_Specification.pdf PDF
Attachment 5_Q and A Form.xlsx XLSX spreadsheet
Attachment 1_Statement of Work.pdf PDF
Attachment 4_Pricing Worksheet.xlsx XLSX spreadsheet
SPC_IRT_II_RFQ.pdf PDF
Attachment 3_List of Deliverables.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&As

SPECIAL PURPOSE CRAFT - ICE RESCUE TRANSPORT (SPC-IRT II)
ATTACHMENT 5 – QUESTIONS AND ANSWERS FORM
RFQ No.: 70Z02326Q93250001
Questions No.ReferenceQuestionsAnswersColumn1
General NoteSOW 089Crew Familiarization DiscussionFamiliarization (FAM): The FAM will be conducted with the delivery and acceptance of each boat. Environmental conditions may limit the effectiveness and ability to complete all the FAM items. If the Coast Guard believes additional FAM is needed at a later date when environmental conditions support completing all FAM items, A new order will be placed for an additional FAM event.
1SOW 086-3Is a physical BIB to go with each airboat OR one for each location?The physical Boat Information Book (BIB) will be delivered with each boat.
2SOW 040-2.1.2Where will the USCG monthly meetings be held with the contractor (location) OR will these be electronic (Zoom or TEAMS, etc.)?Monthly meetings will be held electronically via MS TEAMS.
3SOW 040-2.2.3Who ever calls the formal meeting (contractor or USCG) would it be more appropriate for that party that called the meeting to send the agenda, minutes, etc. ?The Contractor will prepare a simple agenda with input from the Coast Guard and the Contractor will submit draft minutes for review by the Coast Guard.
4SOW 081-2.1Who hires or pays the 3rd party logistic support and converts to USCG format? Is there USCG personnel assigned to assist with formats with the contractor?USCG will hire the 3rd party logistics support to convert Contractor information into standard Coast Guard logistics data. USCG personnel will assist with formatting the builder’s deliverables as needed.
5SOW 081-2.1Does the USCG have a 3rd party consultant or firm to help the small business meet other aspects of the SOW, If so who pays for this?No the USCG does not have a 3rd party consultant to help the small business. The USCG intends to hire a third party to gather information from the builder to generate the logistics deliverables the USCG requires to support the boats through their lifecycle.
6SOW 092-1.2How many USCG Personnel are coming on the contractor’s site for Acceptance Testing (AT) and is this on their expense? Is this for every boat or just the first boat?The number of USCG personnel that will attend Acceptance Testing (AT) may vary and will likely be 2 or 3. The Coast Guard personnel will travel at Coast Guard expense. AT will be done on every boat.
7SOW 092-1.9If getting underway for the AT at the contractor site the VHF-FM radio will most likely not reach USCG sector. Would you have an alternate for the contact system?Yes, there are alternate means to contact the Sector, and this can be done by phone if VHF is not effective.
8SOW 089-1.1If the contractor evaluates the operators during the training session and determines a need for additional instruction in the use of the SPC-IRT II. Can or will the USCG accept this recommendation and utilize additional instruction?The USCG will evaluate FAM recommendations as needed.
9SOW 089-1.2Does the USCG agree that besides the proper vessel design for vessel survival and durability in Ice transit conditions, continuous proper operation of the vessel by the operator is a major factor for the success of the mission and SPC-IRT II program?Yes, qualified operators are important to mission success. Additional FAM may be needed to reach a minimally acceptable competency level which is executed in a modification.
10SOW 092-3.3 - 092-3.9Full Power and Endurance Test through maneuvering testing–It is not recommended on a new engine to run at full power for 30 minutes until the engine is ‘broken’ in which is stated as 25 hours in their warranty. Can this be revised to satisfy your check out (AT) the best way to do these tests for safety risks, the boat, the company, the USCG, and engine to satisfy these needs to come up with a plan to satisfy both the USCG and the specs of the engine/boat and company?Yes, the intent of the full power trial and endurance test is to demonstrate the engine is performing to its designed capability and operates over a period of time without issue. The USCG will consider alternate approaches to demonstrating this prior to acceptance of a boat. A plan can be submitted that provides alternate methods to demonstrate the AT requirement are met.
11SOW 089-1.12 days of FAM upon delivery. If conditions are not favorable for FAM (summer) then will FAM take place once there are optimal FAM conditions? (winter, fast ice and brash ice/ open water…)FAM will be conducted at the delivery and acceptance of the boat to the extent possible given environmental conditions. If additional FAM is needed to become familiar with operations in other environmental conditions- additional FAM may be ordered through the contract.
12SOW 084-3.2Stated ‘upon delivery the boat is to be cleaned, clear of any road dirt, etc.’ In winter conditions how would this be accomplished if delivered by a commercial low boy semi driver? Will the USCG station supply personnel, a heated area, and water to clean the boat?Reasonable attempts should be made to deliver a boat in new and clean condition. Environmental conditions will influence what is considered reasonable and can be agreed at the time of delivery.
13SOW 084-3.3Is a contractor to be physically present at every delivery at a USCG location even during summer, or If FAM Training will be delayed for proper conditions?The Contractor does not need to be physically present at every delivery. FAM will be completed with each delivery and it is recognized that FAM may need to be reordered and completed a second time based on environmental conditions at the time of delivery.
14SOW 084-3.3Unloading the boat and Trailer from a Low-boy Semi may require a truck with a hitch, can the USCG use their truck for this off-loading? If a contractor supplied vehicle is necessary, this may add costs.If available USCG vehicles can be coordinated to assist with the off-loading but the contractor must be IAW SOW 084-3.3 requirements.
15FAR 52.212-4 (i)Will payment be made to the Small Business Contractor within 15 days of delivery once the DD-250 form is signed? Even if conditions do not warrant FAM?IAW FAR 52.212-4 and SPC-IRT II RFQ PDF pg. 21. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
16FAR 52.212-4 (i)How will the USCG handle or prevent delaying production or shipping due to scheduling issues of Hull inspection or AT, which then delays payment for the “Small Business Contractor”?The Contractor should build into the schedule eight hours (one full work day) for the open hull inspection and an appropriate amount of time for completion of AT. Typical AT events are 1 full day, with some requiring a second day.
17SOW 084-34License plate; If the trailer requires “approved License plate” will the USCG mail or deliver a license plate to be attached for delivery if delivered over the road?No, the USCG cannot provide trailer tag/plate until after delivery and acceptance. On other contracts builders have arranged temporary tags/plates to support delivery.
18SOW 081-4.1The contractor shall execute Non-Disclosure Agreements with designated third-party logistics support. Who will pay for the development for this NDA?The intent of the Non-Disclosure Agreement (NDA) is to protect the builder; therefore any costs associated with the development of the NDA is the contractor's responsibility. The complexity of the NDA will depend on the builders desire to protect information from disclosure by the third party contractor.
19SOW 068-1.1Open Hull Inspection; What mitigations can be assured the open hull inspection will not be delayed, stalling production more than one day with sufficient notification time? Will this be required for each boat? For future boats would
electronic communication? – could photos, facetime, videos be sufficient? Additionally is the Hull Inspection needed on all hulls or just the first?With proper notification, USCG personnel will be available to attend Open Hull Inspection. If USCG personnel are not available, the Open Hull Inspection will be waived. Open Hull Inspection is only done on the first boat.
20SOW 085-2.1Calculations – The USCG asks for calculations in ABYC H-8. However, the vessel exceeds 20 feet in length and therefore is outside the scope of ABYC H-8 for an airboat. Therefore, is it acceptable that the supplied flotation evaluation being provided is sole used as an engineering assessment of the vessels reserve buoyancy and flooding/swamping characteristics and not as an ogicial certification of compliance with the ABYC H-8 standard?Yes, the calculations are for engineering assessment.
21SOW 086-3.1How would the USCG like the contractor to handle non-applicable statements or requirements? IE “seawater cooling” engine coolant system is a close loop coolant system.The Contractor notifies the USCG, and the Contractor and USCG agrees on how to address or remove from the BIB.
22SOW 092-2.2.2Who at the USCG will be accepting the AT Procedures and what reasons would the AT procedures presented not be accepted? And will the USCG at that time provide what needs to be included in the procedures or corrected to be accepted?The Contracting Officer will be accepting AT Procedures. Issues with AT procedures are typically missed tests, lack of pass fail criteria, and not planning to capture pertinent information or data during the test. The Coast Guard will provide specific comments on the AT procedures if there are issues identified.
23SPEC 332-1“a forward-facing cabin mounted searchlight (110,000 Candelas) capable of remote operation from both front seats. Does a light need to be mounted on the cabin? If lights are mounted on the cage is this sugicient, for cabin mounted lights
creates issues?Yes, the light may be mounted on the cage.
24SPEC 332-1Does this spec call for a remote spotlight? If that is the case will high lumen fixed mounted lighting be sugicient as the contactor or supplier does not recommend a moving search light on an ice transit vessel due to cold and shock, and will not warranty it, or any parts it may damage when it brakes.Yes, a remote light is required by the Specification. After contract award, concerns with this requirement may be addressed through a contract modification.
25SPEC 424-1.5Is the NGX-1 NMEA 2000 dual gateway connector used to interface obsolete electronics with nema2000 necessary?Yes, the NGX-1 may not be used but is required.
26SPEC 600-1.8Floating Marker light – Is there a specific model or spec required?There is not a specific model or spec for this light. The USCG typically uses 1) ACR SM-3, or 2) LSC FML-7 floating marker lights.
27SPEC 600If the contractor recommends a spare set of blades for each boat or each station to keep the boat in operation if damage occurs during a rescue or peak season, would the USCG want to add this equipment to the outfitting list?If recommended, spare blades may be ordered using the material and sub-contracting CLIN. In addition, the Contractor may include them (and the cost) as part of SOW 083-2.4 Maintenance Requirements List Kit.
28SPEC 600If the contractor recommends engine specific engine code reader for each boat or each station to quickly diagnose issues during peak season, would the USCG want to add this equipment to the Outfitting list?The engine code reader should not be part of the outfit. It should be listed in the SOW 083-5 List of Special Tools and Test Equipment.
29
30