This document is Attachment 3 from a construction project specification detailing concrete removal and replacement requirements. The diagram specifies 24" wide concrete removal in multiple 24' x 10' areas, including a corridor and greenhouse, with specific instructions for concrete cutting, replacement, and rebar installation. Key technical details include: sawing ¼" deep grooves in each area, cutting through doorways to required depth, installing 16" square yard boxes with stainless components, removing an existing small concrete pad outside a door, and using #4 rebar dowels when replacing concrete. Additional specifications note cleanout and p-trap placement, with a 6" pipe extension past p-traps leading to a manhole, ensuring precise infrastructure modification and reconstruction guidelines.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3: Concrete
24’
10’
24” wide concrete removal 24’
#4 rebar Dowel into existing concrete when replacing
Cleanout and p-traps not beneath concrete
24’
24’
24’
P-traps
Cleanouts
To Manhole
6” pipe past p-traps
Corridor
Through doorways cut out to required depth
(each entran16” square yard box with stainless
Saw cut ¼” deep groove in each area as shown;
typical through green house
Remove existing small concrete pad outside door and replace