Attachment 3 - Greenhouse Concrete.pdf

PDF 85 KB Posted

Attached to
Replace Greenhouse Floor Drain in College Station, TX
Solicitation number
1232SA25Q0624
Issued by

About this file

This document is Attachment 3 from a construction project specification detailing concrete removal and replacement requirements. The diagram specifies 24" wide concrete removal in multiple 24' x 10' areas, including a corridor and greenhouse, with specific instructions for concrete cutting, replacement, and rebar installation. Key technical details include: sawing ¼" deep grooves in each area, cutting through doorways to required depth, installing 16" square yard boxes with stainless components, removing an existing small concrete pad outside a door, and using #4 rebar dowels when replacing concrete. Additional specifications note cleanout and p-trap placement, with a 6" pipe extension past p-traps leading to a manhole, ensuring precise infrastructure modification and reconstruction guidelines.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3: Concrete

24’

10’

24” wide concrete removal 24’

#4 rebar Dowel into existing concrete when replacing

Cleanout and p-traps not beneath concrete

24’

24’

24’

P-traps

Cleanouts

To Manhole

6” pipe past p-traps

Corridor

Through doorways cut out to required depth

(each entran16” square yard box with stainless

Saw cut ¼” deep groove in each area as shown;

typical through green house

Remove existing small concrete pad outside door and replace

File details come from the government source that posted it. Updated .