Attachment 3 - Enclosure 1 - ORC Acronyms and Definitions.pdf

PDF 991 KB Posted

Attached to
Optimized Remediation Contract at McConnell Air Force Base, KS - Request for Proposals
Solicitation number
FA890323R0032
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA890323R00320002 SF 30.pdf PDF
Attachment 1 - McConnell AFB ORC PWS Dated 13 July 2023.pdf PDF
Attachment 11 - McConnell AFB ORC Final SubCLIN Structure Rv3.xlsx XLSX spreadsheet
Attachment L-2_Past Performance Questionnaire.docx DOCX document
McConnell ORC RFP QA Answers.xlsx XLSX spreadsheet
Solicitation Amendment - FA890323R00320002.pdf PDF
Solicitation Section L - Instructions Conditions and Notices to Offerors.pdf PDF
Solicitation Amendment FA890323R00320001 SF 30.pdf PDF
Solicitation Amendment - FA890323R00320001.pdf PDF
Attachment L-1_Past Performance Information.docx DOCX document
Attachment M-1_ORC Relevancy Matrix.pdf PDF
Attachment 6 - Compliance With Contract Insurance.pdf PDF
Solicitation Section M - Evaluation Factors for Award.pdf PDF
Attachment 5 - Enclosure 3 - Community Involvement Plan Outline.pdf PDF
Attachment 2- Base Support Letter Dated 7 June 2023.pdf PDF
Attachment 4 - Enclosures 2A and 2B.pdf PDF
Q and A Template.xlsx XLSX spreadsheet
Attachment 16 - Government Response to Questions - Virtual Site Visit.xlsx XLSX spreadsheet
Attachment 15 - Interim Guidance on 1-4 Dioxane.pdf PDF
Solicitation Section L - Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 11 - McConnell AFB ORC Final SubCLIN Structure.xlsx XLSX spreadsheet
Attachment 7 - Internal Confidentiality Agreement.pdf PDF
Attachment 1 - McConnell AFB ORC PWS Dated 11 May 2023.pdf PDF
Attachment 13 - CPSMR Template 25 AUG 2019.docx DOCX document
Solicitation Document - FA890323R0032.pdf PDF
Attachment L-4_Sample Client Authorization Letter.docx DOCX document
Attachment 8 - Delinquent Tax or Felony Conviction.pdf PDF
Attachment L-2_Past Performance Questionnaire.docx DOCX document
Attachment 14 - AFCEC Chemistry Data Quality Fact Sheet 01 APR 2020.pdf PDF
Attachment 12 - Wage Determination 2015-5341 27 DEC 2022.pdf PDF
Attachment 9 - Telecommunications Representation.pdf PDF
Attachment 10 - DFARS 252.204-7019 and DFARS 252.204-7020.pdf PDF
Attachment L-3_Consent Letter.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure 1: Acronyms and Definitions

ACRONYMS

AF Air Force AFCEC Air Force Civil Engineer Center AFFF Aqueous Film Forming Foam AFI Air Force Instruction AFSSI Air Force Systems Security Instruction AGC Advanced Geophysical Classification API American Petroleum Institute APP Accident Prevention Plan ASTM American Society for Testing and Materials BCE Base Civil Engineer BRAC Base Realignment and Closure CAC Common Access Cards CADD Computer-Aided Design and Drafting CD Compact Discs CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations CIP Common Installation Picture/Community Involvement Plan CLIN Contract Line Item Number CMRA Contractor Manpower Reporting Application CO/KO Contracting Officer COC Contaminants of Concern CONUS Continental United States COR Contracting Officer’s Representative CPSMR Contractor’s Progress, Status, and Management Report CQP Construction Quality Plan CSDGM Content Standards for Digital Geospatial Metadata CSM Conceptual Site Model CWM Chemical Warfare Material DAGCAP DoD Advanced Geophysical Classification Accreditation Program DD Decision Document DERP Defense Environmental Restoration Program DFAR Department of Defense Federal Acquisition Regulation DISA Defense Information Systems Agency DLH Data Loading Handbook DMM Discarded Military Munitions DoD Department of Defense DoDD Department of Defense Directive DoDM Department of Defense Manual DOT Department of Transportation DQO Data Quality Objectives EE/CA Engineering Evaluations/Cost Analysis EESO-MIS Enterprise Environmental, Safety, and Occupational Health Management

Information System

Attachment 3

FA890323R0032

Enclosure 1, dated 25 Aug 2022

ELAP Environmental Laboratory Accreditation Program EMS Environmental Management System EO Executive Order EOD Explosive Ordnance Disposal EPCRA Emergency Planning and Community Right-to-Know Act ERP Environmental Restoration Program ERPIMS Environmental Resources Program Information Management System ESD Explanation of Significant Differences ESRI Environmental Systems Research Institute's ESS Enterprise Sourcing Squadron ESTCP Environmental Security Technology Certification Program FAR Federal Acquisition Regulation FFA Federal Facility Agreement FGDC Federal Geographic Data Committee FS Feasibility Study FUSRAP Formerly Utilized Sites Remedial Action Program FY Fiscal Year GCO Geophysical Classification Organization GeoBase Installation Execution Support GFI Government Furnished Information GFP Government Furnished Property GIO Geospatial Integration Office GIS Geographic Information System GPS Global Positioning Systems GSR Green and Sustainable Remediation HSP Health and Safety Plan IBC International Building Code IDW Investigation Derived Waste IMS Integrated Master Schedule IRP Installation Restoration Program ISAP Installation Specific Action Plan ITRC Interstate Technology and Regulatory Council LCC Life-cycle Cost LTM Long Term Management MC Munitions Constituents MCL Maximum Contaminant Level MD Management Directive MDL Master Document List MDS Mission Data Set MEC Munitions and Explosives of Concern MMRP Military Munitions Response Program MOU Memorandum of Understanding MPS Milestone Payment Schedule MXD Map Exchange Files NACE National Association of Corrosions Engineers

Attachment 3

NAD83 North American Datum 1983 NCP National Oil and Hazardous Substances Contingency Plan NEC National Electrical Code NFA No Further Action NFPA National Fire Protection Association NIST National Institute of Standards and Technology NOV Notice of Violation NPL National Priorities List O&M Operations and Maintenance OGC Office of the General Counsel ORC Optimized Remediation Contract OSHA Occupational Safety and Health Administration OSWER Office of Solid Waste and Emergency Response (USEPA) PA Preliminary Assessment PAO Public Affairs Officer PCB Polychlorinated Biphenyls PFOA Perfluorooctanoic Acid PFOS Perfluorooctane Sulfonate PM Program Manager PMP Project Management Plan PMR Project Management Review PO Performance Objectives POC Point of Contact POP Period of Performance (overall contract/task order) PP Performance Period (specific to Performance Objective) PWS Performance Work Statement QA/QC Quality Assurance and Quality Control QASP Quality Assurance Surveillance Plan QPP Quality Program Plan RAB Restoration Advisory Board RACR Remedial Action Completion Report RA-O Remedial Action-Operation RAO Remedial Action Objectives RC Response Complete RCRA Resource Conservation and Recovery Act RECAP Risk Evaluation Corrective Action Program RFI RCRA Facility Investigation RI Remedial Investigation RIP Remedy in Place ROD Records of Decision RPM Remedial Project Manager SARA Superfund Amendments and Reauthorization Act SC Site Closeout SDSFIE Spatial Data Standards for Facilities, Infrastructure, and Environment SERDP Strategic Environmental Research and Development Program

Attachment 3

SHM Safety and Health Manager SI Site Investigation SRG Security Requirements Guides SSHP Site Safety and Health Plan SSI Supplemental Site Investigation SSPC Steel Structures and Painting Counsel STIG Secure Technical Implementation Guides TCE Trichloroethene UFC Uniform Fire Code/Unified Facilities Criteria UFP-QAPP Uniform Federal Policy for Quality Assurance Project Plans USACE United States Army Corps of Engineers USEPA United States Environmental Protection Agency UTM Universal Transverse Mercator UXO Unexploded Ordinance WP Work Plan

Attachment 3

DEFINITIONS

The definitions included in this Enclosure were adapted from the following sources:

1. New Jersey Department of Environmental Protection Site Remediation Program

Technical Guidance for Preparation and Submission of a Conceptual Site Model dated 16 December 2011.

2. Air Force Instruction 32-7020 dated 7 November 2014.

3. Council on Environmental Quality Aligning National Environmental Policy Act

Processes with Environmental Management Systems, A Guide for NEPA and EMS Practitioners dated April 2007.

4. Interstate Technical Regulatory Council Green and Sustainable Remediation: A Practical Framework dated November 2011.

5. Air Force Civil Engineer Center Optimized Exit Strategy Compendium for Performance- Based Remediation dated October 2014.

6. 42 U.S. Code § 9601 Comprehensive Environmental Response, Compensation, and Liability Act Definitions.

7. United States Environmental Protection Agency Guide to Preparing Superfund Proposed Plans, Records of Decision, and Other Remedy Selection Decision Documents dated July 1999.

8. National Academies Press Contaminants in the Subsurface: Source Zone Assessment and Remediation dated 2005.

In the case where the definition provided below does not align with the source reference, the source reference shall prevail.

Definitions Alternate Objective See PWS Section 1.2.7.

Conceptual Site Model1 A written and/or illustrative representation of the physical, chemical and biological processes that control the transport, migration and actual/potential impacts of contamination (in soil, air, ground water, surface water and/or sediments) to human and/or ecological receptors. It can range from a simple illustration to a more sophisticated comprehensive document and applied to all phases of the remedial process to understand the relationship between sources, migration pathways, and receptors associated with the site or area of concern and identified COCs. It serves to identify currently complete or potentially complete pathways to receptors and the potential for future risks. It should be continually revised to reflect the current understanding of the site during all phases of the investigation, remediation and support the remedial decision.

Decision Document2 A generic name for the document that selects a response action under all legal authorities. All DDs, including PPs and RODs, must go through legal and technical review. The remedial action objectives defined in the DD will be used later in the environmental restoration process to confirm and demonstrate that DOD has met the obligations established in the DD.

Attachment 3

Definitions Draft Document Document submitted for AF and USACE review and approval. In all respects, Draft Documents shall be complete; substantively correct and consistent with applicable laws, regulations, and DoD/AF policies; in proper format; and free of grammatical and typographical errors. In general, Draft Documents are the initial version reviewed by AF and USACE. Draft Documents shall not be submitted to regulatory agencies for review.

Draft Final Document Document incorporating AF and USACE comments and submitted for regulatory agency review and/or approval. Draft Final Documents may also be required prior to Final Document preparation. Note some documents may initially be submitted to the regulatory agencies as Final with any comments being incorporated into subsequent documents as appropriate (e.g., system status reports, monitoring reports, “data dumps”).

Emerging Contaminant2

Contaminants that either (1) do not have regulatory standards based on peer-reviewed science, or (2) contaminants that have the regulatory standards which may change due to new science, detection capabilities, or pathways.

Environmental Management System3

A structure of procedures and policies used to systematically identify, evaluate, and manage environmental impacts of ongoing activities, products, and services.

Designed to provide order and consistency for organizations to address environmental concerns in a comprehensive manner, an EMS for a Federal agency is intended to ensure that all necessary actions are taken to integrate environmental accountability into day-to-day decision-making and long-term planning processes.

An EMS employs a continuous, rigorous, self-monitoring cycle for continual improvement of environmental performance.

Exit Strategy See PWS Section 8.1.2.

Final Document Document that has received AF and USACE approval, and where applicable, regulatory agency concurrence and/or approval. For documents requiring AF and/or regulatory agency signature, the document will not be considered Final until it is signed by the appropriate signatory(ies).

Green and Sustainable Remediation4

The site-specific employment of products, processes, technologies, and procedures that mitigate contaminant risk to receptors while making decisions that are cognizant of balancing community goals, economic impacts, and net environmental effects.

Land Use Control2 Any type of physical, legal, proprietary or administrative mechanism that restricts the use of, or limits access to, real property to prevent or reduce risks to human health and the environment. Physical mechanisms (i.e., engineering controls) encompass a variety of engineered remedies to contain or reduce contamination and physical barriers to limit access to property, such as landfill caps, fences, or signs. The legal, proprietary, or administrative mechanisms used for LUCs are generally the same as those used for Institutional Controls (ICs), as discussed in the National Contingency Plan. Examples of ICs include deed notices; IC registries, property easements and covenants; installation administrative controls, such as construction and work request review and approval processes; and administrative orders and cleanup agreements.

Attachment 3

Life-Cycle Cost (LCC) An estimate of POP and post-POP costs based on proposed activities, activity duration, and assumptions from contract award through Contractor’s projected Site Closeout date (or 30 years for sites with indefinite closeout dates).

Long-Term Management2

Environmental monitoring, review of site conditions, and maintenance of a remedial action to ensure continued protection as designed once a site achieves Response Complete. LTM includes operation and maintenance which are the measures required to maintain the effectiveness of response actions. LTM should not be used until no further environmental restoration response actions are appropriate or anticipated. LTM should not be used to refer to monitoring after RIP (this includes sites for which the selected response action is natural attenuation). Examples of LTM include landfill cap maintenance, leachate disposal, fence monitoring and repair, management of five-year review execution, and LUC maintenance.

Note: the requirements for Five-Year Reviews are in accordance with the PWS and may not be included in LTM required under ORCs.

Optimized Remediation Contract

A contract that will effectively and efficiently manage the Air Force ERP in a performance-based, results-oriented, and cost conscious framework. One significant component will be the incorporation of lessons learned during PBRs in the development of ORC performance objectives. ORCs will be firm fixed price contracts and generally cover all known sites at an installation. Contractors will be incentivized to achieve performance objectives in keeping with the end state of choice as determined by a business case analysis of total life cycle cost with the objective of minimizing future Air Force liability and cost to the greatest degree feasible. While that end state of choice is generally RC, ORCs will utilize existing site data to inform realistic performance objective selection.

Performance Goal5 A standard being used to define when an effort has achieved satisfactory performance for a site for which the Performance Objective is OES. In a Performance Model, it is the value for a specific Performance Indicator that distinguishes success from failure of the implemented approach. As such, the Performance Goal is the pass/fail criterion for a given Performance Indicator.

Performance Indicator5 A measurable or calculable feature of an approach, system, or process that provides direct interpretive value with respect to (1) remedial mechanisms or (2) achievement of a remedial objective.

Performance Metric5 A unit of measure for a Performance Indicator.

Performance Model5 A predictive graphic model that describes the expected course of the remediation process (i.e., how conditions are expected to change over time as measured using appropriate Performance Indicators from the current state until the Performance Goal is achieved).

Performance Objective

The contractually required endpoint, status, condition, or requirement.

Performance Period

The contractually required duration to achieve the Performance Objective.

Performance Standard The condition that must be satisfied to demonstrate a Performance Objective has been achieved.

Attachment 3

Record of Decision2 The document required by CERCLA containing the final decision and statutory determinations of the lead agency concerning selection of the remedial action at a site(s). This includes any preliminary phase of a remedial action, such as an interim remedial action, which would require an interim ROD.

Reduce Life-Cycle Cost

See PWS Section 1.2.5.

Remedial Action6 Those actions consistent with permanent remedy taken instead of or in addition to removal actions in the event of a release or threatened release of a hazardous substance into the environment, to prevent or minimize the release of hazardous substances so that they do not migrate to cause substantial danger to present or future public health or welfare or the environment. The term includes, but is not limited to, such actions at the location of the release as storage, confinement, perimeter protection using dikes, trenches, or ditches, clay cover, neutralization, cleanup of released hazardous substances and associated contaminated materials, recycling or reuse, diversion, destruction, segregation of reactive wastes, dredging or excavations, repair or replacement of leaking containers, collection of leachate and runoff, onsite treatment or incineration, provision of alternative water supplies, and any monitoring reasonably required to assure that such actions protect the public health and welfare and the environment. The term includes the costs of permanent relocation of residents and businesses and community facilities where the President determines that, alone or in combination with other measures, such relocation is more cost-effective than and environmentally preferable to the transportation, storage, treatment, destruction, or secure disposition offsite of hazardous substances, or may otherwise be necessary to protect the public health or welfare; the term includes offsite transport and offsite storage, treatment, destruction, or secure disposition of hazardous substances and associated contaminated materials.

Remedial Action – Construction2

The period of time in which a response action is being implemented, but is not yet operating as designed. At the end of this phase of work, a remedy is in place.

Remedial Action Objectives7

Describe what the proposed site cleanup is expected to accomplish.

Note: these are generally defined in the DD.

Remedial Action - Operation2

The period of time that a selected remedy must operate before achieving remedial action objectives. At the end of this phase of work, the response is complete.

Remedial Design7 An engineering phase during which additional technical information and data identified are incorporated into technical drawings and specifications developed for the subsequent remedial action. These specifications are based upon the detailed description of the selected remedy and the cleanup criteria provided in the ROD.

Attachment 3

Remedy in Place2

Designation that a final remedial action has been constructed, is functional, and is operating as planned in the RD and would be expected to meet the remedial action objectives detailed in the DD. Examples of RIP are a soil vapor extraction system or an in situ chemical treatment system that is installed and operating as designed and for which performance data indicate the system will achieve remedial action objectives, thus demonstrating proper operation of the system. Because remedial action objectives have not been met, the site cannot be considered RC.

Response Complete2

A milestone signifying that the DoD Component has met the remedial action objectives for a site, documented the determination, and sought regulatory agreement. RC signifies that DoD has determined at the end of the PA/SI or RI that no additional response action is required; achieved RIP and the required RA- O has achieved the remedial action objectives; or where there is no RA-O phase, then the remedial action-construction has achieved the remedial action objectives.

LTM may occur after RC is achieved and precedes Site Closeout.

Site Closeout2 The stage at which the DoD has completed active management and monitoring at an environmental restoration site, and no additional environmental restoration funds will be expended at the site. SC occurs when environmental restoration goals have been achieved that allow unlimited use and unrestricted exposure of the property (e.g., no further LTM, including LUCs, is required).

Note: achieving Site Closeout may include, but not be limited to, the dismantling, removal, recycling, reclamation and/or disposal of all remedial activity systems and ancillary equipment above and underground to return the site to its natural state, well abandonment, and site restoration in accordance with Installation and regulatory requirements.

Source Strength8 The mass of contaminant present in the source zone and its flux from the source zone to the larger groundwater plume. The source strength is intended to convey information not only about the longevity of the source, but also about the size of the plume that would be created due to the flux from the source. Source-strength evaluations shall quantitatively determine the magnitude of each source relative to observed transport and attenuation rates and shall include all applicable COCs. Data gap evaluations to delineate the extent of source-zone contamination shall be performed consistent with state-of-the-science methodologies (e.g., application of high resolution aquifer profiling, DNAPL partitioning tracer tests, vapor-phase tomography, downhole geophysics) and guidance.

Source Zone Delineation8

The location of a primary contaminant source in the subsurface (both horizontally and vertically) to include all applicable phase partitioning (e.g., NAPL, sorbed, dissolved, and vapor) and distribution into low permeability materials.

Attachment 3

File details come from the government source that posted it. Updated .