About this file

This document is a Breaker Maintenance checklist form for an SPS2 type circuit breaker, associated with Gainesville Regional Utilities' (GRU) 138 KV Oil Breaker Replacements Project in Florida. The form provides a comprehensive maintenance inspection template for electrical circuit breakers, detailing multiple critical testing procedures including timing tests, travel tests, ductor measurements, megger testing, power factor testing, SF6 gas analysis, pressure switch settings verification, alarm checks, mechanical inspections, and general maintenance tasks.

The maintenance checklist includes specific technical parameters such as first trip timing (< 26ms), closing time (< 63ms), stroke measurement (110 mm), electrical resistance measurements (< 130 micro ohms), insulation resistance testing, SF6 gas purity requirements (> 97%), moisture levels (< 300 ppm), and pressure switch settings (operating pressure at 87 psi). The form allows for detailed documentation of test results across three separate poles, with space for recording serial number, breaker type, ambient temperature, and technician comments, supporting GRU's systematic approach to maintaining and replacing aging electrical infrastructure.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breaker Maintenance

Breaker Ser # Date

Type SPS2 kv Amps

Counter Found Left Amb. Temp

Pole 1 Pole 2 Pole 3 Timing Test

(1) First Trip (< 26ms)

(2) Closing Time (< 63ms)

Travel Test

(1) Stroke (110 mm)

(2) Wipe

Ductor (< 130 Micro ohms)

Megger - 1000V Closed

(> 1000 Mega ohms) Open 1 3 5

(> 2000 Mega ohms) 2 4 6 1 to 2 3 to 4 5 to 6

Power Factor Testing

Test SF6 Gas

(1) Purity (> 97%)

(2) So2 (< 40)

(3) Moisture (< 300 ppm)

Check Pressure switch settings

(1) Operating pressure (87 psi)

(2) Low pressure Alarm (75 psi)

(3) Low Pressure Cut-out (72 psi)

Test Alarms

Check Mech. for loose or warn parts

Lube Mech.

Spring Charging time (< 15 sec.)

Check Heaters

Clean Cabinet

Performed by

Comments