Attachment 3 - DRAWINGS - 557-23-103 - 6 Aug 2026.pdf

PDF 47 MB Posted

Attached to
Amendment 0001 - 36C24726Q0772 - Project 557-23-103 | Replace Building 2 and Building 4 Generators | Construction
Solicitation number
36C24726Q0772
Issued by

About this file

This is a drawing set cover sheet and phasing documentation for a federal construction project to replace emergency generators at the Carl Vinson Veterans Affairs Medical Center in Dublin, Georgia. The project (557-23-103) involves replacement of generators serving Buildings 2 and 4, with comprehensive construction phasing plans designed to minimize operational disruptions while maintaining continuous emergency power throughout the replacement process.

The drawings encompass multiple discipline packages including architectural, structural, electrical, mechanical, plumbing, fire protection, security, and ICRA (Infection Control Risk Assessment) requirements. Key deliverables include campus site plans, phasing plans for Buildings 2 and 4 across six and four phases respectively, architectural and electrical demolition/new work plans, generator enclosure details, control wiring diagrams, panel schedules, and various infrastructure details. The phasing strategy emphasizes coordination with VA facility operations, with all outages scheduled during night and weekend hours to minimize impact to hospital services. Critical construction sequencing includes preliminary site preparation and electrical room modifications (Phase I), underground infrastructure installation (Phase II), new generator and switchboard installation with testing (Phase III), auxiliary equipment completion and commissioning (Phase IV), sequential transfer of existing automatic transfer switches to new emergency switchboard (Phase V), temporary ATS replacement and transformer installation (Phase VI), and final demolition of existing equipment with system acceptance testing and training (Phase VII). All work requires coordination with the VA Contracting Officer, minimum two-week notification for scheduled shutdowns, fuel system maintenance to support 96 hours of continuous operation, and comprehensive NETA acceptance and NFPA 110 operational testing before final acceptance.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V.A.C.

COVER SHEET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1826 VETERANS BLVD.

DUBLIN, GA 31021

Revisions: Date:

VA DUBLIN HEALTHCARE SYSTEM

D.L.E.

557-23-103

GI-001

REPLACEMENT OF

BUILDING 2 & 4 GENERATORS

BID DOCUMENTS R1

06/15/2026(502) 836-4232

10901 FRONT BEACH ROAD, SUITE 1415

PANAMA CITY BEACH, FL 32407

www.force-protect.com

(303) 730-0434

8822 RIDGELINE BLVD #310

HIGHLANDS RANCH, CO 80129

www.calibre-engineering.com

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

N/A

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS

AutoCAD SHX Text

CARL VINSON VAMC

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text

PROJECT NO. 557-23-103

AutoCAD SHX Text GENERAL GI-001 COVER SHEET COVER SHEET GI-002 CAMPUS SITE PLAN CAMPUS SITE PLAN GC-001 PHASING NOTES PHASING NOTES GC-002 PHASING PLANS - BUILDING 2, EXISTING CONDITIONS & PHASE I PHASING PLANS - BUILDING 2, EXISTING CONDITIONS & PHASE I GC-003 PHASING PLANS - BUILDING 2, PHASE II & PHASE III PHASING PLANS - BUILDING 2, PHASE II & PHASE III GC-004 PHASING PLANS - BUILDING 2, PHASE IV & PHASE V PHASING PLANS - BUILDING 2, PHASE IV & PHASE V GC-005 PHASING PLAN - BUILDING 2, PHASE VI PHASING PLAN - BUILDING 2, PHASE VI GC-006 PHASING PLANS - BUILDING 4, EXISTING CONDITIONS PHASING PLANS - BUILDING 4, EXISTING CONDITIONS GC-007 PHASING PLANS - BUILDING 4, PHASE I PHASING PLANS - BUILDING 4, PHASE I GC-008 PHASING PLANS - BUILDING 4, PHASE II PHASING PLANS - BUILDING 4, PHASE II GC-009 PHASING PLANS - BUILDING 4, PHASE III PHASING PLANS - BUILDING 4, PHASE III GC-010 PHASING PLANS - BUILDING 4, PHASE IV PHASING PLANS - BUILDING 4, PHASE IV GC-011 PHASING PLANS - BUILDING 4, PHASE V PHASING PLANS - BUILDING 4, PHASE V GC-012 PHASING PLANS - BUILDING 4, PHASE VI PHASING PLANS - BUILDING 4, PHASE VI ICRA ICRA-01 ICRA GENERAL REQUIREMENTS ICRA GENERAL REQUIREMENTS CIVIL CE100 EXISTING CONDITIONS EXISTING CONDITIONS CD100 DEMOLITION & STORMWATER MANAGEMENT PLAN DEMOLITION & STORMWATER MANAGEMENT PLAN CU100 SITE AND UTILITY PLAN SITE AND UTILITY PLAN CI100 DETAILS DETAILS CI100 DETAILS DETAILS STRUCTURAL S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS S-002 GENERAL STRUCTURAL NOTES GENERAL STRUCTURAL NOTES S-101 BUILDING 2 ENCLOSURE FOUNDATION PLAN BUILDING 2 ENCLOSURE FOUNDATION PLAN S-102 BUILDING 4 ENCLOSURE FOUNDATION PLAN BUILDING 4 ENCLOSURE FOUNDATION PLAN S-201 GENERATOR ENCLOSURE ELEVATIONS GENERATOR ENCLOSURE ELEVATIONS S-301 TYPICAL CONCRETE DETAILS TYPICAL CONCRETE DETAILS S-302 TYPICAL CONCRETE DETAILS TYPICAL CONCRETE DETAILS S-401 TYPICAL MASONRY DETAILS TYPICAL MASONRY DETAILS ARCHITECTURAL A-001 ARCHITECTURAL SYMBOLS, NOTES & ABBREVIATIONS ARCHITECTURAL SYMBOLS, NOTES & ABBREVIATIONS AD-100 BUILDING 2 BASEMENT ARCHITECTURAL DEMOLITION PLAN BUILDING 2 BASEMENT ARCHITECTURAL DEMOLITION PLAN AD-101 BUILDING 4 FIRST FLOOR ARCHITECTURAL DEMOLITION PLANS BUILDING 4 FIRST FLOOR ARCHITECTURAL DEMOLITION PLANS A-100 BUILDING 2 BASEMENT ARCHITECTURAL NEW WORK PLAN BUILDING 2 BASEMENT ARCHITECTURAL NEW WORK PLAN A-101 BUILDING 2 GENERATOR ENCLOSURE ARCHITECTURAL NEW WORK PLANS BUILDING 2 GENERATOR ENCLOSURE ARCHITECTURAL NEW WORK PLANS A-102 BUILDING 4 FIRST FLOOR ARCHITECTURAL NEW WORK PLANS BUILDING 4 FIRST FLOOR ARCHITECTURAL NEW WORK PLANS A-103 BUILDING 4 GENERATOR ENCLOSURE ARCHITECTURAL NEW WORK PLANS BUILDING 4 GENERATOR ENCLOSURE ARCHITECTURAL NEW WORK PLANS A-500 ARCHITECTURAL DETAILS ARCHITECTURAL DETAILS FIRE PROTECTION FX-001 FIRE PROTECTION SYMBOLS, NOTES, AND ABBREVIATIONS FIRE PROTECTION SYMBOLS, NOTES, AND ABBREVIATIONS FX-100 BUILDING 2 BASEMENT FIRE PROTECTION DEMOLITION AND NEW WORK PLANS BUILDING 2 BASEMENT FIRE PROTECTION DEMOLITION AND NEW WORK PLANS FX-101 BUILDING 4 FIRST FLOOR FIRE PROTECTION DEMOLITION AND NEW WORK PLANS BUILDING 4 FIRST FLOOR FIRE PROTECTION DEMOLITION AND NEW WORK PLANS FX-102 BUILDING 12 FIRST FLOOR FIRE PROTECTION NEW WORK PLAN BUILDING 12 FIRST FLOOR FIRE PROTECTION NEW WORK PLAN FX-103 BUILDINGS 4 & 12 FIRE PROTECTION NEW WORK PLAN BUILDINGS 4 & 12 FIRE PROTECTION NEW WORK PLAN FX-500 FIRE PROTECTION DETAILS FIRE PROTECTION DETAILS FA-100 BUILDING 2 BASEMENT FIRE DETECTION EXISTING CONDITIONS AND DEMOLITION PLANS BUILDING 2 BASEMENT FIRE DETECTION EXISTING CONDITIONS AND DEMOLITION PLANS FA-101 BUILDING 2 BASEMENT & BUILDING 4 FIRST FLOOR FIRE DETECTION NEW WORK PLANS BUILDING 2 BASEMENT & BUILDING 4 FIRST FLOOR FIRE DETECTION NEW WORK PLANS PLUMBING PL-001 PLUMBING SYMBOLS & NOTES PLUMBING SYMBOLS & NOTES PW-100 BUILDING 2 BASEMENT SANITARY DEMOLITION AND NEW WORK PLANS BUILDING 2 BASEMENT SANITARY DEMOLITION AND NEW WORK PLANS PW-101 BUILDING 2 GENERATOR ENCLOSURE SANITARY NEW WORK PLAN BUILDING 2 GENERATOR ENCLOSURE SANITARY NEW WORK PLAN PW-102 BUILDING 4 FIRST FLOOR SANITARY NEW WORK PLANS BUILDING 4 FIRST FLOOR SANITARY NEW WORK PLANS MECHANICAL M-001 GENERAL MECHANICAL SYMBOLS AND NOTES GENERAL MECHANICAL SYMBOLS AND NOTES M-002 GENERAL MECHANICAL ABBREVIATIONS GENERAL MECHANICAL ABBREVIATIONS MD-100 BUILDING 2 BASEMENT MECHANICAL DEMOLITION PLAN BUILDING 2 BASEMENT MECHANICAL DEMOLITION PLAN MD-101 BUILDING 4 FIRST FLOOR AND ROOF MECHANICAL DEMOLITION PLANS BUILDING 4 FIRST FLOOR AND ROOF MECHANICAL DEMOLITION PLANS M-100 BUILDING 2 BASEMENT MECHANICAL NEW WORK PLANS BUILDING 2 BASEMENT MECHANICAL NEW WORK PLANS M-101 BUILDING 4 FIRST FLOOR MECHANICAL NEW WORK PLANS BUILDING 4 FIRST FLOOR MECHANICAL NEW WORK PLANS M-500 MECHANICAL DETAILS 1 MECHANICAL DETAILS 1 M-501 MECHANICAL DETAILS 2 MECHANICAL DETAILS 2 M-502 MECHANICAL DETAILS 3 MECHANICAL DETAILS 3 M-600 MECHANICAL SCHEDULES MECHANICAL SCHEDULES MI-100 BUILDINGS 2 & 4 GENERATOR ENCLOSURE MECHANICAL CONTROLS NEW WORK PLANS BUILDINGS 2 & 4 GENERATOR ENCLOSURE MECHANICAL CONTROLS NEW WORK PLANS MI-500 MECHANICAL CONTROLS 1 MECHANICAL CONTROLS 1 MI-501 MECHANICAL CONTROLS 2 MECHANICAL CONTROLS 2 MI-502 MECHANICAL CONTROLS 3 MECHANICAL CONTROLS 3 ELECTRICAL E-001 ELECTRICAL SYMBOLS, NOTES AND ABBREVIATIONS ELECTRICAL SYMBOLS, NOTES AND ABBREVIATIONS ED-100 BUILDING 2 BASEMENT ELECTRICAL DEMOLITION PLAN BUILDING 2 BASEMENT ELECTRICAL DEMOLITION PLAN ED-101 BUILDING 4 ELECTRICAL DEMOLITION PLANS BUILDING 4 ELECTRICAL DEMOLITION PLANS ES-001 ELECTRICAL DEMOLITION SITE PLAN - BUILDING 2 ELECTRICAL DEMOLITION SITE PLAN - BUILDING 2 ES-002 ELECTRICAL DEMOLITION SITE PLAN - BUILDING 3 ELECTRICAL DEMOLITION SITE PLAN - BUILDING 3 ES-003 ELECTRICAL NEW WORK SITE PLAN - BUILDING 2 ELECTRICAL NEW WORK SITE PLAN - BUILDING 2 ES-004 ELECTRICAL NEW WORK SITE PLAN 1 - BUILDING 4 ELECTRICAL NEW WORK SITE PLAN 1 - BUILDING 4 ES-005 ELECTRICAL NEW WORK SITE PLAN 2 - BUILDING 4 ELECTRICAL NEW WORK SITE PLAN 2 - BUILDING 4 E-100 BUILDING 2 BASEMENT NEW WORK ELECTRICAL PLAN BUILDING 2 BASEMENT NEW WORK ELECTRICAL PLAN E-101 BUILDING 4 BASEMENT AND FIRST FLOOR NEW WORK ELECTRICAL PLANS BUILDING 4 BASEMENT AND FIRST FLOOR NEW WORK ELECTRICAL PLANS EL-100 BUILDING 2 BASEMENT DEMOLITION LIGHTING PLAN BUILDING 2 BASEMENT DEMOLITION LIGHTING PLAN EL-101 BUILDING 2 BASEMENT NEW WORK LIGHTING PLAN BUILDING 2 BASEMENT NEW WORK LIGHTING PLAN EL-102 BUILDING 4 FIRST FLOOR NEW WORK LIGHTING PLAN BUILDING 4 FIRST FLOOR NEW WORK LIGHTING PLAN EL-103 LIGHTING NEW WORK SITE PLAN - BUILDING 2 LIGHTING NEW WORK SITE PLAN - BUILDING 2 EL-104 LIGHTING NEW WORK SITE PLAN - BUILDING 4 LIGHTING NEW WORK SITE PLAN - BUILDING 4 E-500 ELECTRICAL DETAILS 1 ELECTRICAL DETAILS 1 E-501 ELECTRICAL DETAILS 2 ELECTRICAL DETAILS 2 E-502 ELECTRICAL DETAILS 3 ELECTRICAL DETAILS 3 E-503 GENERATOR DETAILS GENERATOR DETAILS E-504 ATS DETAILS ATS DETAILS E-505 LOAD BANK DETAILS LOAD BANK DETAILS E-506 PANEL SCHEDULES - BUILDING 2 PANEL SCHEDULES - BUILDING 2 E-507 PANEL SCHEDULES - BUILDING 4 PANEL SCHEDULES - BUILDING 4 E-600 BUILDING 2 PARTIAL ONE-LINE DIAGRAMS - DEMOLITION BUILDING 2 PARTIAL ONE-LINE DIAGRAMS - DEMOLITION E-601 BUILDING 4 PARTIAL ONE-LINE DIAGRAM - DEMOLITION BUILDING 4 PARTIAL ONE-LINE DIAGRAM - DEMOLITION E-602 BUILDING 2 PARTIAL ONE-LINE DIAGRAM - NEW WORK BUILDING 2 PARTIAL ONE-LINE DIAGRAM - NEW WORK E-603 BUILDING 4 PARTIAL ONE-LINE DIAGRAM - NEW WORK BUILDING 4 PARTIAL ONE-LINE DIAGRAM - NEW WORK E-604 BUILDING 2 & 4 CONTROLS WIRING DIAGRAMS BUILDING 2 & 4 CONTROLS WIRING DIAGRAMS SECURITY TY-100 SECURITY NEW WORK SITE PLAN - BUILDING 2 SECURITY NEW WORK SITE PLAN - BUILDING 2 TY-101 SECURITY NEW WORK SITE PLAN - BUILDING 4 SECURITY NEW WORK SITE PLAN - BUILDING 4 TY-102 BUILDINGS 2 & 4 NEW WORK SECURITY PLANS BUILDINGS 2 & 4 NEW WORK SECURITY PLANS TY-500 SECURITY DETAILS 1 SECURITY DETAILS 1 TY-501 SECURITY DETAILS 2 SECURITY DETAILS 2

AutoCAD SHX Text

DUBLIN, GA

AutoCAD SHX Text

REPLACEMENT OF BUILDING 2 & 4 GENERATORS

AutoCAD SHX Text

AUGUSTA

AutoCAD SHX Text

ATLANTA

AutoCAD SHX Text

COLUMBUS

AutoCAD SHX Text

MACON

AutoCAD SHX Text

SAVANNAH

AutoCAD SHX Text

LOCATION MAP SCALE: NOT TO SCALE

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

DUBLIN

AutoCAD SHX Text

PROJECT LOCATION

SIGN

SIGN

SLAB

SIGN

EA

SE

M

EN

T

AP

PR

OXI

M

AT

EL

Y

SH

OW

N

' E

XI

ST

IN

G W

AT

ER

L

IN

E

EA

SE

M

EN

T

UP

UP

VAN

ACCESSIBLE

LOADING AREA

7' -0

5'-0"

SF

SF

V.A.C.

CAMPUS SITE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1826 VETERANS BLVD.

DUBLIN, GA 31021

Revisions: Date:

VA DUBLIN HEALTHCARE SYSTEM

D.L.E.

557-23-103

GI-002

REPLACEMENT OF

BUILDING 2 & 4 GENERATORS

BID DOCUMENTS R1

06/15/2026(502) 836-4232

10901 FRONT BEACH ROAD, SUITE 1415

PANAMA CITY BEACH, FL 32407

www.force-protect.com

(303) 730-0434

8822 RIDGELINE BLVD #310

HIGHLANDS RANCH, CO 80129

www.calibre-engineering.com

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

N/A

AutoCAD SHX Text

BLDG. 17

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

CONCRETE DITCH

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

BLDG. 72

AutoCAD SHX Text

CT

AutoCAD SHX Text

CT

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

OBSERVATION MONITORING WELL

AutoCAD SHX Text

METAL BLDGS.

AutoCAD SHX Text

BLDG. 31

AutoCAD SHX Text

BLDG. 46

AutoCAD SHX Text

BLDG. 41

AutoCAD SHX Text

BLDG. 36

AutoCAD SHX Text

BLDG. 24

AutoCAD SHX Text

BLDG. 43

AutoCAD SHX Text

BLACKWOOD DRIVE

AutoCAD SHX Text

NEFF PLACE

AutoCAD SHX Text

NEFF PLACE

AutoCAD SHX Text

EXISTING JOHNSON STREET

AutoCAD SHX Text

JOHNSON STREET

AutoCAD SHX Text

ALEXANDER DRIVE

AutoCAD SHX Text

BLACKWOOD DRIVE

AutoCAD SHX Text

BLDG 109

AutoCAD SHX Text

BLDG. 63

AutoCAD SHX Text

BLDG. 81

AutoCAD SHX Text

STEPS

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

BLDG. 27

AutoCAD SHX Text

BLDG. 16

AutoCAD SHX Text

BLDG. 71

AutoCAD SHX Text

BLDG. 28

AutoCAD SHX Text

BLDG. 66

AutoCAD SHX Text

BLDG. 69

AutoCAD SHX Text

BLDG. 30

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING #2

AutoCAD SHX Text

PARKING #2

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING #1

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING #7

AutoCAD SHX Text

PARKING #3

AutoCAD SHX Text

PARKING #4

AutoCAD SHX Text

PARKING #5

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING #8

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

BLDG. 32

AutoCAD SHX Text

BLDG. 5

AutoCAD SHX Text

BLDG. 3

AutoCAD SHX Text

BLDG. 1

AutoCAD SHX Text

BLDG. 9

AutoCAD SHX Text

BLDG. 13

AutoCAD SHX Text

BLDG. 11

AutoCAD SHX Text

BLDG. 40

AutoCAD SHX Text

BLDG. 4

AutoCAD SHX Text

BLDG. 6

AutoCAD SHX Text

BLDG. 8

AutoCAD SHX Text

BLDG. 10

AutoCAD SHX Text

BLDG. 12

AutoCAD SHX Text

BLDG. 85

AutoCAD SHX Text

BLDG. 14

AutoCAD SHX Text

BLDG. 86

AutoCAD SHX Text

BLDG. 34

AutoCAD SHX Text

BLDG. 35

AutoCAD SHX Text

BLDG. 25

AutoCAD SHX Text

BLDG. 26

AutoCAD SHX Text

BLDG. 29

AutoCAD SHX Text

BLDG. 15

AutoCAD SHX Text

BLDG. 19

AutoCAD SHX Text

GAZEBO

AutoCAD SHX Text

SUBSTATION

AutoCAD SHX Text

BLDG. 39

AutoCAD SHX Text

GAZEBO

AutoCAD SHX Text

BLDG. 68

AutoCAD SHX Text

BLDG. 67

AutoCAD SHX Text

BLDG. 21

AutoCAD SHX Text

BELLEVUE AVENUE

AutoCAD SHX Text

TROJAKOWSKI AVENUE

AutoCAD SHX Text

ALEXANDER DRIVE

AutoCAD SHX Text

EVANS AVENUE

AutoCAD SHX Text

TROJAKOWSKI AVENUE

AutoCAD SHX Text

EVANS AVENUE

AutoCAD SHX Text

BLDG. 44

AutoCAD SHX Text

CROWLEY AVENUE

AutoCAD SHX Text

CROWLEY AVENUE

AutoCAD SHX Text

VETERANS PARKWAY US HWY 80

AutoCAD SHX Text

VETERANS PARKWAY US HWY 80

AutoCAD SHX Text

VETERANS PARKWAY US HWY 80

AutoCAD SHX Text

JOHNSON STREET

AutoCAD SHX Text

LAKE LEISURE

AutoCAD SHX Text

JOHNSON STREET

AutoCAD SHX Text

BLACKWOOD DRIVE

AutoCAD SHX Text

ALEXANDER DRIVE

AutoCAD SHX Text

BLDG. 84

AutoCAD SHX Text

BLDG. 73

AutoCAD SHX Text

JOHNSON STREET

AutoCAD SHX Text Bldg 5 Gen

AutoCAD SHX Text Bldg 27 Gen

AutoCAD SHX Text Bldg 8 Gen

AutoCAD SHX Text Circuit 2 Gen

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

HILLCREST PKWY.

AutoCAD SHX Text

HILLCREST PKWY.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VISITOR'S / OUTPATIENT

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

SPECIALIST

AutoCAD SHX Text H.C.

AutoCAD SHX Text

PATIENT / VISITOR'S

AutoCAD SHX Text

PATIENT / VISITOR'S

AutoCAD SHX Text

PATIENT / VISITOR'S

AutoCAD SHX Text

PATIENT / VISITOR'S

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

STAFF / VISITOR'S

AutoCAD SHX Text

STAFF / VISITOR'S

AutoCAD SHX Text

STAFF / VISITOR'S

AutoCAD SHX Text

STAFF / VISITOR'S

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

STAFF / VISITOR'S

AutoCAD SHX Text

STAFF / VISITOR'S

AutoCAD SHX Text

LOADING

AutoCAD SHX Text

PATIENT/VISITOR'S PARKING

AutoCAD SHX Text

STAFF / VISITOR'S

AutoCAD SHX Text

STAFF / VISITOR'S / OUTPATIENT

AutoCAD SHX Text

FUEL TANK

AutoCAD SHX Text

MRI

AutoCAD SHX Text

SOLAR PANELS

AutoCAD SHX Text

THOMAS LANE

AutoCAD SHX Text

THOMAS LANE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

2.5" PLASTIC WITNESS POST

AutoCAD SHX Text

1/2" REBAR FOUND IN

AutoCAD SHX Text

CONCRETE MONUMENT

AutoCAD SHX Text

CONCRETE NAIL FOUND

AutoCAD SHX Text

NORTHWEST DRIVE

AutoCAD SHX Text

BLDG.29 ANNEX

AutoCAD SHX Text

JOHNSON STREET

AutoCAD SHX Text

NEW PARKING

AutoCAD SHX Text

EVANS AVENUE

AutoCAD SHX Text

TROJAKOWSKI AVENUE

AutoCAD SHX Text

NEW JOHNSON STREET WEST

AutoCAD SHX Text New Water Tower Location

AutoCAD SHX Text Bldg.10

AutoCAD SHX Text New Chiller Plant

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text Primary Care Wom Health

AutoCAD SHX Text Future Parking Areas

AutoCAD SHX Text Future Outpatient Care Building

AutoCAD SHX Text Future Addition

AutoCAD SHX Text Future Addition

AutoCAD SHX Text

FISHER HOUSE

AutoCAD SHX Text

STAFF PARKING #6

AutoCAD SHX Text

BLDG. 2

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CAMPUS SITE PLAN

AutoCAD SHX Text 1"=75'

AutoCAD SHX Text

AutoCAD SHX Text

GI-002

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

AREA OF WORK

KEY SYMBOL

R.V.

PHASING NOTES

N/A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1826 VETERANS BLVD.

DUBLIN, GA 31021

Revisions: Date:

VA DUBLIN HEALTHCARE SYSTEM

D.L.E.

557-23-103

GC-001

REPLACEMENT OF

BUILDING 2 & 4 GENERATORS

BID DOCUMENTS R1

06/15/2026(502) 836-4232

10901 FRONT BEACH ROAD, SUITE 1415

PANAMA CITY BEACH, FL 32407

www.force-protect.com

(303) 730-0434

8822 RIDGELINE BLVD #310

HIGHLANDS RANCH, CO 80129

www.calibre-engineering.com

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text PHASING PLAN THE INTENT OF THE PHASING FOR THIS CONSTRUCTION IS TO MINIMIZE OUTAGE PERIODS. ALL WORK SHALL BE COORDINATED WITH THE VA COR. SHUTDOWNS SHALL BE COORDINATED WITH THE STATION AT A MINIMUM OF 2 WEEKS PRIOR TO REQUESTED TIME. TO MINIMIZE OUTAGE PERIODS ALL INSTALLATIONS TO BE COMPLETED UNDER THIS SCOPE SHALL BE COMPLETED TO THE FULLEST EXTENT PRIOR TO THE SHUT DOWN OF ANY EXISTING EQUIPMENT. ALL CONDUIT AND CONDUCTORS SHALL BE RUN FROM THE NEW DISTRIBUTION SOURCE TO EACH ASSOCIATED ENDPOINT DEVICE AND PREPARED FOR CONNECTION PRIOR TO ANY OUTAGES. ALL OUTAGES SHALL BE SCHEDULED DURING WEEKEND/OFF-HOURS TO ENSURE MINIMAL INTERRUPTION TO FACILITY OPERATIONS. CONTRACTOR SHALL ENSURE THAT AT THE END OF A PERIOD OF A SCHEDULE OUTAGE, ALL ASSOCIATED EQUIPMENT IS RETURNED TO OPERATIONAL STATUS.

AutoCAD SHX Text CONSTRUCTION PHASING HOURS ALL OUTAGES SHALL BE COMPLETED DURING NIGHT/WEEKEND HOURS TO MINIMIZE THE IMPACT TO OPERATIONS. DAYTIME HOURS: 8:00 AM TO 5:00 PM NIGHT HOURS: 5:00 PM TO 8:00 AM WEEKEND HOURS: 5:00 PM FRIDAY TO 8:00 AM MONDAY CONTRACTOR SHALL SUBMIT A DETAILED PHASING SCHEDULE TO THE VA COR AND A/E FOR REVIEW INCLUDING PERIOD OF PERFORMANCE AND ASSOCIATED AREAS. OUTAGES SHALL BE COORDINATED WITH THE VA COR AND SCHEDULED DURING WEEKEND HOURS TO MINIMIZE IMPACT TO FACILITY OPERATIONS. NO WORK ON WEEKENDS AND HOLIDAYS WITHOUT VA NOTIFICATION TO MINIMIZE DISRUPTION TO STAFF.

AutoCAD SHX Text ATS PHASING NOTES ALL WORK SHALL BE COORDINATED WITH THE VA COR. CONTRACTOR SHALL ENSURE AT THE COMPLETION OF THE OUTAGE, THE ATS IS PREPARED AND READY FOR USE. CONTRACTOR SHALL TEST ATS TO ENSURE OPERATIONAL STATUS. ATS SHALL BE INTEGRATED INTO THE EXISTING SEQUENCE OF OPERATIONS. FUNCTIONALITY OF ASSOCIATED ATS SHALL BE RETURNED TO IT'S ORIGINAL STATUS AT THE COMPLETION OF CONSTRUCTION.

AutoCAD SHX Text ATS PHASING 1. PRELIMINARY PLANNING 1.1. ASSESS THE SYSTEM: ASSESS THE SYSTEM: O VERIFY ALL LOADS SERVED BY THE ASSOCIATED ATS. VERIFY ALL LOADS SERVED BY THE ASSOCIATED ATS. 1.2. COORDINATE WITH VA COR: COORDINATE WITH VA COR: O NOTIFY FACILITY MANAGEMENT, OPERATIONS STAFF, AND ANY CRITICAL SYSTEM OPERATORS ABOUT THE REPLACEMENT SCHEDULE AND EXPECTED IMPACT. NOTIFY FACILITY MANAGEMENT, OPERATIONS STAFF, AND ANY CRITICAL SYSTEM OPERATORS ABOUT THE REPLACEMENT SCHEDULE AND EXPECTED IMPACT. O OBTAIN APPROVAL FOR PLANNED OUTAGES AS REQUIRED BY VA COR. OBTAIN APPROVAL FOR PLANNED OUTAGES AS REQUIRED BY VA COR. 1.3. TEST THE EXISTING SYSTEM: TEST THE EXISTING SYSTEM: O CONDUCT TESTING TO VERIFY THE FUNCTIONALITY OF UPSTREAM AND DOWNSTREAM COMPONENTS (E.G., GENERATORS AND LOADS) BEFORE THE CONDUCT TESTING TO VERIFY THE FUNCTIONALITY OF UPSTREAM AND DOWNSTREAM COMPONENTS (E.G., GENERATORS AND LOADS) BEFORE THE REPLACEMENT OF THE ASSOCIATED ATS. 2. PREPARE FOR REPLACEMENT 2.1 OBTAIN EQUIPMENT AND MATERIALS: O NEW ATS SHALL BE RELOCATED TO INSTALLATION LOCATION. NEW ATS SHALL BE RELOCATED TO INSTALLATION LOCATION. O HAVE ALL NECESSARY TOOLS, CABLES, CONNECTORS, AND DOCUMENTATION READY. HAVE ALL NECESSARY TOOLS, CABLES, CONNECTORS, AND DOCUMENTATION READY. 2.2 PRE-ASSEMBLE COMPONENTS: O PRECONFIGURE THE NEW ATS WITH REQUIRED SETTINGS (E.G. TRANSITION TYPE, AND DELAY TIMES) TO REDUCE INSTALLATION TIME. PRECONFIGURE THE NEW ATS WITH REQUIRED SETTINGS (E.G. TRANSITION TYPE, AND DELAY TIMES) TO REDUCE INSTALLATION TIME. 2.3 VERIFY SAFETY MEASURES: O ENSURE PROPER LOCKOUT/TAGOUT (LOTO) PROCEDURES ARE FOLLOWED. ENSURE PROPER LOCKOUT/TAGOUT (LOTO) PROCEDURES ARE FOLLOWED. O CONFIRM THAT ARC FLASH AND ELECTRICAL SAFETY PROTOCOLS ARE IN PLACE PER NFPA 70E. CONFIRM THAT ARC FLASH AND ELECTRICAL SAFETY PROTOCOLS ARE IN PLACE PER NFPA 70E. 3. REPLACEMENT PHASING STEPS PHASE 1: INSTALL REPLACEMENT ATS 1. POSITION THE NEW ATS: POSITION THE NEW ATS: O MOUNT THE NEW ATS IN THE NOTED LOCATION, ENSURING PROPER ALIGNMENT AND SECURE FASTENING. MOUNT THE NEW ATS IN THE NOTED LOCATION, ENSURING PROPER ALIGNMENT AND SECURE FASTENING. 2. INSTALL NEW POWER CONDUCTORS: INSTALL NEW POWER CONDUCTORS: O CONNECT THE NORMAL POWER, EMERGENCY POWER , AND LOAD CONDUCTORS TO THE CORRESPONDING TERMINALS ON THE NEW ATS. CONNECT THE NORMAL POWER, EMERGENCY POWER , AND LOAD CONDUCTORS TO THE CORRESPONDING TERMINALS ON THE NEW ATS. O MATCH THE LABELED CONTROL WIRING TO THE APPROPRIATE TERMINALS ON THE NEW ATS (E.G., START SIGNALS, MONITORING, ALARMS). MATCH THE LABELED CONTROL WIRING TO THE APPROPRIATE TERMINALS ON THE NEW ATS (E.G., START SIGNALS, MONITORING, ALARMS). O VERIFY CORRECT TERMINAL ASSIGNMENTS USING THE MANUFACTURER'S WIRING DIAGRAM. VERIFY CORRECT TERMINAL ASSIGNMENTS USING THE MANUFACTURER'S WIRING DIAGRAM. 3. INSTALL NEW CONTROL WIRING: INSTALL NEW CONTROL WIRING: O PULL AND TERMINATE NEW CONTROL WIRING, ENSURING PROPER CONNECTIONS FOR: PULL AND TERMINATE NEW CONTROL WIRING, ENSURING PROPER CONNECTIONS FOR: O START SIGNALS: TO THE GENERATOR. START SIGNALS: TO THE GENERATOR. O STATUS MONITORING: FOR UTILITY AND GENERATOR AVAILABILITY. STATUS MONITORING: FOR UTILITY AND GENERATOR AVAILABILITY. O ALARM OUTPUTS: FOR REMOTE MONITORING AND FAULT NOTIFICATIONS. ALARM OUTPUTS: FOR REMOTE MONITORING AND FAULT NOTIFICATIONS. O REMOTE CONTROL SIGNALS: FOR START, STOP, AND BYPASS CONTROLS. REMOTE CONTROL SIGNALS: FOR START, STOP, AND BYPASS CONTROLS. O USE THE MANUFACTURER'S WIRING DIAGRAM TO VERIFY CORRECT TERMINAL ASSIGNMENTS. USE THE MANUFACTURER'S WIRING DIAGRAM TO VERIFY CORRECT TERMINAL ASSIGNMENTS. 4. VERIFY GROUNDING: VERIFY GROUNDING: O ENSURE THE NEW ATS IS PROPERLY GROUNDED PER NEC ARTICLE 250 ENSURE THE NEW ATS IS PROPERLY GROUNDED PER NEC ARTICLE 250 5. ATS'S SHALL BE TESTED INITIALLY WITH NEW EMERGENCY POWER SYSTEM AND MONITORING SYSTEM PRIOR TO REPLACEMENT ATS'S SHALL BE TESTED INITIALLY WITH NEW EMERGENCY POWER SYSTEM AND MONITORING SYSTEM PRIOR TO REPLACEMENT OF LOAD SIDE DEVICES AND CONNECTIONS. PHASE 2: REMOVE EXISTING ATS 1. ISOLATE THE ATS: O DE-ENERGIZE THE UTILITY AND GENERATOR FEEDS TO THE ATS FOLLOWING LOTO PROCEDURES. DE-ENERGIZE THE UTILITY AND GENERATOR FEEDS TO THE ATS FOLLOWING LOTO PROCEDURES. O CONFIRM THE ATS IS COMPLETELY DE-ENERGIZED USING APPROPRIATE TESTING EQUIPMENT. CONFIRM THE ATS IS COMPLETELY DE-ENERGIZED USING APPROPRIATE TESTING EQUIPMENT. 2. DISCONNECT WIRING: O CAREFULLY LABEL ALL CABLES (UTILITY, GENERATOR, LOAD, CONTROL WIRING) FOR ACCURATE RECONNECTION. CAREFULLY LABEL ALL CABLES (UTILITY, GENERATOR, LOAD, CONTROL WIRING) FOR ACCURATE RECONNECTION. O LABEL CONTROL WIRING: CLEARLY LABEL ALL CONTROL WIRING CONNECTIONS, SUCH AS: LABEL CONTROL WIRING: CLEARLY LABEL ALL CONTROL WIRING CONNECTIONS, SUCH AS: 1. START SIGNALS: FROM THE ATS TO THE GENERATOR. 2. STATUS MONITORING: CONNECTIONS FOR SOURCE AVAILABILITY (UTILITY AND GENERATOR). 3. REMOTE CONTROL SIGNALS: ANY REMOTE START, STOP, OR BYPASS CONTROLS. 4. ALARM OUTPUTS: SIGNALS FOR MONITORING ATS POSITION AND FAULT CONDITIONS. 3. REMOVE THE ATS AND CONDUCTORS: O UNBOLT AND SAFELY REMOVE THE EXISTING ATS FROM ITS MOUNTING. UNBOLT AND SAFELY REMOVE THE EXISTING ATS FROM ITS MOUNTING. O REMOVE ALL EXISTING POWER AND CONTROL CONDUCTORS, ENSURING PROPER DISPOSAL OF OLD WIRING. REMOVE ALL EXISTING POWER AND CONTROL CONDUCTORS, ENSURING PROPER DISPOSAL OF OLD WIRING. PHASE 3: COMMISSION THE NEW ATS 4. PERFORM INITIAL TESTING: PERFORM INITIAL TESTING: O CONDUCT INSULATION RESISTANCE TESTS ON POWER CONDUCTORS. CONDUCT INSULATION RESISTANCE TESTS ON POWER CONDUCTORS. O VERIFY PROPER PHASING AND CONTINUITY FOR ALL CONNECTIONS. VERIFY PROPER PHASING AND CONTINUITY FOR ALL CONNECTIONS. 5. TEST ATS FUNCTIONALITY: TEST ATS FUNCTIONALITY: O SIMULATE A UTILITY POWER FAILURE TO TEST AUTOMATIC TRANSFER TO THE GENERATOR AND BACK TO UTILITY POWER. SIMULATE A UTILITY POWER FAILURE TO TEST AUTOMATIC TRANSFER TO THE GENERATOR AND BACK TO UTILITY POWER. O CONFIRM PROPER OPERATION OF AUXILIARY FUNCTIONS (E.G., REMOTE MONITORING, ALARMS). CONFIRM PROPER OPERATION OF AUXILIARY FUNCTIONS (E.G., REMOTE MONITORING, ALARMS). 6. MONITOR LOADS: MONITOR LOADS: O RE-ENERGIZE LOADS AND MONITOR FOR ABNORMALITIES DURING THE TRANSITION. RE-ENERGIZE LOADS AND MONITOR FOR ABNORMALITIES DURING THE TRANSITION. 4. POST-REPLACEMENT ACTIONS 1. DOCUMENT CHANGES: DOCUMENT CHANGES: O UPDATE AS-BUILT DRAWINGS AND LOAD SCHEDULES TO REFLECT THE NEW ATS INSTALLATION. UPDATE AS-BUILT DRAWINGS AND LOAD SCHEDULES TO REFLECT THE NEW ATS INSTALLATION. O RECORD ALL TEST RESULTS AND COMMISSIONING REPORTS. RECORD ALL TEST RESULTS AND COMMISSIONING REPORTS. 2. INFORM VA COR: INFORM VA COR: O NOTIFY ALL VA COR THAT THE REPLACEMENT IS COMPLETE AND THE SYSTEM IS OPERATIONAL. NOTIFY ALL VA COR THAT THE REPLACEMENT IS COMPLETE AND THE SYSTEM IS OPERATIONAL. 3. SCHEDULE FOLLOW-UP: SCHEDULE FOLLOW-UP: O PLAN A FOLLOW-UP INSPECTION AFTER A SET PERIOD TO VERIFY CONTINUED PROPER OPERATIONPLAN A FOLLOW-UP INSPECTION AFTER A SET PERIOD TO VERIFY CONTINUED PROPER OPERATION

AutoCAD SHX Text ATS 4LCC2 GENERAL NOTE THE CONTRACTOR SHALL BE PREPARED TO PROVIDE TEMPORARY OR ALTERNATE POWER PROVISIONS TO CONNECT THE DOWNSTREAM PANELBOARD TO AN APPROVED ALTERNATE POWER SOURCE IN THE EVENT THAT, DURING COMMISSIONING OR TESTING, ANY EQUIPMENT IS DETERMINED TO BE NOT PROPERLY FUNCTIONAL OR UNAVAILABLE. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAINTAINING CONTINUOUS AND RELIABLE OPERATION OF ALL DEVICES AND SYSTEMS SUPPLIED BY ATS 4LCC2 THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION. ANY REQUIRED TEMPORARY CONNECTIONS, BYPASSES, OR RECONFIGURATION NECESSARY TO MAINTAIN SERVICE SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE COORDINATED AND APPROVED BY THE VA IN ADVANCE. UPON COMPLETION OF CONSTRUCTION, ALL TEMPORARY POWER ARRANGEMENTS SHALL BE REMOVED, AND THE AUTOMATIC TRANSFER SWITCH (ATS) SERVING PANELBOARD 4LCC2 SHALL BE LEFT IN A FULLY OPERATIONAL, CODE-COMPLIANT CONDITION, FREE OF TROUBLE, ALARM, OR SUPERVISORY CONDITIONS. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, VA REQUIREMENTS, AND APPLICABLE CODES AND STANDARDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH TEMPORARY POWER, COORDINATION, TESTING, AND RESTORATION REQUIRED TO MAINTAIN A COMPLETE AND OPERATIONAL SYSTEM

PHASING GENERAL NOTE PRIOR TO DISCONNECTING PANELBOARD [PANEL NAME] FROM THE EXISTING DISTRIBUTION SYSTEM, THE CONTRACTOR SHALL INSTALL THE NEW TRANSFORMER, CONDUIT SYSTEM, RACEWAYS, JUNCTION BOXES, PULL BOXES, SUPPORTS, AND ASSOCIATED INFRASTRUCTURE TO THE MAXIMUM EXTENT PRACTICAL. ALL CONDUIT INSTALLATIONS, CONDUCTOR ROUTING (WHERE FEASIBLE), EQUIPMENT MOUNTING, TERMINATIONS NOT REQUIRING AN OUTAGE, AND PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE SCHEDULED ELECTRICAL OUTAGE. THE CONTRACTOR SHALL COORDINATE ALL OUTAGES WITH THE VA COR AND FACILITY OPERATIONS PERSONNEL A MINIMUM OF THE TIME SPECIFIED IN THE CONTRACT DOCUMENTS IN ADVANCE OF THE PROPOSED OUTAGE. OUTAGES SHALL BE SCHEDULED TO MINIMIZE DISRUPTION TO FACILITY OPERATIONS AND SHALL BE PERFORMED DURING NIGHTS, WEEKENDS, OR OTHER VA-APPROVED LOW-OCCUPANCY PERIODS. THE DURATION OF EACH OUTAGE SHALL BE LIMITED TO ONLY THE TIME NECESSARY TO DISCONNECT THE EXISTING FEEDER, COMPLETE THE FINAL ELECTRICAL CONNECTIONS, PERFORM TESTING, AND PLACE THE NEW EQUIPMENT INTO SERVICE. THE EXISTING PANELBOARD AND ASSOCIATED DISTRIBUTION SYSTEM SHALL REMAIN FULLY OPERATIONAL UNTIL THE NEW TRANSFORMER, FEEDER, AND ASSOCIATED EQUIPMENT HAVE BEEN COMPLETELY INSTALLED, INSPECTED, TESTED, AND DETERMINED TO BE READY FOR ENERGIZATION. FOLLOWING COMPLETION OF THE CHANGEOVER, THE CONTRACTOR SHALL PERFORM ALL REQUIRED TESTING, VERIFY PROPER SYSTEM OPERATION, AND RESTORE NORMAL SERVICE PRIOR TO RETURNING THE SYSTEM TO THE VA. CONTRACTOR SHALL PROVIDE ALL TEMPORARY MEASURES, LABOR, MATERIALS, AND COORDINATION NECESSARY TO MAINTAIN A SAFE, COMPLETE, AND OPERATIONAL ELECTRICAL SYSTEM THROUGHOUT CONSTRUCTION. IF THE CONTRACTOR ELECTS TO UTILIZE TEMPORARY POWER OR TEMPORARY GENERATION AS PART OF THE MEANS AND METHODS FOR COMPLETING THE WORK, THE CONTRACTOR SHALL PROVIDE, AT NO ADDITIONAL COST TO THE OWNER, ALL LABOR, MATERIALS, EQUIPMENT, TEMPORARY GENERATORS, CABLES, RACEWAYS, CONNECTORS, DOCKING STATIONS, OVERCURRENT PROTECTION, GROUNDING, FUEL SYSTEMS, CONTROLS, TERMINATIONS, SUPPORTS, MONITORING, AND ALL OTHER DEVICES AND ACCESSORIES REQUIRED TO PROVIDE A SAFE, COMPLETE, AND OPERATIONAL TEMPORARY POWER SYSTEM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY POWER CONNECTIONS, COMMISSIONING, OPERATION, MAINTENANCE, REFUELING, AND MAINTAINING ADEQUATE FUEL CAPACITY THROUGHOUT THE DURATION OF TEMPORARY POWER OPERATION TO SUPPORT CONTINUOUS FACILITY OPERATIONS. TEMPORARY POWER INSTALLATIONS SHALL COMPLY WITH THE CONTRACT DOCUMENTS, APPLICABLE CODES AND STANDARDS, AND ALL MANUFACTURER INSTALLATION REQUIREMENTS.

PHASING PLANS - BUILDING 2,

EXISTING CONDITIONS & PHASE I

N/A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1826 VETERANS BLVD.

DUBLIN, GA 31021

Revisions: Date:

VA DUBLIN HEALTHCARE SYSTEM

D.L.E.

557-23-103

GC-002

REPLACEMENT OF

BUILDING 2 & 4 GENERATORS

BID DOCUMENTS R1

06/15/2026(502) 836-4232

10901 FRONT BEACH ROAD, SUITE 1415

PANAMA CITY BEACH, FL 32407

www.force-protect.com

(303) 730-0434

8822 RIDGELINE BLVD #310

HIGHLANDS RANCH, CO 80129

www.calibre-engineering.com

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

BM120

AutoCAD SHX Text

A/C SHOP BM122

AutoCAD SHX Text

REFRIGERATION COMPRESSOR ROOM BM121

AutoCAD SHX Text

STORAGE BM123A

AutoCAD SHX Text

CORRIDOR CRB1-2

AutoCAD SHX Text

BM110C

AutoCAD SHX Text

LOCKER ROOM BM110A

AutoCAD SHX Text

DARK ROOM BM108D

AutoCAD SHX Text

STORAGE BM108B

AutoCAD SHX Text

WHEELCHAIR REPAIR BM107

AutoCAD SHX Text

STORAGE BM108A

AutoCAD SHX Text

MEDIA ROOM BM108

AutoCAD SHX Text

MECH ROOM BM108C

AutoCAD SHX Text

IT CLOSET

AutoCAD SHX Text

STORAGE BM123

AutoCAD SHX Text

ELEC B124-2

AutoCAD SHX Text

ELEC BM124A

AutoCAD SHX Text

CORRIDOR CRB5-2

AutoCAD SHX Text

FORM ROOM PROCESS STORAGE BM106

AutoCAD SHX Text

CLOSET BM106B

AutoCAD SHX Text

ELEC BM105

AutoCAD SHX Text

FIRE CLOSET BM127G

AutoCAD SHX Text

STORAGE BM127

AutoCAD SHX Text

ELEV D-2

AutoCAD SHX Text

STAIR D-2 STB4-2

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR FUEL TANK

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR

AutoCAD SHX Text T

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

BM120

AutoCAD SHX Text

A/C SHOP BM122

AutoCAD SHX Text

REFRIGERATION COMPRESSOR ROOM BM121

AutoCAD SHX Text

STORAGE BM123A

AutoCAD SHX Text

CORRIDOR CRB1-2

AutoCAD SHX Text

BM110C

AutoCAD SHX Text

LOCKER ROOM BM110A

AutoCAD SHX Text

DARK ROOM BM108D

AutoCAD SHX Text

STORAGE BM108B

AutoCAD SHX Text

WHEELCHAIR REPAIR BM107

AutoCAD SHX Text

STORAGE BM108A

AutoCAD SHX Text

MEDIA ROOM BM108

AutoCAD SHX Text

MECH ROOM BM108C

AutoCAD SHX Text

IT CLOSET

AutoCAD SHX Text

ELEC B124-2

AutoCAD SHX Text

ELEC BM124A

AutoCAD SHX Text

CORRIDOR CRB5-2

AutoCAD SHX Text

FORM ROOM PROCESS STORAGE BM106

AutoCAD SHX Text

CLOSET BM106B

AutoCAD SHX Text

ELEC BM105

AutoCAD SHX Text

FIRE CLOSET BM127G

AutoCAD SHX Text

STORAGE BM127

AutoCAD SHX Text

ELEV D-2

AutoCAD SHX Text

STAIR D-2 STB4-2

AutoCAD SHX Text T

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR FUEL TANK

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 2 BASEMENT - EXISTING CONDITIONS

AutoCAD SHX Text 3/32"=1-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-002

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 2 BASEMENT ELECTRICAL PLAN - PHASE I

AutoCAD SHX Text 3/32"=1-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-002

AutoCAD SHX Text

PHASE I NOTES

AutoCAD SHX Text A.

AutoCAD SHX Text PREPARE THE ELECTRICAL ROOM FOR INSTALLATION OF THE NEW EMERGENCY SWITCHBOARD, TEMPORARY AUTOMATIC TRANSFER SWITCH (ATS), AND ASSOCIATED EQUIPMENT. COMPLETE ALL REQUIRED DEMOLITION AND BUILDING MODIFICATIONS NECESSARY TO FACILITATE THE NEW INSTALLATION WHILE MAINTAINING CONTINUOUS OPERATION OF THE EXISTING EMERGENCY POWER SYSTEM. BEGIN SITE DEMOLITION REQUIRED FOR THE INSTALLATION OF THE NEW UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM, GENERATOR FOUNDATION, FUEL SYSTEM, SCREEN WALL, AND ASSOCIATED SITE INFRASTRUCTURE.

AutoCAD SHX Text B.

AutoCAD SHX Text COMPLETE ALL REQUIRED ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, SANITARY, FIRE PROTECTION, FIRE ALARM, COMMUNICATIONS, SECURITY, AND ELECTRICAL MODIFICATIONS NECESSARY TO PREPARE THE ELECTRICAL ROOM FOR INSTALLATION OF THE NEW EMERGENCY POWER EQUIPMENT. MODIFICATIONS SHALL INCLUDE, BUT SHALL NOT BE LIMITED TO, REMOVAL OR RELOCATION OF EXISTING UTILITIES, CONDUITS, PIPING, DUCTWORK, CABLE TRAYS, LIGHTING, CEILINGS, WALLS, DOORS, FLOOR PENETRATIONS, HOUSEKEEPING PADS, EQUIPMENT FOUNDATIONS, HVAC EQUIPMENT, VENTILATION SYSTEMS, SANITARY DRAINAGE, FIRE SPRINKLER PIPING, FIRE ALARM DEVICES, COMMUNICATIONS CABLING, SECURITY DEVICES, GROUNDING SYSTEMS, FIRESTOPPING, AND ALL OTHER BUILDING INFRASTRUCTURE REQUIRED TO PROVIDE ADEQUATE SPACE, ACCESS, CODE-REQUIRED WORKING CLEARANCES, DEDICATED ELECTRICAL SPACE, AND MAINTENANCE ACCESS FOR THE NEW ELECTRICAL DISTRIBUTION EQUIPMENT.

AutoCAD SHX Text C.

AutoCAD SHX Text ALL DEMOLITION AND BUILDING MODIFICATIONS SHALL BE PERFORMED IN A MANNER THAT MAINTAINS SAFE ACCESS, EGRESS, FIRE PROTECTION, ENVIRONMENTAL CONTROLS, AND CONTINUOUS OPERATION OF EXISTING ELECTRICAL, MECHANICAL, COMMUNICATIONS, SECURITY, FIRE ALARM, LIFE SAFETY, AND OTHER CRITICAL BUILDING SYSTEMS. ANY REQUIRED OUTAGES SHALL BE COORDINATED WITH THE VA COR AND FACILITY OPERATIONS PERSONNEL AND SHALL BE SCHEDULED DURING VA-APPROVED NIGHTTIME OR WEEKEND HOURS.

AutoCAD SHX Text D.

AutoCAD SHX Text FOLLOWING COMPLETION OF ALL ROOM PREPARATION ACTIVITIES, CONTRACTOR SHALL VERIFY THAT ALL REQUIRED BUILDING MODIFICATIONS HAVE BEEN COMPLETED, ALL IMPACTED SYSTEMS HAVE BEEN RESTORED TO NORMAL OPERATION, AND THE ELECTRICAL ROOM IS READY FOR INSTALLATION OF THE NEW EMERGENCY POWER EQUIPMENT. CONTRACTOR SHALL PERFORM TESTING OF ALL IMPACTED BUILDING SYSTEMS, INCLUDING HVAC, FIRE PROTECTION, FIRE ALARM, COMMUNICATIONS, SECURITY, LIGHTING, AND ELECTRICAL SYSTEMS, TO VERIFY PROPER OPERATION PRIOR TO PROCEEDING TO THE NEXT PHASE.

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

EXISTING CONDITIONS NOTE

AutoCAD SHX Text A.

CONTRACTOR SHALL COMPLETE FIELD VERIFICATION OF EXISTING CONDITIONS, VERIFY ALL UNDERGROUND AND ABOVEGROUND UTILITIES, AND COORDINATE ALL DEMOLITION, RELOCATION, AND MODIFICATION ACTIVITIES WITH THE VA COR PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL COORDINATE ALL WORK BETWEEN TRADES TO ELIMINATE CONFLICTS AND ENSURE THE ELECTRICAL ROOM IS FULLY PREPARED FOR INSTALLATION OF THE NEW EQUIPMENT.

PHASE II & PHASE III

N/A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1826 VETERANS BLVD.

DUBLIN, GA 31021

Revisions: Date:

VA DUBLIN HEALTHCARE SYSTEM

D.L.E.

557-23-103

GC-003

REPLACEMENT OF

BUILDING 2 & 4 GENERATORS

BID DOCUMENTS R1

06/15/2026(502) 836-4232

10901 FRONT BEACH ROAD, SUITE 1415

PANAMA CITY BEACH, FL 32407

www.force-protect.com

(303) 730-0434

8822 RIDGELINE BLVD #310

HIGHLANDS RANCH, CO 80129

www.calibre-engineering.com

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

BM120

AutoCAD SHX Text

A/C SHOP BM122

AutoCAD SHX Text

REFRIGERATION COMPRESSOR ROOM BM121

AutoCAD SHX Text

STORAGE BM123A

AutoCAD SHX Text

CORRIDOR CRB1-2

AutoCAD SHX Text

BM110C

AutoCAD SHX Text

LOCKER ROOM BM110A

AutoCAD SHX Text

DARK ROOM BM108D

AutoCAD SHX Text

STORAGE BM108B

AutoCAD SHX Text

WHEELCHAIR REPAIR BM107

AutoCAD SHX Text

STORAGE BM108A

AutoCAD SHX Text

MEDIA ROOM BM108

AutoCAD SHX Text

MECH ROOM BM108C

AutoCAD SHX Text

IT CLOSET

AutoCAD SHX Text

ELEC B124-2

AutoCAD SHX Text

ELEC BM124A

AutoCAD SHX Text

CORRIDOR CRB5-2

AutoCAD SHX Text

FORM ROOM PROCESS STORAGE BM106

AutoCAD SHX Text

CLOSET BM106B

AutoCAD SHX Text

ELEC BM105

AutoCAD SHX Text

FIRE CLOSET BM127G

AutoCAD SHX Text

STORAGE BM127

AutoCAD SHX Text

ELEV D-2

AutoCAD SHX Text

STAIR D-2 STB4-2

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR

AutoCAD SHX Text T

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR FUEL TANK

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

BM120

AutoCAD SHX Text

A/C SHOP BM122

AutoCAD SHX Text

REFRIGERATION COMPRESSOR ROOM BM121

AutoCAD SHX Text

STORAGE BM123A

AutoCAD SHX Text

CORRIDOR CRB1-2

AutoCAD SHX Text

BM110C

AutoCAD SHX Text

LOCKER ROOM BM110A

AutoCAD SHX Text

DARK ROOM BM108D

AutoCAD SHX Text

STORAGE BM108B

AutoCAD SHX Text

WHEELCHAIR REPAIR BM107

AutoCAD SHX Text

STORAGE BM108A

AutoCAD SHX Text

MEDIA ROOM BM108

AutoCAD SHX Text

MECH ROOM BM108C

AutoCAD SHX Text

IT CLOSET

AutoCAD SHX Text

ELEC B124-2

AutoCAD SHX Text

ELEC BM124A

AutoCAD SHX Text

CORRIDOR CRB5-2

AutoCAD SHX Text

FORM ROOM PROCESS STORAGE BM106

AutoCAD SHX Text

CLOSET BM106B

AutoCAD SHX Text

ELEC BM105

AutoCAD SHX Text

FIRE CLOSET BM127G

AutoCAD SHX Text

STORAGE BM127

AutoCAD SHX Text

ELEV D-2

AutoCAD SHX Text

STAIR D-2 STB4-2

AutoCAD SHX Text T

AutoCAD SHX Text

NEW BUILDING 2 GENERATOR

AutoCAD SHX Text

NEW BUILDING 2 GENERATOR FUEL TANK

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR FUEL TANK

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

ATS

AutoCAD SHX Text

TEMPORARY ATS

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 2 BASEMENT ELECTRICAL PLAN - PHASE II

AutoCAD SHX Text 3/32"=1-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-003

AutoCAD SHX Text

PHASE II NOTES

AutoCAD SHX Text A.

AutoCAD SHX Text INSTALL ALL UNDERGROUND ELECTRICAL DISTRIBUTION INFRASTRUCTURE INCLUDING DUCT BANKS, CONDUITS, HANDHOLES, PULL BOXES, GROUNDING SYSTEMS, FUEL SYSTEM PIPING, AND ALL ASSOCIATED SITE WORK REQUIRED FOR THE NEW GENERATOR INSTALLATION. COMPLETE GENERATOR FOUNDATION, HOUSEKEEPING PADS, EQUIPMENT PADS, AND SITE PREPARATION.

AutoCAD SHX Text B.

AutoCAD SHX Text INSTALL CONDUITS, FEEDERS (WHERE PRACTICAL), PULL STRINGS, GROUNDING CONDUCTORS, AND ALL SUPPORTING INFRASTRUCTURE TO THE MAXIMUM EXTENT POSSIBLE PRIOR TO ANY ELECTRICAL CHANGEOVER. CONTRACTOR SHALL COORDINATE ALL UNDERGROUND INSTALLATIONS WITH CIVIL, STRUCTURAL, MECHANICAL, COMMUNICATIONS, SECURITY, PLUMBING, FIRE PROTECTION, AND OTHER TRADES TO ELIMINATE CONFLICTS. VERIFY DUCT BANK INSTALLATIONS, GROUNDING SYSTEM CONTINUITY, CONDUIT MANDREL TESTING, CONDUIT CLEANING, AND REQUIRED INSPECTIONS PRIOR TO BACKFILL.

AutoCAD SHX Text C.

AutoCAD SHX Text COMPLETE ALL SITE MODIFICATIONS REQUIRED FOR THE RELOCATION, REPLACEMENT, OR RECONNECTION OF EXISTING EXTERIOR LIGHTING SYSTEMS IMPACTED BY THE NEW GENERATOR INSTALLATION. CONTRACTOR SHALL PROVIDE ALL NEW CONDUITS, CONDUCTORS, PULL BOXES, FOUNDATIONS, POLES (WHERE INDICATED), GROUNDING, AND ASSOCIATED MATERIALS REQUIRED TO MAINTAIN A COMPLETE AND OPERATIONAL SITE LIGHTING SYSTEM.

AutoCAD SHX Text D.

AutoCAD SHX Text CONTRACTOR SHALL COORDINATE ALL WORK ASSOCIATED WITH EXISTING UTILITY-OWNED LIGHTING SYSTEMS WITH GEORGIA POWER. COORDINATION SHALL INCLUDE REMOVAL, RELOCATION, MODIFICATION, REPLACEMENT, RECONNECTION, OF NOTED SITE LIGHT FIXTURES. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED APPLICATIONS, SCHEDULING, UTILITY COORDINATION, INSPECTIONS, AND ASSOCIATED COSTS NECESSARY TO COMPLETE THE WORK, UNLESS OTHERWISE INDICATED IN THE CONTRACT DOCUMENTS. ALL WORK IMPACTING EXISTING SITE LIGHTING SHALL BE COORDINATED WITH THE VA COR TO MINIMIZE DISRUPTION TO FACILITY OPERATIONS AND SITE SAFETY. FOLLOWING COMPLETION OF THE WORK, CONTRACTOR SHALL TEST ALL MODIFIED LIGHTING CIRCUITS, VERIFY PROPER OPERATION OF ALL NEW AND EXISTING LIGHTING EQUIPMENT, CONFIRM PHOTOCELL OR LIGHTING CONTROL OPERATION, VERIFY GROUNDING CONTINUITY, AND RESTORE THE SITE LIGHTING SYSTEM TO FULL OPERATION PRIOR TO PROCEEDING TO THE NEXT PHASE.

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

BUILDING 2 BASEMENT ELECTRICAL PLAN - PHASE III

AutoCAD SHX Text 3/32"=1-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-003

AutoCAD SHX Text

PHASE III NOTES

AutoCAD SHX Text A.

AutoCAD SHX Text INSTALL THE NEW GENERATOR, EMERGENCY SWITCHBOARD (EM SWBD), TEMPORARY AUTOMATIC TRANSFER SWITCH (ATS), FUEL SYSTEM COMPONENTS, CONTROL WIRING, PLC EQUIPMENT, MONITORING DEVICES, COMMUNICATION CABLING, AND ALL ASSOCIATED ELECTRICAL DISTRIBUTION EQUIPMENT. COMPLETE INSTALLATION OF ALL CONDUITS, FEEDERS, TERMINATIONS, CONTROL CABLING, GROUNDING, AUXILIARY SYSTEMS, AND ASSOCIATED INFRASTRUCTURE TO THE MAXIMUM EXTENT PRACTICAL PRIOR TO ANY REQUIRED ELECTRICAL OUTAGE TO MINIMIZE THE DURATION OF SYSTEM CHANGEOVERS.

AutoCAD SHX Text B.

AutoCAD SHX Text THE EXISTING EMERGENCY GENERATOR, EMERGENCY SWITCHBOARD, AUTOMATIC TRANSFER SWITCHES (ATSs), AND ASSOCIATED EMERGENCY DISTRIBUTION INFRASTRUCTURE SHALL REMAIN FULLY OPERATIONAL AND SHALL CONTINUE TO SERVE ALL EXISTING LOADS DURING INSTALLATION OF THE NEW EMERGENCY POWER SYSTEM.

AutoCAD SHX Text C.

AutoCAD SHX Text ALL OUTAGES SHALL BE COORDINATED WITH THE VA COR AND FACILITY OPERATIONS PERSONNEL AND SHALL BE PERFORMED DURING VA-APPROVED NIGHTTIME OR WEEKEND HOURS. CONTRACTOR SHALL PROVIDE ALL TEMPORARY CONNECTIONS, CONTROL MODIFICATIONS, PROGRAMMING, TESTING, AND ASSOCIATED WORK NECESSARY TO MAINTAIN A SAFE, COMPLETE, AND FULLY OPERATIONAL EMERGENCY POWER SYSTEM THROUGHOUT ALL PHASES OF CONSTRUCTION.

AutoCAD SHX Text D.

AutoCAD SHX Text CONTRACTOR SHALL PROVIDE ALL CONTROL DEVICES, PROTECTIVE RELAYS, PROGRAMMING, PLC LOGIC, INTERLOCKS, METERING, COMMUNICATIONS, CONTROL POWER, AND ACCESSORIES REQUIRED TO PROVIDE A COMPLETE, FULLY FUNCTIONAL, AND OPERATIONAL EMERGENCY POWER SYSTEM.

AutoCAD SHX Text E.

AutoCAD SHX Text PRIOR TO ENERGIZATION AND PRIOR TO COMMENCEMENT OF SUBSEQUENT PHASES, THE CONTRACTOR SHALL SUCCESSFULLY COMPLETE INSULATION RESISTANCE TESTING, CONTINUITY TESTING, PHASE ROTATION VERIFICATION, GROUNDING SYSTEM TESTING, CABLE TERMINATION INSPECTIONS, PROTECTIVE RELAY TESTING, BREAKER FUNCTIONAL TESTING, CONTROL WIRING VERIFICATION, PLC PROGRAMMING VERIFICATION, COMMUNICATIONS TESTING, GENERATOR MANUFACTURER START-UP, FUEL SYSTEM TESTING, METERING VERIFICATION, AND PRELIMINARY FUNCTIONAL PERFORMANCE TESTING. ALL EQUIPMENT SHALL BE FULLY TESTED AND VERIFIED TO OPERATE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS PRIOR TO INITIATING THE SEQUENTIAL REALLOCATION OF LOADS DURING SUBSEQUENT PHASES.

AutoCAD SHX Text F.

AutoCAD SHX Text FOLLOWING SUCCESSFUL TESTING, THE CONTRACTOR SHALL DEMONSTRATE PROPER OPERATION OF THE GENERATOR, EMERGENCY SWITCHBOARD, TEMPORARY ATS, CONTROL SYSTEMS, AND ASSOCIATED EQUIPMENT TO THE VA COR. ALL DEFICIENCIES IDENTIFIED DURING TESTING SHALL BE CORRECTED PRIOR TO PROCEEDING TO THE NEXT PHASE OF CONSTRUCTION.

AutoCAD SHX Text G.

AutoCAD SHX Text THE CONTRACTOR SHALL ENSURE THE EXISTING GENERATOR FUEL STORAGE SYSTEM REMAINS FULLY OPERATIONAL AND MAINTAINS SUFFICIENT FUEL TO SUPPORT A MINIMUM OF NINETY-SIX (96) HOURS OF CONTINUOUS EMERGENCY OPERATION THROUGHOUT CONSTRUCTION. CONTRACTOR SHALL MONITOR FUEL LEVELS AND COORDINATE FUEL DELIVERY AS NECESSARY TO MAINTAIN THE REQUIRED EMERGENCY POWER CAPACITY AT ALL TIMES.

AutoCAD SHX Text N

PROJECT NORTH

PHASE IV & PHASE V

N/A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1826 VETERANS BLVD.

DUBLIN, GA 31021

Revisions: Date:

VA DUBLIN HEALTHCARE SYSTEM

D.L.E.

557-23-103

GC-004

REPLACEMENT OF

BUILDING 2 & 4 GENERATORS

BID DOCUMENTS R1

06/15/2026(502) 836-4232

10901 FRONT BEACH ROAD, SUITE 1415

PANAMA CITY BEACH, FL 32407

www.force-protect.com

(303) 730-0434

8822 RIDGELINE BLVD #310

HIGHLANDS RANCH, CO 80129

www.calibre-engineering.com

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

BM120

AutoCAD SHX Text

A/C SHOP BM122

AutoCAD SHX Text

REFRIGERATION COMPRESSOR ROOM BM121

AutoCAD SHX Text

STORAGE BM123A

AutoCAD SHX Text

CORRIDOR CRB1-2

AutoCAD SHX Text

BM110C

AutoCAD SHX Text

LOCKER ROOM BM110A

AutoCAD SHX Text

DARK ROOM BM108D

AutoCAD SHX Text

STORAGE BM108B

AutoCAD SHX Text

WHEELCHAIR REPAIR BM107

AutoCAD SHX Text

STORAGE BM108A

AutoCAD SHX Text

MEDIA ROOM BM108

AutoCAD SHX Text

MECH ROOM BM108C

AutoCAD SHX Text

IT CLOSET

AutoCAD SHX Text

ELEC B124-2

AutoCAD SHX Text

ELEC BM124A

AutoCAD SHX Text

CORRIDOR CRB5-2

AutoCAD SHX Text

FORM ROOM PROCESS STORAGE BM106

AutoCAD SHX Text

CLOSET BM106B

AutoCAD SHX Text

ELEC BM105

AutoCAD SHX Text

FIRE CLOSET BM127G

AutoCAD SHX Text

STORAGE BM127

AutoCAD SHX Text

ELEV D-2

AutoCAD SHX Text

STAIR D-2 STB4-2

AutoCAD SHX Text T

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR

AutoCAD SHX Text

EXISTING BUILDING 2 GENERATOR FUEL TANK

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

NEW BUILDING 2 GENERATOR

AutoCAD SHX Text

NEW BUILDING 2 GENERATOR FUEL TANK

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

SWBD

AutoCAD SHX Text

ATS

AutoCAD SHX Text

TEMPORARY ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

ATS

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

BM120

AutoCAD SHX Text

A/C SHOP BM122

AutoCAD SHX Text

REFRI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .