This document is a set of Bid Documents/Existing Conditions and Demolition Plans for a federal construction project at the VA Dublin Healthcare System in Dublin, Georgia. The project, numbered D.L.E. 557-23-103 (Drawing FA-100), involves the replacement of Building 2 and Building 4 generators at 1826 Veterans Boulevard, Dublin, GA 31021. The project is under the Office of Construction and Facilities Management, U.S. Department of Veterans Affairs, with an issue date of June 15, 2026.
The drawing set includes detailed architectural and engineering plans for Building 2 basement fire detection system demolition and existing conditions. The plans depict the basement layout with current fire alarm control panel locations, existing fire detection devices, and proposed demolition requirements. The document provides a Fire Alarm System Input/Output Matrix detailing device compatibility and connections across multiple buildings. Key plan sheets include the Building 2 Basement Fire Detection Demolition Plan, Building 2 FACP Existing Location Plan, and Building 2 Basement Key Plan. The Architect/Engineer of Record is NBM (Northeast Infrastructure, LLC), located in Honesdale, Pennsylvania, with consulting services from Calibre Engineering located in Highlands Ranch, Colorado. General demolition notes specify contractor responsibilities for system removal, proper disposal, safety protocols, and restoration procedures.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V.A.C.
BUILDING 2 BASEMENT FIRE
DETECTION EXISTING CONDITIONS
AND DEMOLITION PLANS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1826 VETERANS BLVD.
DUBLIN, GA 31021
Revisions: Date:
VA DUBLIN HEALTHCARE SYSTEM
D.L.E.
557-23-103
FA-100
REPLACEMENT OF
BUILDING 2 & 4 GENERATORS
BID DOCUMENTS R1
06/15/2026(502) 836-4232
10901 FRONT BEACH ROAD, SUITE 1415
PANAMA CITY BEACH, FL 32407
www.force-protect.com
(303) 730-0434
8822 RIDGELINE BLVD #310
HIGHLANDS RANCH, CO 80129
www.calibre-engineering.com
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
X
AutoCAD SHX Text
UP
AutoCAD SHX Text
IT CLOSET
AutoCAD SHX Text
STORAGE BM123
AutoCAD SHX Text
ELEC BM124
AutoCAD SHX Text
ELEC BM124A
AutoCAD SHX Text
CORRIDOR CRB5-2
AutoCAD SHX Text
FIRE CLOSET BM127G
AutoCAD SHX Text
ELEVATOR D-2
AutoCAD SHX Text
STAIR D-2 STB4-2
AutoCAD SHX Text
REFRIGERATION COMPRESSOR ROOM BM121
AutoCAD SHX Text
HD
AutoCAD SHX Text
HD
AutoCAD SHX Text
HD
AutoCAD SHX Text
MECH ROOM BM104
AutoCAD SHX Text
MECH ROOM BM103B
AutoCAD SHX Text
MECH ROOM BM103
AutoCAD SHX Text
FACP
AutoCAD SHX Text
CORRIDOR CRB1-2
AutoCAD SHX Text
EXISTING FIRE ALARM CONTROL PANEL
AutoCAD SHX Text
FACP
AutoCAD SHX Text
BUILDING 2 BASEMENT CORRIDOR
AutoCAD SHX Text
EXISTING DEVICES
AutoCAD SHX Text
BUILDING 2 BASEMENT ELEC. ROOM BM124A
AutoCAD SHX Text
HD
AutoCAD SHX Text
HD
AutoCAD SHX Text
HD
AutoCAD SHX Text
BUILDING 2 BASEMENT ELEC. ROOM BM124A
AutoCAD SHX Text
BUILDING 2 BASEMENT ELEC. ROOM BM124A
AutoCAD SHX Text L
AutoCAD SHX Text
LAWRENCE J. MARCHETTI
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE051700E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DETECTION DEMOLITION PLAN
AutoCAD SHX Text 1/4"=1-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 2 BASEMENT FIRE
AutoCAD SHX Text
FA-100
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BASEMENT KEY PLAN
AutoCAD SHX Text 1/64"=1'-0"
AutoCAD SHX Text
BUILDING 2
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
FACP EXISTING LOCATION PLAN
AutoCAD SHX Text 1/4"=1-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 2 BASEMENT
AutoCAD SHX Text
FA-100
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text FIRE ALARM DETECTION DEVICES LOCATED WITHIN ROOMS 124 AND 124A SHALL BE DEMOLISHED AS INDICATED. THE EXISTING FIRE ALARM CONTROL PANEL (FACP) SHALL REMAIN IN SERVICE AND SHALL NOT BE REPLACED.
AutoCAD SHX Text 2.
AutoCAD SHX Text FOLLOWING DEMOLITION OF THE FIRE ALARM DETECTION DEVICES IN ROOMS 124 AND 124A, THE CONTRACTOR SHALL REPROGRAM THE EXISTING FACP AND ALL ASSOCIATED SYSTEM LOGIC AS REQUIRED AND REMOVE EXISTING DEVICES FROM PANEL PROGRAM.
AutoCAD SHX Text 3.
AutoCAD SHX Text THE CONTRACTOR SHALL ENSURE THAT ALL REMAINING FIRE ALARM SYSTEM FUNCTIONS AND DEVICES CONTINUE TO OPERATE PROPERLY AND IN FULL COMPLIANCE WITH NFPA 72 AND VA REQUIREMENTS. THE FIRE ALARM SYSTEM SHALL BE LEFT COMPLETE, FULLY OPERATIONAL, AND FREE OF TROUBLE, SUPERVISORY, OR FAULT CONDITIONS AT THE COMPLETION OF DEMOLITION AND CONSTRUCTION.
AutoCAD SHX Text 4.
AutoCAD SHX Text ALL WORK, INCLUDING DEMOLITION, REPROGRAMMING, TESTING, AND RESTORATION OF SYSTEM OPERATION, SHALL BE PERFORMED BY A FACTORY-AUTHORIZED FIRE ALARM CONTRACTOR. ALL REQUIRED COORDINATION WITH THE VA, FIRE PROTECTION, AND FACILITY ENGINEERING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
AutoCAD SHX Text 5.
AutoCAD SHX Text THE CONTRACTOR SHALL PERFORM ALL REQUIRED TESTING AND VERIFICATION NECESSARY TO CONFIRM PROPER SYSTEM OPERATION FOLLOWING REPROGRAMMING AND SHALL PROVIDE DOCUMENTATION AND AS-BUILT RECORDS AS REQUIRED.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
FIRE ALARM
AutoCAD SHX Text
DEMOLITION RISER DIAGRAM
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
FA-100
AutoCAD SHX Text
RISER DIAGRAM LEGEND
AutoCAD SHX Text
18AWG UTP SOLID IN 3/4" CONDUIT
AutoCAD SHX Text
GENERAL LEGEND
AutoCAD SHX Text
DEMOLITION
AutoCAD SHX Text
SYMBOLS
AutoCAD SHX Text
HEAT DETECTOR
AutoCAD SHX Text
FIRE ALARM CONTROL PANEL
AutoCAD SHX Text
SMOKE DETECTOR
AutoCAD SHX Text
VALVE TAMPER SWITCH
AutoCAD SHX Text
WATERFLOW SWITCH
AutoCAD SHX Text
HD
AutoCAD SHX Text
FACP
AutoCAD SHX Text S
AutoCAD SHX Text
TS
AutoCAD SHX Text
WS
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text THIS SYSTEM SHALL CONFORM TO THE PROJECT SPECIFICATIONS AND REFERENCES CONTAINED THEREIN.
AutoCAD SHX Text 2.
AutoCAD SHX Text ALL EQUIPMENT AND SYSTEM COMPONENTS FURNISHED AND INSTALLED SHALL BE NEW AND LISTED BY UL FOR THEIR INTENDED USE. THE EQUIPMENT AND SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE CODES AND STANDARDS, THE MANUFACTURERS. RECOMMENDATIONS, AND WITHIN THE LIMITATIONS OF THE UL LISTINGS. ALL EQUIPMENT SHALL BE THE STANDARD PRODUCT OF A SINGLE MANUFACTURER. EVIDENCE OF UL LISTING IS REQUIRED.
AutoCAD SHX Text 3.
AutoCAD SHX Text
ALL WIRING SHALL CONFORM TO NFPA 70- NATIONAL ELECTRICAL CODE 2026.
AutoCAD SHX Text 4.
AutoCAD SHX Text
ALL SMOKE DETECTORS SHALL BE LOCATED AT LEAST 3-FEET FROM AIR SUPPLY DIFFUSERS.
AutoCAD SHX Text 5.
AutoCAD SHX Text ALL REQUIRED MANUAL FIRE ALARM BOXES SHALL BE LOCATED ON THE LATCH SIDE OF EXIT DOORS.
AutoCAD SHX Text 6.
AutoCAD SHX Text ALL INITIATING DEVICE CIRCUITS (IDC) AND SIGNALING LINE CIRCUITS (SLC) SHALL BE CLASS "B", PER NFPA-72 2025 NATIONAL FIRE ALARM CODE AND VA FIRE PROTECTION ENGINEERING DESIGN MANUAL (VAFPDM).
AutoCAD SHX Text 7.
AutoCAD SHX Text ALL NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B", 2-WIRE CIRCUITS AS DESCRIBED IN NFPA-72.
AutoCAD SHX Text 8.
AutoCAD SHX Text
POWER FOR FACP SHALL BE SUPPLIED BY A DEDICATED BRANCH CIRCUIT.
AutoCAD SHX Text 9.
AutoCAD SHX Text POWER LIMITED FIRE ALARM (PLFA) CIRCUITS SHALL BE INSTALLED IN CONFORMANCE WITH ARTICLE 760 OF THE NATIONAL ELECTRICAL CODE (NFPA 70).
AutoCAD SHX Text 10.
AutoCAD SHX Text ADDRESSABLE MONITORING MODULES SHALL BE PROVIDED TO MONITOR THE STATUS OF WATERFLOW SWITCHES, TAMPER SWITCHES AND PRESSURE SWITCHES.
File details come from the government source that posted it. Updated .