Attachment__3_-_Delivery_Installation_Instructions.docx

DOCX document 38 KB Posted

Attached to
USPO Processing and Distribution Bldg.
Solicitation number
03-0812C
Issued by
Sacramento County, San Francisco City, California

About this file

This is a Delivery and Installation Instructions document related to a California state and local contract opportunity for vending machine services at a USPO Processing and Distribution Building. The solicitation is an informal competitive request for two drink vending machines and one ambient snack machine. The document provides detailed guidance for vendors regarding the delivery and installation procedures for the vending equipment, including specifications for placement, setup requirements, and operational readiness upon delivery to the designated facility location.

The instructions establish the technical and logistical requirements that successful bidders must follow to ensure proper installation and functionality of the vending machines at the USPO facility. The document outlines vendor responsibilities for coordinating delivery schedules, preparing installation sites, connecting utilities where necessary, and verifying equipment operation before handoff to the government entity. These instructions serve as a binding operational framework that bidders must acknowledge and agree to comply with as part of their proposal submission, ensuring standardized implementation across all potential vendors.

View the file

Other files

File Type Posted
Bidder_Declaration.docx DOCX document
DGS_PD_843.pdf PDF
std204.pdf PDF
DR815_Request_for_Quote.pdf PDF
Darfur_Contracting_Act_Cert_form.docx DOCX document
Attachment__2_Specifications_for_Vending_Machines__002_.docx DOCX document
Post-Consumer_Recycled_Content_Certification.pdf PDF
RFQ_Letterhead.docx DOCX document
Attachment__1_-_Request_for_Quote_Requirements__VM_.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USPO Processing and Distribution Bldg.

Location 03-0812 Informal Competitive

ATTACHMENT #3 DELIVERY / INSTALLATION REQUIREMENTS

Location:

USPO Processing and Distribution Bldg.

1675 7th Street Oakland CA, 94615

Vendor Instructions:

· Truck w/ liftgate required.

· Must contact BEC or BEP Vendor to obtain access to restricted areas, arrange delivery and installation. The information will be provided to the winning bidder

· Remove all crating and packaging materials, dispose off-site.

· No substitutes without a written consultation.

· Please include in your bid the potential to remove old vending machines, 3 must be disposed.

· Dispose machines through an approved recycling center.

· Bar code and recycling receipt must be submitted with invoices to be paid.

· Invoice will be signed upon completion of all PO requirements

· For new machines must set up, level, test for function for all 3 new machines.

· To expedite payment, invoices must include a complete description of each unit, including delivery location number (3-812-0) and address, brand, model, serial number, warranty on machine parts and labor.

Scheduling:

MUST BE COORDINATED 2 WEEKS IN ADVANCE. Must contact BEP Vendor and BEC to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.

Delivery And Installation Requirements:

Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).

NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.

Delivery Terms:

Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.

NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.

Existing Equipment:

Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.

Substitutions, Inspection, Acceptance, and Rejection:

As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.

Newly Manufactured Goods:

All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.

Attachment #3 – USPO Processing and Distribution Bldg. Page 1 of 3

File details come from the government source that posted it. Updated .