This is a Contract Discrepancy Report (CDR) template for the Golden Gate National Cemetery National Shrine Project (Project No. 895-NS-FY26-001) located in San Bruno, California.
The CDR is a standardized form used to document and track contractual performance issues and discrepancies. The form captures the contract number, report number, and identifies the involved parties including the contractor/manager and the Contracting Officer Representative (COR). It documents key timeline dates: preparation date, contractor return date, and action completion date. The discrepancy section requires detailed description of the problem with reference to applicable Performance Work Statement (PWS) directives. The contractor provides a formal response addressing the cause of the discrepancy, corrective actions taken, and preventive measures to avoid recurrence. The government evaluation section allows the Contracting Officer or COR to indicate acceptance, partial acceptance, or rejection of the contractor's response. Government actions may include reduced payment, cure notice, show cause orders, or other remedial measures. The form concludes with a close-out section requiring sign-off and dated signatures from the contractor, COR, and Contracting Officer to document that all parties have been notified and the discrepancy has been resolved.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Golden Gate National Cemetery National Shrine Project – FY26 San Bruno, CA 94066 Project No.: 895-NS-FY26-001
ATTACHMENT 3
CONTRACT DISCREPANCY REPORT (CDR)
CONTRACT DISCREPANCY REPORT
Contract Number:
Report No. for this Discrepancy:
To: (Contractor/Manager’s Name) From: (Name of COR)
5. Dates 5a. Prepared: 5b. Returned by Contractor:
5c. Action Complete:
Discrepancy or Problem: (Describe in detail. Include reference to PWS Directive; attach additional sheet if necessary.)
Signature of Contracting Officer or COR:
8a. To: (Contracting Officer and/or COR)
8b. From: (Contractor)
9. Contractor Response as to Cause, Corrective Action, and Actions to Prevent Recurrence: (attach additional sheet if necessary.)
10a. Signature of Contractor Representative:
10b. Date:
11. Government Evaluation: (Acceptance, partial acceptance, reflection; attach additional sheet if necessary.)
12. Government Actions: (Reduced payment, cure notice, show cause, other)
13. Close Out Name Title Signature Date
a. Contractor Notified
b. COR
c. CO