Exhibit C - Upright Headstone Realignment Diagrams.pdf
PDF 210 KB Posted
- Attached to
- Golden Gate Shrine 895-NS-FY26-001
- Solicitation number
- 36C78626B0024_1
About this file
This document is an exhibit containing upright headstone realignment diagrams for the Santa Fe National Cemetery National Shrine Project FY22, Phase I (Project No. 904-Mill-FY22-001).
The exhibit presents technical diagrams illustrating the realignment methodology for burial section headstones. Figure 2 provides a plan view showing the realignment process using keystones as reference points to establish proper row and column alignment. The diagram indicates that an initial keystone is set first, followed by subsequent keystones placed on a realignment grid. String lines are used to align headstones in both transverse and longitudinal directions, with rows to be parallel and columns to be parallel. Intermediate headstones are set after keystones are established. The diagram notes that in sloping terrain, additional keystones may be necessary to provide smooth transitions. Figure 3 presents elevation views showing typical vertical alignment in both flat and sloped sections. The flat section elevation depicts existing undisturbed soil surfaces and headstone positioning relative to original locations marked by dashed lines. The sloped section elevation illustrates projected vertical alignment relative to average top soil surface level, with keystones and realigned headstones positioned according to mean or average surface elevations. These diagrams serve as technical specifications for the proper installation and alignment of headstones during the cemetery renovation phase.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Santa Fe National Cemetery National Shrine Project – FY22 Cemetery Section Renovation - Phase I Project No.: 904-Mill-FY22-001
EXHIBIT ‘C’
UPRIGHT HEADSTONE REALIGNMENT DIAGRAMS
cemGaussM Callout Initial Keystone cemGaussM Callout Subsequent Keystones (To be set onto the realignment grid) cemGaussM Callout Intermediate headstones are set after keystones are established cemGaussM Text Box In sloping terrain additional keystones may need to be set to provide a smooth transition
Santa Fe National Cemetery National Shrine Project – FY22 Cemetery Section Renovation - Phase I Project No.: 904-Mill-FY22-001
File details come from the government source that posted it. Updated .