Attachment 3 - Construction Drawings - 653-CSI-105 - Part1.pdf

PDF 4 MB Posted

Attached to
Z2DA--CON CSI 653-CSI-105 Demo and Replace MRI in Building 84
Solicitation number
36C26024R0016
Issued by

About this file

This document contains construction drawings and specifications for the "Demo and Replace MRI in Building 84" project at the Roseburg VA Medical Center in Roseburg, OR. The drawings cover architectural, structural, mechanical, and electrical disciplines, including demolition and new construction plans, details, and schedules.

The related federal contract opportunity is a solicitation (Solicitation Number: 36C26024R0016) issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 20 to perform the demo and replacement work. The magnitude of the project is not specified, but the solicitation includes details on the site visit, vendor registration requirements, and points of contact for additional information. Interested offerors are advised to ensure their vendor information is up-to-date with the VA Financial Service Center to avoid delays if selected for award.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES G-001

COVER SHEET

BUILDING 84

100% CONSTRUCTION

DOCUMENTS

01 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES GS101

PHASING PLAN

BUILDING 84

100% CONSTRUCTION

02 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES A-001

ARCH SYMBOLS, ABBREVIATIONS

& GENERAL NOTES BUILDING 84

100% CONSTRUCTION

03 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS101

ICRA

BUILDING 84

100% CONSTRUCTION

04 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AS201

FIRE AND LIFE SAFETY

BUILDING 84

100% CONSTRUCTION

05 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AD101

DEMO FLOOR PLAN

BUILDING 84

100% CONSTRUCTION

06 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AD102

DEMO CEILING PLAN

BUILDING 84

100% CONSTRUCTION

07 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AE101

FLOOR PLAN

BUILDING 84

100% CONSTRUCTION

08 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AC101

CEILING PLAN

BUILDING 84

100% CONSTRUCTION

09 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AE211

ROOF PLAN

BUILDING 84

100% CONSTRUCTION

10 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AE401

ENLARGED EQUIPMENT PLAN

BUILDING 84

100% CONSTRUCTION

11 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES AE421

INTERIOR ELEVATIONS

BUILDING 84

100% CONSTRUCTION

12 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES A-501

DETAILS

BUILDING 84

100% CONSTRUCTION

13 OF 62Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES A-601

SCHEDULES & TYPES

BUILDING 84

100% CONSTRUCTION

14 OF 62Revisions: Date:

RE

GI

ST

ERE

D PROFESSIONAL

PAUL N. CROCKER

ENGINEER

JAN.14,2003

OREGON

72398PE

STR

UCTURAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

RLCPNC

4/24/23

S-001

GENERAL STUCTURAL NOTES,

ABBREVIATIONS AND SPECIAL INSPECTION

SCHEDULESPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

BUILDING 84

100% SUBMITTAL

Revisions: Date: 15 OF 62

ST

ERE

D PROFESSIONAL

PAUL N. CROCKER

ENGINEER

JAN.14,2003

OREGON

72398PE

STR

UCTURAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

RLCPNC

4/24/23

SF101

FLOOR PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

BUILDING 84

Revisions: Date: 16 OF 62

ST

ERE

D PROFESSIONAL

PAUL N. CROCKER

ENGINEER

JAN.14,2003

OREGON

72398PE

STR

UCTURAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

RLCPNC

4/24/23

SF401

TYPICAL DETAILS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

BUILDING 84

Revisions: Date: 17 OF 62

EXIST MASONRY

WALL

PIPE SLEEVE

PIPE

INSULATION

PIPE

MINERAL WOOL

INSIDEOUTSIDE

CAULK (TYP)

PIPE

INSULATION

WITH JACKET

PIPE THRU WALL DETAIL 1

CAULK (TYP)

2 RECTANGULAR DUCT THRU WALL DETAIL

SCALE: NOT TO SCALE

EXIST MASONRY WALL

MIN. 1" THICKNESS MINERAL

WOOL PACKING. (TYP)

CAULK (TYP)

1" CAULK (TYP)

STEEL DUCT.

STEEL SLEEVE. (TYP) 1" MAX.

ANNULAR SPACE

M-501

MECHANICAL DETAILS

MGH/JW CY/JJ04/28/2023

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

Revisions: Date:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

CONSTRUCTION

DOCUMENTS

RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL

M-502

EXISTING CRYOGEN VENT DETAILS

MGH/JW CY/JJ04/28/2023

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

Revisions: Date:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

CONSTRUCTION

DOCUMENTS

RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL RL

SCALE: NOT TO SCALE

EXISTING CRYOGEN VENT ASSEMBLY1

SCALE: NOT TO SCALE

CRYOGEN VENT PIPE - SECTION AT MAGNET2

1. INSTALL IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS TO COMPLY WITH ADA REGULATIONS

2. 1.28 GPF

3. WHITE COLOR

1. GE SUPPLIED, GE INSTALLED.

M-601

MECHANICAL AND PLUMBING

SCHEDULES

MGH/JW CY/JJ04/28/2023

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

Revisions: Date:

DEMO AND REPLACE MRI

ROSEBURG VA MEDICAL CENTER, ROSEBURG, OR

653-CSI-105

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

CONSTRUCTION

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

E-001

ABBREVIATIONS, GENERAL

NOTES, AND SHEET INDEXSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

Revisions: Date: 36 OF 62

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

E-002

ELECTRICAL LEGENDS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

Revisions: Date: 37 OF 62

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ES101

OVERALL ELECTRICAL PLAN

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

Revisions: Date: 38 OF 62

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ED101

LIGHTING DEMOLITION PLAN - MRI

AREASPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

DOCUMENTS

1'0 2' 4'

Revisions: Date: 39 OF 62

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ED102

POWER DEMOLITION PLAN - MRI

AREASPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

DOCUMENTS

Revisions: Date: 40 OF 62

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ED103

SPECIAL SYSTEMS DEMOLITION

PLAN - MRI AREASPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

DOCUMENTS

Revisions: Date: 41 OF 62

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EL101

LIGHTING PLAN - MRI AREA

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

DOCUMENTS

Revisions: Date: 42 OF 62

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EP101

POWER PLAN - MRI AREA

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

DEMO AND REPLACE MRI 653-CSI-105

100% CONSTRUCTION

DOCUMENTS

Revisions: Date: 43 OF 62

File details come from the government source that posted it. Updated .