Attachment 3 - CDRLs.docx
DOCX document 369 KB Posted
- Solicitation number
- HM047626R0055
About this file
This is a Contract Data Requirements List (CDRL) document that specifies 13 mandatory data deliverables for the Terminal Instrument Procedures (TERPS) contract (HM047626R0055) with the National Geospatial-Intelligence Agency. All deliverables must be properly classified, portion marked, and submitted via the contractor-managed data management system. The document establishes specific naming conventions for all submissions using the format: [Data Item Number]TERPS[Title]v[Version][Date].
The required deliverables include: Monthly Program and Fund Status Reports (A001, due by the 10th of each month); Sprint Review Reports (A002, due within 3 business days after sprint completion); GFP/GFI/Material Lists (A003, delivered in Microsoft Excel within 30 days of award); Customer Engagement Meeting Minutes and Action Items (A004, within 3 business days of meetings); Software Code and Software Documentation (A005, for each operational release); Training Plans (A006, at start of each release cycle); Quality Control Plans (A007, monthly); Staffing Plans (A008, within 30 days of award and updated within 14 days of changes); Release Planning Event Reports (A009, within 5 business days of planning events); Program Management Reviews (A010, quarterly or as directed, with initial submission 90 days after award); Design Review Presentations (A011, as directed); Corrective Action Reports (A012, within 5 business days when performance deficiencies occur); and End of Release Reports (A013, within 5 business days after operational deployment). All documentation must be delivered in Microsoft Word, Excel, or PowerPoint format without proprietary information, and copies must be distributed to the Program Manager, Contracting Officer's Representative, Contracting Officer, Source Foundation Mission Owner, and Confluence repository as applicable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_Solicitation__TERPS_Software_(HM047626R0055) AMD 001.pdf | ||
| Attachment 1 - TERPS PWS - AMD 001.pdf | ||
| Attachment 2 - TERPS Pricing Template - AMD 001.xlsx | XLSX spreadsheet | |
| Attachment 8 - TERPS SAM.GOV Q_A.xlsx | XLSX spreadsheet | |
| Attachment 5 - Bidders Library TERPS - AMD 001.xlsx | XLSX spreadsheet | |
| Attachment 1 - TERPS PWS.pdf | ||
| Combined_Synopsis_Solicitation__TERPS_Software_(HM047626R0055).pdf | ||
| Attachment 4 - QASP TERPS.pdf | ||
| Attachment 5 - Bidders Library TERPS.xlsx | XLSX spreadsheet | |
| Attachment 2 - TERPS Pricing Template.xlsx | XLSX spreadsheet | |
| Attachment 7 - Past Performance Questionnaire.docx | DOCX document | |
| Attachment 6 - QA.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment 4 HM047626R0055
National Geospatial-Intelligence Agency (NGA)
Contract Data Requirements List (CDRL) for
Terminals Instrument Procedures (TERPS)
October 28, 2025
Table of Contents
| 1.0 Introduction | 3 |
| 1.1 Purpose | 3 |
| 1.2 Authorities & Applicability | 3 |
| 2.0 General Instructions | 3 |
| 2.1 Delivery Instructions | 3 |
| 2.2 Naming Conventions | 3 |
| 3.0 CDRL Index | 4 |
| 3.1 Applicable Guidance | 4 |
| 4.0 CDRL Detailed Descriptions | 4 |
| 4.1 Monthly Status Reports (A001) | 5 |
| 4.2 Sprint Review Report (A002) | 6 |
| 4.3 GFP/ GFI/ Material List (A003) | 7 |
| 4.4 Customer Engagement, Meeting Minutes and Action Items (A004) | 8 |
| 4.5 Software Code and Software Documentation (A005) | 9 |
| 4.6 Training Plan (A006) | 10 |
| 4.7 Quality Control Plan (A007) | 11 |
| 4.8 Staffing Plan (A008) | 13 |
| 4.9 Release Planning Event Report (A009) | 14 |
| 4.10 Program Management Review (A010) | 15 |
| 4.11 Design Review Presentation (A011) | 16 |
| 4.12 Corrective Action Report (A012) | 17 |
| 4.13 End of Release Report (A013) | 18 |
1.0 Introduction
1.1 Purpose
The purpose of this document is to define the Contract Data Requirements List (CDRL) and provide general instructions and guidance associated with the preparation and delivery of the deliverables required under the Terminals Instrument Procedures (TERPS) contract.
1.2 Authorities & Applicability
The authorities for the associated CDRL and the corresponding DD Form 1423-1(s) can be found within Sections 3 and 4 of this document. If additional assistance is needed, contact the Program Manager (PM) or the Contracting Officers Representative (COR).
2.0 General Instructions
2.1 Delivery Instructions
Data Items shall be appropriately classified and portion marked at time of submission. Data Items not properly marked will be rejected as non-compliant.
All Data Items shall be delivered via the Contractor provided, managed, and access-controlled data management system as specified in the TERPS Performance Work Statement (PWS).
2.2 Naming Conventions
Data Items shall be created using the following standard naming convention. The naming convention consists of each of the data elements below separated by an underscore (i.e. "_").
a. [Sequence Number] – the Data Item number (Block 1 from 1423-1) D001-D0##
b. [Program Name] – TERPS
c. [Data Item Title] – Title of Data Item (Block 2 from Form 1423-1)
d. [Version number] – X.Y (e.g. v1.1)
e. [Date] - in the format, year (YYYY) + month (MM) + day (DD) (e.g. 20260901)
An example filename that conforms to the standard naming convention is provided below: A010_TERPS_ Program_ Management_Review v1.1_20261101.doc
3.0 CDRL Index
3.1 Applicable Guidance
The deliverables listed below are required through the life of the Contract, including Contract options and Contract close-out. Deliverable updates shall include updates to these documents “as directed” by the Government. The Contractor shall work with the PM and or COR for the appropriate format of each deliverable prior to the first delivery of any deliverable listed in the table below.
| CDRL |
| Data Deliverable Title with PWS Reference |
| FREQUENCY |
| A001 |
| Monthly Program and Fund Status Report (PWS 6.0) |
| Due by the close of business the 10th calendar day of the following month |
| A002 |
| Sprint Review Report (PWS 5.1) |
| As required, but not later than 3 business days after the meeting |
| A003 |
| GFP / GFI / Material List (PWS 9.0) |
| A continuous listing presented to NGA no later than 3 business days after each appropriate meeting |
| A004 |
| Customer Engagement, Meeting Minutes & Action Items |
| Within 30 days after Contract Award; Updated as requested. |
| A005 |
| Software Code and Software Documentation (PWS 4.2) |
| Required for each SWAP submission |
| A006 |
| Training Plan |
| At start of each Release cycle and any changes thereafter |
| A007 |
| Quality Control Plan |
| Monthly |
| A008 |
| Staffing Plan |
| Award + 30 calendar days |
| A009 |
| Release Planning Event Report (PWS 5.1) |
| 5 business days after RPE |
| A010 |
| Program Management Review (PWS 6.1) |
| Quarterly, or as directed |
| A011 |
| Design Review Presentation |
| As directed |
| A012 |
| Corrective Action Report |
| As directed |
4.0 CDRL Detailed Descriptions
The Contractor shall provide the following data deliverables to the Government as directed in each of the following DD-1423-1.
4.1 Monthly Program and Fund Status Report (A001)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Monthly Program and Fund Status Report
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| Contractor Format Acceptable |
| PWS Section 6.0 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| See block 16 |
| See block 16 |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| See block 16 |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: Unless otherwise directed by the Government, documentation shall be delivered in Microsoft Word for Government use and modification without any proprietary information. Submissions will be electronic unless hardcopy versions are requested by the Government.
Block 10: Due by the close of business the 10th calendar day of the following month
Block 12: Due by the close of business the 10th calendar day of the following month
Block 13: Due by the close of business the 10th calendar day of the following month
PM
COR
CO
SF Mission Owner
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.2 Sprint Review Report (A002)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Sprint Review Report
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| Contractor Format Acceptable |
| PWS Section 5.1 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| See block 16 |
| See block 16 |
b. COPIES
8. APP CODE
11. AS OF DATE
N/A
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
See block 16
| Draft |
| Reg |
| Repro |
Block 16 Block 4: Unless otherwise directed by the Government, documentation shall be delivered in Microsoft Word for Government use and modification without any proprietary information. Submissions will be electronic unless hardcopy versions are requested by the Government.
Block 10: As required, but not later than 3 business days after end of the sprint.
Block 12: As required, but not later than 3 business days after end of the sprint.
Block 13: As required, but not later than 3 business days after end of the sprint.
PM
COR
CO
SF Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.3 GFP/ GFI/ Material List (A003)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
GFP/GFI/Material List
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Contractor Format Acceptable
5. CONTRACT REFERENCE
PWS Section 9.0
6. REQUIRING OFFICE
PEO/MC&G
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| See block 16 |
| See block 16 |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| See block 16 |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: (U) The GFP/ GFI / Material List shall be delivered in Microsoft Excel for Government use and modification without containing any proprietary information.
Block 12: (U) The GFP/ GFI / Material List shall be delivered Award +30 calendar days.
(U) The Material List shall contain the following:
· Contract Number
· Contractor Point of Contact
· Date of Last Physical Inventory
· Inventory with the following:
· Item Name Asset Identification Number or Unique Item Identifier
PM
COR
CO
SF Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.4 Customer Engagement, Meeting Minutes and Action Items (A004)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Customer Engagement, Meeting Minutes and Action Items
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| Contractor Format Acceptable |
| PWS Section 6.0 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| See block 16 |
| See block 16 |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| See block 16 |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: (U) The item shall be delivered in Microsoft Word and/or Excel for Government use and modification without containing any proprietary information.
Block 10: (U) Revisions shall be delivered as directed by the Government.
Block 12 and 13. (U) When directed by the Government, the items shall be delivered NLT three (3) business days after the event/meeting/engagement.
(U) Minutes/action items included with all TEMs w/ PMO, Program Kick-off, PMRs, RPEs, Ad Hoc per request at the direction of the Government.
(U) The Meeting Minutes and Action Items shall address in depth the following:
· The purpose and objective of the meeting or trip
· The meeting or trip location
· A summary of the discussions that occurred
· Relevant conclusions/recommendations based on the meeting or trip
· Action items resulting from the meeting or trip
· List of attendees or participants Briefing charts, if presented, shall be attached for information only
PM
COR
CO
SF Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.5 Software Code and Software Documentation (A005)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Software Code and Software Documentation
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| Contractor Format Acceptable |
| PWS Section 4.2 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| See block 16 |
| See block 16 |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| See block 16 |
| Draft |
| Reg |
| Repro |
Block 16 Block 16 Block 12: (U) Provide for first operational release.
Block 13: (U) Provide for subsequent operational release.
Notes:
1. (U) All applicable Software Code and Software Code Documentation shall be delivered in the Government directed code and document repository.
2. (U) All software must meet Government testing, inspection, security, and acceptance criteria before delivery.
3. (U) Architecture and System Engineering documents and artifacts needed to support Integration, Sustainment, Cybersecurity and Enterprise Readiness.
(U) All software must meet NGA’s security requirements i.e., NGA 503.
PM
COR
CO
Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.6 Training Plan (A006)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Training Plan
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| Contractor Format Acceptable |
| PWS Section 12.0, Table A0006 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| See block 16 |
| See block 16 |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| See block 16 |
| Draft |
| Reg |
| Repro |
Block 16 Block 16 Block 4: Unless otherwise directed by the Government, documentation shall be delivered in Microsoft Word for Government use and modification without any proprietary information. Submissions will be electronic unless hardcopy versions are requested by the Government.
Block 10: No later than 3 business days after each appropriate meeting
Block 12: No later than 3 business days after each appropriate meeting
Block 13: No later than 3 business days after each appropriate meeting
PM
COR
CO
SF Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.7 Quality Control Plan (A007)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Quality Control Plan
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
6. REQUIRING OFFICE
| Contractor Format Acceptable |
| PWS Sections 4.0, 5.0, and 6.0 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| Monthly |
| Monthly |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| Monthly |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: (U) The Quality Control Plan shall be delivered in Microsoft Word for Government use and modification without containing any proprietary information.
Block 10: (U) Revisions to Quality Control Plan sections shall be delivered as requested by the Government.
Block 12: (U) The Quality Control Plan shall be delivered to the Government Award +45 calendar days.
Block 13. (U) Updates to the Quality Control Plan shall be delivered as directed by the Government.
(U) The Contractor shall implement and perform a Quality Control function to ensure that all activities performed, and products delivered under the Contract. The Quality Control function shall be documented in a Quality Control Plan. The plan shall identify Contractor responsibilities and activities required to implement a comprehensive Quality Control program. The plan shall identify staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements. The plan shall describe the organization responsible for implementing the QCP. The QCP shall describe the processes and procedures used to ensure a robust execution of the plan.
(U) The Contractor shall implement and conduct a performance measurement activity to evaluate the Contractor’s performance under this contract. This activity shall be documented in the Quality Control Plan. The plan shall identify the means of measurement or formula(s) to be used for calculations, the performance threshold (acceptability), and the frequency and method of reporting.
(U) If the Contractor is not meeting the minimum requirements, the Contractor shall develop and deliver a Corrective Action Plan in the manner and within the time frame specified by the Government, specifying how and by what date it shall bring performance up to the required levels.
· (U) The GPMO and/or COR along with the Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. If a change is required to the existing contract, it will be incorporated as a contract modification by the CO.
PM
COR
CO
SF Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.8 Staffing Plan (A008)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Staffing Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
Contractor Format Acceptable
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
PEO/MC&G
PWS Section 6.0
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| As Required |
| First Release |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| Each Release |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: (U) The Staffing List shall be delivered in Microsoft Word to the Government without containing any proprietary information.
Block 12. (U) The initial Staffing List shall be delivered to Government within 30 calendar days after award and shall include the following information:
· Staffing Plan Summary including named staff, domain knowledge, years’ experience, relevant experience, assignment, key personnel, labor category, part or full time, permanent or contractor, contact information
· Employee Retention Plan
· Subcontractor Management Plan if relevant
· Key Personnel Detail Block 13: (U) Update to Staffing List: All updates to the staffing plan shall be delivered to the Government no later than 14 calendar days after update.
(U) The contractor shall develop and maintain a current Staffing List with planned departure date for all Contractor and Subcontractor personnel assigned to the contract. The Staffing List shall be current as of the first day of the current month. It shall identify any personnel that left the contract during the previous month and identify any personnel scheduled to on-board on the contract during the current or following month. Names of personnel that have left the contract shall be removed from the Staffing List within four (4) working days of their departure. The Staffing List shall be posted for GPMO personnel, COR, and CO access.
PM
GitLab Repository
Confluence
SF Mission Owner
CO
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.9 Release Planning Event Report (A009)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Release Planning Event Report
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See Block 16 |
| PWS Section 5.1.2 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| As required |
| 10 days after test completion |
b. COPIES
8. APP CODE
11. AS OF DATE
N/A
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
As required
| Draft |
| Reg |
| Repro |
0Block 16 Block 10. (U) The Deployment and Release Schedule shall be delivered five (5) business days after each Release Planning Event.
Block 12: (U) The initial Deployment and Release Schedule shall be delivered five (5) business days after the initial Release Planning Event.
(U) The deployment and release schedule shall:
· Provide a schedule in MS Project format for the deployment activities, identifying the capability to be deployed by sprint, epics or user stories, and environments to be deployed into.
· Include any Government required NTO testing, test plans, enterprise test events, deployments, scans, external demos, quality standards, Government-Managed Independent Verification and Validation (IV&V), security approval as directed by the Government.
· Delineate role and responsibilities (e.g., RACI (Responsible, Accountable, Consulted, and Informed)).
Identify risk and issues, alternate or contingency plans, and notifications to stakeholder’s plan.
PM
CO
Confluence
SF Mission Owner
COR
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.10 Program Management Review (A010)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Program Management Review
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
6. REQUIRING OFFICE
| Per the QASP |
| PWS Section 6.0 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| When requested |
| 30 days after contract award |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| When requested |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: (U) The Program Management Review (PMR) shall be delivered in Microsoft PowerPoint for Government use and modification without containing any proprietary information.
Block 10: (U) Revisions to Program Management Review sections shall be delivered as requested by the Government.
Block 12: (U) The Initial Program Management Review shall be delivered at Award +90 calendar days.
Block 13. (U) Subsequent Program Management Review shall be provided Quarterly.
(U) The Program Management Review shall provide:
· Program progress, financial execution including financial performance for each CLIN that includes burned rates and other financial information and projection, staffing profile for the overall program.
· Reports of outages, deployments, risks, issues, mitigation strategies, blockers, showstoppers, and process failures.
· Program accomplishments includes but is not limited to:
· Status of development schedule and major accomplishments Status of any cost saving initiatives
PM
COR
CO
SF Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.11 Design Review Presentation (A011)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Design Review Presentation
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| Contractor Format Acceptable |
| PWS Section 5.1.1 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| N/A |
| D |
| As requested per CO |
| As requested per CO |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| As requested |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: (U) Contractor format for the Design Review Presentation is acceptable. The deliverable is for Government use and modification without containing any proprietary information.
Block 10: (U) Revisions to Design Review Presentation shall be delivered as requested by the Government.
(U) The contractor shall prepare a Design Review Presentation and host the applicable number of design review sessions with the Government and contractor stakeholders (i.e., operations support and development contractors, and any other stakeholders that support the Aeronautical and MC&G Program Offices) for review and approval. This step will facilitate architecture and design trade-offs that enable the government to make critical investment decisions in systems architecture as needed before building proceeds.
(U) Per Government direction, the contractor shall provide the following artifacts for the solution if applicable:
PM
COR
CO
SF Mission Owner
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.12 Corrective Action Report (A012)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Corrective Action Report
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See Block 16 |
| PWS Section 12.0 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
N/A
| As Required |
| As directed by Government |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| As directed by Government |
| Draft |
| Reg |
| Repro |
Block 16 Block 4: (U) The Corrective Action Report shall be delivered in Contractor Format in Microsoft Word without containing any proprietary information.
(U) If the contractor is not meeting the minimum requirements, the contractor shall develop and deliver a Corrective Action Report in the manner and within the time frame specified by the Government, stipulating how and by what date it shall bring performance up to the required levels.
(U) The contractor shall deliver the Corrective Action Report to the Government within five (5) business days.
PM
COR
CO
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
4.13 (U) End of Release Report (A013)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
End of Release Report
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| Contractor Format Acceptable |
| PWS Section 5.1 |
| PEO/MC&G |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
N/A
| See Block 16 |
| See Block 16 |
b. COPIES
8. APP CODE
11. AS OF DATE
| 13. DATE SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
N/A
| N/A |
| See Block 16 |
| Draft |
| Reg |
| Repro |
Block 16
Blocks 10, 12, and 14: (U) The Contractor shall provide the Government with a Release report no later than five (5) business days after each release is deployed into the operational environment.
(U) The Contractor shall provide the Government with a report that includes the following items:
· Overview of the release
· Date deployed
· Capabilities delivered in the release
· Design and Documentation Deliverables
· Roadmap Update
PM
COR
CO
SharePoint
Jira
Confluence
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
UNCLASSIFIED Page 68 of 70 image1.jpeg
File details come from the government source that posted it. Updated .