About this file

This is an electrical maintenance schedule attachment for a high voltage electrical services contract solicitation (3016-25) issued by the New Hampshire Department of Administrative Services for the Pease Air National Guard Base. The schedule outlines a comprehensive electrical maintenance program spanning April 12-21, 2025, detailing planned outages across multiple switch gear, transformer buildings, and generator systems throughout the facility. The maintenance activities are organized by building and infrastructure component, including work on electrical panels designated by voltage levels (208V and 408V), HVAC systems, fire pump equipment, ramp lighting, antenna systems, and guard shack facilities. Each maintenance task specifies the affected buildings, expected outage duration ranging from 2-4 hours, scheduled date and time window, and generator backup requirements (full, partial, or none). The contract requires bidders to have a minimum of five years of verifiable commercial experience with appropriate licenses and certifications, and mandates a mandatory site visitation on March 25, 2025, at 8:00 AM with a bid closing deadline of April 11, 2025, at 11:00 AM Eastern Time. The contract term extends from Governor and Executive Council approval through May 31, 2030, with potential extension options for up to two additional years.

Contractors must be capable of providing 24/7 emergency response with three-hour emergency repair response times and submit hourly labor rates for apprentice, journeyman, and master electricians during normal and after-hours periods. The state will evaluate all proposals on a total cost basis. Contractors are responsible for providing all necessary labor, tools, transportation, materials, equipment, and permits while adhering to OSHA, NFPA, and Department of Defense guidelines. Security requirements include criminal background checks and access control procedures specific to the military installation. Contractors must maintain comprehensive insurance coverage and workers' compensation compliance. While no specific budget range was disclosed, the extensive nature of the maintenance schedule and multi-year contract term suggest significant potential contract value with the flexibility for additions or deletions of locations and equipment throughout the contract period.

View the file

Other files

File Type Posted
attachment-1-bid-3016-25.docx DOCX document
attachment-2-bid-3016-25.pdf PDF
bid-3016-25-award.pdf PDF
bid-3016-25.pdf PDF
attachment_2_bid_3016_25.pdf PDF
attachment_3_bid_3016_25.xlsx XLSX spreadsheet
bid_3016_25.pdf PDF
attachment_1_bid_3016_25.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pease ANGB Electrical Maintenance Schedule
Switch GearTransformerBuildingGeneratorDurationOutage Schedule
2-1451491492-3 Hours13 April 0800-1600
152153,151151 Partial Generator2-4 Hours
157157, Radio Antennaantenna Generator2-4 Hours
145N145N, 157, Radio AntennaPartial Generator2-4 Hours
145S145Spartial Generator2-4 Hours
1-160165165, all of fuels area, MSA, Commercial Guard ShackFuels Generator2-4 Hours14 April 0800 - 1200
2-146Bldgs. 146 and 270?2-3 Hours14 April 1200 - 1400
146146
2-257257257Partial Generator2-4 Hours15 April 0800 - 1200
1561562-4 Hours15 April 0800 - 1400
TRNL (North Ramp Lights 270)TRNL (North Ramp Lights)2-4 Hours15 April 0800 - 1600
TEMP MPC (added to contract)TEMP MPC (added to contract)Full Generator15 April 0800 - 1000
3-2562562562-3 Hours14 April 1400 - 1600
264264partial Generator
3-254TAL (Tower 3-5 Apron Lights)TAL (Tower 3-5 Apron Lights)2-4 Hours19 April 0800 - 1200
254 Addition (408) Most of offices254 Addition (408) Most of officesMOCC generator2-4 Hours19 April 0800 - 1000
3-254 Fire Pump253 (480)253 (480)2-3 Hours19 April 1200 - 1400
254 Fire Pump254 Fire Pump2-4 Hours
Ramp LightingRamp Lighting
3-253253 (208)253 (208)being replaced at a later dateNONE
254 (408)254 (408)
254 (208)254 (208)
4-251251 (208)251 (208)being replaced at a later date12 April 0800 - 1600
251 (408)251 (408)
252 (208)252 (208)12 April 0800 - 1600
252 (408)252 (408)
4-2472472472-3 Hours12 April 0800 - 1600
243243Partial Generator12 April 0800 - 1600
4-245244 (208)244 (208)Partial Generator2-4 Hours12 April 0800 - 1600
244 (408) HVAC Ramp Lighting244 (408) HVAC Ramp LightingPartial Generator2-4 Hours
245245Partial Generator2-4 Hours
4-2492492492-4 Hours20 April 0800 - 1200
255255 & Main Guard ShackHas Cannon Plug2-4 Hours20 April 0800 - 1400
4-258262262Partial Generator2-3 Hours21 April 1200 - 1400
258258
1-1402-3 Hours20 April 1400 - 1600
Water TowerWater Tower2-4 Hours
B-100B-100
1-15T-259 reutilized for Bldg. 160 (BRDS)T-259 reutilized for Bldg. 160 (BRDS)Including Fire Alarm Contractor2-4 Hours21 April 0800 - 1200
SF 6 Switch Bldg. 100Need Help Checking
Main 13-254, 3-256, 3-253, 3-254 Fire Pump, 1-140, 1-15, 1-5, 1-160NONE
Main 22-146, 2-257, 2-145, 2-257, 2-245, 2-247, 4-251, 4-251, 4-258, 2-249,NONE