About this file
This spreadsheet details an electrical maintenance schedule for Pease Air National Guard Base (ANGB), outlining a comprehensive generator and electrical system maintenance plan spanning from 12 April to 21 April. The document provides a detailed breakdown of electrical system outages across multiple buildings and infrastructure components, including specific time slots for generator usage, partial and full generator operations, and maintenance windows for various facilities such as ramp lighting, fire pumps, offices, guard shacks, and critical infrastructure systems.
The maintenance schedule involves systematic electrical system interventions across different sections of the base, with outage durations typically ranging from 2-4 hours and specific time blocks allocated for each location. The plan appears to involve strategic electrical system maintenance, including work on switch gears, transformers, building generators, radio antenna systems, and various electrical panels with different voltage specifications (208V, 408V, 480V). The scheduling suggests a coordinated approach to minimizing operational disruptions while conducting necessary electrical maintenance and infrastructure upgrades at the Pease Air National Guard Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| attachment-1-bid-3016-25.docx | DOCX document | |
| attachment-2-bid-3016-25.pdf | ||
| bid-3016-25-award.pdf | ||
| attachment-3-bid-3016-25.xlsx | XLSX spreadsheet | |
| bid-3016-25.pdf | ||
| attachment_2_bid_3016_25.pdf | ||
| bid_3016_25.pdf | ||
| attachment_1_bid_3016_25.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Pease ANGB Electrical Maintenance Schedule | |||||
| Switch Gear | Transformer | Building | Generator | Duration | Outage Schedule |
| 2-145 | 149 | 149 | 2-3 Hours | 13 April 0800-1600 | |
| 152 | 153,151 | 151 Partial Generator | 2-4 Hours | ||
| 157 | 157, Radio Antenna | antenna Generator | 2-4 Hours | ||
| 145N | 145N, 157, Radio Antenna | Partial Generator | 2-4 Hours | ||
| 145S | 145S | partial Generator | 2-4 Hours | ||
| 1-160 | 165 | 165, all of fuels area, MSA, Commercial Guard Shack | Fuels Generator | 2-4 Hours | 14 April 0800 - 1200 |
| 2-146 | Bldgs. 146 and 270? | 2-3 Hours | 14 April 1200 - 1400 | ||
| 146 | 146 | ||||
| 2-257 | 257 | 257 | Partial Generator | 2-4 Hours | 15 April 0800 - 1200 |
| 156 | 156 | 2-4 Hours | 15 April 0800 - 1400 | ||
| TRNL (North Ramp Lights 270) | TRNL (North Ramp Lights) | 2-4 Hours | 15 April 0800 - 1600 | ||
| TEMP MPC (added to contract) | TEMP MPC (added to contract) | Full Generator | 15 April 0800 - 1000 | ||
| 3-256 | 256 | 256 | 2-3 Hours | 14 April 1400 - 1600 | |
| 264 | 264 | partial Generator | |||
| 3-254 | TAL (Tower 3-5 Apron Lights) | TAL (Tower 3-5 Apron Lights) | 2-4 Hours | 19 April 0800 - 1200 | |
| 254 Addition (408) Most of offices | 254 Addition (408) Most of offices | MOCC generator | 2-4 Hours | 19 April 0800 - 1000 | |
| 3-254 Fire Pump | 253 (480) | 253 (480) | 2-3 Hours | 19 April 1200 - 1400 | |
| 254 Fire Pump | 254 Fire Pump | 2-4 Hours | |||
| Ramp Lighting | Ramp Lighting | ||||
| 3-253 | 253 (208) | 253 (208) | being replaced at a later date | NONE | |
| 254 (408) | 254 (408) | ||||
| 254 (208) | 254 (208) | ||||
| 4-251 | 251 (208) | 251 (208) | being replaced at a later date | 12 April 0800 - 1600 | |
| 251 (408) | 251 (408) | ||||
| 252 (208) | 252 (208) | 12 April 0800 - 1600 | |||
| 252 (408) | 252 (408) | ||||
| 4-247 | 247 | 247 | 2-3 Hours | 12 April 0800 - 1600 | |
| 243 | 243 | Partial Generator | 12 April 0800 - 1600 | ||
| 4-245 | 244 (208) | 244 (208) | Partial Generator | 2-4 Hours | 12 April 0800 - 1600 |
| 244 (408) HVAC Ramp Lighting | 244 (408) HVAC Ramp Lighting | Partial Generator | 2-4 Hours | ||
| 245 | 245 | Partial Generator | 2-4 Hours | ||
| 4-249 | 249 | 249 | 2-4 Hours | 20 April 0800 - 1200 | |
| 255 | 255 & Main Guard Shack | Has Cannon Plug | 2-4 Hours | 20 April 0800 - 1400 | |
| 4-258 | 262 | 262 | Partial Generator | 2-3 Hours | 21 April 1200 - 1400 |
| 258 | 258 | ||||
| 1-140 | 2-3 Hours | 20 April 1400 - 1600 | |||
| Water Tower | Water Tower | 2-4 Hours | |||
| B-100 | B-100 | ||||
| 1-15 | T-259 reutilized for Bldg. 160 (BRDS) | T-259 reutilized for Bldg. 160 (BRDS) | Including Fire Alarm Contractor | 2-4 Hours | 21 April 0800 - 1200 |
| SF 6 Switch Bldg. 100 | Need Help Checking |
| Main 1 | 3-254, 3-256, 3-253, 3-254 Fire Pump, 1-140, 1-15, 1-5, 1-160 | NONE |
| Main 2 | 2-146, 2-257, 2-145, 2-257, 2-245, 2-247, 4-251, 4-251, 4-258, 2-249, | NONE |