Attachment 3 - 260815 FIELD TESTING-INSPECTION ELECTRICAL.pdf

PDF 212 KB Posted

Attached to
USAID/South Sudan Juba Compound Electrical Upgrade Federal contract opportunity
Solicitation number
72066821R00014
Issued by
US Agency for International Development South Sudan

About this file

This document contains technical specifications for field testing and inspection of electrical systems for the USAID/South Sudan Juba Compound Electrical Upgrade project. The specifications cover qualifications for independent testing agencies and personnel, test equipment suitability and calibration, coordination requirements, and reporting procedures. Key systems to be tested include medium-voltage cables and equipment, transformers, switchgear, motor control centers, generators, UPS systems, and lightning protection. Testing agencies must be certified by NETA or NICET and independent of component manufacturers, suppliers, and installers. Test equipment must comply with NETA standards for suitability and calibration. Comprehensive reports are required documenting test methods, settings, expected and actual measurement results.

View the file

Other files for this federal contract opportunity

Other files attached to USAID/South Sudan Juba Compound Electrical Upgrade, newest first.
File Type Posted
RFP No. 72066821R00014_Amendment No. 4_28 October, 2021.pdf PDF
J.3.8_E1-704_Residential Compound Single Line Diagram_AMD003.pdf PDF
J.3.8_E1-701_Existing Office Single Diagram. AMD003.pdf PDF
J.3.7_E1-102_Existing Residential Site Plan_AMD003.pdf PDF
J.3.7_E1-101_Existing Office Compound Site Plan_AMD003.pdf PDF
Amendment 03 RFP 72066821R00014 Juba Elec. Upgrade..pdf PDF
J.3.8_E1-702_Existing Residential Compound Singe Line Diagram_AMD003.pdf PDF
J.3.7_E1-104_Residential Compound Site Plan_AMD003.pdf PDF
RFP 72066821R00014 Juba Compound Electrical Upgrade Amendment 0002.pdf PDF
Q and A 72066821R00014 for USAID South Sudan Juba Compound Electrical Upgrade.pdf PDF
Attachment 1 -013550 ConSec Juba Electrical Upgrade Project Final.pdf PDF
Attachment 1 - 011005 Exec and Coord Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 230905 INSTRUMENTATION AND CONTROLS FOR HVAC OBO.pdf PDF
Attachment 3 - 260508 COMMON WORK ELEC-COMM.pdf PDF
Attachment 3 - 260518 LOW-VOLT POWER CONDUCTORS JAN19.pdf PDF
Attachment 3 - 261214 MEDIUM-VOLTAGE TRANSFORMERS.pdf PDF
Attachment 3 - 262725 WIRING DEVICES JAN19.pdf PDF
Attachment 3 - 262417 PANELBOARDS JAN19.pdf PDF
Attachment 3 - 262913 ENCLOSED CONTROLLERS JAN12.pdf PDF
Attachment 4 - E1-102 EXISTING RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-101 EXISTING OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 4 - M1-705 GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-104 RESIDENTIAL COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 4 - E1-701 EXISTING OFFICE COMPOUND SINGLE LINE DIAGRAM.pdf PDF
Attachment 6 - Design Intent Report.pdf PDF
Attachment 8-Past Performance Information Sheet.xlsx XLSX spreadsheet
SF1442-14b Juba Compound Electrical Upgrade.pdf PDF
Attachment 3 - 262500 ENCLOSED BUS ASSEMBLIES.pdf PDF
Attachment 1 -017825 O and M Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 260573 OVERCURRENT PROTECTIVE DEVICE STUDY JAN17R.pdf PDF
Attachment 3 - 260915 ELECTRICAL POWER MONITOR JAN20.pdf PDF
Attachment 3 - 262300 LOW-VOLTAGE SWITCHGEAR JAN17RR.pdf PDF
Attachment 3 - 263354 JUCR UPS JAN19.pdf PDF
Attachment 3 - 335617 UNDERGROUND FUEL STORAGE TANKS AND DISTRIBUTION OBO.pdf PDF
Attachment 3 - 337105 UNDERGROUND DUCTS AND RACEWAYS JAN19.pdf PDF
Attachment 3 - 263600 TRANSFER SWITCHES FL.pdf PDF
Attachment 4 - E1-103 OFFICE COMPOUND SITE PLAN.pdf PDF
Attachment 4 - E1-104 RESIDENTIAL COMPOUND SITE PLAN.pdf PDF
Attachment 4 - M1-701 EXISTING GENERATOR DIESEL FUEL SYSTEM PIPING SCHEMATIC.pdf PDF
Attachment 4 - M1-501 SCHEDULE AND DETAILS.pdf PDF
Attachment 4 - M1-101 EXISTING OFFICE COMPOUND ENLARGED SITE PLAN.pdf PDF
Attachment 5-Design Submittal Requirements.xlsx XLSX spreadsheet
Attachment 7 - Juba Electrical Distribution Study - Final (For Information Only).pdf PDF
Attachment 1 -017825A CMMS Template v2-00-02.xlsx XLSX spreadsheet
Attachment 1 -017705 Closeout Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -015005 TempFa Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -013525 Safety Juba Electrical Upgrades Final.pdf PDF
Attachment 1 -013205 Scheduling Juba Electrical Upgrades Final.pdf PDF
Attachment 3 - 000000 TABLE OF CONTENTS.pdf PDF
Attachment 3 - 262313 PARALLELING SWITCHGEAR JAN20.pdf PDF
Show all 50

USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUBA ELECTRICAL UPGRADE DEVELOPMENT July 13, 2020

JUBA SOUTH SUDAN Issued for Bid

FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS SECTION 260815 - 1

SECTION 260815 - FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes general requirements for field testing and inspection of electrical systems. More detailed requirements are specified in each Section listed in the “Related

Sections” paragraph. General requirements include the following:

1. Qualifications of testing agencies and their personnel.

2. Suitability of test equipment.

3. Calibration of test instruments.

4. Coordination requirements for testing and inspecting.

5. Reporting requirements for testing and inspecting.

<EDIT LIST OF SECTIONS BELOW TO REFLECT

SECTIONS INCLUDED FOR PROJECT>

B. Related Sections include the following:

1. Section 260508 "Common Work Results for Electrical, Communications, and

Electronic Security,” including for electrical safety accessories.

2. Division 26 Section on medium-voltage cables.

3. Section 260518 “Low-Voltage Electrical Power Conductors and Cables.”

4. Section 260525 “Grounding and Bonding for Electrical Systems.”

5. Section 2605073 “Overcurrent Protective Device Coordination Study.”

6. Section 260915 “Electrical Power Monitoring.”

7. Section 260924 “Lighting Control Devices.”

8. Section 260934 “Centralized Dimming Controls.”

9. [Division 26 Section on secondary unit substations.]

10. Section 261214 “Medium-Voltage Transformers.”

11. [Division 26 Section on medium-voltage switchgear.]

12. Section 262214 “Low-Voltage Transformers.”

13. Section 262300 “Low-Voltage Switchgear.”

14. Section 262313 “Paralleling Switchgear.”

15. Section 262315 “Double-Ended Switchgear.”

16. Section 262325 “Power Sequence of Operation.”

17. Section 262412 “Switchboards.”

18. Section 262417 “Panelboards.”

19. Division 26 Section on motor-control centers.

20. Division 26 Section on enclosed bus assemblies.

21. Division 26 Section on fused power circuit devices.

22. Division 26 Section on enclosed switches and circuit breakers.

23. Division 26 Section on enclosed controllers.

24. Division 26 Section on variable frequency motor controllers.

FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS SECTION 260815 - 2

25. Section 263214 “Engine Generators.”

26. Section 263354 “Joint-Unclassified Computer Room Uninterruptible Power Supply.”

27. Section263237 “Resistive Load banks.”

28. Section 263535 “Power Factor Correction Equipment.”

29. [Section 263552 “Low-Voltage Regulators.”]

30. [Section 263554 “Medium Voltage Regulators.”]

31. Division 26 Section on transfer switches.

32. Section 264115 “Lightning Protection.”

33. Section 264315 “Surge Protective Devices.”

1.2 QUALITY ASSURANCE

A. Independent Testing Agency: Provide the services of an Independent Testing Agency for field testing and inspection of each system listed in the “Related Section” paragraph of this Section.

1. Qualifications: Independent of manufacturers, suppliers, and installers of components to be tested or inspected.

a. Testing Agency's Field Supervisor for Power Component Testing: Person currently certified by the InterNational Electrical Testing Association (NETA) or the National Institute for Certification in Engineering Technologies (NICET) to supervise on-site testing specified in Division 26 power component Sections.

B. Test Equipment Suitability: Comply with NETA ATS, Section 5.2.

C. Test Equipment Calibration: Comply with NETA ATS, Section 5.3.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 GENERAL TESTING AND INSPECTION PROCEDURES

A. Testing Preparation: Prepare systems, equipment, and components for tests and inspections, and perform preliminary tests to ensure that systems, equipment, and components are ready for

Independent Testing Agency testing. Include the following minimum preparations as appropriate:

1. Perform insulation-resistance tests.

2. Perform continuity tests.

3. Perform rotation test (for motors to be tested).

4. Provide a stable source of electrical power for test instrumentation at each test location.

B. Field Test and Inspection Reporting: In addition to requirements specified in Related Sections, ensure that each test and inspection report includes the following:

FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS SECTION 260815 - 3

1. Manufacturer's written testing and inspecting instructions.

2. Calibration and adjustment settings of adjustable and interchangeable devices involved in tests.

3. Tabulation of expected measurement results made before measurements.

4. Tabulation of "as-found" and "as-left" measurement and observation results.

3.2 SAFETY DURING TESTING

A. In advance of testing and commissioning, review project-specific safety recommendations from reports prepared in accordance with Section 260573 “Overcurrent Protective Device

Coordination Study.” Use safety accessories provided in Section 260508 “Common Work

Results for Electrical, Communications, and Electronic Safety.”

END OF SECTION 260815