This document contains technical specifications for field testing and inspection of electrical systems for the USAID/South Sudan Juba Compound Electrical Upgrade project. The specifications cover qualifications for independent testing agencies and personnel, test equipment suitability and calibration, coordination requirements, and reporting procedures. Key systems to be tested include medium-voltage cables and equipment, transformers, switchgear, motor control centers, generators, UPS systems, and lightning protection. Testing agencies must be certified by NETA or NICET and independent of component manufacturers, suppliers, and installers. Test equipment must comply with NETA standards for suitability and calibration. Comprehensive reports are required documenting test methods, settings, expected and actual measurement results.
View the file
Other files for this federal contract opportunity
Show all 50
USAID/South Sudan Juba Compound Electrical Upgrade has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUBA ELECTRICAL UPGRADE DEVELOPMENT July 13, 2020
JUBA SOUTH SUDAN Issued for Bid
FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS SECTION 260815 - 1
SECTION 260815 - FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes general requirements for field testing and inspection of electrical systems. More detailed requirements are specified in each Section listed in the “Related
Sections” paragraph. General requirements include the following:
1. Qualifications of testing agencies and their personnel.
2. Suitability of test equipment.
3. Calibration of test instruments.
4. Coordination requirements for testing and inspecting.
5. Reporting requirements for testing and inspecting.
<EDIT LIST OF SECTIONS BELOW TO REFLECT
SECTIONS INCLUDED FOR PROJECT>
B. Related Sections include the following:
1. Section 260508 "Common Work Results for Electrical, Communications, and
Electronic Security,” including for electrical safety accessories.
2. Division 26 Section on medium-voltage cables.
3. Section 260518 “Low-Voltage Electrical Power Conductors and Cables.”
4. Section 260525 “Grounding and Bonding for Electrical Systems.”
5. Section 2605073 “Overcurrent Protective Device Coordination Study.”
6. Section 260915 “Electrical Power Monitoring.”
7. Section 260924 “Lighting Control Devices.”
8. Section 260934 “Centralized Dimming Controls.”
9. [Division 26 Section on secondary unit substations.]
10. Section 261214 “Medium-Voltage Transformers.”
11. [Division 26 Section on medium-voltage switchgear.]
12. Section 262214 “Low-Voltage Transformers.”
13. Section 262300 “Low-Voltage Switchgear.”
14. Section 262313 “Paralleling Switchgear.”
15. Section 262315 “Double-Ended Switchgear.”
16. Section 262325 “Power Sequence of Operation.”
17. Section 262412 “Switchboards.”
18. Section 262417 “Panelboards.”
19. Division 26 Section on motor-control centers.
20. Division 26 Section on enclosed bus assemblies.
21. Division 26 Section on fused power circuit devices.
22. Division 26 Section on enclosed switches and circuit breakers.
23. Division 26 Section on enclosed controllers.
24. Division 26 Section on variable frequency motor controllers.
FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS SECTION 260815 - 2
25. Section 263214 “Engine Generators.”
26. Section 263354 “Joint-Unclassified Computer Room Uninterruptible Power Supply.”
27. Section263237 “Resistive Load banks.”
28. Section 263535 “Power Factor Correction Equipment.”
29. [Section 263552 “Low-Voltage Regulators.”]
30. [Section 263554 “Medium Voltage Regulators.”]
31. Division 26 Section on transfer switches.
32. Section 264115 “Lightning Protection.”
33. Section 264315 “Surge Protective Devices.”
1.2 QUALITY ASSURANCE
A. Independent Testing Agency: Provide the services of an Independent Testing Agency for field testing and inspection of each system listed in the “Related Section” paragraph of this Section.
1. Qualifications: Independent of manufacturers, suppliers, and installers of components to be tested or inspected.
a. Testing Agency's Field Supervisor for Power Component Testing: Person currently certified by the InterNational Electrical Testing Association (NETA) or the National Institute for Certification in Engineering Technologies (NICET) to supervise on-site testing specified in Division 26 power component Sections.
B. Test Equipment Suitability: Comply with NETA ATS, Section 5.2.
C. Test Equipment Calibration: Comply with NETA ATS, Section 5.3.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 GENERAL TESTING AND INSPECTION PROCEDURES
A. Testing Preparation: Prepare systems, equipment, and components for tests and inspections, and perform preliminary tests to ensure that systems, equipment, and components are ready for
Independent Testing Agency testing. Include the following minimum preparations as appropriate:
1. Perform insulation-resistance tests.
2. Perform continuity tests.
3. Perform rotation test (for motors to be tested).
4. Provide a stable source of electrical power for test instrumentation at each test location.
B. Field Test and Inspection Reporting: In addition to requirements specified in Related Sections, ensure that each test and inspection report includes the following:
FIELD TESTING AND INSPECTION OF ELECTRICAL SYSTEMS SECTION 260815 - 3
1. Manufacturer's written testing and inspecting instructions.
2. Calibration and adjustment settings of adjustable and interchangeable devices involved in tests.
3. Tabulation of expected measurement results made before measurements.
4. Tabulation of "as-found" and "as-left" measurement and observation results.
3.2 SAFETY DURING TESTING
A. In advance of testing and commissioning, review project-specific safety recommendations from reports prepared in accordance with Section 260573 “Overcurrent Protective Device
Coordination Study.” Use safety accessories provided in Section 260508 “Common Work
Results for Electrical, Communications, and Electronic Safety.”
END OF SECTION 260815