This solicitation is seeking bids for infrastructure upgrades at the Columbus VA medical center in Ohio. Key requirements include replacing sidewalks, curbs and pavement damaged during construction of new communication duct banks. Bids are due by August 15th, 2022 and this procurement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The Department of Veterans Affairs Technology Acquisition Center Austin will evaluate bids and make award. Offerors must be verified as an SDVOSB by the VA's Center for Veterans Enterprise and visible in the Vendor Information Portal database at time of submission. The pre-bid site visit will be held on July 28th, 2022 and the contracting officer's representative for any questions is Robin Cramer.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
PROJECT NAME
757-21-701 EHRM Infrastructure Upgrades
SUBMITTAL Final Bid Documents SUBJECT Site Narrative
Site and Landscape 1
Project Overview and Background
This narrative provides supplemental information to further define the infrastructure upgrades for the EHRM Columbus project. This narrative is intended to provide additional guidance for the Final Bid Documents level pricing to be provided by the design team. Also, these plans and narrative will be reviewed by the VA. The information provided herein was obtained from conversations with the VA, surveys provided by the VA, and visual site reconnaissance.
Geotechnical
No subsurface exploration has been completed, nor is planned to be completed, for this project.
Pavement
The contractor shall replace all sidewalks, curbs, and pavement damaged or removed during construction of the new duct banks.
Sanitary Sewer
No sanitary sewer service or sanitary main extensions are required as part of this project.
Storm Drainage
No storm sewer service or storm sewer main extensions are required as part of this project.
General Utilities
There will not be any water, fire, or gas line extensions as part of this project. Refer to the plans for additional information. It was determined that a new communication duct bank and manholes will be required as shown on sheet GS-001. Reference Technology plans for additional information and communication duct bank rehabilitations that may be needed.
Detention and Water Quality and Sediment Basin
No Detention or Water Quality improvements are anticipated as a part of this project.
Contractor will be responsible for installing erosion control measures as needed to control sediment migration and sediment tracking off of the site.