This is a collection of technology drawings and specifications for EHRM Infrastructure Upgrades at the VA Loch Raven facility in Maryland. The drawings include detailed telecommunications room layouts, cable tray configurations, data rack elevations, and technology demolition/installation plans across multiple floors of the facility.

The drawings specify requirements for various telecommunications infrastructure including wireless access points (WAP), information outlets, cable trays, fiber optic cabling between telecom rooms, security cameras, card access readers, and associated equipment racks and enclosures. Key elements include fiber connectivity between the Main Cross Connect (MCR) and multiple Telecommunications Rooms (TR), bonding and grounding requirements, cable management systems, and equipment rack configurations. The plans provide detailed equipment schedules, camera requirements, controlled security schemes, and information outlet configurations. The drawings cover multiple buildings and floors, with specific details for telecom rooms TR-01, TR-02, TR-05, TR-07 and the MCR.

View the file

Other files

File Type Posted
36C77624R0114 0002.pdf PDF
Attachment 01 Site Visit Sign In Log - EHRM 20241211.pdf PDF
Attachment 02 Site Visit Agenda - Loch Raven.doc DOC document
Attachment 7 - EHRM Infra Upgrade Drawings 1 of 2 Dated 12.10.24.pdf PDF
Attachment 9 - Structural Appendix - PEC Report.pdf PDF
Attachment 8 - EHRM Infra Upgrade Drawings 2 of 2 Dated 12.10.24.pdf PDF
36C77624R0114 0001.docx DOCX document
Attachment 11 SOW - Att 10 - CIVIL PART 1A - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 03 - SOW - Specs - 2 of 4.pdf PDF
Attachment 18 SOW - Att 17 - CIVIL PART 3 - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 24 SOW - Att 23 - Structural Appdx PEC Report - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 28 Loch Raven VA Medical Center Visitor Guide - Campus Map.pdf PDF
Attachment 21 SOW - Att 20 - Gen Info Docs - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 05 - SOW - Specs - 4 of 4.pdf PDF
Attachment 22 SOW - Att 21 - STRUCT Docs - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 01 SOW EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 12 SOW - Att 11 - CIVIL PART 1B - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 25 DBA Wage Rate 11.21.24.pdf PDF
Attachment 27 Site Visit Instructions Loch Raven.docx DOCX document
Attachment 17 SOW - Att 16 - CIVIL PART 2D - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 04 - SOW - Specs - 3 of 4.pdf PDF
Attachment 20 SOW - Att 19 - FP-PL-MECH Combined - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 29 Division Cost Breakdown.xlsx XLSX spreadsheet
36C77624R0114_1.pdf PDF
Attachment 13 SOW - Att 12 - CIVIL PART 1C - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 10 SOW - Att 09 - ARCH PART 4 - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 14 SOW - Att 13 - CIVIL PART 2A - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 15 SOW - Att 14 - CIVIL PART 2B - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 19 SOW - Att 18 - ELECTRIC DOC - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 06 SOW - Att 04 - Asbestos Report - EHRM - Infra Upgrades - Loch Raven.xls XLS spreadsheet
Attachment 09 SOW - Att 08 - ARCH PART 3 - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 07 SOW - Att 06 - ARCH PART 1 - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 16 SOW - Att 15 - CIVIL PART 2C - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Attachment 26 - J and A Final Redacted.pdf PDF
Attachment 02 - SOW - Specs - 1 of 4.pdf PDF
Attachment 08 SOW - Att 07 - ARCH PART 2 - EHRM - Infra Upgrades - Loch Raven.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

TN000

TECHNOLOGY COVERSHEET

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

CMBRevisions: Date:

SOL # 36C77624R0114 Project # 512-22-710 EHRM Infrastructure Upgrades - Loch Raven MD - Construction

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

TN400

TECHNOLOGY DETAILS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

OWNER

PROVIDED

EQUIPMENT

OWNER

PROVIDED

EQUIPMENT

OWNER

PROVIDED

EQUIPMENT

OWNER

PROVIDED

EQUIPMENT

OWNER

PROVIDED

EQUIPMENT

OWNER

PROVIDED

EQUIPMENT

OWNER

PROVIDED

EQUIPMENT

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

TN500

TECHNOLOGY DIAGRAMS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

TN501

TECHNOLOGY DIAGRAMS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

ELECTRICAL

PANEL

SERVING ROOM

BUILDING

STEEL

ETHERNET

ETHERNET

SWITCH BY

OWNER

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

TN502

TECHNOLOGY DIAGRAMS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

TN600

TECHNOLOGY SCHEDULES

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

X

X X

X

X

X X

XX

X

X

#14 B

LDG.

120 BED NURSING

HOME

GREEN

THE ALAM

EDA

PARKING

LOT

REC

ONFIGURED

PATIENT

NEW STAFF PARKING

LOT

BLDG.

#2MENTAL

HEALTH CLINIC

BLDG.

#4 ADMINISTRATION

HOUSE

X XX X X XX

UPDATED 5/22/08

H /C

PARKING FOR 6

H /C

PARKING FOR 7

H/ C

PA

RK

IN

G

FO

R

SM

OKING

KIOSK

H /C

RAM

P

H /C

RAM

P

H /C

RAM

P

H /C

RAM

P

H /C

RAM

P

SI

DE

WA

LK

SI

DE

WA

LK

x x x x

C

LINIC

IM

AGING

NEW

VEH

IC

ULAR

C

ANOPY

NEW

STORM

W

ATER RETENTION

SWALE

50'

10' 0'

100'

200'

RESEARC

H

SKYLIGHTS

48 0.4800

10 8.0000

9' x xx

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

TS001

TECHNOLOGY SITE PLAN

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TD100

OVERALL BASEMENT DEMOLITION PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

HAC

TOILET

ELEVATOR

ELEVATOR

STORAGE

TEL. CLOSET

ELEC.

CLOSET

SW

ING

OFFICE

STORAGE

VOL. OFFICE

SW

ING

OFFICE

MAIN ROOM

STAFF

TOILET

UNNION

OFFICE

VOL. OFFICE

DEPUTY

MEDICAL CENTER

DIRECTOR'S OFFICE

STAFF

TOILET

138 B

MULTI-PURPOSE

ROOM B

RT. OFFICE

RT. OFFICE

MENS

TOILET

W

OMENS

TOILET

EQUIPMENT

LOUNGE

A

TR

C A

SOCIAL WOR

B

PHYSICANS O ICE

B A

E AM ROOM

C

ST

HAC

C

VESTIBULE

C A

CANTEEN VENDING

A

STORAGE

A A

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TD101

OVERALL LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TD102

OVERALL LEVEL 02 DEMOLITION PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

TR

G

CORRIDOR

GC A

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TN100

OVERALL BASEMENT PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

HAC

TOILET

ELEVATOR

ELEVATOR

STORAGE

TEL. CLOSET

ELEC.

CLOSET

SW

ING

OFFICE

STORAGE

VOL. OFFICE

SW

ING

OFFICE

MAIN ROOM

STAFF

TOILET

UNNION

OFFICE

VOL. OFFICE

DEPUTY

MEDICAL CENTER

DIRECTOR'S OFFICE

STAFF

TOILET

138 B

MULTI-PURPOSE

ROOM B

RT. OFFICE

RT. OFFICE

MENS

TOILET

W

OMENS

TOILET

EQUIPMENT

LOUNGE

A

TR

C A

SOCIAL WOR

B

PHYSICANS O ICE

B A

E AM ROOM

C

ST

HAC

C

VESTIBULE

C A

CANTEEN VENDING

A

STORAGE

A A

CORR.

C1-2

TR

1A-29A

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TN101

OVERALL LEVEL 01 PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

TR

2A-1 B

TR

2A-06A

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TN102

OVERALL LEVEL 02 PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

1A-29A

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TN300

TECHNOLOGY ENLARGED PLANS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

2A-1 B

TR

2A-14B

TR

2A-06A

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TN301

TECHNOLOGY ENLARGED PLANS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

COMPUTER ROOM

G-1

COMPUTER ROOM

G-15

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

01-TN302

TECHNOLOGY ENLARGED PLANS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

TE / STORAGE

3-2-NHCU

PROGRAM DIRECTORE OFFICE

5-2-NHCU

SWING SPACE

7-2-NHCU

CLOSET

CONFERENCE ROOM

1-2-NHCU

RESTROOM

2-2-NHCU UNISEX TOILET

2-2A-NHCU

HAC

MECH ROOM

11-2-NHCU

MECH CLOSET

CORRIDOR

C1-2-NHCU

CORRIDOR

C2-2-NHCU

STAFF LOUNGE

4-2-NHCU

COMM CARE OFFICE

6-2-NHCU

ADMINISTRATION

8-2-NHCU

MEDICAL DIRECTOR

10-2-NHCU COMM CARE ADMIN OFFICE

12-2-NHCU

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

02-TD101

LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

PROGRAM DIRECTORE OFFICE

5-2-NHCU

SWING SPACE

7-2-NHCU

CLOSET

CONFERENCE ROOM

1-2-NHCU

RESTROOM

2-2-NHCU UNISEX TOILET

2-2A-NHCU

HAC

MECH ROOM

11-2-NHCU

MECH CLOSET

CORRIDOR

C1-2-NHCU

CORRIDOR

C2-2-NHCU

STAFF LOUNGE

4-2-NHCU

COMM CARE OFFICE

6-2-NHCU

ADMINISTRATION

8-2-NHCU

MEDICAL DIRECTOR

10-2-NHCU COMM CARE ADMIN OFFICE

12-2-NHCU

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

02-TN101

LEVEL 01 PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

PROGRAM DIRECTORE OFFICE

5-2-NHCU

TE / STORAGE

3-2-NHCU

PROGRAM DIRECTORE OFFICE

5-2-NHCU

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

02-TN300

TECHNOLOGY ENLARGED PLANS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

05-TD101

LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

1B-158

TRIAGE

1B157ADU MACHINE

1B-156

COMP AND PENSION

1C-101

COMP PENSION SUPV OFFICE

1C-107

PRIMARY CARE

1C-105

COMMON LOBY SPACE

1C-106

CHECK - IN CUBICLES

C1-16

TELEPHONE CLOSET

1C-101A

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

05-TN101

LEVEL 01 PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

1B-158

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

05-TN300

TECHNOLOGY ENLARGED PLANS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

07-TD101

LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

07-TN101

LEVEL 01 PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

07-TN300

TECHNOLOGY ENLARGED PLANS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

PROSTHETICS STORAGE

LEATHER

108A

UTILITY

MECH

108C

STORAG

108B

TOILET

TOILET

FITTING / CASTING

FITTING / CASTING

LAB

HK

PRIVATE OFFICE

102A

GROUP OFFICE / EVALUATION

CORRIDOR

C-1

RECEPTION / WAITING

LOBBY

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

14-TD101

LEVEL 01 DEMOLITION PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

PROSTHETICS STORAGE

LEATHER

108A

UTILITY

MECH

108C

STORAG

108B

TOILET

TOILET

FITTING / CASTING

FITTING / CASTING

LAB

HK

PRIVATE OFFICE

102A

GROUP OFFICE / EVALUATION

CORRIDOR

C-1

RECEPTION / WAITING

LOBBY

The FUTURE. Built Smarter www.imegcorp.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

14-TN101

LEVEL 01 PLAN - TECHNOLOGY

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS

23-USDVA-02

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

NO

T

FO

R

CO

NS

TR

UC

TI

ON

14-TN300

TECHNOLOGY ENLARGED PLANS

02/14/2024

512-22-710EHRM INFRASTRUCTURE

UPGRADES - LOCH RAVEN

100% CONSTRUCTION DOCUMENTS