Attachment 2 - TE 2 - Quality Assurance Surveillance Plan.docx

DOCX document 17 KB Posted

Attached to
Navy Bloodborne Infection Management Center Infectious Disease Testing
Solicitation number
N6264521R0057
Issued by

About this file

This document contains a Quality Assurance Surveillance Plan and details of a related federal contract opportunity for infectious disease testing services. The Quality Assurance Surveillance Plan outlines critical performance processes around timely, accurate and thorough completion of contract requirements. Key performance standards address adherence to schedules, quality of deliverables, and past performance. Surveillance methods include random sampling, inspections, and customer complaints. Performance will be measured on metrics such as quality control plans, contract deliverables, overall performance, and testing turnaround times. Incentives and disincentives tie annual performance ratings to potential contract extensions or terminations.

The combined synopsis and solicitation seeks proposals for infectious disease testing services in support of the Navy Bloodborne Infection Management Center. Proposals are due by November 17, 2021. The requirement is full and open competition under NAICS code 621511 with a $35 million business size standard. The single-award IDIQ task order contract has a five-year ordering period for all requirements.

View the file

Other files

File Type Posted
N6264521R0057 0002.docx DOCX document
N6264521R0057 0001.docx DOCX document
Attachment 15 - TE 15 - Blank DD250.pdf PDF
Attachment 11 - TE 11 - Military Duty Codes.docx DOCX document
Attachment 6 - TE 6 - Gen Mgt Stat Format.doc DOC document
Attachment 22 - Offeror Information Form.pdf PDF
Attachment 18 - Pricing Table.docx DOCX document
Attachment 1 - TE 1 - Locations.xlsx XLSX spreadsheet
Attachment 17 - TE 17 - Documentation Web Sites.docx DOCX document
N6264521R0057.docx DOCX document
Attachment 21 - Pricing Workbook for N6264521R0057.xlsx XLSX spreadsheet
Attachment 14 - TE 14 - Roster for HIV Ab Testing.pdf PDF
Attachment 8 - TE 8 - Deficiency Codes.doc DOC document
Attachment 19 - Awardee Technical Proposal.docx DOCX document
Attachment 12 - TE 12 - Transfer File Format.docx DOCX document
Attachment 7 - TE 7 - Barcode Label Specifications.docx DOCX document
Attachment 20 - Past Performance Information Sheet.docx DOCX document
Attachment 5 - TE 5 - DoDSR Req.doc DOC document
Attachment 9 - TE 9 - Source of Test Codes.doc DOC document
Attachment 13 - TE 13 - Data Transfer File Format_All Tests.docx DOCX document
Attachment 3 - TE 3 - Deliverables.docx DOCX document
Attachment 23 - B2B Gateway Form.pdf PDF
Attachment 10 - TE 10 - Algorithm.docx DOCX document
Attachment 16 - TE 16 - Applicable Regulations and Manuals.docx DOCX document
Attachment 24 - Contract Administration Plan.docx DOCX document
Attachment 4 - TE 4 - CAC Requirements.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 2

QUALITY ASSURANCE SURVEILLANCE PLAN

Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The Quality Assurance Surveillance Plan (QASP) will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate, and complete fashion.

1. Critical performance processes and requirements. Critical to the performance of the Navy’s required HIV and hepatitis B/C testing services is the timely, accurate and thorough completion of all contract/task order requirements.

2. Performance Standards

a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).

b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.

c. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.

3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints.

4 .Performance Measurement: Performance will be measured in accordance with the following table:

Performance Element
Performance Requirement
Surveillance Method
Frequency
Acceptable Quality Level
Contractor Quality Control Plan
QC activities, inspections, and corrective actions completed as required by the plan.
Inspection by the COR
Quarterly for overall QC activities;
100% Compliance with the contractor plan.

As Required for corrective actions.

Contract Deliverables
Contract deliverables furnished as prescribed in the PWS, Technical Exhibits, Task Orders, etc., as applicable.
Inspection by the COR
100% inspection of all contract deliverables.
>95% of deliverables submitted timely and without rework required.
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on Contractor Performance
Assessment by the COR
Annual
All performance elements rated Satisfactory (or higher)
Testing Turn Around Times (TATs) and Contractor Test Reporting Requirements
The Contactor shall ensure the Government receives final reported resolutions within the specified timeframes of Contractor specimen receipt as defined in Performance Work Statement (PWS) requirement 2.9.2. (Table C-1)
Inspection by the COR
Monthly
>90% compliance with all required Testing Turn Around Time (TATs) as specified at PWS paragraph 2.9.2. (Table (C-1)
Invoicing
Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice
Monthly
100% accuracy

If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.

Incentives/Disincentives:

The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/task order may result in the non-exercise of available options.

For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.

In accordance with contract clause FAR 52.212-4 Contract Terms and Conditions – Commercial Items, the contractor will be incentivized to provide quality services in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.

File details come from the government source that posted it. Updated .