Attachment 2 Submittal Register.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
KELL160158 - Replacement of two air cooled chillers Bldg 2058
Solicitation number
FA301620B0011
Issued by

About this file

This submittal register and solicitation provide details for a federal contract to replace two air-cooled chillers at Building 2058 on an Air Force base. The solicitation seeks replacement of the chillers with brand name equipment and includes a justification. Offerors must submit cost proposals in RS Means format and include any supporting documents by the closing date. The construction work is subject to the Construction Wage Rate Requirement and Davis Bacon Act wages. This opportunity is set aside for women-owned small businesses certified in the WOSB Program Repository. The virtual site visit video is provided to review the location. The submittal register outlines over 80 items requiring approval at various stages of the project for specifications including asbestos abatement, lead safety, schedule, closeout documents and equipment.

View the file

Other files

File Type Posted
Revised Q and As_ 14Aug2020_Amendment 03.pdf PDF
FA301620B00110003 Amendment 0003.pdf PDF
Revised Q and As_ 14Aug2020.pdf PDF
Attachment 9 - Section M Rev12Aug2020.docx DOCX document
FA301620B00110002 Amendment 0002.pdf PDF
Revised Q and As_ 12Aug2020.pdf PDF
Attachment 8 - Section L Rev12Aug2020.docx DOCX document
Revised Q and As (RFIs) 10Aug2020.docx DOCX document
Attachment 1 - SOW 29July2020.pdf PDF
FA301620B0011 Amendment 0001.pdf PDF
Attachment 8 - Section L Rev31Jul2020.docx DOCX document
Revised Q and As (RFIs) 5Aug2020.docx DOCX document
Q and As (RFIs).docx DOCX document
Addendum_Base_MFGR Selection List Trane letter.xlsx XLSX spreadsheet
B 2058_Chiller 1_Serial Number.JPG JPG image
B 2058_Chiller 3 and 4_Support Systems.JPG JPG image
B 2058_Chiller 3_Valves.JPG JPG image
B 2058_Electrical Panel By Chiller 1 and 2.JPG JPG image
B 2058_Chiller 4_Valves.JPG JPG image
B 2058_Chiller 2_Serial Number.JPG JPG image
B 2058_Chiller 1.JPG JPG image
Attachment 4 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Occupancy for 2058.pdf PDF
Attachment 1 SOW -22Apr2020.pdf PDF
FA301620B0011.pdf PDF
Attachment 5- Climatological Data 2019-2020.pdf PDF
HVAC Chiller Justification and Approval-Signed.pdf PDF
Attachment 3 - DD1354.pdf PDF
Building 2058 Map 2.jpg JPG image
Attachment 9 - Section M.docx DOCX document
Attachment 6 -Wage Determination TX20200231 BUILDING.pdf PDF
Building 2058 Map 1.jpg JPG image
Attachment 8 - Section L.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
1.11.00SD-01 Preconstruction Submittals
Salvage PlanG
01 11 00.10SD-01 Preconstruction Submittals
Salvage Plan
1.14.00SD-01 Preconstruction Submittals
list of Contract Personnel1.4.1.1G
Installation Access1.4.1.2
1.30.00SD-01 Preconstruction Submittals
View Location Map1.3G
Progress and Completion1.4G
Pictures
01 32 01.00 10SD-01 Preconstruction Submittals
Project Schedule CPMG
01 32 16.00 20SD-01 Preconstruction Submittals
Baseline Construction Schedule1.2G
Baseline Design Schedule1.2G
SD-07 Certificates
Monthly Updates1.4
01 35 13.30 00SD-01 Preconstruction Submittals
Digital Photos
SD-02 Shop Drawings
Surveys
File Geodatabase
Maps
01 35 26SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)1.6G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 35 26SD-06 Test Reports
Notifications and Reports1.11
Accident Reports1.11.2G
LHE Inspection Reports1.11.3
SD-07 Certificates
Crane Operators/Riggers1.5.1.3
Standard Lift Plan1.6.6.2G
Critical Lift Plan1.6.6.3G
Naval Architecture AnalysisG
Activity Hazard Analysis (AHA)1.7
Confined Space Entry Permit1.8.1
Hot Work Permit1.8.1
Certificate of Compliance1.11.4
License Certificates
Radiography Operation PlanningG
Work Sheet
Portable Gauge OperationsG
Planning Worksheet
01 45 00.00 10SD-01 Preconstruction Submittals
Contractor Quality Control (CQC)3.2G
Plan
Additional Requirements for3.2.2G
Design Quality Control (DQC) Pln
SD-05 Design Data
Discipline-Specific Checklists3.2.2
Design Quality Control3.8.1
a
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 45 00.00 10SD-06 Test Reports
Verification Statement3.8.2
01 45 00.00 20SD-01 Preconstruction Submittals
Contractor Quality Control (CQC)G
Plan
01 45 00.10 20SD-01 Preconstruction Submittals
QC Plan1.6G
01 50 00SD-01 Preconstruction Submittals
Construction Site Plan1.3G
Traffic Control Plan3.4.1G
Haul Road Plan2.2.1G
SD-06 Test Reports
Backflow Preventer Tests2.4
SD-07 Certificates
Backflow Tester1.4.1
Backflow Preventers1.4
01 57 20SD-01 Preconstruction Submittals
Asbestos Hazard Abatement Plan3.11.1.4G
Asbestos CertificationsG
Asbestos Transporter LicenseG
Asbestos Medical clearancesG
(may be reviewed on site)
Asbestos Training CertificatesG
Asbestos TDSHS License asG
applicable
Environmental Protection Plan1.6G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 57 20Environmental Protection Plan3.16G
Fish and Wildlife3.1.7G
Environmental Permits1.5.1G
Equipment Inventory3.7.2
SD-06 Test Reports
Any Asbestos Inspection reportsG
that have not been provided by te
area specific Environmental Office.
Any Asbestos Inspection Reports
that were not included in the
original assessment or a results to
a change in the scope of work.
G Unsigned copy of State
Renovation, Demolition
Notifications 15 days prior; G
Lead Work PlansG
Lead Occupant Protection Plan.G
Texas Department of StateG
Health Services Lead Licenses
Lead NotificationsG
Lead Training CertificatesG
Lead Based Paint ReportsG
Lead Inspection reportsG
SD-03 Product Data
Asbestos Air Monitoring reportsG
Lead Air Monitoring reportsG
h
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 57 20SD-04 Samples
Lead OSHA Negative ExposureG
Assessment or
Lead Work Plan.G
EPA Lead Training
Lead Awareness TrainingG
certificates
OSHA Air MonitoringG
Lead Training CertificatesG
Waste Disposal Plan, May beG
included in work plan
Lead Inspection reportsG
Lead Based Paint ReportsG
SD-06 Test Reports
Analytical Results3.1.4.1G
01 62 35SD-01 Preconstruction Submittals
Biobased ProductsG
01 78 00SD-03 Product Data
Warranty Management Plan1.4.1
Warranty Tags1.4.3
Spare Parts Data
SD-08 Manufacturer’s Instructions
Instructions1.4.1
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 78 00Operation and Maintenance3.2G
Manuals
SD-11 Closeout Submittals
As-Built Drawings3.1G
Record DrawingsG
As-Built Record of Equipment1.4.1
and Materials
Final Approved Shop Drawings
Construction Contract
Specifications
Certification of EPA Designated2.1G
Items
02 41 00SD-01 Preconstruction Submittals
Demolition Plan1.2.2G
Deconstruction Plan1.2.2G
Existing Conditions1.11
SD-07 Certificates
Notification1.7G
SD-11 Closeout Submittals
Receipts3.3.4
02 61 13SD-02 Shop Drawings
Surveys3.1
SD-03 Product Data
Work Plan1.3G
Closure Report3.11G
SD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 61 13Backfill2.2
Surveys3.1
Confirmation Sampling and3.5
Analysis
Sampling of Stored Material3.7.1G
Sampling Liquid3.7.2G
Compaction3.9.2
02 81 00SD-03 Product Data
Packaging Notifications2.1.1
Hazardous Waste Management3.1G
Plan
Onsite Hazardous Waste3.2G
Management
Notices of Non-Compliance and3.3
Notices of Violation
SD-06 Test Reports
Recordkeeping3.7G
Exception Report3.7G
Spill Response3.8
SD-07 Certificates
Transportation and Disposal1.4.1G
Coordinator
Training1.4.2G
Certification1.4.3
Shipping Documents and3.3.3G
Packagings Certification
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 81 00Security Plan3.3.4
Certificates of Disposal3.3.5
Waste Minimization3.6
02 82 00SD-03 Product Data
Amended Water1.2.2G
Safety Data Sheets (SDS) for All1.3.9G
Materials
Encapsulants2.1G
Respirators3.1.2.1G
Local Exhaust Equipment3.1.7G
Pressure Differential Automatic3.1.7G
Recording Instrument
Vacuums3.1.8G
Glovebags3.1.10G
SD-06 Test Reports
Air Sampling Results1.5.5G
Pressure Differential Recordings1.5.6G
for Local Exhaust System
Encapsulation Test Patches3.2.12.2G
Clearance Sampling3.2.14.5G
Asbestos Disposal Quantity3.3.3.2G
Report
SD-07 Certificates
Employee Training1.3.4G
Notifications1.3.5G
Respiratory Protection Program1.3.7G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 82 00Asbestos Hazard Abatement Plan1.3.10G
Testing Laboratory1.3.11G
Landfill Approval1.3.12G
Delivery Tickets1.3.12G
Waste Shipment Records1.3.12G
Transporter Certification1.3.13G
Medical Certification1.3.14G
Private Qualified Person1.5.1G
Documentation
Designated Competent Person1.5.2G
Worker's License1.5.3G
Contractor's License1.5.4G
Federal, State or Local Citations1.5.9G
on Previous Projects
Encapsulants2.1G
Equipment Used to Contain3.1G
Airborne Asbestos Fibers
Water Filtration Equipment3.1.3.3G
Vacuums3.1.8G
Ventilation Systems3.1.8G
SD-11 Closeout Submittals
Permits[ and Licenses]1.3.5G
Notifications1.3.5G
Respirator Program Records1.3.7.1G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 82 00Protective Clothing1.5.7G
Decontamination Quality Control
Records
Protective Clothing1.5.8G
Decontamination Facility
Notification
Rental Equipment1.7.1G
02 83 00SD-01 Preconstruction Submittals
Competent Person1.5.1.1G
Training Certification1.5.1.2G
Occupational and Environmental1.5.2.3G
Assessment Data Report
Medical Examinations1.5.2.4G
Lead, Cadmium, Chromium1.5.2.8G
Waste Management Plan
Licenses, Permits and1.5.4G
Notifications
Occupant Protection Plan1.5.5G
Lead, Cadmium, Chromium1.5.2.2G
Compliance Plan
Lead, Cadmium, Chromium3.1.1.6G
Compliance Plan
Initial Sample ResultsG
Written Evidence of TSD3.5.2.1G
Approval
SD-03 Product Data
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 83 00Respirators1.6.1G
Vacuum Filters1.6.4G
Negative Air Pressure System1.6.7G
Materials and Equipment2.1G
Expendable Supplies2.1.1G
Local Exhaust Equipment3.1.1.5G
Pressure Differential Automatic3.1.1.5G
Recording Instrument
Pressure Differential Log3.1.1.6G
SD-06 Test Reports
Sampling and Analysis1.3.3G
Occupational and Environmental1.5.2.3G
Assessment Data Report
Sampling Results1.5.2.3G
Pressure Differential Recordings1.5.3G
For Local Exhaust System
SD-07 Certificates
Testing Laboratory1.5.1.3G
Third Party Consultant1.5.1.4G
Qualifications
Occupant Notification3.1.1.1G
Notification of theG
Commencement of [LBP] Hazard
Abatement
Clearance Certification3.5.1.1G
SD-11 Closeout Submittals
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 83 00Hazardous Waste Manifest3.5.2.1G
Turn-In Documents or Weight3.5.2.1G
Tickets
02 85 00SD-01 Preconstruction Submittals
Ventilation System Mold1.2.26G
Remediator Qualifications
Preliminary Visual Assessment1.4.1.1G
Report
Microbial Remediation Plan1.4.1.2G
Respiratory Protection Program1.4.1.3G
Worker Records1.4.1.4
Certified Industrial Hygienist1.4.1.5G
(CIH)/Industrial Hygienist (IH)
Qualifications
Microbial Remediation Supervisor1.4.1.6G
Qualifications
SD-03 Product Data
Disinfectants or Biocide1.2.11G
Sanitizing Solutions
Fungicidal Agents, (EPA)1.2.14G
Personal Protective Equipment1.2.21G
(PPE)
Pressure Differential Measuring1.2.24
Instrument
Safety Data Sheets (SDS) for All2.2G
Materials
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
02 85 00Dehumidifiers3.1.4
Air Filtration Units3.1.5
SD-06 Test Reports
IH Daily Reports1.4.3G
SD-11 Closeout Submittals
Submittals at Completion of1.4.4G
Remediation Work
23 64 10SD-03 Product Data
Water Chiller2.5G
Verification of Dimensions1.6.1
Factory Tests2.9
System Performance Tests3.6
Demonstrations3.7
Refrigerant2.6.1
Water Chiller - Field Acceptance3.5.1
Test Plan
SD-06 Test Reports
Field Acceptance Testing3.5
Water Chiller - Field Acceptance3.5.2
Test Report
Factory Tests2.9
System Performance Tests3.6
SD-07 Certificates
Refrigeration System3.1.8G
Ozone Depleting Substances1.3.1
Technician Certification
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
23 64 10SD-08 Manufacturer’s Instructions
Water Chiller - Installation3.1G
Instructions
SD-10 Operation and Maintenance
Data
Operation and Maintenance3.7G
Manuals
SD-11 Closeout Submittals
Indoor Air Quality During3.4S
Construction
23 64 26SD-03 Product Data
Grooved Mechanical Connections2.2.2.4G
For Steel
Grooved Mechanical Connections2.6.3G
For Copper
Calibrated Balancing Valves2.7.8G
Automatic Flow Control Valves2.7.9G
Pump Discharge Valve2.7.10
Water Temperature Mixing Valve2.7.11G
Water Temperature Regulating2.7.12G
Valves
Water Pressure Reducing Valve2.7.13
Pressure Relief Valve2.7.14
Combination Pressure and2.7.15
Temperature Relief Valves
Expansion Joints2.8.9G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
23 64 26Pumps2.9G
Combination Strainer and Pump2.8.3
Suction Diffuser
Expansion Tanks2.10
Air Separator Tanks2.11
Water Treatment Systems2.12G
SD-06 Test Reports
Piping Welds NDE Report3.1.1.3
Pressure Tests Reports3.5.2G
Condenser Water Quality Test3.5.3G
Reports
Condenser Water Quality Test3.5.3G
Reports
One-Year Inspection Report For3.7G
Cooling Water
SD-07 Certificates
Employer's Record Documents3.1.1.1
(For Welding)
Welding Procedures and3.1.1.2
Qualifications
Piping for Steam and Condensate2.4
Piping for High-Pressure2.5
Compressed-Air Systems
Fittings2.4
Fittings2.5
Unions2.4
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
23 64 26Unions2.5
Flanges2.4
Flanges2.5
Gaskets2.4
Gaskets2.5
Bolting2.4
Bolting2.5
SD-08 Manufacturer’s Instructions
Lesson plan for the Instruction3.6G
Course
SD-10 Operation and Maintenance
Data
Water Treatment Systems2.12G
Calibrated Balancing Valves2.7.8G
Automatic Flow Control Valves2.7.9G
Pump Discharge Valve2.7.10G
Water Temperature Mixing Valve2.7.11G
Water Temperature Regulating2.7.12G
Valves
Water Pressure Reducing Valve2.7.13G
Pressure Relief Valve2.7.14G
Combination Pressure and2.7.15G
Temperature Relief Valves
Expansion Joints2.8.9G
Pumps2.9G
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
Two Air Cooled Chillers B2058CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
23 64 26Combination Strainer and Pump2.8.3G
Suction Diffuser
Expansion Tanks2.10G
Air Separator Tanks2.11G