Attachment 2 Submittal Register.xlsx
XLSX spreadsheet 62 KB Posted
- Solicitation number
- FA301620B0011
About this file
This submittal register and solicitation provide details for a federal contract to replace two air-cooled chillers at Building 2058 on an Air Force base. The solicitation seeks replacement of the chillers with brand name equipment and includes a justification. Offerors must submit cost proposals in RS Means format and include any supporting documents by the closing date. The construction work is subject to the Construction Wage Rate Requirement and Davis Bacon Act wages. This opportunity is set aside for women-owned small businesses certified in the WOSB Program Repository. The virtual site visit video is provided to review the location. The submittal register outlines over 80 items requiring approval at various stages of the project for specifications including asbestos abatement, lead safety, schedule, closeout documents and equipment.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 1.11.00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Salvage Plan | G | ||||||||||||||||||
| 01 11 00.10 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Salvage Plan | |||||||||||||||||||
| 1.14.00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| list of Contract Personnel | 1.4.1.1 | G | |||||||||||||||||
| Installation Access | 1.4.1.2 | ||||||||||||||||||
| 1.30.00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| View Location Map | 1.3 | G | |||||||||||||||||
| Progress and Completion | 1.4 | G | |||||||||||||||||
| Pictures | |||||||||||||||||||
| 01 32 01.00 10 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Project Schedule CPM | G | ||||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Baseline Construction Schedule | 1.2 | G | |||||||||||||||||
| Baseline Design Schedule | 1.2 | G | |||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Monthly Updates | 1.4 | ||||||||||||||||||
| 01 35 13.30 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Digital Photos | |||||||||||||||||||
| SD-02 Shop Drawings | |||||||||||||||||||
| Surveys | |||||||||||||||||||
| File Geodatabase | |||||||||||||||||||
| Maps | |||||||||||||||||||
| 01 35 26 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Accident Prevention Plan (APP) | 1.6 | G | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 01 35 26 | SD-06 Test Reports | ||||||||||||||||||
| Notifications and Reports | 1.11 | ||||||||||||||||||
| Accident Reports | 1.11.2 | G | |||||||||||||||||
| LHE Inspection Reports | 1.11.3 | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Crane Operators/Riggers | 1.5.1.3 | ||||||||||||||||||
| Standard Lift Plan | 1.6.6.2 | G | |||||||||||||||||
| Critical Lift Plan | 1.6.6.3 | G | |||||||||||||||||
| Naval Architecture Analysis | G | ||||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.7 | ||||||||||||||||||
| Confined Space Entry Permit | 1.8.1 | ||||||||||||||||||
| Hot Work Permit | 1.8.1 | ||||||||||||||||||
| Certificate of Compliance | 1.11.4 | ||||||||||||||||||
| License Certificates | |||||||||||||||||||
| Radiography Operation Planning | G | ||||||||||||||||||
| Work Sheet | |||||||||||||||||||
| Portable Gauge Operations | G | ||||||||||||||||||
| Planning Worksheet | |||||||||||||||||||
| 01 45 00.00 10 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Contractor Quality Control (CQC) | 3.2 | G | |||||||||||||||||
| Plan | |||||||||||||||||||
| Additional Requirements for | 3.2.2 | G | |||||||||||||||||
| Design Quality Control (DQC) Pl | n | ||||||||||||||||||
| SD-05 Design Data | |||||||||||||||||||
| Discipline-Specific Checklists | 3.2.2 | ||||||||||||||||||
| Design Quality Control | 3.8.1 | ||||||||||||||||||
| a | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 01 45 00.00 10 | SD-06 Test Reports | ||||||||||||||||||
| Verification Statement | 3.8.2 | ||||||||||||||||||
| 01 45 00.00 20 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Contractor Quality Control (CQC) | G | ||||||||||||||||||
| Plan | |||||||||||||||||||
| 01 45 00.10 20 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| QC Plan | 1.6 | G | |||||||||||||||||
| 01 50 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Construction Site Plan | 1.3 | G | |||||||||||||||||
| Traffic Control Plan | 3.4.1 | G | |||||||||||||||||
| Haul Road Plan | 2.2.1 | G | |||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Backflow Preventer Tests | 2.4 | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Backflow Tester | 1.4.1 | ||||||||||||||||||
| Backflow Preventers | 1.4 | ||||||||||||||||||
| 01 57 20 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Asbestos Hazard Abatement Plan | 3.11.1.4 | G | |||||||||||||||||
| Asbestos Certifications | G | ||||||||||||||||||
| Asbestos Transporter License | G | ||||||||||||||||||
| Asbestos Medical clearances | G | ||||||||||||||||||
| (may be reviewed on site) | |||||||||||||||||||
| Asbestos Training Certificates | G | ||||||||||||||||||
| Asbestos TDSHS License as | G | ||||||||||||||||||
| applicable | |||||||||||||||||||
| Environmental Protection Plan | 1.6 | G | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 01 57 20 | Environmental Protection Plan | 3.16 | G | ||||||||||||||||
| Fish and Wildlife | 3.1.7 | G | |||||||||||||||||
| Environmental Permits | 1.5.1 | G | |||||||||||||||||
| Equipment Inventory | 3.7.2 | ||||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Any Asbestos Inspection reports | G | ||||||||||||||||||
| that have not been provided by t | e | ||||||||||||||||||
| area specific Environmental Offic | e. | ||||||||||||||||||
| Any Asbestos Inspection Reports | |||||||||||||||||||
| that were not included in the | |||||||||||||||||||
| original assessment or a results t | o | ||||||||||||||||||
| a change in the scope of work. | |||||||||||||||||||
| G Unsigned copy of State | |||||||||||||||||||
| Renovation, Demolition | |||||||||||||||||||
| Notifications 15 days prior; G | |||||||||||||||||||
| Lead Work Plans | G | ||||||||||||||||||
| Lead Occupant Protection Plan. | G | ||||||||||||||||||
| Texas Department of State | G | ||||||||||||||||||
| Health Services Lead Licenses | |||||||||||||||||||
| Lead Notifications | G | ||||||||||||||||||
| Lead Training Certificates | G | ||||||||||||||||||
| Lead Based Paint Reports | G | ||||||||||||||||||
| Lead Inspection reports | G | ||||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Asbestos Air Monitoring reports | G | ||||||||||||||||||
| Lead Air Monitoring reports | G | ||||||||||||||||||
| h | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 57 20 | SD-04 Samples | |||||||||||||||||
| Lead OSHA Negative Exposure | G | |||||||||||||||||
| Assessment or | ||||||||||||||||||
| Lead Work Plan. | G | |||||||||||||||||
| EPA Lead Training | ||||||||||||||||||
| Lead Awareness Training | G | |||||||||||||||||
| certificates | ||||||||||||||||||
| OSHA Air Monitoring | G | |||||||||||||||||
| Lead Training Certificates | G | |||||||||||||||||
| Waste Disposal Plan, May be | G | |||||||||||||||||
| included in work plan | ||||||||||||||||||
| Lead Inspection reports | G | |||||||||||||||||
| Lead Based Paint Reports | G | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Analytical Results | 3.1.4.1 | G | ||||||||||||||||
| 01 62 35 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Biobased Products | G | |||||||||||||||||
| 01 78 00 | SD-03 Product Data | |||||||||||||||||
| Warranty Management Plan | 1.4.1 | |||||||||||||||||
| Warranty Tags | 1.4.3 | |||||||||||||||||
| Spare Parts Data | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Instructions | 1.4.1 | |||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data |
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 01 78 00 | Operation and Maintenance | 3.2 | G | ||||||||||||||||
| Manuals | |||||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| As-Built Drawings | 3.1 | G | |||||||||||||||||
| Record Drawings | G | ||||||||||||||||||
| As-Built Record of Equipment | 1.4.1 | ||||||||||||||||||
| and Materials | |||||||||||||||||||
| Final Approved Shop Drawings | |||||||||||||||||||
| Construction Contract | |||||||||||||||||||
| Specifications | |||||||||||||||||||
| Certification of EPA Designated | 2.1 | G | |||||||||||||||||
| Items | |||||||||||||||||||
| 02 41 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Demolition Plan | 1.2.2 | G | |||||||||||||||||
| Deconstruction Plan | 1.2.2 | G | |||||||||||||||||
| Existing Conditions | 1.11 | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Notification | 1.7 | G | |||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| Receipts | 3.3.4 | ||||||||||||||||||
| 02 61 13 | SD-02 Shop Drawings | ||||||||||||||||||
| Surveys | 3.1 | ||||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Work Plan | 1.3 | G | |||||||||||||||||
| Closure Report | 3.11 | G | |||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 02 61 13 | Backfill | 2.2 | |||||||||||||||||
| Surveys | 3.1 | ||||||||||||||||||
| Confirmation Sampling and | 3.5 | ||||||||||||||||||
| Analysis | |||||||||||||||||||
| Sampling of Stored Material | 3.7.1 | G | |||||||||||||||||
| Sampling Liquid | 3.7.2 | G | |||||||||||||||||
| Compaction | 3.9.2 | ||||||||||||||||||
| 02 81 00 | SD-03 Product Data | ||||||||||||||||||
| Packaging Notifications | 2.1.1 | ||||||||||||||||||
| Hazardous Waste Management | 3.1 | G | |||||||||||||||||
| Plan | |||||||||||||||||||
| Onsite Hazardous Waste | 3.2 | G | |||||||||||||||||
| Management | |||||||||||||||||||
| Notices of Non-Compliance and | 3.3 | ||||||||||||||||||
| Notices of Violation | |||||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Recordkeeping | 3.7 | G | |||||||||||||||||
| Exception Report | 3.7 | G | |||||||||||||||||
| Spill Response | 3.8 | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Transportation and Disposal | 1.4.1 | G | |||||||||||||||||
| Coordinator | |||||||||||||||||||
| Training | 1.4.2 | G | |||||||||||||||||
| Certification | 1.4.3 | ||||||||||||||||||
| Shipping Documents and | 3.3.3 | G | |||||||||||||||||
| Packagings Certification | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 02 81 00 | Security Plan | 3.3.4 | |||||||||||||||||
| Certificates of Disposal | 3.3.5 | ||||||||||||||||||
| Waste Minimization | 3.6 | ||||||||||||||||||
| 02 82 00 | SD-03 Product Data | ||||||||||||||||||
| Amended Water | 1.2.2 | G | |||||||||||||||||
| Safety Data Sheets (SDS) for All | 1.3.9 | G | |||||||||||||||||
| Materials | |||||||||||||||||||
| Encapsulants | 2.1 | G | |||||||||||||||||
| Respirators | 3.1.2.1 | G | |||||||||||||||||
| Local Exhaust Equipment | 3.1.7 | G | |||||||||||||||||
| Pressure Differential Automatic | 3.1.7 | G | |||||||||||||||||
| Recording Instrument | |||||||||||||||||||
| Vacuums | 3.1.8 | G | |||||||||||||||||
| Glovebags | 3.1.10 | G | |||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Air Sampling Results | 1.5.5 | G | |||||||||||||||||
| Pressure Differential Recordings | 1.5.6 | G | |||||||||||||||||
| for Local Exhaust System | |||||||||||||||||||
| Encapsulation Test Patches | 3.2.12.2 | G | |||||||||||||||||
| Clearance Sampling | 3.2.14.5 | G | |||||||||||||||||
| Asbestos Disposal Quantity | 3.3.3.2 | G | |||||||||||||||||
| Report | |||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Employee Training | 1.3.4 | G | |||||||||||||||||
| Notifications | 1.3.5 | G | |||||||||||||||||
| Respiratory Protection Program | 1.3.7 | G | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 02 82 00 | Asbestos Hazard Abatement Plan | 1.3.10 | G | |||||||||||||||
| Testing Laboratory | 1.3.11 | G | ||||||||||||||||
| Landfill Approval | 1.3.12 | G | ||||||||||||||||
| Delivery Tickets | 1.3.12 | G | ||||||||||||||||
| Waste Shipment Records | 1.3.12 | G | ||||||||||||||||
| Transporter Certification | 1.3.13 | G | ||||||||||||||||
| Medical Certification | 1.3.14 | G | ||||||||||||||||
| Private Qualified Person | 1.5.1 | G | ||||||||||||||||
| Documentation | ||||||||||||||||||
| Designated Competent Person | 1.5.2 | G | ||||||||||||||||
| Worker's License | 1.5.3 | G | ||||||||||||||||
| Contractor's License | 1.5.4 | G | ||||||||||||||||
| Federal, State or Local Citations | 1.5.9 | G | ||||||||||||||||
| on Previous Projects | ||||||||||||||||||
| Encapsulants | 2.1 | G | ||||||||||||||||
| Equipment Used to Contain | 3.1 | G | ||||||||||||||||
| Airborne Asbestos Fibers | ||||||||||||||||||
| Water Filtration Equipment | 3.1.3.3 | G | ||||||||||||||||
| Vacuums | 3.1.8 | G | ||||||||||||||||
| Ventilation Systems | 3.1.8 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Permits[ and Licenses] | 1.3.5 | G | ||||||||||||||||
| Notifications | 1.3.5 | G | ||||||||||||||||
| Respirator Program Records | 1.3.7.1 | G |
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 02 82 00 | Protective Clothing | 1.5.7 | G | ||||||||||||||||
| Decontamination Quality Control | |||||||||||||||||||
| Records | |||||||||||||||||||
| Protective Clothing | 1.5.8 | G | |||||||||||||||||
| Decontamination Facility | |||||||||||||||||||
| Notification | |||||||||||||||||||
| Rental Equipment | 1.7.1 | G | |||||||||||||||||
| 02 83 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Competent Person | 1.5.1.1 | G | |||||||||||||||||
| Training Certification | 1.5.1.2 | G | |||||||||||||||||
| Occupational and Environmental | 1.5.2.3 | G | |||||||||||||||||
| Assessment Data Report | |||||||||||||||||||
| Medical Examinations | 1.5.2.4 | G | |||||||||||||||||
| Lead, Cadmium, Chromium | 1.5.2.8 | G | |||||||||||||||||
| Waste Management Plan | |||||||||||||||||||
| Licenses, Permits and | 1.5.4 | G | |||||||||||||||||
| Notifications | |||||||||||||||||||
| Occupant Protection Plan | 1.5.5 | G | |||||||||||||||||
| Lead, Cadmium, Chromium | 1.5.2.2 | G | |||||||||||||||||
| Compliance Plan | |||||||||||||||||||
| Lead, Cadmium, Chromium | 3.1.1.6 | G | |||||||||||||||||
| Compliance Plan | |||||||||||||||||||
| Initial Sample Results | G | ||||||||||||||||||
| Written Evidence of TSD | 3.5.2.1 | G | |||||||||||||||||
| Approval | |||||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 02 83 00 | Respirators | 1.6.1 | G | ||||||||||||||||
| Vacuum Filters | 1.6.4 | G | |||||||||||||||||
| Negative Air Pressure System | 1.6.7 | G | |||||||||||||||||
| Materials and Equipment | 2.1 | G | |||||||||||||||||
| Expendable Supplies | 2.1.1 | G | |||||||||||||||||
| Local Exhaust Equipment | 3.1.1.5 | G | |||||||||||||||||
| Pressure Differential Automatic | 3.1.1.5 | G | |||||||||||||||||
| Recording Instrument | |||||||||||||||||||
| Pressure Differential Log | 3.1.1.6 | G | |||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Sampling and Analysis | 1.3.3 | G | |||||||||||||||||
| Occupational and Environmental | 1.5.2.3 | G | |||||||||||||||||
| Assessment Data Report | |||||||||||||||||||
| Sampling Results | 1.5.2.3 | G | |||||||||||||||||
| Pressure Differential Recordings | 1.5.3 | G | |||||||||||||||||
| For Local Exhaust System | |||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Testing Laboratory | 1.5.1.3 | G | |||||||||||||||||
| Third Party Consultant | 1.5.1.4 | G | |||||||||||||||||
| Qualifications | |||||||||||||||||||
| Occupant Notification | 3.1.1.1 | G | |||||||||||||||||
| Notification of the | G | ||||||||||||||||||
| Commencement of [LBP] Hazard | |||||||||||||||||||
| Abatement | |||||||||||||||||||
| Clearance Certification | 3.5.1.1 | G | |||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 02 83 00 | Hazardous Waste Manifest | 3.5.2.1 | G | ||||||||||||||||
| Turn-In Documents or Weight | 3.5.2.1 | G | |||||||||||||||||
| Tickets | |||||||||||||||||||
| 02 85 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Ventilation System Mold | 1.2.26 | G | |||||||||||||||||
| Remediator Qualifications | |||||||||||||||||||
| Preliminary Visual Assessment | 1.4.1.1 | G | |||||||||||||||||
| Report | |||||||||||||||||||
| Microbial Remediation Plan | 1.4.1.2 | G | |||||||||||||||||
| Respiratory Protection Program | 1.4.1.3 | G | |||||||||||||||||
| Worker Records | 1.4.1.4 | ||||||||||||||||||
| Certified Industrial Hygienist | 1.4.1.5 | G | |||||||||||||||||
| (CIH)/Industrial Hygienist (IH) | |||||||||||||||||||
| Qualifications | |||||||||||||||||||
| Microbial Remediation Supervisor | 1.4.1.6 | G | |||||||||||||||||
| Qualifications | |||||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Disinfectants or Biocide | 1.2.11 | G | |||||||||||||||||
| Sanitizing Solutions | |||||||||||||||||||
| Fungicidal Agents, (EPA) | 1.2.14 | G | |||||||||||||||||
| Personal Protective Equipment | 1.2.21 | G | |||||||||||||||||
| (PPE) | |||||||||||||||||||
| Pressure Differential Measuring | 1.2.24 | ||||||||||||||||||
| Instrument | |||||||||||||||||||
| Safety Data Sheets (SDS) for All | 2.2 | G | |||||||||||||||||
| Materials | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 02 85 00 | Dehumidifiers | 3.1.4 | |||||||||||||||||
| Air Filtration Units | 3.1.5 | ||||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| IH Daily Reports | 1.4.3 | G | |||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| Submittals at Completion of | 1.4.4 | G | |||||||||||||||||
| Remediation Work | |||||||||||||||||||
| 23 64 10 | SD-03 Product Data | ||||||||||||||||||
| Water Chiller | 2.5 | G | |||||||||||||||||
| Verification of Dimensions | 1.6.1 | ||||||||||||||||||
| Factory Tests | 2.9 | ||||||||||||||||||
| System Performance Tests | 3.6 | ||||||||||||||||||
| Demonstrations | 3.7 | ||||||||||||||||||
| Refrigerant | 2.6.1 | ||||||||||||||||||
| Water Chiller - Field Acceptance | 3.5.1 | ||||||||||||||||||
| Test Plan | |||||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Field Acceptance Testing | 3.5 | ||||||||||||||||||
| Water Chiller - Field Acceptance | 3.5.2 | ||||||||||||||||||
| Test Report | |||||||||||||||||||
| Factory Tests | 2.9 | ||||||||||||||||||
| System Performance Tests | 3.6 | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Refrigeration System | 3.1.8 | G | |||||||||||||||||
| Ozone Depleting Substances | 1.3.1 | ||||||||||||||||||
| Technician Certification | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 64 10 | SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Water Chiller - Installation | 3.1 | G | |||||||||||||||||
| Instructions | |||||||||||||||||||
| SD-10 Operation and Maintenance | |||||||||||||||||||
| Data | |||||||||||||||||||
| Operation and Maintenance | 3.7 | G | |||||||||||||||||
| Manuals | |||||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| Indoor Air Quality During | 3.4 | S | |||||||||||||||||
| Construction | |||||||||||||||||||
| 23 64 26 | SD-03 Product Data | ||||||||||||||||||
| Grooved Mechanical Connections | 2.2.2.4 | G | |||||||||||||||||
| For Steel | |||||||||||||||||||
| Grooved Mechanical Connections | 2.6.3 | G | |||||||||||||||||
| For Copper | |||||||||||||||||||
| Calibrated Balancing Valves | 2.7.8 | G | |||||||||||||||||
| Automatic Flow Control Valves | 2.7.9 | G | |||||||||||||||||
| Pump Discharge Valve | 2.7.10 | ||||||||||||||||||
| Water Temperature Mixing Valve | 2.7.11 | G | |||||||||||||||||
| Water Temperature Regulating | 2.7.12 | G | |||||||||||||||||
| Valves | |||||||||||||||||||
| Water Pressure Reducing Valve | 2.7.13 | ||||||||||||||||||
| Pressure Relief Valve | 2.7.14 | ||||||||||||||||||
| Combination Pressure and | 2.7.15 | ||||||||||||||||||
| Temperature Relief Valves | |||||||||||||||||||
| Expansion Joints | 2.8.9 | G | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 64 26 | Pumps | 2.9 | G | ||||||||||||||||
| Combination Strainer and Pump | 2.8.3 | ||||||||||||||||||
| Suction Diffuser | |||||||||||||||||||
| Expansion Tanks | 2.10 | ||||||||||||||||||
| Air Separator Tanks | 2.11 | ||||||||||||||||||
| Water Treatment Systems | 2.12 | G | |||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Piping Welds NDE Report | 3.1.1.3 | ||||||||||||||||||
| Pressure Tests Reports | 3.5.2 | G | |||||||||||||||||
| Condenser Water Quality Test | 3.5.3 | G | |||||||||||||||||
| Reports | |||||||||||||||||||
| Condenser Water Quality Test | 3.5.3 | G | |||||||||||||||||
| Reports | |||||||||||||||||||
| One-Year Inspection Report For | 3.7 | G | |||||||||||||||||
| Cooling Water | |||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Employer's Record Documents | 3.1.1.1 | ||||||||||||||||||
| (For Welding) | |||||||||||||||||||
| Welding Procedures and | 3.1.1.2 | ||||||||||||||||||
| Qualifications | |||||||||||||||||||
| Piping for Steam and Condensate | 2.4 | ||||||||||||||||||
| Piping for High-Pressure | 2.5 | ||||||||||||||||||
| Compressed-Air Systems | |||||||||||||||||||
| Fittings | 2.4 | ||||||||||||||||||
| Fittings | 2.5 | ||||||||||||||||||
| Unions | 2.4 | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 23 64 26 | Unions | 2.5 | ||||||||||||||||
| Flanges | 2.4 | |||||||||||||||||
| Flanges | 2.5 | |||||||||||||||||
| Gaskets | 2.4 | |||||||||||||||||
| Gaskets | 2.5 | |||||||||||||||||
| Bolting | 2.4 | |||||||||||||||||
| Bolting | 2.5 | |||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Lesson plan for the Instruction | 3.6 | G | ||||||||||||||||
| Course | ||||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Water Treatment Systems | 2.12 | G | ||||||||||||||||
| Calibrated Balancing Valves | 2.7.8 | G | ||||||||||||||||
| Automatic Flow Control Valves | 2.7.9 | G | ||||||||||||||||
| Pump Discharge Valve | 2.7.10 | G | ||||||||||||||||
| Water Temperature Mixing Valve | 2.7.11 | G | ||||||||||||||||
| Water Temperature Regulating | 2.7.12 | G | ||||||||||||||||
| Valves | ||||||||||||||||||
| Water Pressure Reducing Valve | 2.7.13 | G | ||||||||||||||||
| Pressure Relief Valve | 2.7.14 | G | ||||||||||||||||
| Combination Pressure and | 2.7.15 | G | ||||||||||||||||
| Temperature Relief Valves | ||||||||||||||||||
| Expansion Joints | 2.8.9 | G | ||||||||||||||||
| Pumps | 2.9 | G |
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| Two Air Cooled Chillers B2058 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 23 64 26 | Combination Strainer and Pump | 2.8.3 | G | |||||||||||||||
| Suction Diffuser | ||||||||||||||||||
| Expansion Tanks | 2.10 | G | ||||||||||||||||
| Air Separator Tanks | 2.11 | G |