Attachment 2 - Statement of Work - 70Z03826QJ0000100.pdf

PDF 148 KB Posted

Attached to
Repair Indicator, Blade
Solicitation number
70Z03826QJ0000100
Issued by

About this file

This is a Statement of Work for the United States Coast Guard (USCG) Aviation Logistics Center (ALC) in Elizabeth City, North Carolina, for the repair of Blade Indicator components. The contract requires the repair of 10 Blade Indicators (NSN 6685-00-900-8060, Part Number S6115-20520-003) with an option quantity of 10 additional units. Components are to be repaired to Ready for Issue (RFI) condition suitable for installation on MH-60T aircraft. The contractor must perform teardown, test, and evaluation upon receipt to determine component condition. Components determined to be Beyond Economical Repair (BER) are compensated at firm-fixed prices to be determined at time of award, with the contractor providing a failure data report for each BER component. The USCG will issue disposition instructions via contract modification for all BER parts. Repair work must be performed at the contractor's facility or USCG-approved facility at firm-fixed prices, and the contractor is responsible for providing all necessary parts, materials, labor, tooling, and test equipment.

The contractor must be MRR Engineering approved prior to award and maintain ISO 9001-2000 certification or equivalent. All repair work must comply with OEM specifications, FAA Advisory Circular AC 43-4B for corrosion control, and applicable USCG technical manuals. Replacement parts must be new with OEM traceability; systematic part replacement costs are included in the contract price. The contractor must submit a failure data report for each repaired component including NSN, part number, serial number, nomenclature, repair date, and parts listing. All components must be tagged with DD Form 1574 (yellow tag) or FAA Form 8130-3, accompanied by a Certificate of Airworthiness and Certificate of Conformance. Serial number tracking is required with Significant Component History Records (SCHR) and Component Repair Records (CRR); one copy of the CRR must be mailed to USCG ALC within five business days of completion. The evaluation deadline is fifteen calendar days after component receipt; the repair delivery date is to be determined.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 - STATEMENT OF WORK

70Z03826QJ0000100

1.0 Contractor Requirements

1.1 The United States Coast Guard (USCG) Aviation Logistics Center (ALC), Medium Range Recovery

(MRR) Product Line Division located in Elizabeth City, North Carolina has a requirement to repair the following component at the quantities specified in the following table:

Nomenclature Quantity Option

Quantity National Stock Number Part Number

Alternate Part

Numbers

Blade Indicator 10 10 6685-00-900-8060

S6115-20520-003

S6115-20520-3

1201-416-2011

USCG aircraft operate primarily in a saltwater environment and are subject to corrosion. The Contractor is advised to expect corrosion on the components to be repaired under this order. The components shall be repaired and returned by the Contractor in an airworthy condition suitable for installation on MH-60T aircraft.

1.2 The components are utilized on the MH-60T aircraft. Upon receipt of the components, the Contractor shall perform a teardown, test and evaluation (TTE) to determine the condition of the components. Any components determined to be Beyond Economical Repair (BER), the Contractor will be allowed one of the following firm-fixed prices only:

Service Total

BER/Scrap Fee TBD at time of award

Firm fixed fee TBD at time of award

1.2.1 When a component is found to be BER, the Contractor shall prepare a failure data report in accordance with (IAW) Section 2.11. This report shall be included with the returned component. The Contracting Officer will provide disposition instructions IAW Section 2.9 via a modification for all parts found to be BER.

2.0 REPAIR

2.1 Non-Ready for Issue (RFI) components shall be repaired and returned to RFI condition IAW the original equipment manufacturer (OEM) functional performance specifications. Components shall be repaired for the specific fault noted on the DD Form 1577-2, Unserviceable (Repairable) Tag-Material, or CG-1577-A (11-90), Unsatisfactory Report Tag, which will be attached to each non-RFI component. The Contractor shall perform an inspection and correct all deficiencies found. This shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion.

2.2 During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part.

Corrosion removal and treatment of affected areas will be accomplished IAW OEM specifications and Federal

Aviation Administration (FAA) Advisory Circular AC 43-4B, dated 09/11/2018, Corrosion Control for Aircraft.

2.3 Work under this purchase order shall be performed at the Contractor’s facility or USCG approved facility.

The Contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and repair the components listed in this purchase order at the firm-fixed prices listed in the schedule (or modification).

2.4 Contractors are required to be MRR Engineering approved prior to award. If a Contractor is not MRR

Engineering approved, neither the closing date for receipt of offers nor the award of this requirement will be delayed during the Contractor’s approval process. Instead, the Contractor may be considered for future requirements.

2.5 Repair services must be performed IAW the procedures established in this SOW. The documents are listed in order of precedence. Latest revisions of any instruction or manual shall apply. The information contained within is not intended to be all inclusive nor to detract from or modify procedures outlined in the manuals. If the applicable technical manual does not cover a procedure, the Contractor shall utilize the OEM repair manual. If the OEM manual does not cover a procedure, the Contractor shall utilize the best commercial business practice. Where an application of “best commercial practice” is in conflict with these manuals, the

Contracting Officer may approve deviation from requirements. When applicable, each manual will specify if the

Export Control Act applies. The following documents are required to complete the services required by this acquisition. The USCG does not own, nor can it provide the technical documents specified herein.

• All OEM shop, inspection, overhaul, repair, or other OEM Component Maintenance Manuals (CMM)

• All OEM service bulletins, amendments, modifications, and specifications as applicable

• The latest revision of Depot Maintenance Work Request (DMWR) 1-1615-292

2.6 The Contractor shall have access to required repair specifications and test/acceptance criteria and data to ensure all components are tested and repaired IAW the current specifications and procedures. The USCG may review repair manuals and performance/test/ acceptance criteria as required. The Contractor is solely responsible for obtaining all specifications required for this effort. Original design or functional capabilities of the end components and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.

2.7 Parts of a component found to be in a serviceable condition as a result of functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings or as otherwise authorized in writing by the Contracting Officer. Replacement parts shall be new and accompanied with OEM traceability.

The cost for parts that are replaced systematically during repair shall be included in the price listed in the schedule for these operations.

2.8 Prices do not include components that have been cannibalized or severely damaged due to mishandling.

Additionally, USCG aircraft is used primarily around salt water at low altitude for search and rescue missions.

Therefore, corrosion is to be anticipated and is considered "normal" for the aircraft. Corrosion does not constitute unusual damage.

2.8.1 Components received which indicate obvious misuse, cannibalization, or severe damage due to mishandling or crash damage may dictate an exclusion from the prices specified in the contract schedule. Such components shall be inspected, repair costs determined, and authorization to proceed obtained from the

Contracting Officer prior to commencement of work. Once notified of a possible exclusion, The Contracting

Officer will make a written determination within thirty (30) days as to exclusion validity. The Contracting Office may approve the quote, decline the quote and have the component returned as-is, or consider the component BER.

2.9 The USCG typically considers a component BER when the cost to repair exceeds sixty-five (65) percent of the price of a new unit; however, the USCG is not bound by that number and will make all final BER determinations. The USCG will provide disposition instructions (either to scrap the component at the

Contractor’s facility or to return the component to ALC) for all components that are considered BER. The

Contractor shall not dispose of a component until they have been notified by a written modification to the order.

When returning the component to ALC, the components shall be clearly marked as “BER” with the supporting evidence.

2.10 The Government shall not be liable for any amount expended by the Contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the

Contracting Officer.

2.11 The Contractor shall submit a failure data report for each repaired component. This report shall include

NSN, P/N, Serial Number (S/N), nomenclature, date of repair, contract delivery order number, line item number, description of repaired failure, the USCG’s reported failure, a listing of parts repaired, and a listing of parts replaced. The Contractor’s in-house work order may be used to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the repaired component.

2.12 The Contractor is required to be certified and maintain a quality system that complies with the requirements of ISO 9001-2000 Quality Management Systems – Requirements or equivalent. The Contractor is responsible for performing or assuring all inspections and tests necessary to substantiate that the goods or services furnished conform to Government’s requirements. The Contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the Contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at Contractor’s facility to verify the existence, adequacy, and effectiveness of the quality system.

2.13 ALC considers components RFI upon acceptance. Components determined to be non-RFI upon installation may be returned to the Contractor with deficiencies described in a Product Quality Deficiency Report.

2.14 ALC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026

(Hexavalent Chromium) and 1910.1027 (Cadmium).

2.15 Quarterly audits are conducted by ALC on Government Furnished Property at commercial Contractor facilities. The Contractor shall follow the instructions provided each quarter by ALC and comply with its instructions. The Contractor’s role shall be to validate each component identified by S/N by ALC. Validation shall take place on the same date as the audit.

3.0 Certifications

3.1 When checked the Contractor shall:

Maintain OEM certification for the repaired components listed in this statement of work. The

Contractor shall provide immediate notification to the Contracting Officer upon loss of any required certifications. The Contractor shall also:

• Comply with the certification/documentation requirements specified herein.

• Attach certifications/documentation to the outside of the shipping container.

All parts repaired under the provisions of this contract must be airworthy and suitable for installation on USCG aircraft. Each returned component shall be tagged with a DD Form 1574 Serviceable

Condition Code Tag (yellow tag) or a FAA Form 8130-3, Airworthiness Approval Tag, completed in its entirety. The Contractor shall furnish a Certificate of Airworthiness in accordance with FAA procedures

(or USCG approved alternate procedure) and a Certificate of Conformance (COC) IAW FAR 52.246-15 for all components. These forms shall be packaged with each component.

The COC shall be signed by an authorized official of the approved source and must specify the nomenclature, manufacturer's part number, and date of manufacture. For Production Approval Holder, a

COC and a copy of the FAA Parts Manufacturer Approval or other manufacturing authority shall be provided. Contractors shall also provide documentation reflecting the complete unbroken history of ownership of the parts from purchase from the approved manufacturing source until delivery to the

USCG.

4.0 Tracked Components

4.1 Serial number tracking shall be used for validating that the correct components were received at the

Contractor’s repair facility and returned to the USCG. Upon receipt of the components from the USCG, the

Contractor shall verify each component received to ensure that the S/Ns match the ones specified in the order.

Should a discrepancy be identified, the Contractor shall notify the Contracting Officer in writing of the discrepancy.

4.2 When checked the Contractor shall comply with the following documentation requirements:

The components to be repaired under this Purchase Order are tracked in the USCG’s Asset Computerized

Maintenance System (ACMS). ACMS is the management information system used to schedule and record all

USCG equipment maintenance actions and calibration intervals.

Tracked components will be shipped to the Contractor with a Significant Component History Record

(SCHR). The SCHR records the maintenance history of the serial number tracked components. It remains with its corresponding part until reinstalled on an aircraft or is annotated “BER” and scrapped. (NOTE: written approval from the Contracting Officer is required prior to scrapping a serial number tracked component). The

SCHR for scrapped components shall be returned with the component. The Contractor shall retain a copy of the

SCHR for ninety (90) calendar days.

The Contractor shall provide a Component Repair Record (CRR) with the repaired components. The CRR records the maintenance performed on a serial number tracked component and enrolls or disenrolls components from ACMS when those components are scrapped, added to, or removed from the USCG inventory. At a minimum, the CRR shall identify the equipment and contain a description of the maintenance action performed, parts replaced, service bulletins and modifications. The Contractor shall mail one (1) copy of the CRR to USCG

ALC, ATTN: AVENG/ACMS, Elizabeth City, NC 27909-5001 no later than five (5) business days following completion of the rework effort. The original CRR shall be packed with the component. The Contractor shall retain a copy of each CRR for ninety (90) calendar days. The Contractor may request that their in-house work order be accepted to fulfill the CRR requirement. The Contracting Officer will provide a written determination in response to the request.

5.0 Delivery Requirements

5.1 The following table shows the required delivery for each priced line item listed in the schedule. Early deliveries, when appropriate, are desired and acceptable.

Item Description Due No Later Than:

Evaluation Fifteen (15) calendar days after receipt of components

Repair TBD

5.2 Inspection and acceptance shall be performed at destination by USCG personnel for count, condition, and proper completed documentation. Inspection and acceptance deficiencies may delay or cause rejection of invoice payments. Equipment found to have operational deficiencies may be reported on standard form "SF 368", Product Quality Deficiency Report, to the Contractor for investigation. The Contractor shall report findings of the investigation to the Contracting Officer, within thirty (30) calendar days after receipt of quality deficient exhibit.

File details come from the government source that posted it. Updated .