This document provides details for a federal solicitation seeking inspection, maintenance and repair services for fire protection systems. The Defense Logistics Agency Distribution is soliciting proposals under solicitation number SP3300-21-R-0001 for services at the Defense Distribution Center in Susquehanna, Pennsylvania. Interested parties should review the attached Request for Proposal and associated documents for requirements regarding scope of work, response instructions and timelines. Proposals are due by the date specified, with contract award anticipated shortly thereafter. The services required include inspection, testing, maintenance and repair of fire protection systems and components to maintain compliance with all applicable fire codes and regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Inspection, Maintenance, and Repair Services Defense Distribution Center, Susquehanna for Fire Protection Systems New Cumberland, PA

Section 21 23 00.00 20 – Wet Chemical Fire Extinguishing for Kitchen Cabinets Page1 of 5

SECTION 21 23 00.00 20

WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET

04/06

Table of Contents

PART 1 GENERAL

1.1 REFERENCES

1.2 SYSTEM REQUIREMENTS

1.3 SUBMITTALS

1.4 ELECTRICAL WORK

1.5 QUALITY ASSURANCE

1.5.1 Product Data

1.5.2 Operating and Maintenance (O&M) Instructions

PART 2 PRODUCTS

2.1 PREENGINEERED WET CHEMICAL FIRE EXTINGUISHING SYSTEMS

2.2 SYSTEM CONTROLS

2.3 EXISTING BUILDING FIRE ALARM CONTROL PANEL

2.4 IDENTIFICATION SIGNS

PART 3 EXECUTION

3.1 INSTALLATION

3.2 FIELD QUALITY CONTROL

Section 21 23 00.00 20 – Wet Chemical Fire Extinguishing for Kitchen Cabinets Page2 of 5

SECTION 21 23 00.00 20

WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 17A (2013) Standard for Wet Chemical Extinguishing Systems

NFPA 70 (2014) National Electrical Code

NFPA 96 (2014) Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-600-01 (2006; R3 2013) Fire Protection Engineering for Facilities

UNDERWRITERS LABORATORIES (UL)

UL Fire Protection Directory (2012) Fire Protection Equipment Directory

1.2 SYSTEM REQUIREMENTS

Wet chemical fire extinguishing system are for protection of cooking equipment including exhaust hoods, ducts, and related work. Equipment, materials, installation, workmanship, inspection, and testing shall be in strict accordance with the required and advisory provisions of the manufacturer's installation manual, NFPA 17A, NFPA 96, and UFC 3-600- 01 except as modified herein. Each system shall include materials, accessories, and equipment necessary to provide each system complete and ready for use. Each system is to give full consideration to blind spaces, piping, electrical equipment, ducts, and other construction and equipment in accordance with detailed working drawings to be submitted for approval. Devices and equipment for fire protection service shall be UL Fire Protection Directory listed or FM APP GUIDE approved for use with wet chemical fire extinguishing systems. In the NFPA publications referred to herein, the advisory provisions shall be considered to be mandatory, as though the word "shall" had been substituted for "should" wherever it appears. Reference to the "authority having jurisdiction" (AHJ) shall be interpreted to mean the DLA Installation Support Division through the Contracting Officer’s Representative (COR).

1.3 SUBMITTALS

Section 21 23 00.00 20 – Wet Chemical Fire Extinguishing for Kitchen Cabinets Page3 of 5

Government approval is required for submittals with a "G" designation.

The following shall be submitted in accordance with Section 01 33 00, SUBMITTAL

PROCEDURES:

SD-03 Product Data Storage cylinder; G Fusible links; G Release mechanisms; G Valve; G Discharge nozzle; G Pipe and fittings; G Piping and accessories; G Remote manual actuation stations; G Pressure-operated switches; G Manufacturer's installation and maintenance manuals; G

SD-10 Operation and Maintenance Data Fire extinguishing system; G

1.4 ELECTRICAL WORK

Associated with this section shall be provided under Section 26 20 00, INTERIOR DISTRIBUTION SYSTEM, except for control and fire alarm wiring. Fire alarm system is specified in Section 28 31 76, INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE. Provide control and fire alarm wiring, including connections to fire alarm systems, under this section in accordance with NFPA 70. Provide wiring in rigid metal conduit or intermediate metal conduit, except electrical metallic tubing conduit may be provided in dry locations not enclosed in concrete or where not subject to mechanical damage.

1.5 QUALITY ASSURANCE

One electronic copy of annotated catalog data to show the specific model, type, and size of each item. Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, options, and other pertinent information, that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements.

Product data for all equipment must be combined into a single submittal.

1.5.2 Operating and Maintenance (O&M) Instructions

Submit in accordance with Section 01 78 00, CLOSE-OUT SUBMITTALS as supplemented and modified by this specification section.

Section 21 23 00.00 20 – Wet Chemical Fire Extinguishing for Kitchen Cabinets Page4 of 5

Provide one pdf version on electronic media. The manuals must include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment.

PART 2 PRODUCTS

2.1 PREENGINEERED WET CHEMICAL FIRE EXTINGUISHING SYSTEMS

Systems shall comply with NFPA 17A and NFPA 96, except as modified herein. Piping and accessories within the hood shall be stainless steel or chrome plated. All other piping shall be chrome or nickel plated or stainless steel for areas with a non-porous, prefinished surface, such as stainless steel wall plates, or black steel painted to match the adjacent surface for areas with a porous, painted enamel finish, such as gypsum. Galvanized pipe and fittings are not permitted for use with wet chemical extinguishing systems. Exhaust hoods with grease extractors UL Fire Protection Directory listed or FM APP GUIDE approved are not required to have protection downstream of the grease extractors. Wet chemical agent shall be listed for the particular system and recommended by the manufacturer of the system.

Provide systems for protection of cooking equipment, including exhaust hoods and ducts for cooking equipment requiring protection by NFPA 96.

2.2 SYSTEM CONTROLS

Each system shall be mechanically actuated by fusible links and by remote manual actuation stations connected to the extinguishing system release mechanisms by stainless steel cables.

Arrange each system to automatically shut off the flow of fuel and electrical power to cooking appliances, to automatically actuate the building fire alarm system, and to automatically transmit an alarm to the central dispatch alarm. Electrical power to hood exhaust fans shall not be shut off unless specifically required by the UL Fire Protection Directory listing or FM APP GUIDE approval. Provide operating instructions at all system remote manual actuation stations.

2.3 EXISTING BUILDING FIRE ALARM CONTROL PANEL

The fire extinguishing system shall be connected to a spare zone module on an existing panel or provided new, as indicated. The fire alarm panel zone identification label shall be replaced with new label of similar construction which indicates the equipment connected to the zone module. Discharge of the extinguishing system shall actuate the fire alarm control panel in the same manner as other actuating devices. Extinguishing system wiring shall be supervised in the same manner as other devices connected to the fire alarm system.

2.4 IDENTIFICATION SIGNS

Provide red rigid plastic signs with engraved 0.25 inch high white lettering at each remote manual actuation station. Sign legends shall be "Fire Extinguishing System" followed by a brief description of the equipment protected.

PART 3 EXECUTION

Section 21 23 00.00 20 – Wet Chemical Fire Extinguishing for Kitchen Cabinets Page5 of 5

3.1 INSTALLATION

Equipment, materials, installation, workmanship, inspection, and testing shall be in accordance with the manufacturer's installation and maintenance manuals and NFPA 17A, except as modified herein.

3.2 FIELD QUALITY CONTROL

Follow the Chemical System tables in the scope of work for Inspection, Testing, and Maintenance requirements and the Manufacturer’s Instructions for newly installed equipment under this contract. Perform tests to determine compliance with the specified requirements. Test, inspect, and approve piping before covering or concealing.

-- End of Section --

PART 1 GENERAL

1.1 REFERENCES

1.2 SYSTEM REQUIREMENTS

1.3 SUBMITTALS

1.4 ELECTRICAL WORK

1.5 QUALITY ASSURANCE

1.5.1 Product Data

1.5.2 Operating and Maintenance (O&M) Instructions

PART 2 PRODUCTS

2.1 PREENGINEERED WET CHEMICAL FIRE EXTINGUISHING SYSTEMS

2.2 SYSTEM CONTROLS

2.3 EXISTING BUILDING FIRE ALARM CONTROL PANEL

2.4 IDENTIFICATION SIGNS

PART 3 EXECUTION

3.1 INSTALLATION

3.2 FIELD QUALITY CONTROL

Section 21 30 00 – Fire Pumps Page 1 of 16

SECTION 21 30 00

FIRE PUMPS

04/08

GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.4.1 Product Data

1.4.2 Operating and Maintenance (O&M) Instructions

1.4.3 Regulatory Requirements

1.5 DELIVERY, STORAGE, AND HANDLING

PRODUCTS

2.1 MATERIALS AND EQUIPMENT

2.2 REQUIREMENTS FOR FIRE PROTECTION SERVICE

2.2.1 General Requirements

2.2.2 Alarms

2.3 ABOVEGROUND PIPING COMPONENTS

2.3.1 Pipe Sizes 2.5 inches and Larger

2.3.2 Piping Sizes 2 inches and Smaller

2.3.3 Pipe Hangers and Supports

2.3.4 Valves

2.3.5 Hose Valve Manifold Test Header

2.3.6 Pipe Sleeves

2.3.7 Escutcheon Plates

2.4 DISINFECTING MATERIALS

2.4.1 Liquid Chlorine

2.4.2 Hypochlorites

2.4.3 Exhaust System External to Engine

2.5 BATTERIES

2.6 DIESEL FUEL SYSTEM EXTERNAL TO ENGINE

2.6.1 Fuel Piping

2.6.2 Diesel Fuel Tanks

Section 21 30 00 – Fire Pumps Page 2 of 16

2.6.3 Valves

2.7 JOINTS AND FITTINGS FOR COPPER TUBE

2.8 HOSE VALVE MANIFOLD TEST HEADER

2.9 FLOW METER

EXECUTION

3.1 EXAMINATION

3.2 PIPE AND FITTINGS

3.2.1 Cleaning of Piping

3.2.2 Threaded Connections

3.2.3 Pipe Hangers and Supports

3.2.4 Grooved Mechanical Joint

3.2.5 Push-On Joints for Piping

3.2.6 Mechanical Joints

3.3 ELECTRICAL WORK

3.4 PIPE COLOR CODE MARKING

3.5 FLUSHING

3.6 FIELD TESTS

Section 21 30 00 – Fire Pumps Page 3 of 16

SECTION 21 30 00

FIRE PUMPS

GENERAL

1.1 SUMMARY

Except as modified in this Section, install fire pumps in conformance with NFPA 20, NFPA 70, NFPA 72, and UFC 3-600-01 including all recommendations and advisory portions, which shall be considered mandatory; this includes advisory provisions listed in the appendices of such standards, as though the word "shall" had been substituted for the word "should" wherever it appears. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification governs. Devices and equipment for fire protection service shall be UL Fire Protection Directory listed or FM APP GUIDE approved. Reference to the "authority having jurisdiction" (AHJ) shall be interpreted to mean the DLA Installation Support Division through the Contracting Officer’s Representative (COR).

1.2 REFERENCES

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA 10084 (2005) Standard Methods for the Examination of Water and

Wastewater

AWWA B300 (2010; Addenda 2011) Hypochlorites

AWWA B301 (2010) Liquid Chlorine

AWWA C104/A21.4 (2013) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water

AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings

AWWA C111/A21.11 (2012) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings

AWWA C151/A21.51 (2009) Ductile-Iron Pipe, Centrifugally Cast

AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply Service

AWWA C606 (2011) Grooved and Shouldered Joints

ASME INTERNATIONAL (ASME)

ASME B16.11 (2011) Forged Fittings, Socket-Welding and Threaded

Section 21 30 00 – Fire Pumps Page 4 of 16

ASME B16.18 (2012) Cast Copper Alloy Solder Joint Pressure Fittings

ASME B16.21 (2011) Nonmetallic Flat Gaskets for Pipe Flanges

ASME B16.22 (2013) Wrought Copper and Copper Alloy Solder Joint Pressure Fittings

ASME B16.26 (2013) Cast Copper Alloy Fittings for Flared Copper Tubes

ASME B16.3 (2011) Malleable Iron Threaded Fittings: Classes 150 and 300

ASME B16.39 (2009) Malleable Iron Threaded Pipe Unions: Classes 150, 250, and 300

ASME B16.5 (2013) Pipe Flanges and Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch Standard

ASME B16.9 (2012) Factory-Made Wrought Buttwelding Fittings

ASME B31.3 (2012Process Piping

ASTM INTERNATIONAL (ASTM)

ASTM A183 (2003; R 2009) Standard Specification for Carbon Steel Track

Bolts and Nuts

ASTM A193/A193M (2012b) Standard Specification for Alloy-Steel and Stainless Steel Bolting for High-Temperature or High Pressure Service and Other Special Purpose Applications

ASTM A194/A194M (2014) Standard Specification for Carbon and Alloy Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both

ASTM A449 (2010) Standard Specification for Hex Cap Screws, Bolts and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A47/A47M (1999; R 2014) Standard Specification for Ferritic Malleable Iron Castings

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot- Dipped, Zinc-Coated, Welded and Seamless

ASTM A536 (1984; R 2009) Standard Specification for Ductile Iron Castings

ASTM A563 (2007a; R 2014) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A563M (2007; R 2013) Standard Specification for Carbon and Alloy Steel Nuts (Metric)

Section 21 30 00 – Fire Pumps Page 5 of 16

ASTM A795/A795M (2013) Standard Specification for Black and Hot-Dipped Zinc- Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use

ASTM B135 (2010) Standard Specification for Seamless Brass Tube

ASTM B135M (2010) Standard Specification for Seamless Brass Tube (Metric)

ASTM B42 (2010) Standard Specification for Seamless Copper Pipe, Standard Sizes

ASTM B62 (2009) Standard Specification for Composition Bronze or Ounce Metal Castings

ASTM B75/B75M (2011) Standard Specification for Seamless Copper Tube

ASTM B88 (2009) Standard Specification for Seamless Copper Water Tube

ASTM B88M (2013) Standard Specification for Seamless Copper Water Tube (Metric)

ASTM C533 (2013) Standard Specification for Calcium Silicate Block and Pipe Thermal Insulation

ASTM D2000 (2012) Standard Classification System for Rubber Products in Automotive Applications

ASTM D3308 (2012) Standard Specification for PTFE Resin Skived Tape

ASTM F436 (2011) Standard Specification for Hardened Steel Washers

ASTM F436M (2011) Standard Specification for Hardened Steel Washers (Metric)

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND

FITTINGS INDUSTRY (MSS)

MSS SP-58 (2009) Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation

MSS SP-80 (2013) Bronze Gate, Globe, Angle and Check Valves

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA MG 1 (2011; Errata 2012) Motors and Generators

Section 21 30 00 – Fire Pumps Page 6 of 16

NFPA 1963 (2014) Standard for Fire Hose Connections

NFPA 20 (2013) Standard for the Installation of Stationary Pumps for Fire Protection

NFPA 24 (2013) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

NFPA 37 (2010; TIA 10-1; TIA 13-2; TIA 13-3) Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines

NFPA 72 (2013) National Fire Alarm and Signaling Code

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES

(NICET)

NICET 1014-7 (2010) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-600-01 (2006; R3 2013) Fire Protection Engineering for Facilities

UL 1247 (2007; Reprint Jun 2011) Diesel Engines for Driving Stationary

Fire Pumps

UL 142 (2006; Reprint Jul 2013) Steel Aboveground Tanks for Flammable and Combustible Liquids

UL 218 (2009) Standard for Fire Pump Controllers

UL 262 (2004; Reprint Oct 2011) Gate Valves for Fire-Protection Service

UL 448 (2007; Reprint Jul 2013) Centrifugal Stationary Pumps for Fire- Protection Service

UL 80 (2007; Reprint Aug 2009) Steel Tanks for Oil-Burner Fuels and Other Combustible Liquids

UL Fire Protection Directory (2012) Fire Protection Equipment Directory

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:

Section 21 30 00 – Fire Pumps Page 7 of 16

SD-03 Product Data Catalog Data; G

SD-10 Operation and Maintenance Data Operating and Maintenance Instructions; G

1.4 QUALITY ASSURANCE

One electronic copy of annotated catalog data to show the specific model, type, and size of each item. Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, options, and other pertinent information, that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements.

Product data for all equipment must be combined into a single submittal.

Submit in accordance with Section 01 78 00, CLOSE-OUT SUBMITTALS as supplemented and modified by this specification section.

Provide one pdf version on electronic media. The manuals must include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment.

Equipment and material must be listed or approved. Listed or approved, as used in this Section, means listed, labeled or approved by a Nationally Recognized Testing Laboratory (NRTL) such as UL Fire Prot Dir or FM APP GUIDE. The omission of these terms under the description of an item or equipment described must not be construed as waiving this requirement. All listings or approvals by testing laboratories must be from an existing ANSI or UL published standard. The recommended practices stated in the manufacturer's literature or documentation are mandatory requirements.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver equipment and materials to the site in an undamaged condition. Material that is deemed to be damaged or defective by the Contracting Officer from manufacturing, during shipment, or while on-site shall be replaced at the Contractor's expense. Equipment and materials that are deemed to be damaged or defective shall be removed and properly disposed of by the Contractor. New equipment and materials shall be utilized to replace rejected materials or equipment.

Contractors shall receive material and equipment at their own facility and transport this equipment to the Installation and project site themselves. Government is not responsible for

Section 21 30 00 – Fire Pumps Page 8 of 16 damage to material and equipment shipped directly to the Installation. Contractor must be present to accept shipment of material directly to the Installation. Material that is shipped to the main warehouse (Building 2001) can easily be lost in the midst of the large volume of material constantly moving through the receiving warehouse. Material that is shipped to the Installation and subsequently lost shall be replaced at the Contractors expense.

Store materials off the ground with drainage to avoid standing water and provide protection against ground moisture and dampness. Store materials with a moisture barrier at both the ground level and as a cover. Stored items shall be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation shall be the Contractor's responsibility.

During shipping, delivery, and installation, piping and similar openings shall be capped to keep out dirt and other foreign matter.

PRODUCTS

2.1 MATERIALS AND EQUIPMENT

Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to contract award.

2.2 REQUIREMENTS FOR FIRE PROTECTION SERVICE

Materials and Equipment shall have been tested by Underwriters Laboratories, Inc. and listed in UL Fire Protection Directory or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Protection Directory or FM APP GUIDE.

Provide audible and visual alarms as required by NFPA 20 on the controller. Provide remote supervision as required by NFPA 20, in accordance with NFPA 72. The alarm and supervisory signals shall report back to the dispatch controller through the site alarm system.

Alarm signal shall be activated upon the following conditions: electric motor controller has operated into a pump running condition, loss of electrical power to electric motor starter, and phase reversal on line side of motor starter; engine drive controller has operated into an engine running condition, engine drive controller main switch has been turned to OFF or to MANUAL position, trouble on engine driven controller or engine. Exterior alarm devices shall be weatherproof type. Provide alarm silencing switch and red signal lamp, with signal lamp arranged to come on when switch is placed in OFF position.

2.3 ABOVEGROUND PIPING COMPONENTS

Section 21 30 00 – Fire Pumps Page 9 of 16

Piping shall be ASTM A795/A795M, Schedule 40 for pipe lines up through 10 inch diameter and Standard (STD) weight class for piping line sizes 12 and over., Type E or Type S, Grade A; black steel pipe. Steel pipe shall be joined by means of flanges welded to the pipe or mechanical grooved joints only. Piping shall not be joined by welding or weld fittings. Suction piping shall be galvanized on the inside in accordance with NFPA 20.

Joints and fittings shall be designed for not less than 175 psi service and shall be the product of the same manufacturer. Fitting and coupling houses shall be malleable iron conforming to ASTM A47/A47M, Grade 32510; ductile iron conforming to ASTM A536, Grade 65-45-

12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe.

Nuts and bolts shall be heat-treated steel conforming to ASTM A183 and shall be cadmium plated or zinc electroplated.

Flanges shall be ASME B16.5, Class 150 flanges. Flanges shall be provided at valves, connections to equipment, and where indicated.

Gaskets shall be AWWA C111/A21.11, cloth inserted red rubber gaskets.

Bolts shall be ASTM A449, Type 1. Bolts shall extend no less than three full threads beyond the nut with bolts tightened to the required torque.

Nuts shall be ASTM A563, Grade C3.

Washers shall meet the requirements of ASTM F436. Flat circular washers shall be provided under all bolt heads and nuts.

Steel piping shall be ASTM A795/A795M, Schedule 40 pipe, Type E or Type S, Grade A, zinc-coated steel pipe with threaded end connections. Fittings shall be ASME B16.3, Class 150, zinc-coated threaded fittings. Unions shall be ASME B16.39, Class 150, zinc-coated unions.

Section 21 30 00 – Fire Pumps Page 10 of 16

Copper tubing shall be ASTM B88, Type L, where used above ground, or K, for below ground applications, soft annealed. Fittings shall be ASME B16.26, flared joint fittings.

Pipe nipples shall be ASTM B42 copper pipe with threaded end connections.

Pipe hangers and support shall be MSS SP-58 or UL listed UL Fire Protection Directory or FM approved FM APP GUIDE and shall be the adjustable type. Finish of rods, nuts, washers, hangers, and supports shall be zinc-plated after fabrication.

Valves shall be UL listed UL Fire Protection Directory or FM approved FM APP GUIDE for fire protection service. Valves shall have flange or threaded end connections.

Gate valves and control valves shall be outside screw and yoke (O.S.&Y.) type which open by counterclockwise rotation. Butterfly-type control valves are not permitted.

The suction control valves, the discharge control valves, valves to test header and flow meter, and the by-pass control valves shall be equipped with valve tamper switches for monitoring by the fire alarm system.

Check valve shall be clear open, swing type check valve with flange or threaded inspection plate.

Relief valve shall be pilot operated type conforming to NFPA 20. A means of detecting water motion in the relief lines shall be provided where the discharge is not visible within the pump house.

An adjustable circulating relief valve shall be provided for each fire pump in accordance with NFPA 20.

Suction pressure regulating valve shall be FM approved FM APP GUIDE. Suction pressure shall be monitored through a pressure line to the controlling mechanism of the regulating valve. Valve shall be arranged in accordance with the manufacturer's recommendations.

Section 21 30 00 – Fire Pumps Page 11 of 16

Construct header of steel pipe. Provide ASME B16.5, Class 150 flanged inlet connection to hose valve manifold assembly. Provide approved bronze hose gate valve with 2.5 inch National Standard male hose threads with cap and chain; locate 3 feet above grade in the horizontal position for each test header outlet. Welding shall be metallic arc process in accordance with ASME B31.3.

A pipe sleeve shall be provided at each location where piping passes entirely through walls, ceilings, roofs, and floors, including pipe entering buildings from the exterior. Secure sleeves in position and location during construction. Provide sleeves of sufficient length to pass through entire thickness of walls, ceilings, and floors. Provide one inch minimum clearance between exterior of piping or pipe insulation, and interior of sleeve or core-drilled hole. Firmly pack space with mineral wool insulation. Seal space at both ends of the sleeve or core-drilled hole with plastic waterproof cement which will dry to a firm but pliable mass, or provide a mechanically adjustable segmented elastomeric seal. In fire walls and fire floors, a fire seal shall be provided between the pipe and the sleeve in accordance with Section 07 84 00, FIRESTOPPING.

Sleeves in Masonry and Concrete Walls, Ceilings, Roofs, and Floors: Provide hot-dip galvanized steel, ductile-iron, or cast-iron pipe sleeves. Core drilling of masonry and concrete may be provided in lieu of pipe sleeves provided that cavities in the core-drilled hole are completely grouted smooth.

Sleeves in Other Than Masonry and Concrete Walls, Ceilings, Roofs, and Floors:

Provide galvanized steel sheet pipe not less than 0.90 psf.

Provide one-piece or split-hinge metal plates for piping entering floors, walls, and ceilings in exposed areas. Provide polished stainless steel or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on plates in unfinished spaces. Plates shall be secured in place.

2.4 DISINFECTING MATERIALS

Liquid chlorine shall conform to AWWA B301.

Calcium hypochlorite and sodium hypochlorite shall conform to AWWA B300.

Exhaust system shall comply with the requirements of NFPA 20 and NFPA 37. An exhaust muffler shall be provided for each diesel engine driver to reduce noise levels to less than 85

Section 21 30 00 – Fire Pumps Page 12 of 16 dBA. A flexible connector with flange connections shall be provided at the engine. Flexible sections shall be stainless steel suitable for diesel-engines exhaust gas at 1,000 degrees F.

ASTM A53/A53M, Schedule 40, black steel, welding end connections. ASME B16.9 or ASME B16.11 welding fittings shall be of the same material and weight as the piping.

ASME B16.5, Class 150. Flanges shall be provided at connections to diesel engines, exhaust mufflers, and flexible connections. Gaskets shall be ASME B16.21, composition ring, 0.0625 inch. ASTM A193/A193M, Grade B8 bolts and ASTM A194/A194M, Grade 8 nuts shall be provided.

Products containing asbestos will not be permitted. Exhaust piping system including the muffler shall be insulated with ASTM C533 calcium silicate insulation, minimum of 3 inches. Insulation shall be secured with not less than 0.375 inch width fibrous glass reinforced waterproof tape or Type 304 stainless steel bands spaced not more than 8 inches on center. An aluminum jacket encasing the insulation shall be provided. The aluminum jacket shall have a minimum thickness of 0.016 inches, a factory-applied polyethylene and kraft paper moisture barrier on the inside surface. The jacket shall be secured with not less than 0.5 inch wide stainless steel bands, spaced not less than 8 inches on centers.

Longitudinal and circumferential seams of the jacket shall be lapped not less than 3 inches.

Jackets on horizontal line shall be installed so that the longitudinal seams are on the bottom side of the pipe. The seams of the jacket for the vertical lines shall be placed on the off-weather side of the pipe. On vertical lines, the circumferential seams of the jacket shall overlap so the lower edge of each jacket overlaps the upper edge of the jacket below.

2.5 BATTERIES

Batteries for diesel engine driver shall be sealed lead calcium batteries. Batteries shall be mounted in a steel rack with non-corrosive, non-conductive base, not less than 12 inches above the floor.

2.6 DIESEL FUEL SYSTEM EXTERNAL TO ENGINE

Fuel system shall be provided that meets all requirements and advisory provisions of NFPA 20 and NFPA 37. The fuel tank vent piping shall be equipped with screened weatherproof vent cap. Vents shall be extended to the outside. Each tank shall be equipped with a fuel level gauge. Flexible bronze or stainless steel piping connectors with single braid shall be provided at each piping connection to the diesel engine. Supply, return, and fill piping shall be steel piping, except supply and return piping may be copper tubing. Fuel lines shall be protected against mechanical damage. Fill line shall be equipped with 16 mesh removable wire screen. Fill lines shall be extended to the exterior. A weatherproof tank gauge shall be mounted on the exterior wall near each fill line for each tank. The fill cap shall be able to be locked by padlock. The engine supply (suction) connection shall be located on the side of

Section 21 30 00 – Fire Pumps Page 13 of 16 the fuel tank so that 5 percent of the tank volume provides a sump volume not useable by the engine. The elevation of the fuel tank shall be such that the inlet of the fuel supply line is located so that its opening is no lower than the level of the engine fuel transfer pump. The bottom of the tank shall be pitched 1/4 inch/foot to the side opposite the suction inlet connection, and to an accessible 1 inch plugged globe drain valve.

As specified in NFPA 20.

UL 80 or UL 142 for aboveground tanks.

Provide an indicating and lockable ball valve in the supply line adjacent to the tank suction inlet connection. Provide a check valve in fuel return line. Valves must be suitable for oil service. Valves must have at least one union end connection.

MSS SP-80 Class 125

MSS SP-80, Class 125, swing check

Full port design, copper alloy body, 2-position lever handle

2.7 JOINTS AND FITTINGS FOR COPPER TUBE

Wrought copper and bronze solder-joint pressure fittings shall conform to ASME B16.22 and ASTM B75/B75M. Cast copper alloy solder-joint pressure fittings shall conform to ASME B16.18. Cast copper alloy fittings for flared copper tube shall conform to ASME B16.26 and ASTM B62. Brass or bronze adapters for brazed tubing may be used for connecting tubing to flanges and to threaded ends of valves and equipment. Extracted brazed tee joints produced with an acceptable tool and installed as recommended by the manufacturer may be used. Grooved mechanical joints and fittings shall be designed for not less than 125 psig service and shall be the product of the same manufacturer. Grooved fitting and mechanical coupling housing shall be ductile iron conforming to ASTM A536.

Gaskets for use in grooved joints shall be molded synthetic polymer of pressure responsive design and shall conform to ASTM D2000 for circulating medium up to 239 degrees F.

Grooved joints shall conform to AWWA C606. Coupling nuts and bolts for use in grooved joints shall be steel and shall conform to ASTM A183.

2.8 HOSE VALVE MANIFOLD TEST HEADER

Section 21 30 00 – Fire Pumps Page 14 of 16

Hose valve test header shall be connected by ASME B16.5, Class 150 flange inlet connection. Hose valves shall be UL listed UL Fire Protection Directory or FM approved FM APP GUIDE bronze hose gate valves with 2.5 inches American National Fire Hose Connection Screw Standard Threads (NH) in accordance with NFPA 1963. The number of valves shall be in accordance with NFPA 20. Each hose valve shall be equipped with a cap and chain, and located no more than 3 feet and no less than 2 feet above grade.

2.9 FLOW METER

Meter shall be UL listed UL Fire Protection Directory or FM approved FM APP GUIDE as flow meters for fire pump installation with direct flow readout device. Flow meter shall be capable of metering any waterflow quantities between 50 percent and 150 percent of the rated flow of the pumps. Arrange piping to permit flow meter to discharge to pump suction and to discharge through test header. The meter throttle valve and the meter control valves shall be O.S.&Y. valves. Provide automatic air release if flow meter piping between pump discharge and pump suction forms an inverted "U". Meter shall be of the venturi or orifice plate type.

EXECUTION

3.1 EXAMINATION

After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 PIPE AND FITTINGS

Piping shall be inspected, tested, and approved before burying, covering, or concealing.

Fittings shall be provided for changes in direction of piping and for all connections.

Changes in piping sizes shall be made using tapered reducing pipe fittings. Bushings shall not be used. Photograph all piping prior to burying, covering, or concealing. Catalog these photos in a manner that allows cross-reference of photo location and direction taken with layout drawings for this piping.

Interior and ends of piping shall be clean and free of any water or foreign material. Piping shall be kept clean during installation by means of plugs or other approved methods. When work is not in progress, open ends of the piping shall be securely closed so that no water or foreign matter will enter the pipes or fittings. Piping shall be inspected before placing in position.

Jointing compound for pipe threads shall be polytetrafluoroethylene (PTFE) pipe thread tape conforming to ASTM D3308 and shall be applied to male threads only. Exposed ferrous pipe threads shall be provided with one coat of zinc molybdate primer applied to a minimum of dry film thickness of 1 mil.

Section 21 30 00 – Fire Pumps Page 15 of 16

Additional hangers and supports shall be provided for concentrated loads in aboveground piping, such as for valves and risers.

Piping shall be supported at each floor at not more than 10 foot intervals.

Horizontal piping supports shall be spaced as follows:

Maximum Spacing (feet)

Nominal Pipe Size (inches) ≤ 1 1.25 1.5 2 2.5 3 3.5 4 5 6+ Copper Tube 6 7 8 Steel Pipe 7 8 9 10 11 12 13 14 16 17

Grooved mechanical joints shall not be permitted in any underground piping.

Push-on joints for piping systems installed below grade shall not be permitted.

Mechanical joints shall consist of a bolt joint of the stuffing box type as detailed in ANSI A21.10 and described in ANSI A21.11.

Mechanical joints shall be thoroughly bolted in accordance with the manufacturer's recommendations with Tee Head Bolts and bolts of high strength, heat treated cast iron containing 0.50 percent copper or high strength low-allow steel having a minimum yield point strength of 40,000 pounds per square inch and an ultimate tensile strength of 70,000 pounds per square inch.

Gaskets, bolts, and nuts shall conform to ANSI A21.11. Gaskets shall be of neoprene or rubber of such quality that they will not be damaged by the liquid or gases with which they will come into contact.

Glands for ductile iron shall be of high strength ductile iron, and glands for cast iron shall be of high strength cast iron.

3.3 ELECTRICAL WORK

Electric motor and controls shall be in accordance with NFPA 20, NFPA 72 and NFPA 70, unless more stringent requirements are specified herein or are indicated on the drawings.

Electrical wiring and associated equipment shall be provided in accordance with NFPA 20

Section 21 30 00 – Fire Pumps Page 16 of 16 and Section 26 20 00, INTERIOR DISTRIBUTION SYSTEM. Provide wiring in rigid metal conduit or intermediate metal conduit, except electrical metallic tubing conduit may be provided in dry locations not enclosed in concrete or where not subject to mechanical damage.

3.4 PIPE COLOR CODE MARKING

Color code marking of piping as specified in Section 09 90 00, PAINTS AND COATINGS.

3.5 FLUSHING

The fire pump suction and discharge piping shall be flushed at 120 percent of rated capacity of each pump. Where the pump installation consists of more than one pump, the flushing shall be the total quantity of water flowing when all pumps are discharging at 120 percent of their rated capacities. The new pumps may be used to attain the required flushing volume.

No underground piping shall be flushed by using the fire pumps. Flushing operations shall continue until water is clear, but not less than 10 minutes. Submit a signed and dated flushing certificate before requesting field testing.

3.6 FIELD TESTS

Follow the Fire Pump System tables in the scope of work for Inspection, Testing, and Maintenance requirements. Prior to initial operation, inspect equipment and piping systems for compliance with drawings, specifications, and manufacturer's submittals.

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.4.1 Product Data

1.4.2 Operating and Maintenance (O&M) Instructions

1.4.3 Regulatory Requirements

1.5 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 MATERIALS AND EQUIPMENT

2.2 REQUIREMENTS FOR FIRE PROTECTION SERVICE

2.2.1 General Requirements

2.2.2 Alarms

2.3 ABOVEGROUND PIPING COMPONENTS

2.3.1 Pipe Sizes 2.5 inches and Larger

2.3.1.1 Pipe

2.3.1.2 Grooved Mechanical Joints and Fittings

2.3.1.3 Flanges

2.3.1.4 Gaskets

2.3.1.5 Bolts

2.3.1.6 Nuts

2.3.1.7 Washers

2.3.2 Piping Sizes 2 inches and Smaller

2.3.2.1 Steel Pipe

2.3.2.2 Copper Tubing

2.3.3 Pipe Hangers and Supports

2.3.4 Valves

2.3.4.1 Gate Valves and Control Valves

2.3.4.2 Tamper Switch

2.3.4.3 Check Valve

2.3.4.4 Relief Valve

2.3.4.5 Circulating Relief Valve

2.3.4.6 Suction Pressure Regulating Valve

2.3.5 Hose Valve Manifold Test Header

2.3.6 Pipe Sleeves

a. Sleeves in Masonry and Concrete Walls, Ceilings, Roofs, and Floors: Provide hot-dip galvanized steel, ductile-iron, or cast-iron pipe sleeves. Core drilling of masonry and concrete may be provided in lieu of pipe sleeves provided that cavities in ...

b. Sleeves in Other Than Masonry and Concrete Walls, Ceilings, Roofs, and Floors: Provide galvanized steel sheet pipe not less than 0.90 psf.

2.3.7 Escutcheon Plates

2.4 DISINFECTING MATERIALS

2.4.1 Liquid Chlorine

2.4.2 Hypochlorites

2.4.3 Exhaust System External to Engine

2.4.3.1 Steel Pipe and Fittings

2.4.3.2 Flanges

2.4.3.3 Piping Insulation

2.5 BATTERIES

2.6 DIESEL FUEL SYSTEM EXTERNAL TO ENGINE

2.6.1 Fuel Piping

2.6.2 Diesel Fuel Tanks

2.6.3 Valves

2.6.3.1 Globe Valve

2.6.3.2 Check Valve

2.6.3.3 Ball Valve

2.7 JOINTS AND FITTINGS FOR COPPER TUBE

2.8 HOSE VALVE MANIFOLD TEST HEADER

2.9 FLOW METER

PART 3 EXECUTION

3.1 EXAMINATION

3.2 PIPE AND FITTINGS

3.2.1 Cleaning of Piping

3.2.2 Threaded Connections

3.2.3 Pipe Hangers and Supports

3.2.3.1 Vertical Piping

3.2.3.2 Horizontal Piping

3.2.4 Grooved Mechanical Joint

3.2.5 Push-On Joints for Piping

3.2.6 Mechanical Joints

a. Mechanical joints shall consist of a bolt joint of the stuffing box type as detailed in ANSI A21.10 and described in ANSI A21.11.

b. Mechanical joints shall be thoroughly bolted in accordance with the manufacturer's recommendations with Tee Head Bolts and bolts of high strength, heat treated cast iron containing 0.50 percent copper or high strength low-allow steel having a minim...

c. Gaskets, bolts, and nuts shall conform to ANSI A21.11. Gaskets shall be of neoprene or rubber of such quality that they will not be damaged by the liquid or gases with which they will come into contact.

d. Glands for ductile iron shall be of high strength ductile iron, and glands for cast iron shall be of high strength cast iron.

3.3 ELECTRICAL WORK

3.4 PIPE COLOR CODE MARKING

3.5 FLUSHING

3.6 FIELD TESTS

Section 21 95 00.00 10 – Fire Sprinkler System Repairs Page 1 of 19

SECTION 21 95 00.00 10

FIRE SPRINKLER SYSTEM REPAIRS

07/14

GENERAL

1.1 REFERENCES

1.2 SYSTEM DESCRIPTION

1.2.1 Background

1.3 SUBMITTALS

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 PROJECT / SITE CONDITIONS

1.6 ACCESSIBILITY OF WORK

PRODUCTS

2.1 STANDARD PRODUCTS

2.2 NAMEPLATES/IDENTIFICATION SIGNS

2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE

2.4 FIRE ALARM AND MASS NOTIFICATION SIGNALLING

EXECUTION

3.1 GENERAL WORK

3.1.1 Visual Inspection

3.1.2 Control Valves

3.1.3 Instrument Gauges

3.2 SYSTEM FLUSHING

3.2.1 System Preparation

3.2.2 Pipe Flushing Procedure

3.2.3 System Marking

3.3 TEMPORARY IMPAIRMENT OF SPRINKLER SYSTEM

3.3.1 Procedure for System Impairment

3.3.2 Impairment Coordinator Coordination

3.3.3 Impairment Worksheet

3.3.4 System Reactivation

3.4 FIELD PAINTING

3.5 SCHEDULE

3.6 WASTE MANAGEMENT

Section 21 95 00.00 10 – Fire Sprinkler System Repairs Page 2 of 19

3.7 SPRINKLER SYSTEM PERFORMANCE

3.8 ALARM WORK

3.9 FINAL ACCEPTANCE TESTS

3.9.1 Wet Systems:

3.9.2 Dry Systems

3.10 DATA AND RECORDS REFERENCES

Section 21 95 00.00 10 – Fire Sprinkler System Repairs Page 3 of 19

SECTION 21 95 00.00 10

FIRE SPRINKLER SYSTEM REPAIRS

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C651 (2005; Errata 2005) Disinfecting Water Mains

ASTM E213 (2009) Standard Practice for Ultrasonic Testing of Metal Pipe and

Tubing

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-58 (2009) Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation

NFPA 12 (2009) Standard on Carbon Dioxide Extinguishing Systems

NFPA 13 (2013) Standard for the Installation of Sprinkler Systems

NFPA 20 (2013) Standard for the Installation of Stationary Pumps for Fire Protection

NFPA 25 (2014) Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES

(NICET)

NICET 1014-7 (2010) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout

THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC Paint 25 (1997; E 2004) Zinc Oxide, Alkyd, Linseed Oil Primer for Use

Over Hand Cleaned Steel, Type I and Type II

Section 21 95 00.00 10 – Fire Sprinkler System Repairs Page 4 of 19

UL 262 (2004; Reprint Jun 2008) Gate Valves for Fire-Protection Service

UL 789 (2004; Reprint Aug 2008) Indicator Posts for Fire-Protection Service

UL Fire Protection Direction (2011) Fire Protection Equipment Directory

1.2 SYSTEM DESCRIPTION

The intent of this specification is to define the DDSP Installation requirements associated with the inspection, testing, and repair of fire suppression systems.

Work on fire suppression systems will vary depending the Inspection, Testing, and Maintenance cycle required in the contract’s statement of work document and exhibits. In some cases, problems will require verification through further inspection and testing.

Contract drawings provide specific locations of each building on the depot, specific locations of each system within a particular building.

At the conclusion of repair activities, including inspection, repair, and/or replacement, systems will be tested to confirm that they function within acceptable parameters as defined in NFPA 25. Coordinate final testing with COR. Installation Fire Inspector is to be present for each fire sprinkler system acceptance test.

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control Approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-06 Test Reports Impairment Worksheets; G Final Acceptance Test Report; G

Three copies of the completed Final Acceptance Test Reports no later than 7 days after the completion of the Final Acceptance Tests. All items in the Final Acceptance Test Report shall be signed by the Fire Protection Specialist.

1.4 DELIVERY, STORAGE, AND HANDLING

Equipment brought on-site may be stored at the contractor’s dedicated location in Building

750. This equipment should be secured by the contractor at the location for security purposes.

Section 21 95 00.00 10 – Fire Sprinkler System Repairs Page 5 of 19

Deliver equipment and materials to the site in an undamaged condition. Material that is deemed to be damaged or defective by the Contracting Officer from manufacturing, during shipment, or while on-site shall be replaced at the Contractor's expense. Equipment and materials that are deemed to be damaged or defective shall be removed and properly disposed of by the Contractor. New equipment and materials shall be utilized to replace rejected materials or equipment.

Contractors shall receive material and equipment at their own facility and transport this equipment to the Installation and project site themselves. Government is not responsible for damage to material and equipment shipped directly to the Installation. Contractor must be present to accept shipment of material directly to the Installation. Material that is shipped to the main warehouse (Building 2001) can easily be lost in the midst of the large volume of material constantly moving through the receiving warehouse. Material that is shipped to the Installation and subsequently lost shall be replaced at the Contractors expense.

Store materials off the ground with drainage to avoid standing water and provide protection against ground moisture and dampness. Store materials with a moisture barrier at both the ground level and as a cover. Stored items shall be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation shall be the Contractor's responsibility.

During shipping, delivery, and installation, piping and similar openings shall be capped to keep out dirt and other foreign matter.

1.5 PROJECT / SITE CONDITIONS

This project will involve the inspection, maintenance, testing, and repair of systems in buildings throughout the entire site. All of the buildings currently present on-site are active and in constant use. Coordination with site personnel through the COR needs to occur on a daily basis to achieve a successful project.

1.6 ACCESSIBILITY OF WORK

The majority of alarm valves on the installation are located in sprinkler valve houses separated from the main warehouse storage area. However, in a few buildings, the systems are located at the perimeter of the warehouse area. Warehouse sprinkler piping is located above floor and rack storage. Warehouse storage areas have constant activity on a daily basis. The site is a 24 hours a day, 7 days per week operation. Coordination with site personnel through the COR will be critical to minimize the impact on DDSP operations and maximize the effectiveness of the work crews trying to get work done in these areas.

PRODUCTS

2.1 STANDARD PRODUCTS

Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior assignment of the specific project. Replacement of existing components, modification of existing fire sprinkler systems, addition to or extension of existing fire sprinkler systems, and new parts on existing systems shall comply with the

Section 21 95 00.00 10 – Fire Sprinkler System Repairs Page 6 of 19 applicable specification section for the type of system on which the parts shall be installed including Section 21 12 00, STANDPIPE SYSTEMS; Section 21 13 13; WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION; Section 21 13 16, DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION; Section 21 13 18, PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION; Section 21 13 19, DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION; Section 21 23 00.00 20, WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINETS; and Section 21 30 00, FIRE PUMPS.

2.2 NAMEPLATES/IDENTIFICATION SIGNS

Per NFPA 13, attach properly lettered and approved metal signs to each piece of fire sprinkler system components that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number. Valve identification signs and hydraulic design data nameplates shall be permanently affixed to the riser of each system in appropriate locations. See Section 10 14 20.00 10, FIRE PROTECTION SYSTEM SIGNAGE for specific requirements.

2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE

Materials and equipment shall have been tested by Underwriters Laboratories, Inc. and listed in UL Fire Protection Directory or approved by Factory Mutual and listed in FM P7825a and FM P7825b. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Protection Directory or FM P7825a and FM P7825b.

2.4 FIRE ALARM AND MASS NOTIFICATION SIGNALLING

See Section 28 31 76, INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE for specific requirements.

EXECUTION

3.1 GENERAL WORK

The contract drawings provided include layout drawings for each building included in this project. These drawings are provided to locate critical components of each fire sprinkler system. Notes are provided to offer more detail of the types of systems, unique installation details, and unique working conditions.

Before any work…