This request for proposal (RFP) solicits inspection, maintenance, and repair services for fire protection systems at the Defense Distribution Center, Susquehanna located in New Cumberland, Pennsylvania. The solicitation requires the contractor to provide preventative maintenance and remedial repair services for fire suppression systems, fire pumps, fire hydrants, and nitrogen generation systems across 52 facilities. The contractor must also inspect, test, and maintain fire alarm and mass notification systems located in 66 buildings, including outdoor giant voice towers. The contractor will be responsible for staffing positions including a project manager, project superintendent, construction quality control manager, and site safety and health officer, all meeting minimum experience and certification requirements. The contract term is for one base year with four one-year options. The RFP includes attachments outlining the statement of work and technical requirements for responding by the closing date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Exhibit 3 Fire Suppression Systems, Inspection and Testing Requirements
Wet Pipe Sprinkler System Requirements Page 1 of 24
WET PIPE SPRINKLER SYSTEMS (including Antifreeze Systems) Combined Recommendation for Wet Pipe Sprinkler Systems
Cycle System Component * Work
Annually
Entire System
- Visually check pipe hangars, sprinkler heads for obstructions, piping for leaks, riser condition.
All Control Valves (Lock, Unlocked, Supervised, or Unsupervised)
Test 13.3.3.1: Operate valve through its full range and return to its normal position.
- Confirm valve position after operation.
Waterflow Alarm Devices (Water motor gong, vane-type and pressure switch-type water flow devices)
Inspect 13.2.6:
-Operate to verify function and alarm at panel.
-Verify alarm test valve alignment and tamper switch (if applicable)
Supervisory Signal Devices Inspect 5.2.5: Inspect to verify devices are free from physical damage.
Main Drain
Test 13.2.5, 13.2.5.1:
- Conduct Main Drain Test.
- Read and record static and residual pressure.
- Attach readings to gauge with a tag.
- Compare resulting test pressures with previous test pressures and verify results are within acceptable limits or identify corrective measures.
Alarm valve and trim
Inspect 13.4.1.1:
-Visual inspection of alarm valve exterior, trim, gauges.
- Verify and record valve pressure and legibility of hydraulic placard (if applicable).
Fire Department Connections
Inspect 13.7.1:
- Verify accessibility and condition.
- If caps are missing, check for obstructions.
Hydraulic Placard Inspect 5.2.6:
Spare Sprinklers Inspect 5.2.1.4:
Information Signs Inspect 5.2.8:
Pipe and Fittings Inspect 5.2.2:
Backflow Preventers
Test 13.6.2:
Test backflow preventers and record results (where systems permits this type of testing). Repair leaking check valves.
2 Years In addition to the annual requirements listed above, perform the following:
Wet Pipe Sprinkler System Requirements Page 2 of 24
WET PIPE SPRINKLER SYSTEMS (including Antifreeze Systems) Combined Recommendation for Wet Pipe Sprinkler Systems
Control Valves - Maintenance 13.3.4: Lubricate valves and stems.
Antifreeze Solution Test 5.3.4:
Gauges - Recalibrate or replace gauges.
5 Years
Obstruction Inspection Inspection, 14.2 Sprinklers (Extra-High or greater temp heads) Test 5.3.1.1.1.4
Alarm Valve and Appurtenances (Strainers, Filters, Orifices)
Inspect 13.4.1.2: Clean and inspect internals of alarm valve and appurtenances.
Check Valves Inspect 13.4.2.1: Internal inspection and operability
Sprinklers (Subject to Corrosion Environment) Test 5.3.1.1.2:
10 Years Sprinklers (Dry Heads) Test 5.3.1.1.1.6
20 Years Fast Response and High Temperature Sprinkler Heads
Test 5.3.1.1.1.3
- Test sample sprinklers to verify response characteristics.
50 years Standard Sprinkler Heads Test 5.3.1.1.1
- Replace or test a sample of sprinkler heads to verify response characteristics.
Following System Repair or Modification
Valve Supervisory Switch Inspect: 13.3.2.1.2
Main Drain - Conduct a main drain test to verify supply.
* Where paragraph sections are referenced, refer to NFPA 25 to locate these section numbers.
Dry Pipe Sprinkler System Requirements Page 3 of 24
DRY PIPE SPRINKLER SYSTEMS
Combined Recommendation for Dry Pipe Sprinkler Systems
Entire System - Visually check pipe hangars, sprinkler heads for obstructions, piping for leaks, riser condition.
Test 13.3.3.1:
- Operate valve through its full range and return to its normal position.
(Water motor gong, vane-type and pressure switch-type water flow devices)
- Operate to verify function and alarm at panel.
- Verify alarm test valve alignment and tamper switch (if applicable)
Supervisory Signal Devices Inspect 5.2.5:
- Inspect to verify devices are free from physical damage.
- Read and record static and residual pressure.
- Attach readings to gauge with a tag.
- Compare resulting test pressures with previous test pressures and verify results are within acceptable limits or identify corrective measures.
Dry Pipe Alarm Valve and Trim
Test 13.4.4.2.2:
- Visual inspection of alarm valve exterior, trim, gauges.
- Verify and record valve pressure
- Perform full flow trip test
Priming Water Level Test 13.4.4.2.1:
- Check priming water level (before and after trip test).
Quick Opening Device Test 13.4.4.2.4:
- If caps are missing, check for obstructions.
Low Air Pressure Alarm, Dry Pipe Valve Test 13.4.4.2.6:
Low Point/Auxiliary Drains - Drain all low points to remove condensation prior to cold season.
Water Motor Gong Inspect: 13.5.1.1:
Gauges Inspect 5.2.4.2 - 5.2.4.4:
Pipe and Fittings Inspect 5.2.2:
Spare Sprinklers Inspect 5.2.1.4:
Dry Pipe Sprinkler System Requirements Page 4 of 24
Hydraulic Placard Inspect 5.2.6, Verify legibility
Dry Pipe Valve and Riser Enclosure
Inspect 13.4.3.1 / 13.4.3.2.14:
- Verify operability of the heating system at the beginning of the heating season.
- Verify operability of low temperature alarms and alarm at panel.
Test backflow preventers and record results (where systems permits this type of testing). Repair leaking check valves.
2 Years
In addition to the annual requirements listed above, perform the following:
Dry Pipe Alarm Valve and Trim
Maintenance 13.4.3.3.2:
Inspect 13.4.3.1.7:
- Verify that manual actuators are operable.
- Inspect internal condition and clean valve seat before resetting.
Control Valves Maintenance 13.3.4:
- Exercise valve through entire range.
- Lubricate valves and stems.
Air Maintenance Devices - Inspect to verify proper operation.
Obstruction Inspection Inspection, 14.2
Gauges Test 5.3.4, 13.2.7.2:
- Recalibrate or replace gauges.
Sprinklers (Extra-High or greater temp heads) Test 5.3.1.1.1.4
Alarm Valve Appurtenances Inspect 13.4.4.1.6:
- Inspect strainers, filters, restricting orifices
Check Valves Inspect 13.4.2.1: Internal inspection and operability Sprinklers (Subject to Corrosion Environment) Test 5.3.1.1.2:
10 Years Sprinklers (Dry Heads) Test 5.3.1.1.1.6:
20 Years
Dry Pipe Sprinkler System Requirements Page 5 of 24
Fast Response and High Temperature Sprinkler Heads
Test 5.3.1.1.1.3:
- Test sample sprinklers to verify response characteristics.
Test 5.3.1.1.1:
- Replace or test a sample of sprinkler heads to verify response characteristics.
System
Repair or Modification
Valve Supervisory Switch Inspect 13.3.2.1.2:
Main Drain - Conduct a main drain test to verify supply.
Deluge Sprinkler System Requirements Page 6 of 24
DELUGE SPRINKLER SYSTEMS
Combined Recommendations for Deluge Sprinkler Systems
Cycle System Component *Work riser condition, spare sprinkler heads.
- Ensure detectors are unblocked, panels are secured and indicator lamps are functional, notification appliances are in place, and manual stations are in place and unobstructed.
Test 13.3.3.1:
- Operate valve through its full range and return to its normal position.
Inspect 13.2.6, 13.5.1.1:
- Operate to verify function and alarm at panel.
- Verify alarm test valve alignment and
- Inspect to verify devices are free from physical damage.
- Read and record static and residual pressure.
- Attach readings to gauge with a tag.
- Compare resulting test pressures with previous test pressures and verify results
Deluge Alarm Valve and Trim
Test 13.4.3.2.2:
- Visual inspection of alarm valve exterior, trim, gauges.
- Verify and record valve pressure.
Test 13.4.3.2.1:
- Check priming water level (before and after trip test).
Low Air Pressure Alarm, Deluge Valve Test 13.4.3.2.13:
Low Point/Auxiliary Drains - Drain all low points to remove condensation prior to cold season.
Deluge Sprinkler System Requirements Page 7 of 24
Gauges Inspect 5.2.4.2 - 5.2.4.4:
Pipe and Fittings Inspect 5.2.2:
Spare Sprinklers Inspect 5.2.1.4:
Deluge Valve and Riser Enclosure
- Verify operability of the heating system at the beginning of the heating season.
- Verify operability of low temperature alarms and alarm at panel.
Test backflow preventers and record results (where systems permits this type of testing). Repair leaking check valves.
Deluge Alarm Valve and Trim
- Inspect 13.4.3.1.7:
- Maintenance 13.4.3.3.2:
- Verify that manual actuators are operable.
- Inspect internal condition and clean valve seat before resetting.
- Maintenance 13.3.4:
Obstruction Inspection Inspection 14.2:
heads) Test 5.3.1.1.1.4:
Deluge Valve Appurtenances Inspect 13.4.3.1.8:
- Clean and inspect internals of alarm valve and appurtenances.
Inspect 13.4.2.1: Internal inspection and operability Check Valves
Pressure Reducing and Relief Valves (Sprinklers) Test 13.5.1.2:
Deluge Sprinkler System Requirements Page 8 of 24
Sprinklers (Corrosion Resistant) Test 5.3.1.1.2:
20 Years Sprinklers (Fast Response) Test 5.3.1.1.1.3:
50 years Standard Sprinkler Heads Test 5.3.1.1.1:
or
Preaction Sprinkler System Requirements Page 9 of 24
PREACTION SPRINKLER SYSTEMS
Combined Recommendations for PreAction Sprinkler Systems riser condition, spare sprinkler heads.
- Ensure detectors are unblocked, panels are secured and indicator lamps are functional, notification appliances are in place, and manual stations are in place and
Test 13.4.3.1:
- Operate valve through its full range and return to its normal position.
- Operate to verify function and alarm at panel.
- Verify alarm test valve alignment and
- Inspect to verify devices are free from physical damage.
- Read and record static and residual pressure.
- Attach readings to gauge with a tag.
- Compare resulting test pressures with previous test pressures and verify results
PreAction Alarm Valve and Trim
Test 13.4.3.2.2:
- Visual inspection of alarm valve exterior, trim, gauges.
- Verify and record valve pressure.
Test 13.4.3.2.1:
- Check priming water level (before and after trip test).
Low Air Pressure Alarm, PreAction Valve Test 13.4.3.2.13:
Low Point/Auxiliary Drains - Drain all low points to remove condensation prior to cold season.
Preaction Sprinkler System Requirements Page 10 of 24
Water Motor Gong Inspect 13.5.1.1:
Gauges Inspect 5.2.4.2 - 5.2.4.4:
Pipe and Fittings Inspect 5.2.2:
Spare Sprinklers Inspect 5.2.1.4:
PreAction Valve and Riser Enclosure
- Verify operability of the heating system at the beginning of the heating season.
- Verify operability of low temperature alarms and alarm at panel.
Test backflow preventers and record results (where systems permits this type of testing). Repair leaking check valves.
PreAction Alarm Valve and Trim
- Inspect 13.4.3.1.7:
- Maintenance 13.4.3.3.2:
- Verify that manual actuators are operable.
- Inspect internal condition and clean valve seat before resetting.
- Maintenance 13.3.4:
Obstruction Inspection Inspection 14.2:
heads) Test 5.3.1.1.1.4:
PreAction Valve Appurtenances Inspect 13.4.3.1.8:
- Clean and inspect internals of alarm valve and appurtenances.
(Sprinklers) Test 13.5.1.2:
Sprinklers (Corrosion Resistant) Test 5.3.1.1.2:
Preaction Sprinkler System Requirements Page 11 of 24
20 Years Sprinklers (Fast Response) Test 5.3.1.1.1.3:
50 years Standard Sprinkler Heads Test 5.3.1.1.1:
or
Standpipe System Requirements Page 12 of 24
STANDPIPE SYSTEMS/HOSE SYSTEMS
Combined Recommendations for Standpipe/Hose Systems
Piping Inspect 6.2.1:
-Inspect for damage, leaks, missing caps, and obstructions.
Cabinet Inspect, NFPA 1962 Hose Inspect, NFPA 1962 Hose Nozzle Inspect, NFPA 1962 Hose Storage Device Test, NFPA 1962
Pressure Reducing and Relief Valves (Hose Connections) Inspect, 13.5.2.1
-Operate to verify function and alarm at panel.
-Lubricate valves and stems.
Pressure Reducing and Relief Valves (Hose Racks) Inspect, 13.5.3.1
Hose Connections Maintenance, Table 6.1.2
Hose Test, NFPA 1962
Hydrostatic Test Test 6.3.2:
- Hydrostatic test to ensure integrity (for dry standpipe systems only)
Control Valves -Lubricate valves and stems.
Flow Test Test, 6.3.1
- Conduct flow test to verify flow capacity and minimum discharge pressure.
(Hose Connections) Test, 13.5.2.2
(Hose Racks) Test, 13.5.3.2
Mains and Hydrants Requirements Page 13 of 24
MAINS AND HYDRANTS
Combined Recommendations for Mains and Hydrants
Hydrants Maintenance, 7.4.2.2
- Keep hydrants free of snow and ice or other materials
Hydrants Flow Test
Test 7.3.2:
- Open fully and run water until water is clear or 1 minutes, whichever is longer.
- Verify drainage of the barrel after all operations and before cold weather.
Hydrants (Dry-Barrel) Inspect 7.2.2.4:
- Take corrective action as necessary, see Table 7.2.2.5
Hydrants (Wet-Barrel) Inspect 7.2.2.5:
- Take corrective action as necessary, see Table 7.2.2.5
2 Years Hydrants
Maintenance 7.4.2:
- Lubricate hydrant.
- With caps on all outlets, operate not less than five full cycles to ensure operation and to distribute lubrication.
5 Years Piping Flow Test
Test 7.3.1:
-Conduct flow test. Test should be coordinated with the 2-year tasks whenever possible. 20 percent of the site's hydrants should be tested each year so that every hydrant has had a flow test conducted and recorded at the end of the 5-year cycle.
- Document flow tests and provide results to the Fire Department.
After Flow Test Strainers - Inspect and clean after each flow test.
As Required Hydrants
- Apply protective coatings to prevent corrosion.
- Identify by hydrant barrel color code the water distribution system to which the hydrant is connected;
1) Potable Water
2) Non-Potable Fire Protection Water
3) Non-Potable Reuse (Gray) Water. Locate or
Mains and Hydrants Requirements Page 14 of 24
MAINS AND HYDRANTS
Combined Recommendations for Mains and Hydrants confirm on existing plans.
- Identify by hydrant bonnet color code the water flow available from the hydrant.
Fire Pump System Requirements Page 15 of 24
FIRE PUMPS
Combined Recommendations for Fire Pumps
Monthly
Pump House Inspect 8.2.2 (1):
-Inspect for proper condition, ventilation, and heating
Control Valves and Isolation Valves
Inspect 8.2.2 (2):
-Verify proper valve position.
Pressure Gauges Inspect 8.2.2 (2):
- Check reading and verify gauge operability.
Controllers
Inspect 8.2.2 (3):
- Verify that automatic controllers are in the AUTO setting.
- Inspect electronic connections.
- Operate manual and automatic stations.
Record and Submit Pump Runtimes (Date/Hours)
Diesel Engine
Inspect 8.2.2 (4):
- Verify proper charge.
- Controller switch set to Auto
- Verify fuel level for Engine-Driven Pumps (minimum 2/3 full).
- Alarm pilot lights are off
- Crankcase oil level acceptable
- Cooling water level acceptable
- Water jacket heater is operating
Pump Electric Motor
Inspect 8.2.2 (3)
- Transfer switch normal pilot light is on
- Reverse phase alarm pilot light off
- Oil level in motor sight glass is acceptable
- Power to jockey pressure maintenance (jockey) pump is available and pump is functioning normally.
Electric Pump VFD -Operate Pump with VFD in Bypass to ensure operability
Fire Pump System Requirements Page 16 of 24
Electric Pump
Test 8.3.2.8 (1,2):
- Start and churn to verify operability. Electric Pumps shall operate for 10 minutes
- Verify operation of relief valves.
- Record time motor requires to obtain full speed.
- Record pumps starting pressure
- Check for unusual noise or vibration
- Check pump packing boxes, bearings, and pump casing for overheating
Diesel Engine
Test 8.3.2.8 (3):
- Operate engine-driven pump for 30 minutes
- Inspect exhaust system for leaks for Engine-Driven Pumps.
- Start engine-driven pump again using second battery set and churn to verify operability.
- Observe/record time for engine to crank to start
- Observe/record time for engine to reach running speed
- Observe/record engine oil pressure gauge, speed indicator, water, and oil temperature
- Check heat exchanger to confirm cooling water flow.
Control Valves - Operate and lubricate valves. To ensure operability
Controllers
- Calibrate pressure switches.
- Exercise circuit breakers and switches to verify operability.
- Inspect fuses.
Pumps
- Check coupling alignment to ensure that the shaft is aligned.
- Check pump shaft end play.
Fire Pump System Requirements Page 17 of 24
- Lubricate bearings.
- Lubricate couplings.
- Lubricate right-angle drives.
Fuel - Sample fuel to verify quality.
Relief Valves - Calibrate valves.
Emergency Power Supply - Test to verify availability and capacity for pump motor
5 Years Pumps
- Conduct flow test to verify pump output. Test may be through a flow meter returning the water to a storage reservoir or through the test header. Recirculation of water to the suction piping is not permitted. In a multi-pump installation, each pump may be tested separately at not less than 100 percent capacity for 30 minutes.
Water Supply Tank / System Requirements Page 18 of 24
WATER SUPPLY TANKS
Combined Recommendations for Water Supply Tanks
Weekly (during cold weather season)
Pipe Heat Trace Systems without electronic supervision
Inspect 9.2.5.6
- Verify systems are functional
- Verify piping not frozen
Solar Powered Tank Agitator without electronic supervision
Inspect
- Verify systems are functional
Confirm Tank Altitude Valve is Functional without electronic supervision
-Observe trending graph to confirm water level variation
Solar Powered Tank Agitator without supervised
-Clean surface of solar array for optimal performance
Confirm Tank Altitude Valve is Functional without electronic supervision
-Observe trending graph to confirm water level variation
Bermad Valve in South Meter Pit is Functional
- Verify proper valve position agrees with Control Panel at Pump House
- Clean water filter associated with Pilot Valves
Tank Exterior (Base and Top of Tank)
Inspect 9.2.4:
- Inspect exterior for condition, damage, corrosion, and accessibility.
Tank Interior (Base, 1st and 2nd Interior Levels, Access Tube to Top of Tank)
Inspect 9.2.5.1:
- Inspect interior for condition, damage, corrosion, and accessibility.
Interior Ladders and External Handrails (top of tank) Inspect 9.2.5.1
Surrounding Area
-Confirm that all Curtain Tie- Downs are Covered -Verify Perimeter Fence in Tact -Verify Man Gate is Secure -Verify access gate is Functional and Secure
- Test 13.3.3.1:
- Operate valve through its full range and return to its normal position.
- Confirm valve position after operation.
Painted / Coated Surfaces Inspect 9.2.5.5
Water Supply Tank / System Requirements Page 19 of 24
WATER SUPPLY TANKS
Combined Recommendations for Water Supply Tanks
Expansion Joints Inspect 9.2.5.3
Control Valves including Drain Valves
Maintenance 13.3.4:
- Exercise valve through operating range.
- Lubricate valves.
Water Level Alarms and Indicators
- Test water level alarms to verify operation and set points.
Tank Vent - Inspect and clean tank vents.
Tank Agitator
- Observe tank agitator for defects
- Perform required maintenance on device
Pressure Gauges Test 9.3.6:
- Calibrate gauges.
Check Valves - Inspect interior of valves.
Level Indicator Test Test 9.3.1:
- Calibrate level indicator.
Water Holding Section Interior
Inspect 9.2.5
- Conduct internal tank inspection to determine condition and amount of corrosion.
Dry Chemical System Requirements Page 20 of 24
DRY CHEMICAL SYSTEMS
Combined Recommendations for Dry Chemical Systems
Semi-Annually
Piping and Nozzles
- Inspect piping, pipe hangers, and nozzles for obstructions and proper support.
- Conform nozzle covers are in place.
Storage Vessels
- Inspect agent container for condition.
- Verify storage pressure of propellant is within
Agent - Verify quantity and quality of agent.
Actuators
- Inspect manual actuators for accessibility.
- Inspect detection devices for contamination and clean.
- Test actuation system without agent release.
Coordinate with annual replacement of fixed temperature sensing elements.
- Verify that interfaces (gas shutoff, power shutoff) operate properly.
Fusible Metal Alloy Link Detectors Replace 11.3.2:
Detectors (other than Metal Alloy) Inspect 11.3.3.1:
- Ensure that detectors are unblocked
Detectors (other than Metal Alloy) Test 11.3.3.1:
Control System
Ensure that panels are secured and indicator lamps are functional, notification appliances are in place, manual stations are in place and
Actuators - Replace fixed temperature sensing elements
(fusible links/metal alloy type).
Pressure Regulators Test 11.3.1.6:
5 Years Storage Vessels Hydrostatic Test 11.5:
- Conduct hydrostatic test for pressure
Dry Chemical System Requirements Page 21 of 24 cylinders in accordance with OSHA and DOT standards.
Wet Chemical System Requirements Page 22 of 24
WET CHEMICAL SYSTEMS
Combined Recommendations for Wet Chemical Systems
Semi-Annually
Piping and Nozzles
- Inspect piping, pipe hangers, and nozzles for obstructions and proper support.
- Conform nozzle covers are in place.
Storage Vessels
- Inspect agent container for condition.
- Verify storage pressure of propellant is within
Agent - Verify quantity and quality of agent.
Actuators
- Inspect manual actuators for accessibility.
- Inspect detection devices for contamination and clean.
- Test actuation system without agent release.
Coordinate with annual replacement of fixed temperature sensing elements.
- Verify that interfaces (gas shutoff, power shutoff) operate properly.
Fusible Metal Alloy Link Detectors Replace 11.3.2:
Detectors (other than Metal Alloy)
Inspect 11.3.3.1:
- Ensure that detectors are unblocked
Detectors (other than Metal Alloy) Test 11.3.3.1:
Control System Ensure that panels are secured and indicator lamps are functional, notification appliances are in place, manual stations are in place and unobstructed.
Actuators - Replace fixed temperature sensing elements
(fusible links/metal alloy type).
Pressure Regulators Test 11.3.1.6:
5 Years Storage Vessels Hydrostatic Test 11.5:
- Conduct hydrostatic test for pressure cylinders in accordance with OSHA and DOT standards.
Nitrogen Generation System Requirements Page 23 of 24
Nitrogen Generation Systems Cycle Work
- Clean filter bowls.
- Calibrate oxygen analyzer per manufacturer's instructions.
Every 3 Months
- Change Particulate pre filter element.
- Operate safety valves.
- Operate manual valves.
- Check for leaks and repair as necessary.
Every 6 Months - Change Coalescing pre filter element.
- Test all air pilot valves.
- Install valve repair kits on flow control valve and equalizer valves when necessary.
- Disassemble and inspect all air-operated valves; install repair kits if required.
- Check for air and product leaks.
- Change Absorber pre filter element.
- Check O2 analyzer sensor for proper operation as per manufacturer's instructions and order replacement.
Every 3 Years - Install repair kits in all pneumatically operated valves.
Dry-Pipe and Preaction System Air Compressors Requirements Page 24 of 24
Dry and PreAction System Air Compressors Cycle Work
- Check Oil Level
- Drain condensate from receiver and traps
- Check for usual noise or vibration
- Clean air filters
- Clean all external parts of the compressor and motor
- Inspect air system for leaks
- Inspect oil for contamination and change if necessary
- Check for belt tension and wear
- Check pulley set screws for tightness
- Tighten nuts and cap screws as required
- Manually test safety relief valve
Quarterly
- Change oil
- Change filters
Exhibit 4 Fire Alarm and Mass Notification Systems, Inspection and Testing Requirements
Fire Alarm System Requirements Page 1 of 7
FIRE ALARM AND MASS NOTIFICATION SYSTEMS
Cycle Alarm/MNS Component
Task
Weekly Wide Area Mass
Notification Control Panel
1. Review event log file, verify that correct events were logged.
2. Review system diagnostic log, correct deficiencies
3. After deficiencies are corrected, delete unneeded log and error files from logs
4. Disable any remote control software installed on system.
Wide Area MNS, All Equipment
1. Send an alert to a diverse set of pre-designated receiving devices and confirm receipt. Include at least one of each type of receiving device.
2. Perform silent activation and/or health monitoring of all components.
3. Perform a test activation for a particular zone/building/area.
Verify that field components perform as expected.
Wide Area MNS Wireless Transceivers
1. Perform silent activation and/or health monitoring of all components.
Fire Alarm and Mass
Panels
1. Inspect and verify panel condition (connections, fuses, LED diodes, etc.)
Quarterly
1. Disconnect grid power from control panel and verify system operation when operating on backup power.
Semi-
Notification, All
1. Inspect all equipment enclosures and all equipment individually. Verify that equipment and enclosures remain in good condition and that integrity is not compromised.
2. Inspect antenna and verify solid connections and no corrosion.
3. Inspect and test wireless transceivers. Verify transceivers operate properly.
4. Test by generating a conductor integrity monitor alarm.
Verify alarm status at dispatch.
5. Disconnect AC power to all control panels. Verify AC power failure alarm status at dispatch. Re-connect AC power prior to test completion.
6. Disconnect AC power to all control panels. Test and verify backup battery voltage under load. Re-connect AC power prior to test completion.
1. Verify the content of pre-recorded messages.
2. Test and verify activation of the correct pre-recorded message based on the selection made.
Fire Alarm System Requirements Page 2 of 7
3. Test and verify activation of the correct pre-recorded message based on a targeted area.
4. Test and verify that all security measures and mechanisms are functional.
All Equipment
1. Inspect to ensure that no changes affect equipment performance. Inspect for building modifications, changes in environmental conditions, device locations, physical obstructions, device orientation, physical damage, and degree of cleanliness
Fire Alarm Control Panel, Mass
Panel, and Annunciator
1. Inspect to verify a system normal condition and physical condition for all equipment related to and within the fire alarm and/or mass notification control panel(s).
2. Test to verify proper receipt of alarm, supervisory, and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs). Verify circuit supervision, including detection of open circuits and ground faults. Verify power supply supervision for detection of loss of ac power and disconnection of secondary batteries.
3. Fuses – Verify rating and supervision
4. Interfaced Equipment – Verify integrity of circuits providing interface between two or more control units. Test interfaced equipment by operating or simulating operation of the equipment being supervised. Verify signals required to be transmitted at the control equipment.
5. Test to verify that all lamps and LEDs illuminate.
6. Primary power supply – Disconnect and test all secondary
(standby) power under maximum load, including all alarm appliances requiring simultaneous operation. Reconnect all secondary (standby) power at end of test. Test redundant power supplies separately
Fire Alarm Control Panel and Mass
Panel Trouble Signals
1. Verify operation of control unit trouble signals. Verify ring-back feature for systems using a trouble-silencing switch that requires resetting.
2. Disconnect switches – If control unit has disconnect or isolating switches, verify performance of intended function of each switch. Verify receipt of trouble signal when a supervised function is disconnected.
3. Ground-fault monitoring circuit – Verify the occurrence of ground-fault indication whenever any installation conductor is grounded.
4. Transmission of signals – Actuate an initiating device and verify receipt of alarm signal at the at the system control
Fire Alarm System Requirements Page 3 of 7 panel in building 911. Create a trouble condition and verify receipt of a trouble signal at the system control panel in building 911. Actuate a supervisory device and verify receipt of a supervisory signal at the off-premises location.
If a transmission carrier is capable of operation under a single- or multiple-fault condition, activate an initiating device during such fault condition and verify receipt of an alarm signal as a trouble signal at the system control panel in building 911.
Fire Alarm and Mass Notification
Transmitters and Transceivers
1. Inspect to verify a system normal condition and physical condition.
2. Test to verify transmission of alarm, supervisory, and trouble signals to dispatch.
3. Test to verify receipt of all mass notification messages and signals from dispatch. Verify circuit supervision, including detection of open circuits and ground faults. Verify power supply supervision for detection of loss of ac power and disconnection of secondary batteries.
4. Fuses – Verify rating and supervision
5. Interfaced Equipment – Verify integrity of circuits providing interface between two or more control units. Test interfaced equipment by operating or simulating operation of the equipment being supervised. Verify signals required to be transmitted at the control equipment.
6. Test to verify that all lamps and LEDs illuminate.
7. Primary power supply – Disconnect and test all secondary
(standby) power under maximum load. Reconnect all secondary (standby) power at end of test. Test redundant power supplies separately
Notification Appliance Circuit Power
Extenders, MNS Amplifiers, Emergency
Textual Visual Appliance Controllers
1. Inspect to verify proper fuse ratings. Verify that lamps and LEDs indicate normal operating status of the equipment.
2. Verify physical condition of the equipment.
3. Verify proper fuse ratings, if any. Verify that lamps and
LEDs indicate normal operating status.
Remote Annunciators
1. Inspect to verify location and condition.
2. Verify the correct operation and identification of annunciators. If provided, verify the correct operation of annunciator under a fault condition.
Local Operator Consoles
1. Inspect to verify location and condition.
2. Test to verify operation of pre-installed messages by utilizing onboard switches to activate messages. Verify
Fire Alarm System Requirements Page 4 of 7 messages from speakers are matched with labels for each switch.
3. Test and operate onboard microphone. Broadcast live message over speakers.
4. Verify receipt of appropriate supervisory signal at mass notification control panel while LOC is in use.
5. Reset any alarms triggered by use of LOC.
Manual Pull Stations
1. Inspect for location and physical condition. Verify that access to manual pull station is not obstructed. Clean manual pull station as necessary to allow for proper operation.
2. Operate manual pull station per the manufacturer’s published instructions. Test both key-operated presignal and general alarm manual pull stations.
Notification Appliances, Speakers, Textual Signs, and Voice Communications
1. Inspect notification appliances to verify location and condition of all appliances.
2. Audible – Verify operation of the notification appliance.
3. Visible – Verify that each appliance flashes.
4. Signs – Verify that each sign displays the correct message
5. Measure sound pressure utilizing a sound level meter.
Verify speakers achieve 15dB above ambient in accordance with UFC 4-021-01.
Digital Alarm Transmitters and
Receivers
1. Test all system functions and features in accordance with the equipment manufacturer’s published instructions. Actuate initiating device and verify receipt of the correct initiating device signal at the supervising station within 90 seconds.
Upon completion of the test, restore the system to its functional operating condition. If test jacks are used, conduct the first and last tests without the use of test jack.
2. Radio Alarm Transmitter – Cause a fault between elements of the transmitting equipment. Verify indication of the fault at the protected premises, or transmission of trouble signal to the supervising station.
Batteries
1. Inspect batteries for corrosion or leakage. Verify tightness of connections. Verify marking of the month/year of manufacture.
2. Prior to conducting any battery testing, verify that all system software stored in volatile memory is protected from loss
Nickel-Cadmium
1. Battery Replacement - Replace batteries in accordance with the recommendations of the alarm equipment manufacturer or when the recharged battery voltage or current falls below
Fire Alarm System Requirements Page 5 of 7 the manufacturer’s recommendations. For equipment containing multiple batteries, if any battery fails any of the listed battery tests, replace all batteries in the equipment.
2. Charger Test – With the batteries fully charged and connected to the charger, place an ampere meter in series with the battery under charge. Verify the charging current is in accordance with the manufacturer’s recommendations for the type of battery used. In the absence of specific information, use 1/30 to 1/25 of the battery rating.
3. Discharge Test – With the battery charger disconnected, load test the batteries following the manufacturer’s recommendations. Verify the voltage level does not fall below the levels specified. Load testing can be by means of an artificial load equal to the full fire alarm load connected to the battery.
4. Load Voltage Test – With the battery charger disconnected, recommendations. Verify the voltage level does not fall below the levels specified. Load testing can be by means of an artificial load equal to the full fire alarm load connected to the battery. Verify the float voltage for the entire battery is 1.42 volts per cell, nominal, under load. If possible measure cells individually. All batteries shall be capable of maintaining standby power for a minimum of 24 hours and 20 minute activation at the end of the 24 hour period.
Sealed Lead-Acid
1. Battery Replacement – Replace batteries in accordance with the recommendations of the alarm equipment manufacturer or when the recharged battery voltage or current falls below the manufacturer’s recommendations.
2. Charger Test – With the batteries fully charged and connected to the charger, measure the voltage across the batteries with a voltmeter. Verify the voltage is 2.30 volts per cell ±0.02 volts at 77°F or as specified by the equipment manufacturer.
3. Discharge Test – With the battery charger disconnected, recommendations. Verify the voltage level does not fall below the levels specified. Load testing can be by means of an artificial load equal to the full fire alarm load connected to the battery.
4. Load Voltage Test – Verify the battery performs under load, in accordance with the battery manufacturer’s specifications.
All batteries shall be capable of maintaining standby power
Fire Alarm System Requirements Page 6 of 7 for a minimum of 24 hours and 20 minute activation at the end of the 24 hour period.
Heat Detectors
1. Inspect to ensure detectors are free of mechanical or water damage, have not been painted, are properly secured, and that altered building conditions have not reduced the effectiveness of the device.
2. Perform heat test with a listed and labeled heat source or in accordance with the manufacturer’s published instructions.
Assure that that the test method for the installed equipment does not damage the non-restorable fixed-temperature element of a combination rate-of-rise/fixed-temperature element detector.
Smoke Detectors
1. Inspect smoke detectors for obstructions that might affect operation of the detector. Verify physical condition and location of the detector.
2. Test smoke detectors in place to ensure smoke entry into the sensing chamber and an alarm response. Use smoke or a listed and labeled product acceptable to the manufacturer or in accordance with their published instructions that ensure smoke entry from the protected area, through the vents, into the sensing chamber used.
3. Perform a functional test on all smoke alarms connected to the fire alarm system by putting the smoke alarm into an alarm condition and verifying that the fire alarm system receives a supervisory signal and does not cause a fire alarm signal.
Duct Detectors
1. Inspect detector to confirm physical condition and that detector is rigidly mounted. Confirm that no penetrations in return air duct exist in the vicinity of the detector. Confirm the detector is installed so as to sample the airstream at the proper location. Clean detector, if allowed by manufacturer, as necessary for proper operation of detector.
2. Sampling tube – Verify proper orientation and confirm that sampling tube protrudes into the duct in accordance with system design.
3. Perform test #1 from Smoke Detectors listed above
4. Test duct smoke detectors that use sampling tubes to ensure that they will properly sample the airstream in the duct using a method acceptable to the manufacturer or in accordance with their published instructions.
Fire Alarm System Requirements Page 7 of 7
5. Utilize listed control equipment or the manufacturer’s calibrated sensitivity test instrument to test that each smoke detector is within its listed and marked sensitivity range.
Waterflow/Pressure Switches
1. Water shall be flowed through an inspector’s test connection indicating the flow of water equal to that from a single sprinkler of the smallest orifice size installed in the system for wet-pipe systems, or an alarm test bypass connection for dry-pipe, pre-action or deluge systems in accordance with
NFPA 25.
Tamper Switches
1. Visually inspect that there is no physical damage, and that covers and watertight seals are in place.
2. Test to verify initiation and receipt of supervisory alarm per manufacturer’s instructions.
EXHIBIT 5
Impairment Procedure
1.1 TEMPORARY IMPAIRMENT OF SPRINKLER SYSTEM
The Contractor is to designate an Impairment Coordinator who will be responsible for coordination of system impairment. The Impairment Coordinator shall become thoroughly familiar with all on-site organizations and contact personnel and will impair systems as defined below.
Taking fire protection systems out of service (impairment) for maintenance, testing, and repair shall be coordinated with installation fire department personnel. The Impairment Coordinator is to alert the COR when and which systems will be taken out of service and for how long on a daily basis. It will be the responsibility of the Impairment Coordinator to deactivate the fire alarm system for sprinkler systems being taken out of operation. The Impairment Coordinator will also notify Installation Fire Department and Dispatch of the specific systems that are being impaired. Training will be provided at the beginning of the project to familiarize the Impairment Coordinator with this procedure. No more than two systems may be taken down in a single building at a time. Systems are to be adjacent to each other. No more than 4 systems may be taken down throughout the site at one time. No sprinkler systems may be left impaired overnight unless a 24-hour fire watch is posted to guard areas that are covered by the impaired sprinkler system. Fire watch is the responsibility of the Contractor.
The contractor shall provide NICET Level 3, NICET Level 4, or FPE personnel at the main fire alarm supervising panel in Building 911 during all tests that require reporting to the main fire alarm supervising panel. Personnel in Building 911 shall be responsible for clearing all fire alarm testing related signals at the main fire alarm supervising system.
There are several buildings that will require special attention to the impairment procedure.
These buildings are high traffic and critical function buildings including Buildings 54, 70, 76, 78, 79, 81, 87, 255, 284, 320, 403, 404, 430, 753, 911, 2012, 2055, and the administrative area of 2001 and laboratories located in certain areas of Building 85.
1.2 PROCEDURE FOR SYSTEM IMPAIRMENT
The Impairment Coordinator shall notify the COR 48 hours prior to the impairment of a sprinkler system. This shall be done for EVERY system that is impaired during the contract. Installation Fire Inspectors need to conduct a Fire Safety check of building or area that will be affected by the system impairment prior to deactivation of the sprinkler system. Additionally, any Hot Work required to be completed in the affected area must be done prior to impairment of the system.
No Hot Work permits will be granted during system impairment. The following actions will be taken by the Contractor as required by NFPA 25, Chapter 15.
The extent and expected duration of the impairment have been determined.
Implementation of mitigating measures for the areas or buildings involved have been considered during the period that the system is impaired. This considers the building occupancy type, nature and duration of impairment, building occupancy level during the impairment period, active work being conducted on the fire alarm and fire sprinkler systems during the impairment, condition of other fire protection systems and features, and hazards and assets at risk.
When an automatic sprinkler system is placed out of service, the Impairment Coordinator will arrange for a fire watch for all portions of the building left unprotected by the shutdown until the fire alarm and sprinkler systems have been returned to service.
Contractor shall provide a fire watch for areas unprotected by impaired fire suppression systems or impaired fire alarm systems when an impairment lasts more than 10 hours in a 24 hour period. Fire watch must comply with NFPA 25, 15.5.2.4 and A.15.5.2.4.b. A fire watch will be composed of individuals beyond normal staffing, assigned to walk the areas affected.
The number of fire watch personnel utilized will be determined by the Impairment Coordinator. During a fire watch, personnel conducting this activity will log information on the Fire Watch Log Sheet. The log sheet is to be updated HOURLY during a system impairment. A copy of this log sheet is provided as Table 2 at the end of this exhibit.
Fire watch personnel used for system impairments must be specially trained in fire prevention, the use of fire extinguishers, and in occupant and fire department notification techniques.
The Impairment Coordinator is to assure that the fire sprinkler system is ready for a full flow test.
The Impairment Coordinator must provide notice to the DLA fire department inspector at least 24 hours prior to the time that testing is required.
At the agreed upon time for the test, the full flow test is to be conducted by the Contractor and personally witnessed by the Installation Fire Inspector and the COR.
The test procedure to be utilized will depend on the type of sprinkler system being tested.
Procedures for dry-pipe and wet-pipe sprinkler systems are as follows:
(1) Wet-Pipe Sprinkler Systems
The Fire Protection Specialist shall conduct the Final System Test and shall provide a complete demonstration of the operation of the system. This shall include operation of control valves and operation of inspector's test valve to verify operation of associated waterflow alarm switches. After operation of control valves has been completed, the main drain test shall be repeated to assure that control valves are in the open position. In addition, the representative shall have available copies of as-built drawings and certificates of tests previously conducted. The work shall not be considered accepted until identified discrepancies have been corrected and test documentation is properly completed and received. All test data shall be recorded on the Final System Test Worksheet. A copy of this worksheet is provided as Table 3 at the end of this exhibit.
(2) Dry-Pipe Sprinkler Systems
The Fire Protection Specialist shall conduct the Final System Test and shall provide a complete demonstration of the operation of the system. If applicable, the nitrogen generator system by-pass shall be tested to verify that system pressure is restored in the time specified by NFPA. Before trip testing a Nitrogen-Supervised system, the isolation valves for the nitrogen generation system shall be shut. After testing a Nitrogen- Supervised system, the Nitrogen Power Saver Manifold Sampling Lines shall be disconnected and cleared of possible debris. The Nitrogen bypass shall be shut and the Nitrogen Generation system be put back into normal service after system pressure reaches normal, supervisory status. Testing shall also include operation of control valves and operation of inspector's test valve to verify operation of associated waterflow alarm switches. After operation of control valves has been completed, the main drain test shall be repeated to assure that control valves are in the open position.
Each dry pipe valve shall be trip-tested by reducing normal system air pressure flowing water through operation of the inspector's test connection. Test results will be witnessed and recorded. Test results shall include the number of seconds elapsed between the time the test valve is opened and tripping of the dry alarm valve; trip-point air pressure of the dry pipe valve; water pressure prior to valve tripping; and number of seconds elapsed between time the inspector's test valve is opened and water reaches the orifice. In addition, the Fire Protection Specialist shall have available copies of as-built drawings and certificates of tests previously conducted. The work shall not be considered accepted until identified discrepancies have been corrected and test documentation is properly completed and received. After the system has been tested and drained, the system shall be drained periodically for at least 2 weeks until it can be assured that water from the system has been removed. The Contractor shall submit the Final System Test Worksheet. A copy of this worksheet is provided as Table 3 at the end of this exhibit.
Proper operation of the clapper valve within the valve house upon manual operation of the ITV (Inspector’s Test Valve).
Proper operation of the water motor gong.
Proper operation of fire alarms both locally and at Central Dispatch. This includes confirmation of tamper switch operation, flow switch and pressure (as applicable) operation.
This shall be confirmed through Dispatch via the Fire Inspector or the COR.
Upon successful testing of the sprinkler system, the Installation Fire Inspector shall sign-off on the Impairment Worksheet. In the event that the sprinkler system does not pass the sprinkler test, the reasons for system failure shall be documented and forwarded to the COR for disposition. In either case, the sprinkler system is to be reset and prepared for operation.
Sprinkler System Impairment Procedure
TABLE 1
IMPAIRMENT WORKSHEET
Todays' Date:
Impairment Coordinator's Name
Impairment Coordinator's Cell Phone Number:
Coordinator's Company Name:
Building Number:
Sprinkler System Number:
Dry Wet Preact Deluge Anitfreeze
Reason for Impairment:
Date Impairment Began:
Time Impairment Began:
Estimated Duration of Impairment:
Persons Conducting the Work:
Name of Person on Fire Watch:
Reminders Area Inspected:
Identified Risks (LIST):
SIGNATURES DATES
Impairment Tag Attached to Valve by:
IMPAIRMENT COORDINATOR
Notifications
AREA MANAGER SIGNATURE
FIRE INSPECTOR SIGNATURE
Restoration
Has the impaired system been inspected and tested operational? DDSP Fire Inspector to witness functional testing.
DDSP FIRE INSPECTOR SIGANTURE
Has impariment tag been removed from control valve?
IMPAIRMENT COORDINATOR SIGNATURE
Has Warehouse Area Manager alerted to system restoration.
AREA MANAGER SIGNATURE
Has Fire Department been alerted to system restoration?
FIRE INSPECTOR SIGNATURE
Warehouse Area Manager alerted to impending impairment:
Has Fire Department been alerted to impending impairment?
FAIL: REASONS FOR FAILURE
Type of System:
(USE A SEPARATE WORKSHEET FOR EACH SUB-SYSTEM)
PASS
FIGURE 1
FIRE & LIFE SAFETY SYSTEM PERMIT/IMPAIRMENT TAG
TABLE 2
FIRE WATCH LOG SHEET
Building Number: __________ Date: __________________ Impaired System Number (s):_______________ Log Time HOURLY
Name Time Area Checked
Please return this form to the Impairment Coordinator at the conclusion of this Firewatch.
TABLE 3
FINAL SYSTEM TEST WORKSHEET
1.1 TEMPORARY IMPAIRMENT OF SPRINKLER SYSTEM
1.2 PROCEDURE FOR SYSTEM IMPAIRMENT
1.2.1 The Impairment Coordinator shall perform the following functions in conjunction with the COR. The Impairment Coordinator shall:
1.2.1.1 Alert the area manager(s) that will be affected by the impairment of the sprinkler system.
1.2.1.2 Alert Installation Fire Department personnel of the specific sprinkler systems that are about to be impaired.
1.2.1.3 Alert Central Dispatch of the impending specific sprinkler systems impairment.
1.2.1.4 The Impairment Coordinator will complete the Impairment Worksheet for each system. A copy of this worksheet is provided at the end of this exhibit as Table 1. A copy of the Impairment Worksheet is to be saved in the system file after the spr...
1.2.1.5 The Impairment Coordinator will complete the Fire & Life Safety System Permit/Impairment Tag, see Figure 1 attached.
1.2.1.6 The Impairment Coordinator shall authorize the preplanned impairment and verify that the following procedures have been implemented:
a. The extent and expected duration of the impairment have been determined.
b. Implementation of mitigating measures for the areas or buildings involved have been considered during the period that the system is impaired. This considers the building occupancy type, nature and duration of impairment, building occupancy level d...
c. When an automatic sprinkler system is placed out of service, the Impairment Coordinator will arrange for a fire watch for all portions of the building left unprotected by the shutdown until the fire alarm and sprinkler systems have been returned to...
d. Contractor shall provide a fire watch for areas unprotected by impaired fire suppression systems or impaired fire alarm systems when an impairment lasts more than 10 hours in a 24 hour period. Fire watch must comply with NFPA 25, 15.5.2.4 and A.15...
e. Fire watch personnel used for system impairments must be specially trained in fire prevention, the use of fire extinguishers, and in occupant and fire department notification techniques.
1.2.1.7 When work on a fire sprinkler system is complete, a full flow test shall be completed prior to the release of this system back into service. The Impairment Coordinator shall coordinate the following activities:
a. The Impairment Coordinator is to assure that the fire sprinkler system is ready for a full flow test.
b. The Impairment Coordinator must provide notice to the DLA fire department inspector at least 24 hours prior to the time that testing is required.
c. At the agreed upon time for the test, the full flow test is to be conducted by the Contractor and…