This is a roof replacement schedule attachment for the Illinois Department of Natural Resources (DNR) White Pines and Castle Rock vault toilet roof replacement project. The project encompasses roof system replacement at 11 separate locations, with each location requiring identical or similar work. The scope of work includes removal of existing roof systems and skylights, installation of new skylights, ice and water guards, drip edge, flashing, vent boots, ridge vents, and shingles across approximately 2,103.2 square feet per location. Additional work includes removal and replacement of fascia boards, soffit, and siding at select locations, with total quantities of 72 linear feet of fascia boards, 18 square feet of soffit replacement, and 9.2 square feet of siding replacement across all sites. Each location also requires cleanup and disposal services. The schedule itemizes 11 distinct pay items with standardized quantities across most locations, though locations 407724 and 420576 contain additional work for fascia boards, flashing, soffit, and siding replacement.

The attachment does not provide specific pricing information, response deadlines, award dates, contract term details, or funding source information. No information regarding set-asides, incumbent contractors, site visit requirements, or pre-bid meetings is included in this schedule document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-27-008 White Pines & Castle Rock Vault Toilet Roof Replacement

Location Total Pay item 407730 407723 101055 407724 407725 407726 408903 407729 101056 461303 420576 Quantity Remove Existing Roof System 1 1 1 1 1 1 1 1 1 1 1 11 Each Remove Existing Skylight 2 2 2 2 2 2 2 2 2 2 2 22 Each Remove and Replace Fascia Boards 0 0 0 16 0 0 0 0 0 0 56 72 Ft Install New Skylights 2 2 2 2 2 2 2 2 2 2 2 22 Each Install New Ice and Water Guard 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 2103.2 Sq FT Install New Drip Edge 56 56 56 56 56 56 56 56 56 56 56 616 Ft Install New Flashing 0 0 0 16 0 0 0 0 0 0 56 72 Ft Install New Vent Boot 2 2 2 2 2 2 2 2 2 2 2 22 Each Install New Ridge Vent 10 10 10 10 10 10 10 10 10 10 0 100 Ft Install New Shingles 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 191.2 2103.2 Sq FT Remove and Replace Soffit 0 0 0 16 0 0 0 0 0 2 0 18 Sq FT Remove and Replace Siding 0 0 0 0 0 0 0 0 0 0 9.2 9.2 Sq FT Clean up and Disposal 1 1 1 1 1 1 1 1 1 1 1 11 Each