Attachment 2 - Requirements Roadmap - PMI.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Hoods and Ducts Cleaning and Maintenance
Solicitation number
FA441820Q0013
Issued by

About this file

This combined synopsis and solicitation requests quotes for hoods and duct cleaning, maintenance, and repair services. The Air Force is seeking these services for facilities located at Joint Base Charleston to be performed in accordance with the attached performance work statement. Quotes are due no later than July 7, 2020 and should be submitted electronically to the points of contact listed. A non-mandatory virtual site visit will also be held on June 17. This procurement is set aside entirely for small businesses classified under NAICS code 561790 with a size standard of $7.5M. The contract to be awarded will be fixed-price.

View the file

Other files

File Type Posted
Questions and Answers 20 July 2020.pdf PDF
Questions and Answers 16 July 2020.pdf PDF
Joint Base Charleston Hoods and Duct Cleaning - Pictures.pptx PPTX presentation
Attachment 2 - Pricing Sheet Updated 15 July 2020.xlsx XLSX spreadsheet
Attachment 1 - Equipment List Updated 15 July 2020.xlsx XLSX spreadsheet
Questions and Answers 15 July 2020.pdf PDF
Attachment 1 - Equipment List.xlsx XLSX spreadsheet
Attachment 2 - Pricing Sheet.xlsx XLSX spreadsheet
COMBO - JB CHS Hoods and Duct Cleaning.pdf PDF
Hoods and Ducts PWS 10 July 2020.pdf PDF
COMBO - JB CHS Hoods and Duct Cleaning.pdf PDF
Attachment 2 - Pricing Sheet.xlsx XLSX spreadsheet
Attachment 2 - Pricing Sheet.xlsx XLSX spreadsheet
Draft Hoods and Ducts PWS 16 June 20.pdf PDF
Attachment 3 - Air Base Map.pdf PDF
Attachment 4 - Weapon Station Map.pdf PDF
Attachment 1 - Equipment List.xlsx XLSX spreadsheet
COMBO - FA441820Q0013 - Amendment 1.pdf PDF
Hoods and Ducts PWS 26 May 20.pdf PDF
Attachment 1 - Equipment List.xlsx XLSX spreadsheet
COMBO - FA441820Q0013.pdf PDF
Attachment 4 - Weapon Station Map.pdf PDF
Attachment 5 - Air Base Map.pdf PDF
Attachment 3 - Mission Essential Letter.pdf PDF
Attachment 6 - Pricing Sheet 1.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roadmap Worksheet

PROJECT NAME:Hoods & Ducts
VISION:Ensure cleaned and well maintained for safe operations for all personnel
PERFORMANCE WORK STATEMENTQUALITY ASSURANCE SURVEILLANCE PLAN
PERFORMANCE OBJECTIVE
What is the results of each task do you want performed?PERFORMANCE STANDARD

What is the standards for each tasks?

1. Quality of Service (QoS)

2. Schedule and Delivery (SD)

3. Business Management (BM)

4. Regulation Compliance (RC)

5. Cost Control (CC)Workload Estimate/Calculation
What is the est number of items/people/facilities to be serviced?Acceptable Quality Level (AQL)
What is your tolerance for less than 100% performance?INCENTIVE or REMEDY

Would incentivizing this performance element enhance mission results?

What would be the preferred remedy to correct the reported issue

SOURCE OF DATA
What are you going to inspect?DATA STORED
How will it be provided and stored at?METHOD OF ASSESSMENT
How are you going to inspect? see drop down listGrading Criteria
Result: What is needed in order to meet minimum standardsFREQUENCY
How often are you going to inspect?WHO IS RESPONSIBLE

Name/Position

Task 1 - Perform preventative maintenae and cleaning of all hoods and duct system IAW NFPA 96-11, ASTM F2975, and manufacture or commercial standards
SUB ELEMENTS
What are the specific actions or results required to support this objective?Each System

Monthly: 22 x 12 = 264 Qrtly: 24 x 4 = 96 Semi: 13 x 2 = 26 Annual: 6 x 1 = 6 Total = 392 392 Each Bldg Monthly: 5 x 12 = 60 Qrtly: 8 x 4 = 32 Semi: 4 x 2 = 8 Annual: 3 x 1 = 3 Total = 103

103
QoS - Install and maintain protective devices (i.e. barriers, drop cloths, shields, barricades) to prevent damages to equipment, personnel injuries and food contamination at each facility38097%Notice of Concern/Re-performance > Cure Notice > T4CGov't visual inspection against

A00X – Contractor PMI Checklist A00X – Contractor PMI Parts Log SPM COR Status Report

Random Sampling 0 reported = Exceptional 1 reported = Very Good 2 reported = Satisfactory 3 reported = Marginal

4 or more reported = Unsatisfactory50% of all scheduled PMICOR
QoS - (2) Sufficient maintenance parts, minor equipment fasteners (e.g. screws, bolts, nuts, pins, etc) and adhesive maintenance schedule labels are available on-hand for all systems380100%Notice of Concern/Re-performance > Cure Notice > T4CGov't visual inspection against

A00X – Contractor PMI Checklist A00X – Contractor PMI Parts Log SPM COR Status Report

Random Sampling 0 reported = Exceptional 1 reported = Very Good 2 reported = Satisfactory 3 reported = Marginal

4 or more reported = Unsatisfactory50% of all scheduled PMICOR
QoS - Thorough clean-up and restore site back to operational standards for each facility380100%Notice of Concern/Re-performance > Cure Notice > T4CGov't visual inspection against

A00X – Contractor PMI Checklist A00X – Contractor PMI Parts Log SPM COR Status Report

Random Sampling 0 reported = Exceptional 1 reported = Very Good 2 reported = Satisfactory 3 reported = Marginal

4 or more reported = Unsatisfactory50% of all scheduled PMICOR
QoS - Less than two discrepancies reported per system from government representatives after completion of services380100%Notice of Concern/Re-performance > Cure Notice > T4CGov't visual inspection against

A00X – Contractor PMI Checklist A00X – Contractor PMI Parts Log SPM COR Status Report

Random Sampling 0 reported = Exceptional 1 reported = Very Good 2 reported = Satisfactory 3 reported = Marginal

4 or more reported = Unsatisfactory50% of all scheduled PMICOR
S&D - Downtime for required schedule maintenance is completed within two hours per system38097%Notice of Concern > Cure Notice > T4CVisual Inspection and report from of Fac Mng or CORSPM COR Status Report

Random Sampling 1 hrs = Exceptional

1.5 hrs = Very Good 2 hrs = Sat

2.5 days = Marginal

any later = Unsat50% of all scheduled PMICOR
S&D - Submit all deliverables as schedule with no more then two re-works per facility.10097%Notice of Concern/Re-performance > Cure Notice > T4CA00X – After-Action Repair ReportWAWF Invoice100% Inspection0 rework = Exceptional

1 rework = Very Good 2 rework = Satisfactory 3 rework = Marginal

> 3 rework = UnsatisfactoryEvery completed repairCOR
BM - Performed by qualified, professional, customer friendly contractor personnel per facility1030%Notice of Concern > Cure Notice > T4CA003 - Training & Certification RecordsWAWF Invoice100% InspectionOnce per monthCOR
BM - Provide notification and coordination with facility managers and COR for each facility access within seven days of scheduled services100/10397% are completed within 7 daysNotice of Concern > Cure Notice > T4CCOR e-mail or MFR of telephone conversationSPM COR Status Report

100% Inspection 14 days = Exceptional 10 days = Very Good 7 days = Sat 5 days = Marginal

anything less = UnsatAll scheduled PMICOR & Fac Mng
BM - Provide customer surveys to each facility managers upon completion of services for each facility10397% are completed within 7 daysNotice of Concern > Cure Notice > T4CA00X - Customer Survey and ReportWAWF Invoice100% Inspection14 days = Exceptional

10 days = Very Good 7 days = Sat 5 days = Marginal

anything less = UnsatOnce per monthCOR
RC - Remove and dispose of all HAZMAT generated debris off base into proper state approved disposal site for each facility.10394% of all systems are reported with less then 2 discrepanciesNotice of Concern/Re-performance > Cure Notice > T4CGov't visual inspection against

A00X – Contractor PMI Checklist A00X – Contractor PMI Parts Log SPM COR Status Report

Random Sampling 0 reported = Exceptional 1 reported = Very Good 2 reported = Satisfactory 3 reported = Marginal

4 or more reported = Unsatisfactory50% of all scheduled PMICOR
Task 2 - Perform necessary repairs of all hoods and duct system
SUB ELEMENTS

What are the specific actions or results required to support this objective?

QoS - Restore equipment back to fully functional & safe working conditions5100%Notice of Concern/Re-performance > Cure Notice > T4CA00X - Written Repair Estimate
A00X - After Action Repair ReportWAWF Invoice100% Inspection5Every completed repairCOR
QoS - Restore critical equipment back to operations or eliminate safety hazards of emergency service calls within 24 hours ional & safe working conditions
QoS - Restore critical equipment back to operations or eliminate safety hazards of emergency service calls within 24 hours ional & safe working conditions
QoS - Sufficient repair parts are available580%Notice of Concern/Re-performance > Cure Notice > T4CA00X – Repair Parts LogWAWF Invoice100% Inspection4Every completed repairCOR
QoS - Thorough clean-up of site after completion of all service call580%Notice of Concern/Re-performance > Cure Notice > T4CVisual Inspection of Fac Mng or CORSPM COR Status Report
100% Inspection4Every completed repairCOR
S&D - Mean time to repair once materials are received580% are completed within 7 daysNotice of Concern > Cure Notice > T4CA004 – Contractor Written Repair EstimateHand carry, E-mail or PIEE/CCM

COR/CO signed repair estimate WAWF Invoice 100% Inspection 6 hours = Exceptional 12 hours = Very Good 1 days = Satisfactory 2 days = Marginal

> 2 days = UnsatisfactoryEvery completed repairCOR
BM - Mean time to respond to repair Service Calls

Emergency - 2 hrs Urgent - 8 hrs

Routine - 24 hrs580% of the timeNotice of Concern > Cure Notice > T4CGov't visual inspection against
SPM COR Status Report

100% Inspection Emergency - 2 hrs Urgent - 8 hrs

Routine - 24 hrsEvery completed repairCOR
BM - Mean time to provide repair deliverables580% are completed within 7 daysNotice of Concern > Cure Notice > T4CA00X - Written Repair Estimate
A00X - After Action Repair ReportWAWF Invoice100% Inspection1 day = Exceptional

3 days = Very Good 7 days = Satisfactory 14 days = Marginal

> 14 days = UnsatisfactoryEvery completed repairCOR
BM - Performed by qualified, professional, customer friendly contractor personnel580% of the timeNotice of Concern > Cure Notice > T4CA003 - Training & Certification RecordsWAWF Invoice or PIEE/CCM100% Inspection5Once per monthCOR
RC - Provide services and parts of each system IAW NFPA 96-11, ASTM F2975, and manufacture or commercial standards with minimum discrepancies reported.580% of all systems are reported with less then 2 discrepanciesNotice of Concern/Re-performance > Cure Notice > T4CGov't visual inspection against

A00X - Written Repair Estimate A00X - After Action Repair Report SPM COR Status Report

100% Inspection 0 reported = Exceptional 1 reported = Very Good 2 reported = Satisfactory 3 reported = Marginal

4 or more reported = UnsatisfactoryEvery completed repairCOR
RC - Remove and dispose of all HAZMAT generated debris off base into proper state approved disposal site.580% of all systems are reported with less then 2 discrepanciesNotice of Concern/Re-performance > Cure Notice > T4CGov't visual inspection against

A00X - Written Repair Estimate A00X - After Action Repair Report SPM COR Status Report

100% Inspection 0 reported = Exceptional 1 reported = Very Good 2 reported = Satisfactory 3 reported = Marginal

4 or more reported = UnsatisfactoryEvery completed repairCOR
Task 3 - Provide all pre-performance deliverables prior to performance start date.
SUB ELEMENTS
What are the specific actions or results required to support this objective?Monthly: 5 x 12 = 60

Qrtly: 9 x 4 = 36 Semi: 3 x 2 = 6 Annual: 3 x 1 = 3

S&D - Submit all Exhibit Deliverables as schedule 9 No more then 2 reworks per year Notice of Concern > Cure Notice > T4C A00X - Safety Data Sheets A00X - AT Level I Training Certificate A00X - Insurance Policy(ies) A00X - Safety/Accident Plan A00X - Service Contract Reporting Requirement A00X - Employment eligibility verification A00X* - Contractor Form 74 and copy of Driver’s license/State ID, SSN Card A00X* - SPAWAR Facility Access Request Form A00X - Quality Control Plan WAWF Invoice or PIEE/CCM

*Except PII info 100% Inspection 0 rework = Exceptional 1 rework = Very Good 2 rework = Satisfactory 3 rework = Marginal > 3 rework = Unsatisfactory Once per year COR

MR Data

TaskFreqNative Fire Control, LLCAir FloKinetix
Inspt20EaEaEa/Mo
PM and Cleaning94EaEaEa
Repairs5LotN/ALH/Lot
Routine24 hoursN/AN/A
Urgent8 hoursN/A8 hours
Emergency4 hoursN/A2 hours
Repair Time1 dayN/A2 hours
PM & C Discrepancies94010580.9361702128
Repairs50111
Q: RemedyN/RP, CN, T4DN/RP, CN, T4DN/RP, CN, T4D
S: RemedyN, CN, T4DN, CN, T4DN, CN, T4D
R: RemedyN, CN, T4DN, CN, T4DN, CN, T4D
Professionlism: RemedyN, CN, T4DN, CN, T4DN, CN, T4D

Lists

METHODS OF INSPECTION
Random Sampling
Trend Analysis
Customer Feedback
100% Inspection
Periodic Inspection
Third Party Audits

File details come from the government source that posted it. Updated .