Attachment 2 PRS.pdf
PDF 104 KB Posted
- Attached to
- Lenel OnGuard Software Magnetic Door Locking System Federal contract opportunity
- Solicitation number
- W911RX-24-Q-0047
About this file
This document is a Performance Requirements Summary (PRS) that outlines the performance standards, thresholds, and surveillance methods for a federal contract to install a Magnetic Door Locking System (MDLS) using Lenel OnGuard software on Buildings 210 and 253.
The key requirements include installing the MDLS, providing hardware and software for exterior door access control, ensuring users and Contracting Officer's Representatives (CORs) can manipulate the doors/locks, integrating the system with government-furnished desktop computers, and providing training. The contractor must also comply with Service Contract Reporting requirements by reporting the contract costs incurred to the System for Award Management (SAM) website. The performance standards require 100% compliance with no deviations, and 100% inspection monitoring. This PRS is referenced in the attached federal contract opportunity announcement for the Lenel OnGuard MDLS installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Revision 1.pdf | ||
| Attachment 1 PWS (Rev-1).pdf | ||
| Exhibit B (Rev-1) Pictures of Building 210.pdf | ||
| Exhibit C (Rev-1) Pictures of Building 253.pdf | ||
| Question-Answers Response 1.pdf | ||
| Exhibit E Floor Plans.pdf | ||
| Attachment 1 PWS.pdf | ||
| Attachment 3 Wage Determination.pdf | ||
| Attachment 4 Questionnaire.pdf | ||
| Exhibit A Pricing Bid Schedule.xlsx | XLSX spreadsheet | |
| Exhibit B Pictures of Building 210.pdf | ||
| Exhibit C Pictures of Building 253.pdf | ||
| Solicitation MDLS Bldg 210 253.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
PERFORMANCE
OBJECTIVE
STANDARD PERFORMANCE
THRESHOLD
ACCEPTABLE
QUALITY
LEVELS (AQLs)
METHOD OF
SURVEILLANCE
PRS#1 - PWS para 5.2.1 The contractor shall install the MDLS in Building 210 and 253.
Industry Standard that maximizes the full potential of the MDLS capabilities.
Installation and/or training is conducted during normal business hours 07:30 – 16:00.
100% Compliance Zero Deviation from standard
100% inspection
PRS#2 - PWS para 5.2.2 The contractor shall install hardware to exterior doors
Industry Standard that maximizes the full potential of the MDLS capabilities.
Installation and/or training is conducted during
PRS#3 - PWS para 5.2.3
The contractor shall provide a system in which users and CORs must be capable of manipulating exteriors doors/magnetic locks at will and with all systems commands reacting with 100% accuracy
Industry Standard that maximizes the full potential of the MDLS capabilities.
Installation and/or training is conducted during
PRS#4 - PWS para 5.2.4
The contractor shall input magnetic door lock commands via
Industry Standard that maximizes the full potential of the MDLS capabilities.
Installation and/or training is conducted during government furnished desktop computer.
normal business hours 07:30 – 16:00.
PRS #5 – PWS para 5.2.5
The contractor shall provide training for current users as part of the initial software installment
Industry Standard that maximizes the full potential of the MDLS capabilities.
Installation and/or training is conducted during
Service Contract Reporting (SCR)
PWS 5.3
The Contractor shall completely fill in all the information in the format using the following web address www.sam.gov The contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement.
Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. If contract period of performance ends prior to September 30, the contractor has 30 days from end date of the contract to complete the SCR requirement.
Zero Deviation from Standard
100% Inspection http://www.sam.gov/