Attachment 2 PRS.pdf

PDF 104 KB Posted

Attached to
Lenel OnGuard Software Magnetic Door Locking System Federal contract opportunity
Solicitation number
W911RX-24-Q-0047
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document is a Performance Requirements Summary (PRS) that outlines the performance standards, thresholds, and surveillance methods for a federal contract to install a Magnetic Door Locking System (MDLS) using Lenel OnGuard software on Buildings 210 and 253.

The key requirements include installing the MDLS, providing hardware and software for exterior door access control, ensuring users and Contracting Officer's Representatives (CORs) can manipulate the doors/locks, integrating the system with government-furnished desktop computers, and providing training. The contractor must also comply with Service Contract Reporting requirements by reporting the contract costs incurred to the System for Award Management (SAM) website. The performance standards require 100% compliance with no deviations, and 100% inspection monitoring. This PRS is referenced in the attached federal contract opportunity announcement for the Lenel OnGuard MDLS installation.

View the file

Other files for this federal contract opportunity

Other files attached to Lenel OnGuard Software Magnetic Door Locking System, newest first.
File Type Posted
Solicitation Revision 1.pdf PDF
Attachment 1 PWS (Rev-1).pdf PDF
Exhibit B (Rev-1) Pictures of Building 210.pdf PDF
Exhibit C (Rev-1) Pictures of Building 253.pdf PDF
Question-Answers Response 1.pdf PDF
Exhibit E Floor Plans.pdf PDF
Attachment 1 PWS.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 4 Questionnaire.pdf PDF
Exhibit A Pricing Bid Schedule.xlsx XLSX spreadsheet
Exhibit B Pictures of Building 210.pdf PDF
Exhibit C Pictures of Building 253.pdf PDF
Solicitation MDLS Bldg 210 253.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT A

Performance Requirements Summary (PRS)

PERFORMANCE

OBJECTIVE

STANDARD PERFORMANCE

THRESHOLD

ACCEPTABLE

QUALITY

LEVELS (AQLs)

METHOD OF

SURVEILLANCE

PRS#1 - PWS para 5.2.1 The contractor shall install the MDLS in Building 210 and 253.

Industry Standard that maximizes the full potential of the MDLS capabilities.

Installation and/or training is conducted during normal business hours 07:30 – 16:00.

100% Compliance Zero Deviation from standard

100% inspection

PRS#2 - PWS para 5.2.2 The contractor shall install hardware to exterior doors

Industry Standard that maximizes the full potential of the MDLS capabilities.

Installation and/or training is conducted during

PRS#3 - PWS para 5.2.3

The contractor shall provide a system in which users and CORs must be capable of manipulating exteriors doors/magnetic locks at will and with all systems commands reacting with 100% accuracy

Industry Standard that maximizes the full potential of the MDLS capabilities.

Installation and/or training is conducted during

PRS#4 - PWS para 5.2.4

The contractor shall input magnetic door lock commands via

Industry Standard that maximizes the full potential of the MDLS capabilities.

Installation and/or training is conducted during government furnished desktop computer.

normal business hours 07:30 – 16:00.

PRS #5 – PWS para 5.2.5

The contractor shall provide training for current users as part of the initial software installment

Industry Standard that maximizes the full potential of the MDLS capabilities.

Installation and/or training is conducted during

Service Contract Reporting (SCR)

PWS 5.3

The Contractor shall completely fill in all the information in the format using the following web address www.sam.gov The contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement.

Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. If contract period of performance ends prior to September 30, the contractor has 30 days from end date of the contract to complete the SCR requirement.

Zero Deviation from Standard

100% Inspection http://www.sam.gov/