Attachment 2 - Project Deliverables 693JK324RA0001.doc
DOC document 30 KB Posted
- Attached to
- 2024 Pipeline Safety Research and Development (R&D) - Other Transaction Agreements (OTAs)
- Solicitation number
- 693JK324RA0001
About this file
This document is Attachment 2 - Project Deliverables for Research Announcement 693JK324RA0001 issued by the U.S. Department of Transportation's (USDOT) Pipeline and Hazardous Materials Safety Administration (PHMSA). The attachment outlines the key deliverables required under this research project, which aims to establish an understanding of multi-layer pipeline coating disbondment mechanisms due to residual stress and recommend strategies to reduce such disbondment. The deliverables include conducting kick-off meetings, analytical and finite element analysis, material property testing, adhesion and degradation testing, and preparing final reports, papers, and presentations. The project timeline spans 24 months, with interim deliverables due at 3, 6, 9, and 21 months. The research announcement solicits applications for Other Transaction Agreements (OTAs) in the area of pipeline safety research and development, with proposals due by 5:00 PM EST on June 14, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 - Questions and Answers RFQ 693JK324RA0001.docx | DOCX document | |
| Attachment 5 - Additional Info 693JK324RA0001.doc | DOC document | |
| Attachment 6 - Title VI Non Discrimination Assurances 693JK324RA0001.docx | DOCX document | |
| Attachment 4 - Budget Summary 693JK324RA0001.pdf | ||
| RA 693JK324RA0001 Notice.doc | DOC document | |
| Attachment 1 - Team Project Activities 693JK324RA0001.doc | DOC document | |
| Attachment 7 - Research Topics 693JK324RA0001.docx | DOCX document | |
| Attachment 8 - Terms and Conditions RA693JK324RA0001.docx | DOCX document | |
| Attachment 3 - Deliverable-Milestone Schedule 693JK324RA0001.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Transportation (USDOT)
RA #693JK324RA0001
Pipeline and Hazardous Materials Safety Administration (PHMSA) Attachment #2
SAMPLE SAMPLE SAMPLE SAMPLE
PROJECT DELIVERABLES
1. Conduct kick-off Team meeting and determine experimental procedure to measure residual stress. Results due to DOT within three (3) months of the effective date of the Agreement.
2. Conduct analytical and finite element analysis to calculate residual stress and align experimental results with the mechanical modeling. Results due to DOT within six (6) months of the effective date of the Agreement.
3. Measure material properties, residual stress, prepare free films and adhesion test panels, and establish mechanical modeling of the residual stress of the multi-layer coatings. Results due to DOT within nine (9) months of the effective date of the Agreement.
4. Conduct adhesion and free film degradation test and residual stress relaxation testing. Results due to DOT within twenty-one (21) months of the effective date of Agreement.
5. An understanding of multi-layer pipeline coating disbondment mechanism(s) due to residual stress development resulting from coating manufacturing/extrusion process and characteristics of surface anchor profile and surface preparation methods will be established. Due to DOT within twenty-four (24) months of the effective date of the Agreement.
6. Strategy to reduce multi-layer pipeline coating disbondment will also be recommended. Due to DOT within twenty-four (24) months of the effective date of the Agreement.
7. Quarterly status reports, Monthly progress reports, final project report, final research brief and peer review reports will be prepared and submitted in accordance the Agreement.
8. Paper submission to conference presentations and publication to NACE or other pipeline conference. Due to DOT within twenty-four (24) months of the effective date of the Agreement.
SAMPLE SAMPLE SAMPLE SAMPLE
File details come from the government source that posted it. Updated .