Attachment 1 - Team Project Activities 693JK324RA0001.doc
DOC document 34 KB Posted
- Attached to
- 2024 Pipeline Safety Research and Development (R&D) - Other Transaction Agreements (OTAs)
- Solicitation number
- 693JK324RA0001
About this file
This document is an attachment outlining the Team Project Activities for a federal contract opportunity, Solicitation Number 693JK324RA0001, titled "2024 Pipeline Safety Research and Development (R&D) - Other Transaction Agreements (OTAs)."
The key details of the Team Project Activities include: analytical and finite element analysis to calculate residual stresses in multi-layer pipeline coating systems; evaluation and measurement of existing residual stress measurement techniques; identification of the impact of manufacturing parameters on residual stresses; preparation of adhesion test panels with varying surface treatments; determination of adhesion degradation rate through immersion testing; immersion testing of free films to measure aging stability; measurement of residual stress relaxation rate; analytical modeling to predict coating disbondment; attendance at project review meetings; and preparation and submission of reports and publications.
The related federal contract opportunity is soliciting applications for research projects to be awarded and funded as Other Transaction Agreements (OTAs) by the Pipeline & Hazardous Materials Safety Administration (PHMSA), a U.S. Department of Transportation (USDOT) agency. The solicitation provides details on the application process, evaluation criteria, and key dates, including a proposal submission deadline of 5:00 PM EST, Friday, June 14, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 - Questions and Answers RFQ 693JK324RA0001.docx | DOCX document | |
| Attachment 5 - Additional Info 693JK324RA0001.doc | DOC document | |
| Attachment 6 - Title VI Non Discrimination Assurances 693JK324RA0001.docx | DOCX document | |
| Attachment 4 - Budget Summary 693JK324RA0001.pdf | ||
| Attachment 2 - Project Deliverables 693JK324RA0001.doc | DOC document | |
| RA 693JK324RA0001 Notice.doc | DOC document | |
| Attachment 7 - Research Topics 693JK324RA0001.docx | DOCX document | |
| Attachment 8 - Terms and Conditions RA693JK324RA0001.docx | DOCX document | |
| Attachment 3 - Deliverable-Milestone Schedule 693JK324RA0001.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Transportation (USDOT)
RA #693JK324RA0001
Pipeline and Hazardous Materials Safety Administration (PHMSA) Attachment #1
SAMPLE SAMPLE SAMPLE SAMPLE
TEAM PROJECT ACTIVITIES
1. Project Discussion with industrial partners and members of academia to seek additional input, develop TAP Team including Peer review members;
2. Kick-off Team meeting and modify the research program, if necessary;
3. Use analytical and finite element analysis to calculate residual stresses in a multi-layer pipeline coating systems. Identify critical coating material properties to the development of residual stresses. The residual stress calculation includes:
(a) Stress distribution along longitudinal direction of a coated pipe joint, particularly at the cutback;
(b) Stress distribution at the metal-coating interface and across the thickness direction;
4. Evaluate the existing residual stress measurement techniques- cantilever beam, instrumented ring, and others and select the most appropriate method for this research;
5. Make residual stress measurement Identify the impact of manufacturing parameters, such as processing temperatures and coating thickness on residual stresses.
The 3L polyolefin coating systems are:
I.
3L HDPE
1.FBE- 4 mil / adhesive-10 mil / HDPE-140 mil
2.FBE-10 mil / adhesive-10mil / HDPE-140 mil
II.
3L PP
1.FBE- 4 mil / adhesive-10 mil / PP-140 mil
2.FBE-10 mil / adhesive-10mil / PP-140 mil
6. Identify and measure the basic coating material properties to be used in the calculation of residual stresses;
7. Compare the calculated residual stress values with the experimental values and refine the analytical modeling to match with the experimental results on residual stresses;
8. Prepare Adhesion test panels. The following surface preparations will be applied:
I- Anchor profile height– 3 mil, 2 mil, and 1.5 mil
II-
Anchor profile shape – angular and round
III-
Peak density – 60, 80, 100 peaks/inch
IV-
Chloride contamination, 20, 30, 40, 50 mg/m2, V- Dust level – Rating 1, 2, 3 in ISO standard 8502-3
VI-
With and without phosphoric acid wash
VII-
Chromate treatment
9. Determine the adhesion degradation rate by immersion of test panels in
(a) 3% salt solution at 60 C for one year;
(b) dry/wet cycling.
Identify the effect of various surface treatments on adhesion durability;
10. Prepare free films of single layer FBE, adhesive, and multi-layer coating;
11. Immerse free films in 60 C 3% salt water to measure their ageing stability, weight and dimensional change vs. time. The total immersion time is one year;
12. Immerse residual stress samples in 3% salt water at 60C and measure the residual stress relaxation rate;
13. Establish the analytical modeling to predict the coating disbondment and identify the critical parameters to coating disbondment;
14. Attend DOT project review meeting;
15. Mid-term team meeting, including Peer review members;
16. Final team meeting including Peer review members;
17. Prepare and submit Monthly reports, Quarterly Status Reports, the Final Project Report, Research Brief and Peer Review Reports; and
18. Publish papers and make presentation.
SAMPLE SAMPLE SAMPLE SAMPLE SAMPLE
File details come from the government source that posted it. Updated .