Attachment 2 Price Breakdown.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Solicitation: Permanent Housing Construction Repair – Saipan Federal contract opportunity
Solicitation number
70FBR921R00000003
Issued by
Federal Emergency Management Agency Region 9

About this file

This document includes an attachment to a request for proposal for permanent housing construction and repair services on Saipan. The contractor will provide all labor, materials, permits, designs, and equipment to repair 17 homes damaged by Typhoon Yutu in 2018, with an option to repair 5 additional homes. Repairs include installing grab bars, lowering shower steps, and applying non-slip tiles. The base period of performance is 195 calendar days with a total estimated value between $5 million and $10 million. The Federal Emergency Management Agency Region 9 is the contracting agency. The attachment provides property-specific statements of work and pricing breakdown templates to be completed by offerors.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Summary
CLIN 0001CLIN 0002Total
Base$0.00$0.00$0.00
Option$0.00$0.00$0.00
Grand Total$0.00
Note: This sheet will autopopulate based on the values entered in the base and option sheets.

Base

Registration NumberSeptic/SewerAFN Needs**Direct Materials*Direct LaborCLIN 0001A Total Direct Construction CostCLIN 0001B Total Indirect Construction Cost
399555562Sewer ConnectionGrab bar in bathroom$0.00
399559141SepticADA- ramp*, grab bars in bathroom, shower seat, raised commode$0.00
399575986***Sewer ConnectionNone$0.00
412601983***SepticADA- ramp*, grab bars in bathroom, shower seat, raised commode$0.00
412605930Sewer ConnectionNone$0.00
412613258SepticNone$0.00
412622053Sewer ConnectionADA- ramp*, grab bars in bathroom, shower seat, raised commode$0.00
412609658SepticNone$0.00
450706983SepticNone$0.00
504431962Sewer ConnectionNone$0.00
504432328Sewer ConnectionNone$0.00
504434849 (Tinian)SepticNone$0.00
504434924***SepticNone$0.00
504436737SepticADA- ramp*, grab bars in bathroom, shower seat, raised commode$0.00
504441949SepticNone$0.00
504444232SepticNone$0.00
412616775***SepticNone$0.00
Total$0.00$0.00
Grand Total CLIN 00001$0.00
Grand Total CLIN 0002 Contigency$0.00
CLIN 0002A Direct$0.00
CLIN 0002B Indirect$0.00
*Per SOW Section 5, the contractor shall use all Government Furnished Material (GFM) listed in this section. Individual Property Scopes of work detail which items shall be GFM. The price listed in this column for Direct Materials should be any remaining costs after GFM is accounted for.
**See RFP Attachment 5 for ADA ramp sepcs, design, drawing
***These properties are located in an Archeologically Sensitive Zone (ASZ)

Option

Registration NumberSeptic/SewerAFN Needs*Direct MaterialsDirect LaborCLIN 0001A Total Direct Construction CostCLIN 0001B Total Indirect Construction Cost
399595024SepticNone$0.00
412607984SepticGrab Bars in shower & toilet area. Existing Shower step lowered below knee height and non-slip tiles$0.00
412636763SepticNone$0.00
412617989SepticNone$0.00
412619175SepticADA- ramp*, grab bars in bathroom, shower seat, raised commode$0.00
Total$0.00$0.00
Grand Total CLIN 1001$0.00
Grand Total CLIN 1002 Contigency$0.00
CLIN 0002A Direct$0.00
CLIN 0002B Indirect$0.00
*See RFP Attachment 5 for ADA ramp sepcs, design, drawing

File details come from the government source that posted it. Updated .