This document includes an attachment to a Request for Proposal for permanent housing construction and repair services in Saipan. The contractor will provide all labor, materials, permits, designs, and equipment to repair 17 homes damaged by Typhoon Yutu in 2018, with an option to repair 5 additional homes. Repairs will be conducted in Saipan and Tinian over a 195 calendar day base period of performance. The estimated value of construction requirements ranges from $5 million to $10 million. One attachment provides a price breakdown template for the base and option periods of work. A second attachment specifies ADA requirements for ramps, grab bars, and other accessibility features to be provided under the contract. The solicitation is issued by the Federal Emergency Management Agency Region 9 to provide permanent housing reconstruction services in the wake of Typhoon Yutu.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2 70FBR921R00000003.pdf | ||
| Amendment 1 70FBR921R00000003.pdf | ||
| Amendment 1 - Attachment 1 Question Responses.pdf | ||
| Attachment 3 DB Act WD CM20210002.pdf | ||
| SOW Attachement 2. BECQ Property Clearance Permit and Individual Wastewater Disposal System - Legal Ownership Waiver.pdf | ||
| RFP 70FBR921R00000003.pdf | ||
| Attachment 1 RFP Questions Template.xlsx | XLSX spreadsheet | |
| Attachment 2 Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment 5 ADA Ramp Specs Design Drawing 10SEP2020.pdf | ||
| SOW Attachement 5. DPW Clarification on IBC Requirements & Uninhabitable Outdoor Spaces 2019-09-09.pdf | ||
| SOW Attachement 4. Letter for DPW Waiver.pdf | ||
| SOW Attachement 3. Zoning - Legal Ownership Waiver.pdf | ||
| Attachment 4 SF1094-15c.pdf | ||
| Attachment 6 Past Performance Questionnaire.pdf | ||
| SOW Attachement 1. Waiver of Sprinkler Installation for Residential Structures.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Summary | |||
| CLIN 0001 | CLIN 0002 | Total | |
| Base | $0.00 | $0.00 | $0.00 |
| Option | $0.00 | $0.00 | $0.00 |
| Grand Total | $0.00 | |
| Note: This sheet will autopopulate based on the values entered in the base and option sheets. |
Base
| Registration Number | Septic/Sewer | AFN Needs** | Direct Materials* | Direct Labor | CLIN 0001A Total Direct Construction Cost | CLIN 0001B Total Indirect Construction Cost |
| 399555562 | Sewer Connection | Grab bar in bathroom | $0.00 | |||
| 399559141 | Septic | ADA- ramp*, grab bars in bathroom, shower seat, raised commode | $0.00 | |||
| 399575986*** | Sewer Connection | None | $0.00 | |||
| 412601983*** | Septic | ADA- ramp*, grab bars in bathroom, shower seat, raised commode | $0.00 | |||
| 412605930 | Sewer Connection | None | $0.00 | |||
| 412613258 | Septic | None | $0.00 | |||
| 412622053 | Sewer Connection | ADA- ramp*, grab bars in bathroom, shower seat, raised commode | $0.00 | |||
| 412609658 | Septic | None | $0.00 | |||
| 450706983 | Septic | None | $0.00 | |||
| 504431962 | Sewer Connection | None | $0.00 | |||
| 504432328 | Sewer Connection | None | $0.00 | |||
| 399595024 | Septic | None | $0.00 | |||
| 504434924*** | Septic | None | $0.00 | |||
| 504436737 | Septic | ADA- ramp*, grab bars in bathroom, shower seat, raised commode | $0.00 | |||
| 504441949 | Septic | None | $0.00 | |||
| 504444232 | Septic | None | $0.00 | |||
| 412616775*** | Septic | None | $0.00 | |||
| Total | $0.00 | $0.00 | ||||
| Grand Total CLIN 00001 | $0.00 |
| Grand Total CLIN 0002 Contigency | $0.00 | |
| CLIN 0002A Direct | $0.00 | |
| CLIN 0002B Indirect | $0.00 | |
| *Per SOW Section 5, the contractor shall use all Government Furnished Material (GFM) listed in this section. Individual Property Scopes of work detail which items shall be GFM. The price listed in this column for Direct Materials should be any remaining costs after GFM is accounted for. | ||
| **See RFP Attachment 5 for ADA ramp sepcs, design, drawing | ||
| ***These properties are located in an Archeologically Sensitive Zone (ASZ) |
Option
| Registration Number | Septic/Sewer | AFN Needs* | Direct Materials | Direct Labor | CLIN 0001A Total Direct Construction Cost | CLIN 0001B Total Indirect Construction Cost | |
| 412607984 | Septic | Grab Bars in shower & toilet area. Existing Shower step lowered below knee height and non-slip tiles | $0.00 | ||||
| 412636763 | Septic | None | $0.00 | ||||
| 412617989 | Septic | None | $0.00 | ||||
| 412619175 | Septic | ADA- ramp*, grab bars in bathroom, shower seat, raised commode | $0.00 | ||||
| Total | $0.00 | $0.00 | |||||
| Grand Total CLIN 1001 | $0.00 | ||||||
| Grand Total CLIN 1002 Contigency | $0.00 | ||||||
| CLIN 0002A Direct | $0.00 | ||||||
| CLIN 0002B Indirect | $0.00 | ||||||
| *See RFP Attachment 5 for ADA ramp sepcs, design, drawing |