Attachment 2_PPQ.pdf
PDF 209 KB Posted
- Solicitation number
- 47PB5126R0018
- Issued by
- Not on record
About this file
This is a Past Performance Questionnaire template for the General Contractor for the Elevator Modernization Project at the Thurgood Marshall U.S. Courthouse (Solicitation No. 47PB5126R0018).
The questionnaire is designed to be completed by clients or project owners to evaluate contractor performance on past projects relevant to the elevator modernization work. The contractor/offeror completes Blocks 1-4, which capture firm information, work performed (as prime contractor, subcontractor, joint venture, or other), contract details including type (firm fixed price, cost reimbursement, or other), contract dates, and original versus final pricing. Block 4 requests project description information including complexity level (high, medium, or routine) and relevance to the current solicitation. Clients then complete the evaluation section using a five-point rating scale: Exceptional (E), Good (G), Satisfactory (S), Marginal (M), Unsatisfactory (U), or Not Applicable (N). Evaluation categories include Quality (technical data/report preparation, quality standards, problem resolution, quality control); Schedule/Timeliness of Performance (delivery/completion schedules, resource utilization); Customer Satisfaction (end user satisfaction, contractor cooperation, communication); Management/Personnel/Labor (on-site management, workforce qualification, small business utilization, multi-project management capability); Cost/Financial Management (pricing compliance, cost reduction initiatives, invoice accuracy, accounting systems, contract termination history, financial stability); Safety/Security (safety plan adherence, security compliance); and General categories (emergency response, compliance with contractual terms, overall rating). The questionnaire concludes with a summary section asking whether the client would hire or work with the firm again and provides space for detailed comments addressing strengths, weaknesses, and performance risk factors.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Contractor for the Elevator Modernization Project Thurgood Marshall U.S. Courthouse Solicitation No.: 47PB5126R0018
ATTACHMENT 2
PAST PERFORMANCE QUESTIONNAIRE
PBS PAST PERFORMANCE QUESTIONNAIRE
CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)
1. CONTRACTOR/OFFEROR INFORMATION
Firm Name:
Address:
Phone Number:
Unique Entity Identifier:
Contact Name:
Email Address: Contact Phone Number:
2. GENERAL WORK INFORMATION
Work performed as: ☐ Prime Contractor ☐ Subcontractor ☐ Joint Venture ☐ Other (Please explain):
Percent (%) of project work performed:
If a subcontractor, who was the prime (Name/Phone #):
3. CONTRACT INFORMATION
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: ☐ Firm Fixed Price ☐ Cost Reimbursement ☐ Other (Please explain) Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
CUI//SP/SSEL/PROCURE
4. PROJECT DESCRIPTION
Complexity of Work: ☐ High ☐ Med ☐ Routine How is this project relevant to the project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.
Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.
RATING DEFINITION NOTE
(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.
Also, there should have been NO significant weaknesses identified.
(G) Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.
There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
CLIENT INFORMATION
Client Point of Contact Information Name:
Title:
Phone Number:
Email Address:
Project Information Contract Type:
Contract Title:
Contract Location:
Describe your role in the project:
Date Questionnaire was completed (mm/dd/yy):
Client’s Signature:
Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.
1. QUALITY: E G S M U N
(a) Quality of technical data/report preparation efforts. ☐ ☐ ☐ ☐ ☐ ☐
(b) Ability to meet quality standards specified for technical performance. ☐ ☐ ☐ ☐ ☐ ☐
(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance. ☐ ☐ ☐ ☐ ☐ ☐
(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).
2. SCHEDULE/TIMELINESS OF PERFORMANCE: E G S M U N
(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)
(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract. ☐ ☐ ☐ ☐ ☐ ☐
3. CUSTOMER SATISFACTION: E G S M U N
(a) To what extent were the end users satisfied with the project? ☐ ☐ ☐ ☐ ☐ ☐
(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication).
(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? ☐ ☐ ☐ ☐ ☐ ☐
(d) Overall customer satisfaction. ☐ ☐ ☐ ☐ ☐ ☐
4. MANAGEMENT/ PERSONNEL/LABOR E G S M U N
(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? ☐ ☐ ☐ ☐ ☐ ☐
(b) Ability to hire, apply, and retain a qualified workforce to this effort. ☐ ☐ ☐ ☐ ☐ ☐
4. MANAGEMENT/ PERSONNEL/LABOR – Continued E G S M U N
(c) Government Property Control. ☐ ☐ ☐ ☐ ☐ ☐
(d) Knowledge/expertise demonstrated by contractor personnel. ☐ ☐ ☐ ☐ ☐ ☐
(e) Utilization of Small Business concerns. ☐ ☐ ☐ ☐ ☐ ☐
(f) Ability to simultaneously manage multiple projects with multiple disciplines. ☐ ☐ ☐ ☐ ☐ ☐
(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.
(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program). ☐ ☐ ☐ ☐ ☐ ☐
5. COST/FINANCIAL MANAGEMENT E G S M U N
(a) Ability to meet the terms and conditions within the contractually agreed price(s)? ☐ ☐ ☐ ☐ ☐ ☐
(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.
(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).
(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in the comment section below.)
☐ Yes ☐ No
(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in the comment section below.)
☐ Yes ☐ No
(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)
☐ Yes ☐ No
6. SAFETY/SECURITY E G S M U N
(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).
(b) Contractor complied with all security requirements for the project and personnel security requirements. ☐ ☐ ☐ ☐ ☐ ☐
7. GENERAL E G S M U N
(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below ☐ ☐ ☐ ☐ ☐ ☐
(c) In summary, provide an overall rating for the work performed by this contractor. ☐ ☐ ☐ ☐ ☐ ☐
8. SUMMARY
Would you hire or work with this firm again? (If no, please explain in the comments section below.) ☐ Yes ☐ No
COMMENTS SECTION
Please provide additional information below, and attach additional pages if necessary.
Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
File details come from the government source that posted it. Updated .