Attachment 2 - Natural Gas Keesler AFB Usage.xlsx
XLSX spreadsheet 571 KB Posted
- Attached to
- Natural Gas Supply for Keesler AFB
- Solicitation number
- FA301026R0001
About this file
This file is an attachment detailing natural gas usage and procurement specifications for Keesler Air Force Base (AFB). The document outlines a two-year natural gas supply contract from June 1, 2025, to May 31, 2027, with total estimated contract volumes of 485,700 Dth (dekatherms), including 239,200 Dth for summer and 246,500 Dth for winter. The delivery will be through CenterPoint Entex as the local distribution company, with a firm full requirements/utility service at the Henry Hub publication location and a firm delivery type.
The procurement involves natural gas supply for the 81st Civil Engineering Squadron, covering the base, medical center, and multi-family housing via a master meter. Specific monthly usage is detailed for years 2025-2027, with annual totals of 132,440 Dth (2025), 242,850 Dth (2026), and 110,410 Dth (2027). Key contacts include Robert Moseley and Robert Baker, with the installation address at 500 Fisher Street, Keesler AFB, Mississippi 39534. The solicitation (FA301026R0001) is issued by the Department of the Air Force Air Education and Training Command, with a firm fixed price and economic price adjustment pricing arrangement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| Keesler Air Force Base | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0015 | FL | Cheyenne Hub | |||||||||||
| Installation | Keesler Air Force Base | DODAAC/FEDAAC: | GA | Chicago CG | ||||||||||
| Address | 81st Civil Engineering Squadron | HI | CIG Rocky Mtns | |||||||||||
| 500 Fisher Street, Suite 244 | ID | Col Gas Appal | ||||||||||||
| City | Keesler Air Force Base | IL | Col Gulf LA | |||||||||||
| State | MS | IN | Col Gulf Mnline | |||||||||||
| Zip | 39534-0000 | IA | Cons Energy CG | |||||||||||
| Ordering Office | Invoice Certification Office | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | Robert Moseley | Robert Baker | DFAS-LI | KY | Dominion N Pt | |||||||||
| Phone | (228) 377-9019 | (228) 376-8419 | LA | Dominion S Pt | ||||||||||
| Ext | N/A | N/A | ME | Dracut MA | ||||||||||
| DSN | 591-8420 | 591-8419 | MD | El Paso Bondad | ||||||||||
| Fax | 228-376-0820 | (228)-376-8419 | MA | El Paso Permian | ||||||||||
| robert.moseley@us.af.mil | robert.baker.56@us.af.mil | MI | El Paso S Mainline | |||||||||||
| Location | Keesler AFB | Keesler AFB | DODF67100-ACCTG DISB STA | MN | El Paso SanJuan | |||||||||
| Address | 500 Fisher Street | 500 Fisher Street | NR 667100 | MS | Emerson Viking | |||||||||
| Room 244 | Bldg 701, Room 245A | DFAS LI JAQBDD | MO | FL Gas Zn1 | ||||||||||
| Attention | Robert Moseley | Robert Baker | 27 ARKANSAS RD | MT | FL Gas Zn2 | |||||||||
| City | Keesler AFB | Keesler AFB | LIMESTONE | NE | FL Gas Zn3 | |||||||||
| State | MS | MS | ME | NV | Florida CG | |||||||||
| Zip | 39534-0000 | 39534-0000 | 04751-6216 | NH | GTNW Kingsgate | |||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Centerpoint Entex | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 485,700 | Total Summer (Dths) | 239,200 | Total Winter (Dths) | 246,500 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | MT-3 | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| No | None | SD | NGPL Midcont | |||||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | Meter | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2025 | Annual Totals | 132,440 | Summer Totals | 83,160 | Winter Totals | 49,280 | WV | NW S of Grn Rvr | ||||||
| Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||||
| 16,340 | 16,140 | 15,170 | 15,410 | 20,100 | 21,480 | 27,800 | WY | NYMEX | ||||||
| Oneok OK | ||||||||||||||
| Year 2026 | Annual Totals | 242,850 | Summer Totals | 119,600 | Winter Totals | 123,250 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | PG&E CG | ||
| 28,230 | 23,790 | 21,950 | 19,400 | 17,040 | 16,340 | 16,140 | 15,170 | 15,410 | 20,100 | 21,480 | 27,800 | PG&E Malin | ||
| PG&E South | ||||||||||||||
| Year 2027 | Annual Totals | 110,410 | Summer Totals | 36,440 | Winter Totals | 73,970 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | PG&E CG | |||||||||
| 28,230 | 23,790 | 21,950 | 19,400 | 17,040 | PG&E Malin | |||||||||
| PG&E South | ||||||||||||||
| Curtailment Days | Questar Rky Mtn | |||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | SoCal Gas | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | SoCal Gas CG | ||
| SoNat LA | ||||||||||||||
| Solicitation Parameters | Stanfield OR | |||||||||||||
| Sth Star TxOkKs | ||||||||||||||
| Period Beginning | Period Ending | Publication | SIP | Delivery Option | Delivery Type | TC Alb AECO-C | ||||||||
| 06/01/25 | 05/31/27 | INSIDE FERC'S | Henry Hub | (2) Full Requirements/Pool. | Firm | Tenn LA 500 Leg | ||||||||
| Adjustment Factor: | Summer: | Winter: | Tenn LA 500/800 AVG | |||||||||||
| Overage & Shortage Volume Pricing | Tenn LA 800 Leg | |||||||||||||
| Publication | Location | Methodology | Include Adj. Factor | |||||||||||
| Overage Treatment | ||||||||||||||
| Summer Volumes | ||||||||||||||
| Winter Volumes | ||||||||||||||
| Shortage Treatment | ||||||||||||||
| Summer Volumes | ||||||||||||||
| Winter Volumes | ||||||||||||||
| Tenn Zn0 | ||||||||||||||
| Tied to Other Line Items | No | Aggregated With Other Line Items | No | Tenn Zn6 Dlvd | ||||||||||
| Texas Gas Zn 1 | ||||||||||||||
| Note #1 | Contractor Consolidated Billing is required for Keesler AFB in accordance with the Statement of Work. | Transco Zn1 | ||||||||||||
| Note #2 | Load data includes service to Base, Medical Center, Multi-family Housing via master meter. | Transco Zn2 | ||||||||||||
| Note #3 | Transco Zn3 | |||||||||||||
| Note #4 | Transco Zn4 | |||||||||||||
| Transco Zn5 Dlv | ||||||||||||||
| Transco Zn6 NY | ||||||||||||||
| Transco Zn6 Non-NY | ||||||||||||||
| Transwestn Perm | ||||||||||||||
| Trunkline E LA | ||||||||||||||
| Trunkline LA | ||||||||||||||
| Trunkline W LA | ||||||||||||||
| TX Eastern E LA | ||||||||||||||
| TX Eastern E TX | ||||||||||||||
| TX Eastern M1 Kosi | ||||||||||||||
| TX Eastern M-3 | ||||||||||||||
| TX Eastern S TX | ||||||||||||||
| TX Eastern W LA | ||||||||||||||
| Waha | ||||||||||||||
| TX Eastern ZnM1 24-in | ||||||||||||||
| Westcoast Stn 2 |
mailto:robert.baker.56@us.af.milmailto:robert.moseley@us.af.mil
File details come from the government source that posted it. Updated .