This document outlines the terms and conditions for a multiple award construction contract (MACC) for flooring replacement services at Joint Base Anacostia-Bolling. Task orders under the IDIQ contract will range from $500 to $1 million for flooring replacement projects, with most falling between $50,000 to $500,000. The Air Force will issue task order proposals to contractors and make awards based on a best value determination considering price and technical factors. Contractors may be restricted from competing on certain task orders if they have too many existing orders, are behind schedule on work, or received an unfavorable past performance rating. The contract includes provisions for on-ramping additional small business contractors and off-ramping those with poor performance or lack of participation.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA706022R0031

Attachment 2

FLOORING MACC IDIQ CONDITIONS

DESCRIPTION OF WORK

The work to be acquired under the solicitation is for flooring replacement of all types at Joint Base Anacostia- Bolling. This is an indefinite delivery indefinite quantity (IDIQ) contract with no pre-established fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer, and each subsequent Task Order.

DESCRIPTION OF SUBSEQUENT TASK ORDERS

1. The Government may solicit offers for projects for which funds are not certified nor readily available. These are referred as Authority to Advertise (ATA).

2. Task Orders will range from $500.00 to $1,000,000.00, with most Task Orders falling in the range of $50,000.00 to $500,000.00.

TASK ORDER PROCEDURES

1. As the need exists for performance under the terms of this contract, the Contracting Officer or his/her representative will notify the contractor of an existing requirement, and Firm Fixed Price Task Orders will be awarded within the scope of the terms and conditions and specifications of this contract IAW FAR 16.505. A site visit will be scheduled with the contractors to verify measurements and elements of work. The contractorsCES shall submit a proposal IAW the Task Order SOW, specifications, or drawings specified by the Contracting Officer in the individual Fair Opportunity Proposal Request (FOPR).

2. A FOPR will be issued to solicit projects under the MACC following the award of the “seed” project. In addition, the FOPR may also include but is not limited to, the following, as applicable, based on the level of work required:

a. Government prepared SOW, sketches, drawings, and any available as-built, specifications, or design information.

b. Submittal requirements.

3. Upon receipt of the contractors' proposals, the Government will evaluate the proposals for completeness and reasonableness utilizing the evaluation procedures outlined in the Task Order FOPR. Task Order award will be made to the contractor providing the lowest price or best value basis as described in the Task Order FOPR after price is determined to be fair and reasonable by the Contracting Officer.

a. The Government reserves the right to conduct Interchanges through Interchange Notices (IN) with one, some, none, or all Offerors at its discretion.

b. Offerors may not be offered an opportunity to revise their proposal as a result of Interchanges.

c. Proposals shall be valid for at least 120 days, unless specified otherwise in the FOPR.

4. Restriction from Competition. Contractors MAY also be restricted from competition on individual Task Orders if, at the time of Task Order FOPR issuance, any of the following conditions apply:

a. The Contractor has five active Task Orders.

b. The Contractor is more than 5% behind schedule on any active Task Orders (barring those that are behind due to Government delays).

c. If the Contractor has received an unfavorable CPARS rating on any Task Orders within the previous calendar year.

d. Should conditions listed above be alleviated and/or change, the Contracting Officer may determine the contractor to be eligible for competition on subsequent Task Orders.

e. Additionally restricted competition may be based on work requiring special skills or trades, or urgent and compelling schedules. The Contracting Officer reserves the right to award a Task Order without competition based upon a determination that:

i. The agency need for the supplies or services are so urgent that providing a fair opportunity would result in unacceptable delays;

ii. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services being ordered are unique or highly specialized;

iii. The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.

TASK ORDER PERFORMANCE PERIOD

1. The only work authorized under this Flooring MACC IDIQ will be issued by a Task Order. The Government makes no representation as to the number of Task Orders or actual amount of work to be ordered in excess of the minimum guarantees specified herein.

2. The performance period shall be identified by the Government in the FOPR, stipulated in calendar days. The proposals containing performance periods exceeding the calendar days stipulated within the FOPR may be considered unacceptable. FAR Clause 52.211-10, Commencement, Prosecution and Completion of Work will be incorporated into each Task Order identifying the construction schedule. The Government reserves the right to negotiate a performance period or impose a performance period for each Task Order. If the performance period is negotiable, it will be stated as such, in the FOPR.

PERFORMANCE EVALUATIONS

1. At the conclusion of each Task Order, IAW FAR 42.1502(e), for projects exceeding $750,000.00, a past performance evaluation must be input into CPARS. However, Task Order’s not meeting this threshold, at the discretion of the Contracting Officer, may be evaluated for performance and input into the CPARS.

2. The evaluation will take into account all aspects of the contractor’s performance. Performance evaluations may be completed at any time the Contractor’s performance is considered less than satisfactory. Contractors will be provided a copy of the performance evaluation and an opportunity to discuss the evaluation. The performance evaluations may have an impact on the award of future Task Orders.

ON/OFF RAMP PROCEDURES

1. On-Ramp. The Government intends to maintain a pool of three (3) Historically Underutilized Business Zone (HUBZone) Small Business contractors with a proven track record for competing on and then delivering quality construction projects. An integrated assessment will be accomplished to create a ranking of the HUBZone pool. When an on-ramp is used, the Government will utilize the pool of HUBZones, and awardees shall meet the criteria established in the initial Flooring MACC IDIQ solicitation. The offeror chosen to be on-ramped will be the most highly rated offeror in the pool as determined by the integrated assessment. Any on-ramped awardees will compete with any existing or remaining Flooring MACC IDIQ contractors for all Task Orders (excluding the need to meet the minimum obligation amount). Any additions due to on-ramps will not increase the contract ceiling and the ordering period for new awardees will not exceed the overall maximum term of the original contract. The Government reserves the right to not utilize on-ramps when it is determined to be in the best interest of the Government.

1. Off-Ramp. The Government reserves the right to utilize off-ramps when it is determined to be in the best interest of the Government; including, but not limited to, a contractor's lack of participation in competition or Task Orders, poor performance, change of ownership, etc. Flooring MACC IDIQ contractors are highly encouraged to submit a proposal for every FOPR under the IDIQ contract. Be advised, in order to maintain active participation on the Flooring MACC IDIQ contract; contractors shall propose on the majority of the FOPRs issued during the base period or option period. If for any reason, an awardee cannot participate in a competition, the awardee shall provide written notice to the Government of reason(s) for non-participation prior to proposal due date. Participation will be tracked and monitored by Government personnel; failures by Flooring MACC IDIQ contractors to participate in site visits and submit proposals may result in the Government off-ramping, not exercising the option to extend the contract, or exclusion of the contractor from further competition. Throughout the lifetime of the Flooring MACC IDIQ, the Government will evaluate each awardees’ participation, reason(s) for non-participation, and Contractor Performance Assessment Reporting System (CPARS) performance evaluations for task orders completed or in progress. An awardee rated as Satisfactory in all rated categories may remain in the competition pool. Failure to participate in good faith and/or a task order performance assessment ratings of Marginal or Unsatisfactory under the CPARS rating system may result in the awardee being off-ramped from the multiple award contract. An off-ramp decision results in contractor removal from the MACC competition pool and no further awards of task orders. The Government may off-ramp a contractor by implementing either a termination for convenience, a termination for default, or not exercising the option period depending on the circumstances.