Attachment 2_Historical Information.pdf
PDF 41 KB Posted
- Attached to
- Trainer Developer III (TDIII) Federal contract opportunity
- Solicitation number
- 47QFWA24R0017
About this file
This document is Attachment 2 (Historical Information/Representative Tasks and Projects) that provides details about systems and projects previously accomplished through the 502 TDS. The document includes a table showing historical contract values for various contractors including Booz Allen Hamilton, J.F. Taylor Inc., MES Simulation & Training Corp, and Applied Visual Technology Inc., with total obligations under TD2 of $103,179,513.31.
The document outlines six major systems that may require contractor support: Visual (providing graphical representations for mission simulations), Image Generation (creating computer-graphics images), Control Loading (providing realistic flight control forces), Aural (generating aircraft and environmental sounds), Input/Output (facilitating communication between systems), and Host (primary operating system managing multiple users and applications). These systems represent the types of projects developed by 502 TDS but are noted as non-exhaustive examples.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
HISTORICAL INFORMATION / REPRESENTATIVE TASKS AND PROJECTS
The following are representative of the types of tasks and projects that have been accomplished through the 502 TDS:
Systems
The following are representative of the major systems that could make up the types of projects developed by the 502 TDS that may require support from the Contractor. This is not an exhaustive list, nor is it final.
Visual
The visual system shall provide graphical representation simulating various missions, related scenarios, models and/or conditions to the user.
Image Generation
The image generation system shall create images from an image concept projected on screens. The image shall be created with computer-graphics software.
Control Loading
The control loading system shall provide realistic flight control forces in simulation or training devices.
Aural
The aural system shall generate aircraft and environmental sounds to enhance the realism experienced by crew/trainee. The sounds are ultimately a subjective experience, and therefore, flexibility and tune-ability are key in considering system selections.
Input/Output
The input/output system shall provide the instructions necessary to communicate to all systems which make up the overall IT simulation/training system.
Host
The host system is the primary operating system installed on a computer to deal with computer resources in various ways, ultimately allowing the various system applications handled by multiple users to function simultaneously.
[END OF DOCUMENT]
File details come from the government source that posted it. Updated .