Attachment_2_-_GAOA_McNamara_Jonhnsrud_Chipseal_-_Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- 140L3623R0006
About this file
This document package includes drawings and specifications for a federal construction project. The Bureau of Land Management Montana State Office is soliciting proposals to chip seal 6.2 miles of asphalt roadway, resurface day use areas along the Blackfoot River corridor, perform linear grading along 4.9 miles of roadway, and delineate parking at the Whitaker Bridge Day Use Area. The work will be located in Missoula County, Montana and includes furnishing labor, equipment, materials to complete chip sealing, aggregate resurfacing, grading and parking delineation per the drawings and specifications provided.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
CANADA
UNITED STATES
SASKATC
H
EW
AN
ALBERTA
B R
ITIS
H
C O
LU
M
B
IA
N O
R T
H
D
A K
O T
A
S O
U T
H
D
A K
O T
A
WYOMING
ALT
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
MCNAMARA/JOHNSRUD ROAD CHIPSEAL
MISSOULA COUNTY
MISSOULA FIELD OFFICE
DRAWING INDEX
C1 COVER SHEET
C2 NOTES & QUANTITIES
C3 CHIP SEAL SECTION DETAILS
C4 WHITAKER DAY USE OVERFLOW
PARKING AREA
C5 WHITAKER DAY USE SMALL
VEHICLE PARKING AREA
C6-C8 JOHNSRUD / MCNAMARA DAY USE
AGGREGATE SURFACING
VICINITY MAP
(N.T.S)
DIRECTIONS TO SITE:
FROM MISSOULA: TRAVEL EAST ON I-90 E FOR 4.2 MILES. FOLLOW EXIT 109 FOR
MT-200 E TOWARDS BONNER/GREAT FALLS. TRAVEL EAST ON MT-200 E FOR 12.1
MILES. TURN LEFT ON JOHNSRUD PARK ROAD. THE PROJECT BOUNDARY IS THE
INTERSECTION OF JOHNSRUD ROAD AND HWY 200.
ESTIMATED QUANTITIES
ITEM QUANTITY UNIT
MCNAMARA/JOHNSRUD
CHIPSEAL
6.2 MILES
DAY USE AND
CAMPGROUND SURFACE
COURSE INSTALLATION
1860 CCY
TREE REMOVAL AND
DISPOSAL
10 EA
WHITAKER DAY USE SITE
GRADING - EXCAVATION
AND EMBANKMENT
350 CY
WHITAKER DAY USE AREA
SURFACE COURSE
INSTALLATION
1000 CCY
6" PIPE INSTALLED FOR
PARKING DELINEATION
960 LF
BOUNDARY ROCK
BOULDERS (24" - 36" DIA)
50 CY
ROAD SIGN INSTALLATION 17 EA - GOV FURNISHED
SIGNS
CONSTRUCTION
SURVEYING AND STAKING
GOV FURNISHED GOV FURNISHED
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR LOCATION OF
UNDERGROUND UTILITES (811) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER
WITH ANY DISCREPANCIES.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
CONTRACTING OFFICER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
10. THE CONTRACTOR IS TO VERIFY THE LOCATION, ELEVATION, CONDITION, AND
FINISHED GRADE CROSS-SLOPE OF ALL EXISTING SURFACES AT POINTS OF TIE-IN
AND MATCHING PRIOR TO COMMENCEMENT OF GRADING, PAVING, INSTALLATION OF
CURB & GUTTER, SIDEWALK, OR OTHER SURFACE CONSTRUCTION. SHOULD THE
EXISTING LOCATIONS, ELEVATION, CONDITION, OR FINISHED GRADE CROSS-SLOPE
DIFFER FROM THAT SHOWN ON THESE PLANS AND RESULTS IN THE DESIGN INTENT
OF THESE PLANS NOT ABLE TO BE CONSTRUCTED, THE CONTRACTOR SHALL NOTIFY
THE CONTRACTING OFFICER OF DISCREPANCIES AND SEEK DIRECTION ON HOW TO
PROCEED.THE CONTRACTOR ACCEPTS RESPONSIBILITY FOR ALL COSTS
ASSOCIATED WITH CORRECTIVE ACTION IF THESE PROCEDURES ARE NOT
FOLLOWED.
11. TRAFFIC CONTROL PLAN MUST BE SUBMITTED BY THE CONTRACTOR CONSIDERING
SCHEDULE, SIGNAGE, PERSONNEL, AND IMPLEMENTATION TECHNIQUES TO
PROVIDE PUBLIC AND ADMINISTRATIVE ACCESS TO ALL PUBLIC LANDS DURING
CONSTRUCTION.
12. DRAWINGS HAVE BEEN PREPARED ON AN ORIGINAL SHEET SIZE OF 34" X 22"
RECOMMENDED BY:
MARIA CRAIG, OUTDOOR RECREATION PLANNER
REVIEWED BY:
KATHIE MARKS, CIVIL ENGINEER
APPROVED BY:
ERIN CAREY, FIELD OFFICE MANAGER
PROJECT DESCRIPTION
PROJECT CONSISTS OF CHIP SEALING THE NEWLY PAVED MCNAMARA / JOHNSRUD
ROAD, IMPROVING SITE ROADS THROUGHOUT THE BLACKFOOT RECREATION
AREAS, AND DELINEATING THE OVERFLOW PARKING AREA AT THE WHITAKER
BRIDGE DAY USE AREA.
C O
V E
R
M C
N A
M A
R A
J O
H N
S R
U D
R
O A
D
C
H I P
S E
A L
B U
R E
A
F
L A
N
M
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
H E
I
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U L
E
F
I C
E
POTAMAC
MISSOULA
RATTLESNAKE WILDERNESS
MCNAMARA/JOHNSRUD ROAD
CHIPSEAL PROJECT AREA
CLEARWATER
C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N
EXISTING SITE PLAN
DAIGLE'S EDDY DAY USE
SHEEP FLATS DAY USE
THIBIDEAU RAPIDS DAY USE
THIBIDEAU CAMPGROUND
WHITAKER BRIDGE
WHITAKER BRIDGE DAY USE
CHIPSEAL PROJECT END
PROJECT MILE POST 6.2
STATIONING 402+94.54
BLACKFOOT RIVER
TO MISSOULA
GENERAL NOTES
PREPARE AND INSTALL
" CHIPSEAL (FP-14 SPECIFICATION SECTION TABLE
407-1 TYPE 1C) ACCORDING TO FP-14 SPECIFICATION SECTION 407 FOR 6.2
MILES OF ASPHALT PAVEMENT. ASPHALT SECTION PROFILES DEPICTED IN
SHEET 4. INSTALL MILE MARKER SIGNS PROVIDED BY GOVERNMENT ALONG
FIRST 6.2 MILES OF ROADWAY.
2 PREPARE AND RECONDITION ALL DAY USE AND CAMPGROUND SURFACES
PER SPECIFICATION 303 (GRADE, WATER, AND COMPACT) AND INSTALL 4"
LIFT OF SURFACE COURSE AGGREGATE (FP-14 SPECIFICATION SECTION
703.05(C)) ON EXISTING DAY USE AND CAMPGROUND SITE ROADS ALONG THE
DEPICTED JOHNSRUD/MACNAMARA ROADWAYS (SHEETS C5-C7)
3 PREPARE AND RECONDITION WHITAKER BRIDGE DAY USE PARKING AREA
PER SPECIFICATION SECTION 303. INSTALL SURFACE COURSE (FP-14
SPECIFICATION SECTION 703.05(C)). INSTALL PARKING DELINEATION AND
DRAINAGE FEATURES AT WHITAKER BRIDGE OVERFLOW PARKING LOT.
REFER TO DETAILS ON SHEETS 4 & 5.
4 TRAFFIC CONTROL MUST BE PROVIDED BY CONTRACTOR TO ALLOW FOR
PUBLIC ACCESS TO ALL PUBLIC LANDS DURING CONSTRUCTION. ALL LANE
CLOSURES SHALL BE COORDINATED WITH THE BLM, FLAGGED, AND
MONITORED FOR THE DURATION OF WORK.
5 CONTRACTORS MUST ADHERE TO ALL GUIDELINES AND PROVISIONS AS
MENTIONED IN THE BLM NATIONAL NEPA REGISTER DOCUMENT
DOI-BLM-MT-B010-2022-0016-CX
NO SCALE
LOLO NAT'L
FOREST
BUREAU OF LAND
MANAGEMENT
DNRC
PRIVATE
G E
N E
R A
L
N
O T
E S
Q
U A
N T
I T
I E
S
A
K
Y
M A
P
BELMONT DAY USE
RIVER BEND DAY USE
CHIPSEAL PROJECT START
PROJECT MILE POST 0.0,
STATIONING 75+35.00
EARTHWORK [1]
ITEM QUANTITY UNIT
EXCAVATION (CUT) 100 CY
EMABNKMENT (NATIVE) 100 CY
IMPORTED FILL - SURFACE
COURSE AGGREGATE
3000 CY
WASTE
[3]
AS
DESIGNATED
CY
[1]
EARTHWORK QUANTITIES ARE "IN PLACE"
ESTIMATES. NO SHRINK OR SWELL IS ASSUMED.
NO GROUND LOSS IS INCLUDED
[2]
THE QUANTITIES ARE AN ESTIMATE OF THE
ENGINEER. THE CONTRACTOR SHALL MAKE THEIR
OWN INDEPENEDENT ESTIMATE OF QUANTITIES
AND BID THEREON.
NOTE: ALL FINISHED GROUND EARTHWORK FOR
WHITAKER BRIDGE DAY USE PARKING SHALL BE
STAKED BY BLM ENGINEERING PRIOR TO
CONSTRUCTION.
[3]
ALL WASTE MATERIALS SHALL BE UTILIZED IN
SITE WORK OR HAULED TO WASTE SITE AT SHEEP
FLATS DAY USE AREA AS SHOWN IN PLANS.
PUBLIC SAFETY & TRAFFIC CONTROL NOTES
1. CONTRACTOR TO TAKE ALL NECESSARY PRECAUTIONS TO ENSURE PROTECTION OF
THE PUBLIC AND SAFE GUARDING OF WORK.
2. PLACE ROAD BARRIER(S) & ROAD CLOSURE SIGNAGE AT THE SITE ENTRANCE IN
ACCORDANCE WITH FHA FP-14 SPECIFICATION SECTIONS 635.04, 635.05, & 635.07. NO
CONSTRUCTION SHALL OCCUR UNTIL THE PROPER TRAFFIC CONTROL DEVICES FOR
WARNING, CHANNELING, AND PROVIDING SAFETY FOR MOTORISTS ARE IN PLACE.
MAINTAIN THE CONDITION, OPERATION AND EFFECTIVENESS OF ALL TRAFFIC
CONTROL DEVICES UNTIL NO LONGER NEEDED. REMOVE ALL TRAFFIC CONTROL
DEVICES UPON PROJECT COMPLETION.
SITE LAYOUT NOTES
1. ITEMS SHOWN AS "NOT A PART " ARE SHOWN FOR REFERENCE ONLY.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD MEASUREMENT OF ALL
PROPOSED FENCES AND GATES.
3. THE LAYOUT OF SITE AMENITIES AND FENCES MUST BE APPROVED BY THE
GOVERNMENT PRIOR TO INSTALLATION.
4. THE LAYOUT OF ALL NEW PATHWAYS / WALKWAYS AND THE GRADING OF ALL
SLOPES AND CROSS SLOPES SHALL CONFORM TO THE AMERICANS WITH
DISABILITIES ACT (ADA) WHEN DENOTED AS ADA ACCESSABLE ON PLANS.
5 ALL LAYOUT LINES, OFFSETS, OR REFERENCES TO LOCATING OBJECTS ARE EITHER
PARALLEL OR PERPENDICULAR UNLESS OTHERWISE DESIGNATED WITH ANGLE
OFFSETS NOTED.
6. ALL PROPOSED SITE FEATURES SHALL BE LAID OUT AND STAKED FOR REVIEW AND
APPROVAL BY GOVERNMENT PRIOR TO COMMENCEMENT OF INSTALLATION. ANY
REQUIRED ADJUSTMENTS TO THE LAYOUT SHALL BE UNDERTAKEN AS DIRECTED, AT
NO ADDITIONAL COST TO THE GOVERNMENT.
7. PATHWAY WIDTHS SHALL BE AS NOTED ON THE LAYOUT AND MATERIALS PLAN.
GRADING & DRAINAGE NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT ALL LOCATIONS.
2. PITCH EVENLY BETWEEN CONTOUR LINES AND BETWEEN SPOT ELEVATIONS.
3. ALL UNPAVED AREAS MUST DITCH TO DRAIN AT A MINIMUM OF 2% UNLESS NOTED.
4. WHERE NEW PAVING MEETS EXISTING PAVING, MEET LINE AND GRADE OF EXISTING
PAVING WITH SMOOTH TRANSITION BETWEEN NEW AND EXISTING SURFACES.
5. GRADES WITHIN HANDICAP PARKING SPACES AND MANEUVERING AREAS SHALL NOT
EXCEED 1.5% IN ANY DIRECTION.
6. CROSS SLOPES OF PEDESTRIAN WALK WAYS SHALL NOT EXCEED 1.5% UNLESS
NOTED.
7. RUNNING SLOPES OF ALL PEDESTRIAN WALKWAYS SHALL NOT EXCEED 4.5%
UNLESS NOTED.
8. THE CONTRACTOR SHALL VERIFY EXISTING GRADES IN THE FIELD AND REPORT ANY
DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO COMMENCING
CONSTRUCTION.
9. REFER TO THE EARTHWORK SECTION OF THE SPECIFICATIONS FOR BACKFILL AND
GRADING PROCEDURES.
10 EXCESS MATERIALS SHALL NOT BE REMOVED FROM THE SITE UNLESS DIRECTED BY
THE GOVERNMENT. SEE EARTHWORK SPECIFICATIONS FOR DETAILS
ROADWAY & PATHWAY NOTES
1. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAY(S) & PATHWAY(S) UNLESS
OTHERWISE NOTES
2. THE CONTRACTOR SHALL PREPARE THE SUBGRADE PER SPECIFICATION SECTION
204.
3. ROADWAYS SHALL NOT BE CONSTUCTED UNTIL ALL CULVERTS, STORM DRAIN, &
UNDERGROUND UTILITIES HAVE BEEN INSTALLED AND ACCEPTED BY THE
GOVERNMENT.
4. IT SHALL BE THE RESPONSIBILTY OF THE CONTRACTOR TO SUPERVISE AND
CERTIFY THAT PROPER COMPACTION HAS BEEN OBTAINED.
5 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACT TO ADJUST ALL UTILITY
ACCESS COVERS TO PROPOSED GRADES.
6. BEFORE THE PLACEMENT OF ASPHALT AND CONCRETE, THE SUBGRADE SHALL
RECEIVE A GROUND STERILANT APPLIED AT A RATE IN ACCORDANCE WITH THE
MANUFACTURES INSTRUCTIONS.
7. ALL PROPOSED ROADWAYS & PATHWAYS SHALL MEET THE LINE AND GRADE OF
EXISTING ADJACENT ROADWAY SURFACES.
8. WHEN IT IS REQUIRED TO MATCH EXISTING PAVEMENT, EXISTING PAVEMENT SHALL
BE SAW CUT IN A MANNER TO PROVIDE A SMOOTH AND STRAIGHT CUT VERTICAL
EDGE FREE OF DEFECTS.
9. ALL SAWCUT EDGES OF EXISTING PAVEMENT SHALL BE CLEANED AND COATED WITH
A TACK COAT PRIOR TO PLACING NEW PAVEMENT ADJACENT TO THE EXISTING
PAVEMENT.
DEMOLITION NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES TO REMAIN IN PLACE
DURING DEMOLITION.
2. THE CONTRACTOR IS REQUIRED TO PRESERVE THE NATURAL LANDSCAPE AND
PROTECT EXISTING VEGETATION NOT REQUIRED OR OTHERWISE AUTHORIZED TO
BE REMOVED. CONTRACTOR TO REFERENCE PLAN FOR EXCAVATION AND REMOVAL
LIMITS.
3. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED
TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.
4. EXCAVATION AND FINISH GRADE AREAS, TO BE COVERED BY EMBANKMENTS, SHALL
BE THOROUGHLY CLEARED AND STRIPPED OF VEGETATIVE MATTER, BRUSH, TREES,
STUMPS, ROOTS, AND ROCK AS INDICATED ON THE PLAN. CLEARING AND GRUBBING
MATERIAL SHALL BE WASTED IN DESIGNATED AREAS IDENTIFIED ON THE PLAN OR
ON SITE PER THE GOVERNMENTS DIRECTIONS.
5. EXCAVATION MATERIAL NOT USED FOR THE CONSTRUCTION OF EMBANKMENTS
SHALL BE WASTED IN DESIGNATED WASTE AREA(S) AS IDENTIFIED ON THE PLANS
OR AS DIRECTED BY GOVERNMENT. WASTE MATERIAL SHALL BE SHAPED AND
BLENDED INTO THE SURROUNDING TERRAIN AND SHALL NOT EXCEED 3:1 SLOPES
UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT.
6. CONTRACTOR TO SEPARATE ANY SALVAGEABLE TOPSOIL AND USE MATERIAL TO
CAP WASTE SITE DURING EXCAVATION AND CLEARING.
7. ALL ROCK REMOVAL CONSIDERED INCIDENTAL TO SITE GRADING AND MAY BE
CONSERVED ON SITE AS RIP RAP MATERIAL.
8. EXISTING SURFACE MATERIAL INCLUDING GRANITE CURB, ASPHALT, CONCRETE,
SHRUBS, ETC. SHALL BE REMOVED AND DISPOSED OF UNLESS OTHERWISE NOTED.
9. CONTRACTOR SHALL SUPPLY AND MAINTAIN, FOR THE DURATION OF DEMOLITION,
ALL NECESSARY DEVICES FOR EROSION, SEDIMENT, AND DUST CONTROL, AND
DEWATERING WHEN REQUIRED.
10. CARE SHOULD BE TAKEN IN ALL EXCAVATION DUE TO POSSIBLE EXISTENCE OF
UNRECORED UTILITIES.
11. CONSULT ALL DRAWING AND SPECIFICATIONS FOR COORDINATION PRIOR TO
COMMENCING DEMOLITION.
EROSION CONTROL
ITEM QUANTITY UNIT
RIP RAP (24" - 36") 50 CY
DEMOLITION
ITEM QUANTITY UNIT
TREE REMOVAL 10 EA
ESTIMATED QUANTITIES [2]
ROADWAY
ITEM QUANTITY UNIT
CHIP SEAL 6.2 MILES
SIGNAGE INSTALLATION 17 EA
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
C H
P
S
A
L
S
E C
T I O
N
D
E T
A I L S
M C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
CHIP SEAL SECTION NOTES
1 CROSS SECTIONS ARE SHOWN FROM FEDERAL
HIGHWAYS MCNAMARA/JOHNSRUD PAVING PROJECT
COMPLETED IN 2022 AS REFERENCE FOR CHIP
SEALING OPERATIONS. NO OTHER WORK IS TO BE
COMPLETED IN THIS CONTRACT ON EXISTING
ASPHALT SURFACES.
2. ASSUME ANY ROAD SECTIONS AS TYPICAL SECTION 1
IF NOT NOTED IN STATIONING.
3534.688
3533.849
3536.000
3535.080
3533.864
M C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N 0 40 80
FULL SCALE (22" X 34") 1 IN . = 40 FT.
HALF SCALE (11" X 17") 1 IN . = 80 FT.
CONSTRUCTION NOTES
1 DELINEATE AND ADD GRAVEL ROAD BASE TO ALL VEHICLE SURFACES
CALLED OUT IN PLANS. PARKING AREAS SHALL BE DESIGNATED WITH
20'-30' SECTIONS OF PIPE.
2 PARKING AREA EARTHWORK TO BE DONE IN ACCORDANCE WITH ON-SITE
STAKING PROVIDED BY BLM ENGINEERING
3 ALL EQUIPMENT AND MATERIALS USED FOR CONSTRUCTION SHALL
REMAIN ON PREVIOUSLY DISTURBED ROADWAYS AND STAGING AREAS
SPECIFIED BY THE GOVERNMENT.
4 OVERFLOW AND TRAILER PARKING SHALL BE DIRECTED CLOCKWISE TO
ALLOW FOR PULL-IN PARKING AND IMPROVED FLOW OF TRAFFIC.
5 IMPROVED PARKING AREA CONSISTS OF 23 TRAILER PARKING SPACES
AND 10 DESIGNATED SMALL VEHICLE PARKING SPACES.
PROPOSED LAYOUT INSET
WHITAKER OVERFLOW MATERIAL QUANTITIES
MATERIAL TYPE QUANTITY UNIT
SURFACE COURSE
(703.05.C)
1000 CCY
PARKING BOUNDARY
BOULDERS (24" -36" DIA)
50 CY
PARKING SPACES (30-40'
LENGTH)
23 EA
6" DIA SCH. 40 PIPE
(709.09)
700 LF
B
L
A
C
K
F
O
T
V
E
R
B
L
A
C
K
F
O
V
E
R
DEMOLITION NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES TO REMAIN
IN PLACE DURING DEMOLITION.
2. THE CONTRACTOR IS REQUIRED TO PRESERVE THE NATURAL
LANDSCAPE AND PROTECT EXISTING VEGETATION NOT REQUIRED OR
OTHERWISE AUTHORIZED TO BE REMOVED. CONTRACTOR TO
REFERENCE PLAN FOR EXCAVATION AND REMOVAL LIMITS.
3. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE
RESTORED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO
THE GOVERNMENT.
4. EXCAVATION AND FINISH GRADE AREAS, TO BE COVERED BY
EMBANKMENTS, SHALL BE THOROUGHLY CLEARED AND STRIPPED OF
VEGETATIVE MATTER, BRUSH, TREES, STUMPS, ROOTS, AND ROCK AS
INDICATED ON THE PLAN. CLEARING AND GRUBBING MATERIAL SHALL BE
WASTED IN DESIGNATED AREAS IDENTIFIED ON THE PLAN OR ON SITE
PER THE GOVERNMENTS DIRECTIONS.
5. ALL ROCK REMOVAL CONSIDERED INCIDENTAL TO SITE GRADING.
6. CONTRACTOR SHALL SUPPLY AND MAINTAIN, FOR THE DURATION OF
DEMOLITION, ALL NECESSARY DEVICES FOR EROSION, SEDIMENT, AND
DUST CONTROL, AND DEWATERING WHEN REQUIRED.
7. CONSULT ALL DRAWING AND SPECIFICATIONS FOR COORDINATION
PRIOR TO COMMENCING DEMOLITION.
WHITAKER OVERFLOW DEMOLITON QUANTITIES
MATERIAL TYPE QUANTITY UNIT
TREES (202.07) 10 EA - DISPOSAL
SITE GRADING -
EXCAVATION (204.01)
350 CY
PARKING SPACES (NO
DELINEATIONS)
16 EA
EXISTING LAYOUT INSET
EXISTING IMPACT BOUNDARY - GRAY HATCH
APPROXIMATE PARKING LOCATIONS
(NO DILINEATION)
TREES TO BE REMOVED
(8"-24" PONDEROSA)
EXISTING RIP RAP DRAIN (PROTECT IN PLACE)
EXISTING VEGETATION CORRIDOR (PROTECT IN PLACE)
EXISTING VEGETATION CORRIDOR
(PROTECT IN PLACE)
EXISTING RIP RAP DRAIN
DITCH/FLOW LINE
CUT/FILL BOUNDARY
PARKING BOUNDARY
BOULDERS - 24"-36" Ø
PARKING DELINEATION
(6" Ø SCH. 40 PIPE - 30' LENGTH)
EXISTING VEGETATION
EXISTING VEGETATION
(PROTECT IN PLACE)
NATURAL SURFACE -
GRASS/COMPACTED EARTH
W H
I T
A K
B
I D
G
V E
R F
L O
W
P
A R
K I N
G
A R
E A
LEGEND
EXISTING PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
EXISTING VAULT TOILET
WHITAKER SMALL
VEHICLE PARKING
EXISTING VAULT TOILET
WHITAKER SMALL
VEHICLE PARKING
(SHEET 6)
EDGE OF EXISTING AGGREGATE BASE
TIE-IN SURFACE COURSE
TO EXISTING GRADE
SCALE: 1" = 40'
SCALE: 1" = 40'
30'
TYP.
230'
INSTALL ONE-WAY SIGN
GOV. FURNISHED
M C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N 0 40 80
FULL SCALE (22" X 34") 1 IN . = 40 FT.
HALF SCALE (11" X 17") 1 IN . = 80 FT.
CONSTRUCTION NOTES
1 DELINEATE AND ADD GRAVEL ROAD BASE TO ALL VEHICLE SURFACES
CALLED OUT IN PLANS. PARKING AREAS SHALL BE DESIGNATED WITH 20'
SECTIONS OF PIPE.
2 PARKING AREA EARTHWORK TO BE DONE IN ACCORDANCE WITH ON-SITE
STAKING PROVIDED BY BLM ENGINEERING
3 ALL EQUIPMENT AND MATERIALS USED FOR CONSTRUCTION SHALL
REMAIN ON PREVIOUSLY DISTURBED ROADWAYS AND STAGING AREAS
SPECIFIED BY THE GOVERNMENT.
4 OVERFLOW AND TRAILER PARKING SHALL BE DIRECTED CLOCKWISE TO
ALLOW FOR PULL-IN PARKING AND IMPROVED FLOW OF TRAFFIC.
5 IMPROVED PARKING AREA CONSISTS OF 23 TRAILER PARKING SPACES
AND 10 DESIGNATED SMALL VEHICLE PARKING SPACES.
PROPOSED LAYOUT INSET
WHITAKER SMALL VEHICLE PARKING MATERIAL
QUANTITIES
MATERIAL TYPE QUANTITY UNIT
6" DIA SCH. 40 PIPE
(709.09)
260 LF
B
L
A
C
K
F
O
V
E
R
B
L
A
C
K
F
O
V
E
R
EXISTING LAYOUT INSET
EXISTING TOILET. PROTECT IN PLACE.
EXISTING SMALL VEHICLE PARKING
(NO DELINEATION)
EXISTING BOAT RAMP.
PROTECT IN PLACE
PROTECT TOILET AND ALL STRUCTURES
PARKING DELINEATION
(6" Ø SCH. 40 PIPE)
TOP OF CUT
W H
I T
A K
B
I D
G
A
L L
V
E H
I C
L E
P A
R K
I N
G
A
R E
A
LEGEND
EXISTING PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
SCALE: 1" = 40'
SCALE: 1" = 40'
POST AND RAIL FENCE
EXISTING SIGN. PROTECT IN PLACE.
TIE IN SURFACE COURSE TO EXISTING GRADE.
STEEL PIPE DELINEATION DETAIL
NO SCALE
#5 REBAR - 5' - 10' SPACING
INSTALL THROUGH OR AROUND
PIPE AS APPROVED BY GOV - 1' MIN BURY
6" SCH. 40 STEEL PIPE
TOP OF FINISH GRADE
≈ 3"
INSTALL GOV FURNISHED SIGNS
SMALL VEHICLE PARKING
BOAT LAUNCH
OVERFLOW PARKING
INSTALL GOV FURNISHED SIGN
SMALL VEHICLE PARKING
INSTALL GOV FURNISHED SIGN
ONE WAY =►
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N
THIBIDEAU CAMPGROUND
B L A
C K
F O
O
T
R
I V
E R
J O
H N
S R
C N
A M
A R
A
R
O A
D
THIBIDEAU RAPIDS DAY USE AREA
JOHNSRUD / M
CNAMRA ROAD
BLACKFOOT RIVER
N
DAY USE PARKING AREA
CAMPSITE TYP.
VAULT TOILET
QUANTITIES
THIBIDEAU RAPIDS DAY
USE
80 CCY
THIBIDEAU
CAMPGROUND
630 CCY
D A
Y
U
E
A S
CONSTRUCTION NOTES
1 PREPARE ALL EXISTING SITE ROADS PER FP-14 SPECIFICATION SECTION
301 WITH APPROPRIATE EQUIPMENT TO RECONDITION ALL DITCHES,
SHOULDERS, ROADBEDS AND AGGREGATE SURFACES. REMOVE ALL
CONCRETE PINDOWNS, SIGNAGE, AND DELETERIOUS MATERIAL PRIOR
TO RECONDITIONING
2 EXISTING ROADWAY SHALL BE WATERED, PROCESSED AND COMPACTED
PER SPECIFICATION SECTION 301 PRIOR TO FINISH GRADE MATERIAL
FP-14 SPECIFICATION SECTION 705.05(C) OR APPROVED EQUAL BEING
INSTALLED
3 INSTALL 4" LIFT OF SURFACE COURSE AGGREGATE MATERIAL ON ALL
VEHICULAR SURFACES (SITE ROADS, CAMPSITES, AND PARKING AREAS).
CREATE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT 2%
SLOPE TYPICAL
4 COMPACT SURFACE COURSE MATERIAL PER SPECIFICATION SECTION
301.05, 1-IN, COMPACTION METHOD C OR AS APPROVED BY THE BLM.
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N
SHEEP FLATS DAY USE AREA
B
L
A
C
K
F
O
V
E
R
JOHNSRUD / MCNAMARA ROAD
N
DAIGLE'S EDDY DAY USE AREA
JOHNSRUD / M
CNAMARA ROAD
BLACKFOOT RIVER
QUANTITIES
SHEEP FLATS DAY USE 170 CCY
DAIGLE'S EDDY DAY USE 560 CCY
DIAGLE'S EDDY DAY USE PARKING
SHEEP FLATS
WASTE PIT
SHEEP FLATS RIVER ACCESS PARKING AREA
D A
Y
U
E
A S
CONSTRUCTION NOTES
1 PREPARE ALL EXISTING SITE ROADS PER FP-14 SPECIFICATION SECTION
301 WITH APPROPRIATE EQUIPMENT TO RECONDITION ALL DITCHES,
SHOULDERS, ROADBEDS AND AGGREGATE SURFACES. REMOVE ALL
CONCRETE PINDOWNS, SIGNAGE, AND DELETERIOUS MATERIAL PRIOR
TO RECONDITIONING
2 EXISTING ROADWAY SHALL BE WATERED, PROCESSED AND COMPACTED
PER SPECIFICATION SECTION 301 PRIOR TO FINISH GRADE MATERIAL
FP-14 SPECIFICATION SECTION 705.05(C) OR APPROVED EQUAL BEING
INSTALLED
3 INSTALL 4" LIFT OF SURFACE COURSE AGGREGATE MATERIAL ON ALL
VEHICULAR SURFACES (SITE ROADS, CAMPSITES, AND PARKING AREAS).
CREATE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT 2%
SLOPE TYPICAL
4 COMPACT SURFACE COURSE MATERIAL PER SPECIFICATION SECTION
301.05, 1-IN, COMPACTION METHOD C OR AS APPROVED BY THE BLM.
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N
RIVER BEND DAY USE
N
I
N
E
M
I
A
I
R
A
D
N
BELMONT CREEK DAY USE
N
I
N
E
M
I
A
I
R
A
D
BLACKFOOT RIVER
QUANTITIES
BELMONT CREEK DAY
USE AREA
130 CCY
RIVER BEND DAY USE 290 CCY
BELMONT CREEK DAY USE PARKING
RIVER BEND DAY USE PARKING
CONSTRUCTION NOTES
1 PREPARE ALL EXISTING SITE ROADS PER FP-14 SPECIFICATION SECTION
301 WITH APPROPRIATE EQUIPMENT TO RECONDITION ALL DITCHES,
SHOULDERS, ROADBEDS AND AGGREGATE SURFACES. REMOVE ALL
CONCRETE PINDOWNS, SIGNAGE, AND DELETERIOUS MATERIAL PRIOR
TO RECONDITIONING
2 EXISTING ROADWAY SHALL BE WATERED, PROCESSED AND COMPACTED
PER SPECIFICATION SECTION 301 PRIOR TO FINISH GRADE MATERIAL
FP-14 SPECIFICATION SECTION 705.05(C) OR APPROVED EQUAL BEING
INSTALLED
3 INSTALL 4" LIFT OF SURFACE COURSE AGGREGATE MATERIAL ON ALL
VEHICULAR SURFACES (SITE ROADS, CAMPSITES, AND PARKING AREAS).
CREATE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT 2%
SLOPE TYPICAL
4 COMPACT SURFACE COURSE MATERIAL PER SPECIFICATION SECTION
301.05, 1-IN, COMPACTION METHOD C OR AS APPROVED BY THE BLM.
D A
Y
U
E
A S
BOUNDARY FENCE
| C1 - COVER |
| Sheets and Views |
| COVER-C1 COVER |
| C2 - NOTES |
| Sheets and Views |
| NOTES-C3 VICINITY MAP |
| C3 - SECTION DETAILS |
| Sheets and Views |
| SECTION DETAILS-C3 SECTION DETAILS |
| C4 - WHITAKER OVERFLOW |
| Sheets and Views |
| SITE PLAN - WHITAKER-C4 WHITAKER OVERFLOW |
| C5 - WHITAKER SMALL VEHICLE |
| Sheets and Views |
| SITE PLAN - WHITAKER-C5 WHITAKER SMALL VEHICLE |
| C6 - DAY USE 1 |
| Sheets and Views |
| SITE PLAN - DAY USE-C6 DAY USE 1 |
| C7 - DAY USE 2 |
| Sheets and Views |
| SITE PLAN - DAY USE-C7 DAY USE 2 |
| C8 - DAY USE 3 |
| Sheets and Views |
| SITE PLAN - DAY USE-C8 DAY USE 3 |
File details come from the government source that posted it. Updated .