Amendment_2_-_GAOA_McNamara_Johnsrud_-_Issued_0002.pdf
PDF 609 KB Posted
- Solicitation number
- 140L3623R0006
About this file
This solicitation requests proposals for a construction project. The Bureau of Land Management seeks to chip seal approximately 6.2 miles of asphalt roadway, resurface day use areas, perform linear grading along 4.9 miles of roadway, and delineate a parking area. The work will be located in Missoula County, Montana. Offerors must submit proposals by May 25, 2023. The solicitation was amended to update wage determinations, provide site visit records and questions with answers. Products or services required include aggregate for chip sealing, asphalt and concrete work. The agency involved is the Department of the Interior Bureau of Land Management.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3623R0006 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
LMALMA
05/17/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers XXis extended,
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)
BLM MT STATE OFFICE 5001
SOUTHGATE DR BILLINGS MT
59101
BLM_MT_Procurement@blm.gov
CODE 6. ISSUED BY
BLM MT-STATE OFFICE
5001 SOUTHGATE DR
(ATTN: CMUNDT
BILLINGS MT 59101
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/21/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: McNamara / Johnsrud Roads, Chip Sealing and Site Improvements - Great
American Outdoors Act, Montana
See Page 2 of 14 for changes incorporated by this Amendment.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christine Mundt
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No: 140L3623R0006 PROJECT DESCRIPTION: McNamara/Johnsrud Roads, Chip Sealing and Site Improvements (GAOA)
Amendment No. 0002
Description of Changes - This amendment incorporates the following information:
1. In Section J, remove Attachment 3 “General Decision Number: MT20200080 01/06/2023” in its entirety and replace with the revised Attachment 3 “General Decision Number: MT20230079 04/28/2023.”
2. For informational purposes only, the Government is providing the Site Visit Attendance Records from the organized site visit that the Government held on May 5, 2023, at 10:00 am Mountain Time.
3. The Government is providing the attached Questions received from interested offerors and the associated Answers provided by the Government.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Proposal Response Date - The hour and date for receipt of proposals is hereby extended to 5:00 pm Mountain Time on May 25, 2023.
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
SAM.gov https://sam.gov/wage-determination/MT20230079/0
"General Decision Number: MT20230079 04/28/2023
State: Montana
Construction Type: Highway
Counties: Montana Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |� Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |� The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|� Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |� The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 04/28/2023
SUMT2023-001 04/01/2022
Rates Fringes
CARPENTER
Carpenter/Piledriverman.....$ 36.05 14.23 Millwright..................$ 40.87 14.70
CEMENT MASON/CONCRETE FINISHER...$ 33.41 16.51
DIVER
Diver Tender................$ 45.30 18.38 Diving......................$ 92.66 18.38 Stand-By....................$ 46.33 18.38 The tender shall receive 2 hours at the straight time pay rate per shift for dressing and/or undressing when work is done under hyperbaric conditions.
Depth Pay (Surface Diving):
0-20 ft.: Free zone >20-100 ft.: $2.00 per ft.
>100-150 ft.: $3.00 per ft.
>150-220 ft.: $4 00 per ft.
>220 ft.: $5.00 per ft.
Diving in Enclosures (Diver Only):
0-25 ft.: Free zone >25-300 ft.: $1.00 per ft.
ELECTRICIAN (LINE
CONSTRUCTION)
Equipment Operator..........$ 38.38 18.60 Groundman...................$ 29.96 17.64 Lineman.....................$ 50.11 19.88
ELECTRICIAN
All Areas...................$ 39.08 20.00
IRONWORKER.......................$ 30.43 25.22
LABORER
Group 1.....................$ 27.71 12.36 Group 2.....................$ 30.87 12.36 Group 3.....................$ 31.10 12.36 Group 4.....................$ 32.12 12.36 GROUP 1: Flag Person
GROUP 2: All General Labor work; Burning Bar; Bucket Man;
Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement Handler (dry); Chuck Tender; Choker Setter; Concrete Worker;
Curb Machine-Lay Down; Crusher and Batch Plant Worker; Fence Erector; Form Setter; Form Stripper; Heater Tender;
Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for Concrete and other materials; Sign Erection, Guard Rail and Jersey Rail;
Stake Jumper; Spike Driver; Signalman; Tail Hoseman; Tool Checker and Houseman; Traffic Control Worker
GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment Handler; Geotextile and Liners; High-Pressure Nozzleman;
Jackhammer (Pavement Breaker); Laser
Equipment; Non-riding Rollers; Pipelayer; Posthole Digger (power); Power Driven Wheelbarrow; Rigger; Sandblaster; Sod- Cutter-power; Tampers
GROUP 4: Asphalt Raker; Cutting Torch; Grade Setter; High- Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or Truck Mounted Wagon Drill; Welder including Air Arc
PAINTER..........................$ 36.00 12.84
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 32.47 12.77
Group 2.....................$ 34.55 12.77 Group 3.....................$ 35.70 12.77 Group 4.....................$ 36.67 12.77 Group 5.....................$ 38.05 12.77 Group 6.....................$ 39.27 12.77 Group 7.....................$ 41.95 12.77 GROUP 1: Air Compressor; Auto Fine Graders; Belt Finishing Machine; Boring Machine (small); Cement Silo; Crane, A-Frame Truck Crane; Crusher Conveyor; DW-10, 15, and 20 Tractor Roller; Farm Tractor; Forklift; Form Grader; Front End Loader Under 1 CU Yard; Heavy Duty Drills; Herman Nelson Heater;
Mulching Machine; Oiler, All Except Cranes & Shovels; Pumpman
GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to and including 3 CU Yard; Bit Grinder; Bituminous Paving Travel Plant; Boring Machine Large; Broom, Self-Propelled; Concrete Travel Batcher; Concrete Float & Spreader; Concrete Bucket Dispatcher;
Concrete Finish Machine; Concrete Conveyor; Distributor;
Dozer; Rubber-Tired, Push & Side Boom; Elevating Grader/Gradall; Field Equipment Serviceman; Front End Loader 1 CU Yard to including 5 CU Yard; Grade Setter; Heavy Duty Drills, All Types;
Hoist/Tugger, All; Hydralift & Similar; Industrial Locomotive;
Motor Patrol, Except Finish; Mountain Skidder; Oiler - Cranes & Shovels; Pavement Breaker, EMSCO; Power Saw, Self-Propelled;
Pugmill; Pumpcrete/Grout Machine; Punch Truck; Roller, Other Than Asphalt; Roller, Sheepsfoot, Self-Propelled; Roller, 25 Tons and Over; Ross Carrier; Rotomill Under 6 Ft; Trenching Machine; Washing/Screening Plant
GROUP 3: Asphalt Paving Machine; Asphalt Screed;
Backhoe/Excavator/Shovel Over 3 CU Yard; Cableway Highline;
Concrete Batch Plant; Concrete Curing Machine; Concrete Pump;
Cranes; Creter; Cranes, Electric Overhead; Cranes 24 Tons and Under; Curb Machine/Slip Form Paver; Finish Dozer; Front End Loader Over 5 CU Yard; Mechanic/Welder; Pioneer Dozer; Roller Asphalt (Breakdown & Finish); Rotomill, Over 6 FT; Scraper, Single, Twin or Pulling Belly Dump; Yo-Yo Cat
GROUP 4: Asphalt/Hot Plant Operator, Cranes, 25 Tons to 44 Tons; Crusher Operator; Finish Motor Patrol; Finish Scraper
GROUP 5: Cranes, 45 Tons To Including 74 Tons
GROUP 6: Cranes, 75 Tons To Including 149 Tons; Crane, Whirley (All)
GROUP 7: Cranes, 150 Tons To Including 250 Tons (Add $ 1.00 For Every 100 Tons Over 250 Tons; Crane, Tower (All)
TRUCK DRIVER
Group 1.....................$ 28.21 12.57 Group 2.....................$ 35.74 12.57 GROUP 1: Pilot Car
GROUP 2: Combination Truck and Concrete Mixer and Transit Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump Trucks and Similar Equipment; Dumpster; Flat Trucks; Lumber Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom;
Serviceman; Service Truck/Fuel Truck/ Tireperson; Truck Mechanic; Trucks With Power Equipment; Warehouseman, Partsman, Cardex and Warehouse Expeditor; Water Trucks
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
SITE INSPECTION TOUR / PREBID CONFERENCE RECORD
The Government strongly urges offerors to inspect the site to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award.
Solicitation Number: 140L3623R0006 Project Title: McNamara/Johnsrud Roads, Chip Sealing and Site Improvements – Great American Outdoors Act, Montana Date and Time: 05/05/2023; 10:00 AM Mountain Daylight Time Meeting Place(s): From Missoula: Travel East on I-90 E for 4.2 Miles. Follow Exit 109 for MT-200 E towards Bonner/Great Falls. Travel East on MT-200 E for 12.1 miles. Turn left on Johnsrud Park Road. The project boundary is the intersection of Johnsrud Road and Hwy 200.
Conducted by: Grady Anderson
Attended by:
Name Firm
Grady Anderson Bureau of Land Management
Tim Monroe Hardrives Construction Inc
Note – The site is open at anytime for contractors looking to visit the project location outside of the Organized Site Visit that was held on May 5, 2023.
THIS PAGE INTENTIONALLY LEFT BLANK
QUESTIONS AND ANSWERS
Offerors shall submit questions by May 12, 2023, at 5:00 pm, Mountain Time. Questions submitted after this date and time will not be accepted.
Offerors for this RFP, including subcontractors and teammates, shall consolidate questions related to this solicitation in a Request for Information (RFI) formatted Word document. Any RFI is to be emailed as an editable attachment to Christine Mundt (cmundt@blm.gov) or Jorge Alvarez (BLM_MT_Procurement@blm.gov) with the subject line: RFI – 140L3623R0006 McNamara Johnsrud Roads Chipseal (GAOA). Only written RFI’s will be considered and responded to.
BLM responses to the RFI will be posted as an amendment to the solicitation.
Solicitation Number: 140L3623R0006 Project Title: McNamara / Johnsrud Roads, Chip Sealing and Site Improvements – Great American Outdoors Act, Montana
Q1: Where will chips be stockpiled during construction?
A1: Chips can be stockpiled in all major pullouts along Johnsrud Road. Ideally, we will use the parking lots near the Messina Dr. Turnout located here:
https://www.google.com/maps/place/46%C2%B055'07.5%22N+113%C2%B040'26.3%22W/@46.918762,- 113.6746017,179m/data=!3m2!1e3!4b1!4m13!1m8!3m7!1s0x535db23fe3667789:0xa191d7b723eef51e!2sJ ohnsrud+Park+Rd,+Montana+59823!3b1!8m2!3d46.9324249!4d- 113.6426688!16s%2Fg%2F1tt8bylt!3m3!8m2!3d46.918762!4d-113.673958
Q2: Are contractors expected to chip seal the pullouts and intersection entrances?
A2: Yes, this will be depicted in the revised plans and price schedule that will be issued with a future amendment. Once the revised plans and schedule are issued, offerors are encouraged to pay attention to the change in quantities for chip sealing on the price schedule.
Q3: Who is performing the crack sealing on the first stretch of road?
A3: This is being performed by Missoula County.
Q4: Will signs be provided by the government? If so, does the contractor need to concrete the bases?
A4: No, all signs and posts will be installed by the government. This will be reflected in revised plans and price schedule that will be issued with a future amendment.
Q5: Are there concrete pin downs that need to be removed prior to blading/materials hauling?
A5: No, there are currently no concrete pin downs at the day use or campground areas.
Q6: Is the contractor responsible for repainting the speed bump?
A6: BLM is seeking internal clarification and will provide the associated answer in a future amendment.
Q7: Will the contractor be responsible for a second sweeping?
A7: No. Only one sweeping is expected for this project.
Q8: Will the contractor be allowed to do half the work this season and half the work next season if the timing does not work out for chip sealing this year?
A8: BLM is seeking internal clarification and will provide the associated answer in a future amendment.
Q9: The Solicitation & Typical references Asphalt & Concrete but there is only a pay item for Aggregate?
A9: BLM is seeking internal clarification and will provide the associated answer in a future amendment.
mailto:BLM_MT_Procurement@blm.gov https://www.google.com/maps/place/46%C2%B055'07.5%22N+113%C2%B040'26.3%22W/@46.918762,-113.6746017,179m/data=!3m2!1e3!4b1!4m13!1m8!3m7!1s0x535db23fe3667789:0xa191d7b723eef51e!2sJohnsrud+Park+Rd,+Montana+59823!3b1!8m2!3d46.9324249!4d-113.6426688!16s%2Fg%2F1tt8bylt!3m3!8m2!3d46.918762!4d-113.673958 https://www.google.com/maps/place/46%C2%B055'07.5%22N+113%C2%B040'26.3%22W/@46.918762,-113.6746017,179m/data=!3m2!1e3!4b1!4m13!1m8!3m7!1s0x535db23fe3667789:0xa191d7b723eef51e!2sJohnsrud+Park+Rd,+Montana+59823!3b1!8m2!3d46.9324249!4d-113.6426688!16s%2Fg%2F1tt8bylt!3m3!8m2!3d46.918762!4d-113.673958 https://www.google.com/maps/place/46%C2%B055'07.5%22N+113%C2%B040'26.3%22W/@46.918762,-113.6746017,179m/data=!3m2!1e3!4b1!4m13!1m8!3m7!1s0x535db23fe3667789:0xa191d7b723eef51e!2sJohnsrud+Park+Rd,+Montana+59823!3b1!8m2!3d46.9324249!4d-113.6426688!16s%2Fg%2F1tt8bylt!3m3!8m2!3d46.918762!4d-113.673958 https://www.google.com/maps/place/46%C2%B055'07.5%22N+113%C2%B040'26.3%22W/@46.918762,-113.6746017,179m/data=!3m2!1e3!4b1!4m13!1m8!3m7!1s0x535db23fe3667789:0xa191d7b723eef51e!2sJohnsrud+Park+Rd,+Montana+59823!3b1!8m2!3d46.9324249!4d-113.6426688!16s%2Fg%2F1tt8bylt!3m3!8m2!3d46.918762!4d-113.673958
THIS PAGE INTENTIONALLY LEFT BLANK
| Attendance Record.pdf |
| SITE INSPECTION TOUR / PREBID CONFERENCE RECORD |
| Questions and Answers.pdf |
| QUESTIONS AND ANSWERS |
File details come from the government source that posted it. Updated .