Amendment_3_-_GAOA_McNamara_Johnsrud_-_Issued_0003.pdf
PDF 8 MB Posted
- Solicitation number
- 140L3623R0006
About this file
This solicitation requests proposals for construction services to chip seal 6.2 miles of asphalt roadway, resurface day use areas, perform grading along 4.9 miles of roadway, and delineate a parking area in Missoula County, Montana. The Bureau of Land Management, Montana State Office will award a contract to furnish labor, equipment, materials and supplies to complete the work in accordance with the drawings and specifications by May 25, 2023. The solicitation includes questions and answers to clarify requirements for surface course aggregate, tree removal, speed hump markings, and the contractor's ability to spread work over two seasons if necessary.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3623R0006 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMALMA
05/18/20230003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)
BLM MT-STATE OFFICE
ATTN: CMUNDT
5001 SOUTHGATE DR BILLINGS
MT 59101
BLM_MT_PROCUREMENT@BLM.GOV
CODE 6. ISSUED BY
BLM MT-STATE OFFICE
ATTN: CMUNDT
5001 SOUTHGATE DR
BILLINGS MT 59101
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/21/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: McNamara/Johnsrud Roads, Chip Sealing and Site Improvements - Great American Outdoors Act, Montana
See Page 2 of 34 for changes incorporated by this amendment.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christine Mundt
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No: 140L3623R0006 PROJECT DESCRIPTION: McNamara/Johnsrud Roads, Chip Sealing and Site Improvements (GAOA)
Amendment No. 0003
Description of Changes - This amendment incorporates the following information:
1. Remove “Section B – Supplies or Services and Prices) in its entirety and replace with the revised “Section B
– Supplies or Services and Prices Revised – Amendment 0003).
2. In Section J, remove Attachment 1 “GAOA McNamara Johnsrud Chipseal - Technical Specifications” in its entirety and replace with the revised Attachment 1 “GAOA McNamara Johnsrud Chipseal - Technical Specifications 05-17-23.”
3. In Section J, remove Attachment 2 “GAOA McNamara Johnsrud Chipseal – Drawings” in its entirety and replace with the revised Attachment 2 “GAOA McNamara Johnsrud Chipseal - Drawings 05-17-23.”
4. The Government is providing additional Questions received from interested offerors and the associated Answers provided by the Government.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Proposal Response Date - The hour and date for receipt of proposals remains unchanged at 5:00 pm Mountain Time on May 25, 2023.
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
SECTION B – SUPPLIES OR SERVICES AND PRICES
(REVISED – AMENDMENT 0003)
MCNAMARA / JOHNSRUD ROADS, CHIP SEALING AND SITE IMPROVEMENTS –
GREAT AMERICAN OUTDOORS ACT
MONTANA
B.1 Offerors are to complete Block 17 of the SF 1442 with the total proposed fixed price.
B.2 PRICE SCHEDULE
(a) Offers will be considered for award on the following Schedule, but no offer will be considered for award on only a part of the Schedule.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) The quantities in the schedule are estimated quantities for comparison of offers only, and except as provided in the contract clause at 1510-52.211-70, BLM – Variation in Quantity, no claim shall be made against the Government for overruns or underruns.
PRICE SCHEDULE
Item No. Item Description Quantity Unit Unit Price Amount
1 PAY ITEM 15101
Mobilization 1 LS $ $
PAY ITEM 20207
Removal of Individual Trees, disposal method 203.05.a
10 Each $ $
PAY ITEM 20401
Roadway excavation, compaction placement method 2, tolerance class D.
Contract quantity.
350 Cubic Yard $ $
PAY ITEM 25101
Placed riprap, Class 7. Installed - Delineation Boulders
50 CY $ $
PAY ITEM 30115
Aggregate surface course installed, material 703.05(c), compaction method C.
Contract quantity.
2,860 Compacted Cubic Yard $ $
PAY ITEM 40711-01
Chip Seal, Type 1C. Stationing 75+35.00 to 402+94.53. Contract quantity.
73,527 SY $ $
7 PAY ITEM 62201
Hydraulic Excavator 16 HR $ $
8 PAY ITEM 62202
Road Grader 8 HR $ $
9 PAY ITEM 62203
Dump Truck 8 HR $ $
PAY ITEM 63306
Parking Delineator, 6" Sch. 40 Steel Pipe
- Installed with #4 rebar
780 LF $ $
11 PAY ITEM 63501
Temporary traffic control 1 LS $ $
TOTAL ESTIMATED COST $
END OF SCHEDULE
Special Contract Requirements Western Montana District
McNamara / Johnsrud Chip seal Bureau of Land Management
REVISED
Special Contract Requirements for Chip Sealing and Site Improvements of the
McNamara/Johnsrud Roads Description of Work
The McNamara/Johnsrud Chip Seal and Site Improvements Project consists of chip sealing 6.2 miles of asphalt roadway, resurfacing the Blackfoot Corridor Day Use Areas, and delineating the parking area at Whitaker Bridge Day Use Area.
Applicable Standard Specifications
The following Special Contract Requirements (SCRs) are only a portion of the specifications for this project.
These SCRs amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. The FP-14 is a separately published book. In order to understand the solicitation properly you need to have the FP-14 as well as this packet. Pay particular attention to the provisions of Subsection
104.04 in the FP-14 that explain how each of the many contract documents fit together.
One printed copy of the FP-14 will be distributed to the successful bidder.
To view the FP-14 electronically, go to: https://highways.dot.gov/federal-lands/specs
A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail report.center@dot.gov, phone 814-239-1160, or fax 814-239-2156.
Note: These Special Contract Requirements change, supplement, or modify the FP-14 specifications to make them more applicable to BLMs low or very low volume roads and rural construction environments. Specifications are often changed to reduce their complexity, limit testing, and loosen tolerances. Specifications are called out in this way to call attention to where requirements are changed from the standard FP-14 specifications.
How to use the FP-14 specifications with the Special Contract Requirements and the contract’s bid schedule.
• Pay item no. 20401 means this work is defined in section 204 of the FP-14 specifications. For all pay items the first three digits correlate to the FP-14 section that describes that work.
• Next check Special Contract Requirements. If there is a matching section 204 then it modifies the FP-14. If there is no section listed there are no changes, the FP-14 specification is utilized in its entirety. The change direction will be underlined and italicized; the specification text will be plain.
o Example: Section 204 is listed in the Special Contract Requirements with a direction to “Delete Section 204 in its entirety and replace with the following.”
o Apply those changes. None of the original FP-14 specification will be used. Only use the content that is in the Special Contract Requirements.
https://highways.dot.gov/federal-lands/specs mailto:report.center@dot.gov
REVISED
Table of Contents
PREFACE
DIVISION 100 GENERAL REQUIREMENTS
Section 101 – TERMS, FORMAT, AND DEFINITIONS
Section 102. - BID¸ AWARD¸ AND EXECUTI1ON OF CONTRACT
Section 103. - SCOPE OF WORK
Section 104. - CONTROL OF WORK
Section 105. - CONTROL OF MATERIAL
Section 106. - ACCEPTANCE OF WORK
Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 108. - PROSECUTION AND PROGRESS
Section 109. - MEASUREMENT AND PAYMENT
DIVISION 150 PROJECT REQUIREMENTS
Section 151. - MOBILIZATION
Section 152. - CONSTRUCTION SURVEY AND STAKING
Section 153. - CONTRACTOR QUALITY CONTROL
Section 156. – PUBLIC TRAFFIC
DIVISION 200 EARTHWORK
Section 201. - CLEARING AND GRUBBING
Section 201. - CLEARING AND GRUBBING
Section 203. - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
DIVISION 300 AGGREGATE AND BASE COURSES
301 - UNTREATED AGGREGATE COURSES
DIVISION 600 INCIDENTAL CONSTRUCTION
633 – PERMANENT TRAFFIC CONTROL
DIVISION 700 MATERIAL
707 – METAL PIPE
713 - ROADSIDE IMPROVEMENT MATERIAL
REVISED
PREFACE
Preface. Delete Preface
REVISED
DIVISION 100 GENERAL REQUIREMENTS
Section 101 – TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms. Delete all references to the TAR (Transportation Acquisition Regulations) and FAR (Federal Acquisition Regulations) in the specifications.
101.03 Abbreviations. Add the following to Subsection 101.03:
(a) Acronyms.
AA
AAN
AAR
ABA
ACPA
ADA
AFPA
AI
AIA
ARA
AREA
ASCE
ASCII
ASLA
BLM
FTMS
GSA
IEEE
MIL
MSHA
NESC
NFPA
PCA
SAE
USFS
USGS
USPS
Aluminum Association American Association of Nurserymen Association of American Railroad Architectural Barriers Act American Concrete Pavement Association Americans with Disabilities Act American Forest and Paper Association Asphalt Institute American Institute of Architects American Railway Association American Railway Engineering Association American Society of Civil Engineers American Standard Code for Information Interchange American Society of Landscape Architects Bureau of Land Management Federal Test Method Standard General Services Administration Institute of Electrical and Electronic Engineers Military Specifications Mine Safety and Health Administration National Electrical Safety Code National Forest Products Association Portland Cement Association Society of Automotive Engineers United States Forest Service United States Geological Survey United States Postal Service
WCLIB
WWPI
West Coast Lumber Inspection Bureau Western Wood Preservers Institute
Add the following to (b) U.S. Customary unit abbreviations and symbols:
hr mp ppm
Hour Milepost Part Per Million
(f) Miscellaneous unit abbreviations.
MP — milepost location ppm — parts per million volume
STA station location
101.04 Definitions. Make the following changes to Subsection 101.04:
Delete these definitions:
Bid
Bidder
Delete this definition and substitute the following:
Contract Time –
Period of Performance (POP) – The specified time allowed for completion of contract work.
Add the following:
Maximum Particle Size – The smallest sieve opening through which all particles in the material will pass.
Neat Line – A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road – Temporary construction access built along the route of the project.
Protected Streamcourse – A drainage shown on the plans that requires designated mitigation measures.
Right-of-Way – A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
REVISED
REVISED
Utilization Standards – The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Holidays — Holidays occur on the following days:
• 1st day of January - New Years’ Day;
• 3rd Monday of January - Martin Luther King, Jr. Day;
• 3rd Monday of February - Presidents' Day;
• Last Monday of May - Memorial Day;
• 4th day of July - Independence Day;
• 1st Monday of September - Labor Day;
• 2nd Monday of October - Columbus Day;
• 11th day of November – Veterans’ Day;
• 4th Thursday of November - Thanksgiving Day;
• 25th day of December - Christmas Day;
• Other days declared holidays by the Congress or the President; and
• If a holiday occurs on a Saturday, the preceding Friday is also a legal holiday. If a holiday occurs on a Sunday, the Monday following is also a legal holiday.
Add Figure 101-1—Illustration of road structure terms:
REVISED
Section 102. - BID¸ AWARD¸ AND EXECUTI1ON OF CONTRACT
Section 102. Delete Section 102 in its entirety.
Section 103. - SCOPE OF WORK
Section 103. Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Section 104. - CONTROL OF WORK
Section 104. Remove all references to the FAR.
104.04 Coordination of Contract Documents. Delete Subsection
Section 105. - CONTROL OF MATERIAL
Section 105. Remove all references to the FAR.
105.02(a) and (b). Delete Subsections
105.05 Use of Material Found in the Work. Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
REVISED
Section 106. - ACCEPTANCE OF WORK
Section 106. Delete Section
Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107. Delete Section
Section 108. - PROSECUTION AND PROGRESS
Section 108. Delete Section
Section 109. - MEASUREMENT AND PAYMENT
Section 109. Delete Subsections 109.06, 109.07, 109.08, and 109.09:
109.01 Measurement of Work. Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1
Decimal Accuracy of Quantities for Final Payment
Pay Item Level of Precision Linear Foot 1
Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1
REVISED
Cubic Yard 1 Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials
0.01
Hour 0.1
MFBM 0.01
Station Yard 1 Cubic Yard Mile 1 Ton Mile 1
DIVISION 150 PROJECT REQUIREMENTS
Section 151. - MOBILIZATION
Section 151. Delete Subsections 151.03(b), 151.03(c), and 151.03(d) Replace 151.03(b) with the following:
151.03 (b) Up to 25 percent of the original contract amount may be paid upon mobilization to the jobsite prior to any other work being completed. Any portion of the mobilization pay item in excess of 25 percent of the original contract amount will be paid after final acceptance.
Section 152. - CONSTRUCTION SURVEY AND STAKING
Section 152. Make the following changes:
Remove all references to the FAR.
Remove all references to contractor responsibility for surveying and staking. All surveying and staking services will be provided by the government.
Section 153. - CONTRACTOR QUALITY CONTROL
153.03.03 Quality Control Plan. Delete Subsection
153.04 Prosecution of Work. Add the following to Subsection 153.04(a) (2):
At a minimum the contractor shall provide project submittals as shown on the Submittal Log below.
Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.
REVISED
Submittal Log
Log No.
Indirect payment to Pay
Item(s) Description of Submittal Type of
Submittal
Requirement found in
Specification No.
/Drawings
Additional Specification References
1 40711-0100 3/8” Chip seal Type 1C 407
2 30115-0000 Surface Course Aggregate Geotechnical/Material Report 301
3 25101-0000 Placed riprap, Class 7 251
4 63501-0000 Traffic Control Plan 156, 635
Section 156. – PUBLIC TRAFFIC
156.01. Remove all references to the FAR.
156.04 Accommodating Traffic During Work. Add the following:
Provide traffic control plan that allows access to all public and private lands for administrative and public use through the duration of the project. At a minimum, single lane access must be provided throughout the project boundaries.
REVISED
DIVISION 200 EARTHWORK
Section 201. - CLEARING AND GRUBBING
Section 201. Delete Section 201 in its entirety and replace with the following:
Section 201. - CLEARING AND GRUBBING
Description
201.01 This work consists of clearing and grubbing within the clearing limits designated in the plans.
Material
201.02 Conform to the following Subsection:
Backfill material 704.03
Construction Requirements
201.03 General. Construct erosion control measures according to Section 157. Perform work within designated limits.
Do not damage vegetation designated to remain. If damage occurs, repair or replace the vegetation in an acceptable manner. Where possible, preserve vegetation adjacent to bodies of water. Treat cuts or scarred surfaces of trees and shrubs with tree wound dressing.
201.04 Clearing. Within the clearing limits clear trees, brush, and other vegetation as follows:
(a) Cut trees so they fall within the clearing limits;
(b) In areas of cut slope rounding, cut stumps flush with or below the finished ground line;
(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 6 inches of the ground; and
(d) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 14 feet. Trim tree limbs as near flush with the trunk as practicable.
201.05 Grubbing. Grub deep enough to remove stumps, roots, buried logs, moss, turf, or other vegetative matter as follows:
(a) Grub areas to be excavated, except for cut slope rounding areas;
(b) Grub embankment areas. Undisturbed stumps less than 24 inches in diameter may be left in place if they protrude less than 6 inches above the original ground and will be covered with more than 48 inches of embankment. Remove all other stumps;
(c) Grub pits, channel changes, and ditches only to the depth necessary for the excavation;
(d) Backfill stump holes and other grubbing holes with backfill material to the level of the surrounding ground according to Subsection 209.09. Compact backfill according to Subsection 209.10;
and
(e) Utilization standards for merchantable timber are listed below. Fall and buck merchantable material into lengths not to exceed 40 feet. Pieces (logs) meet utilization standards when such pieces would have met Utilization Standards if bucking lengths were varied to include such material.
Minimum Utilization Standards
Length = 16 feet.
Diameter (Inside Bark) at small end = 7 inches
33-1/3 Net Scale in % Gross for Sawlog
201.06 Disposal. Dispose of clearing and grubbing debris according to Subsection 203.05.
201.07 Acceptance. Clearing and grubbing will be evaluated under Subsection 106.02.
Material for tree wound dressing will be evaluated under Subsection 106.03.
Backfilling and compacting of stumps and grubbing holes will be evaluated under Section 209.
Measurement
201.08 Measure the Section 201 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:
Do not make deductions from the area computation unless excluded areas are shown on the plans.
Do not measure clearing and grubbing of borrow sources.
Payment
201.09 The accepted quantities will be paid at the contract price per unit of measurement for the Section 201 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
REVISED
Section 203. - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.05 Disposing of Material. Add the following to Subsection 203.05:
(e) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toe line of embankment slopes. Do not permit the top of the windrows to extend above subgrade. Use construction equipment to matt down all material in a windrow to form a compact and uniform pile. Construct breaks of at least 15 feet at least every 200 feet in a windrow. Do not place windrows against trees.
(f) Scattering. Scatter construction slash in designated areas without damaging trees. Limb all logs.
Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations. When scattering for erosion control, place construction slash as flat as practicable on the completed slope.
(g) Chipping. Use an approved chipping machine to chip slash longer than 3 feet. Deposit chips on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(h) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.
(i) Decking. Remove brush from designated log deck areas. Limb and top logs.
Logs not meeting the Utilization Standards described in Subsection 201.04(c) shall be cut to lengths less than <4> feet and decked in designated log deck location.
Merchantable timber not associated with an existing timber sale shall be cut to length meeting the Utilization Standards described in Subsection 201.04(c).
Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.
(j) Removal to designated locations. Remove construction slash to designated locations.
(k) Piling. Pile construction slash in designated areas. Place and construct piles so that if the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt from stumps.
REVISED
DIVISION 300 AGGREGATE AND BASE COURSES
301 - UNTREATED AGGREGATE COURSES
301.05 Compacting. Delete Section 301.05 and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.
Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
(a) Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(b) Placement Method 2.
(d) Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
(e) Compaction E. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 180, method C or D.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
REVISED
DIVISION 600 INCIDENTAL CONSTRUCTION
633 – PERMANENT TRAFFIC CONTROL
633.01. Add the following to this Subsection:
Parking delineation may be designated as wood, steel, concrete, or other material utilized for traffic control and parking orientation. Delineation shall be installed according to plans and as directed by government in the field.
633.06 Delineators and Object Markers. Add the following to this Subsection:
633.06.(a) Install delineation according to plans and as directed by government in the field.
When utilizing 6” carbon steel pipe as delineation, pipe shall be installed at 3” depth and secured by #5 rebar.
REVISED
DIVISION 700 MATERIAL
Section 703. — AGGREGATE
Table 703-2 Target Value Ranges for Subbase and Base Gradation
Sieve Size Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
A (Subbase) B (Subbase) C (Base) D (Base) E (Base)
2½ inch (63 mm) 100(1)
2 inch (50 mm) 97 – 100(1) 100(1) 100(1)
1½ inch (37.5 mm) 97 – 100(1)
1 inch (25 mm) 65 – 79 (6) 80 – 100 (6) 100(1)
¾ inch (19 mm) 64 – 94 (6) 86 – 100 (6) 100(1)
½ inch (12.5 mm) 45 – 59 (7)
⅜ inch (9.5 mm) 40 – 69 (6) 51 – 82 (6) 62 – 90 (6)
No. 4 (4.75 mm) 28 – 42 (6) 40 – 60 (8) 31 – 54 (6) 36 – 64 (6) 36 – 74 (6)
No. 40 (425 µm) 9 – 17 (4) 12 – 26 (4) 12 – 26 (4)
No. 200 (75 µm) 4.0 – 8.0 (3) 4.0 – 12.0 (4) 4.0 – 7.0 (3) 4.0 – 7.0 (3) 4.0 – 7.0 (3)
(1) Statistical procedures do not apply.
( ) The value in the parentheses is the allowable deviation (±) from the target values.
(c) Surface course aggregate. In addition to Subsection 703.05(a), conform to the following:
(1) Gradation Table 703-3
(2) Liquid limit, AASHTO T 89, Method A 35 max.
(3) Plasticity index, AASHTO T 90 10±3
REVISED
707.09. Reserved. Delete Subsection in its entirety and replace with the following:
707.09. Carbon Steel Pipe.
(a) 6” diameter
(b) Schedule 40
1. Steel pipe as parking delineation.
a. Pipe shall be installed at minimum ½ the diameter depth and secured by #5 rebar.
707 – METAL PIPE
707.09. Reserved. Delete Subsection in its entirety and replace with the following:
707.09. Carbon Steel Pipe.
(c) 6” diameter
(d) Schedule 40
2. Steel pipe as parking delineation.
a. Pipe shall be installed at minimum ½ the diameter depth and secured by #4 rebar in a method approved by the government.
713 - ROADSIDE IMPROVEMENT MATERIAL
713.04 Seed. Add the following:
Only government provided seed mixture is to be used on federal lands.
IDAHO
CANADA
UNITED STATES
SASKATC
H
EW
AN
ALBERTA
B R
ITIS
H
C O
LU
M
B
IA
N O
R T
H
D
A K
O T
A
S O
U T
H
D
A K
O T
A
WYOMING
ALT
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
MCNAMARA/JOHNSRUD ROAD CHIPSEAL
MISSOULA COUNTY
MISSOULA FIELD OFFICE
DRAWING INDEX
C1 COVER SHEET
C2 NOTES & QUANTITIES
C3 CHIP SEAL SECTION DETAILS
C4 WHITAKER DAY USE OVERFLOW
PARKING AREA
C5 WHITAKER DAY USE SMALL
VEHICLE PARKING AREA
C6-C8 JOHNSRUD / MCNAMARA DAY USE
AGGREGATE SURFACING
C9 SPEED HUMP DETAIL
VICINITY MAP
(N.T.S)
DIRECTIONS TO SITE:
FROM MISSOULA: TRAVEL EAST ON I-90 E FOR 4.2 MILES. FOLLOW EXIT 109 FOR
MT-200 E TOWARDS BONNER/GREAT FALLS. TRAVEL EAST ON MT-200 E FOR 12.1
MILES. TURN LEFT ON JOHNSRUD PARK ROAD. THE PROJECT BOUNDARY IS THE
INTERSECTION OF JOHNSRUD ROAD AND HWY 200.
ESTIMATED QUANTITIES
ITEM QUANTITY UNIT
MCNAMARA/JOHNSRUD
CHIPSEAL
6.2 MILES
DAY USE AND
CAMPGROUND SURFACE
COURSE INSTALLATION
1860 CCY
TREE REMOVAL AND
DISPOSAL
10 EA
WHITAKER DAY USE SITE
GRADING - EXCAVATION
AND EMBANKMENT
350 CY
WHITAKER DAY USE AREA
SURFACE COURSE
INSTALLATION
1000 CCY
6" PIPE INSTALLED FOR
PARKING DELINEATION
780 LF
BOUNDARY ROCK
BOULDERS (24" - 36" DIA)
50 CY
CONSTRUCTION
SURVEYING AND STAKING
GOV FURNISHED GOV FURNISHED
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR LOCATION OF
UNDERGROUND UTILITES (811) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER
WITH ANY DISCREPANCIES.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
CONTRACTING OFFICER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
10. THE CONTRACTOR IS TO VERIFY THE LOCATION, ELEVATION, CONDITION, AND
FINISHED GRADE CROSS-SLOPE OF ALL EXISTING SURFACES AT POINTS OF TIE-IN
AND MATCHING PRIOR TO COMMENCEMENT OF GRADING, PAVING, INSTALLATION OF
CURB & GUTTER, SIDEWALK, OR OTHER SURFACE CONSTRUCTION. SHOULD THE
EXISTING LOCATIONS, ELEVATION, CONDITION, OR FINISHED GRADE CROSS-SLOPE
DIFFER FROM THAT SHOWN ON THESE PLANS AND RESULTS IN THE DESIGN INTENT
OF THESE PLANS NOT ABLE TO BE CONSTRUCTED, THE CONTRACTOR SHALL NOTIFY
THE CONTRACTING OFFICER OF DISCREPANCIES AND SEEK DIRECTION ON HOW TO
PROCEED.THE CONTRACTOR ACCEPTS RESPONSIBILITY FOR ALL COSTS
ASSOCIATED WITH CORRECTIVE ACTION IF THESE PROCEDURES ARE NOT
FOLLOWED.
11. TRAFFIC CONTROL PLAN MUST BE SUBMITTED BY THE CONTRACTOR CONSIDERING
SCHEDULE, SIGNAGE, PERSONNEL, AND IMPLEMENTATION TECHNIQUES TO
PROVIDE PUBLIC AND ADMINISTRATIVE ACCESS TO ALL PUBLIC LANDS DURING
CONSTRUCTION.
12. DRAWINGS HAVE BEEN PREPARED ON AN ORIGINAL SHEET SIZE OF 34" X 22"
RECOMMENDED BY:
MARIA CRAIG, OUTDOOR RECREATION PLANNER
REVIEWED BY:
KATHIE MARKS, CIVIL ENGINEER
APPROVED BY:
ERIN CAREY, FIELD OFFICE MANAGER
PROJECT DESCRIPTION
PROJECT CONSISTS OF CHIP SEALING THE NEWLY PAVED MCNAMARA / JOHNSRUD
ROAD, IMPROVING SITE ROADS THROUGHOUT THE BLACKFOOT RECREATION
AREAS, AND DELINEATING THE OVERFLOW PARKING AREA AT THE WHITAKER
BRIDGE DAY USE AREA.
C O
V E
R
M C
N A
M A
R A
J O
H N
S R
U D
R
O A
D
C
H I P
S E
A L
B U
R E
A
F
L A
N
M
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
H E
I
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U L
E
F
I C
E
POTAMAC
MISSOULA
RATTLESNAKE WILDERNESS
MCNAMARA/JOHNSRUD ROAD
CHIPSEAL PROJECT AREA
CLEARWATER
EXISTING SITE PLAN
DAIGLE'S EDDY DAY USE
SHEEP FLATS DAY USE
THIBIDEAU RAPIDS DAY USE
THIBIDEAU CAMPGROUND
WHITAKER BRIDGE
WHITAKER BRIDGE DAY USE
CHIPSEAL PROJECT END
PROJECT MILE POST 6.2
STATIONING 402+94.54
BLACKFOOT RIVER
TO MISSOULA NO SCALE
LOLO NAT'L
FOREST
BUREAU OF LAND
MANAGEMENT
DNRC
G E
N E
R A
L
N
O T
E S
Q
U A
N T
I T
I E
S
A
K
Y
M A
P
BELMONT DAY USE
RIVER BEND DAY USE
CHIPSEAL PROJECT START
PROJECT MILE POST 0.0,
STATIONING 75+35.00
EARTHWORK [1]
ITEM QUANTITY UNIT
EXCAVATION (CUT) 220 CY
EMABNKMENT (NATIVE) 130 CY
IMPORTED FILL - SURFACE
COURSE AGGREGATE
2860 CY
WASTE
[3]
AS
DESIGNATED
CY
[1]
EARTHWORK QUANTITIES ARE "IN PLACE"
ESTIMATES. NO SHRINK OR SWELL IS ASSUMED.
NO GROUND LOSS IS INCLUDED
[2]
THE QUANTITIES ARE AN ESTIMATE OF THE
ENGINEER. THE CONTRACTOR SHALL MAKE THEIR
OWN INDEPENEDENT ESTIMATE OF QUANTITIES
AND BID THEREON.
NOTE: ALL FINISHED GROUND EARTHWORK FOR
WHITAKER BRIDGE DAY USE PARKING SHALL BE
STAKED BY BLM ENGINEERING PRIOR TO
CONSTRUCTION.
[3]
ALL WASTE MATERIALS SHALL BE UTILIZED IN
SITE WORK OR HAULED TO WASTE SITE AT SHEEP
FLATS DAY USE AREA AS SHOWN IN PLANS.
PUBLIC SAFETY & TRAFFIC CONTROL NOTES
1. CONTRACTOR TO TAKE ALL NECESSARY PRECAUTIONS TO ENSURE PROTECTION OF
THE PUBLIC AND SAFE GUARDING OF WORK.
2. PLACE ROAD BARRIER(S) & ROAD CLOSURE SIGNAGE AT THE SITE ENTRANCE IN
ACCORDANCE WITH FHA FP-14 SPECIFICATION SECTIONS 635.04, 635.05, & 635.07. NO
CONSTRUCTION SHALL OCCUR UNTIL THE PROPER TRAFFIC CONTROL DEVICES FOR
WARNING, CHANNELING, AND PROVIDING SAFETY FOR MOTORISTS ARE IN PLACE.
MAINTAIN THE CONDITION, OPERATION AND EFFECTIVENESS OF ALL TRAFFIC
CONTROL DEVICES UNTIL NO LONGER NEEDED. REMOVE ALL TRAFFIC CONTROL
DEVICES UPON PROJECT COMPLETION.
SITE LAYOUT NOTES
1. ITEMS SHOWN AS "NOT A PART " ARE SHOWN FOR REFERENCE ONLY.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD MEASUREMENT OF ALL
PROPOSED FENCES AND GATES.
3. THE LAYOUT OF SITE AMENITIES AND FENCES MUST BE APPROVED BY THE
GOVERNMENT PRIOR TO INSTALLATION.
4. THE LAYOUT OF ALL NEW PATHWAYS / WALKWAYS AND THE GRADING OF ALL
SLOPES AND CROSS SLOPES SHALL CONFORM TO THE AMERICANS WITH
DISABILITIES ACT (ADA) WHEN DENOTED AS ADA ACCESSABLE ON PLANS.
5 ALL LAYOUT LINES, OFFSETS, OR REFERENCES TO LOCATING OBJECTS ARE EITHER
PARALLEL OR PERPENDICULAR UNLESS OTHERWISE DESIGNATED WITH ANGLE
OFFSETS NOTED.
6. ALL PROPOSED SITE FEATURES SHALL BE LAID OUT AND STAKED FOR REVIEW AND
APPROVAL BY GOVERNMENT PRIOR TO COMMENCEMENT OF INSTALLATION. ANY
REQUIRED ADJUSTMENTS TO THE LAYOUT SHALL BE UNDERTAKEN AS DIRECTED, AT
NO ADDITIONAL COST TO THE GOVERNMENT.
7. PATHWAY WIDTHS SHALL BE AS NOTED ON THE LAYOUT AND MATERIALS PLAN.
GRADING & DRAINAGE NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT ALL LOCATIONS.
2. PITCH EVENLY BETWEEN CONTOUR LINES AND BETWEEN SPOT ELEVATIONS.
3. ALL UNPAVED AREAS MUST DITCH TO DRAIN AT A MINIMUM OF 2% UNLESS NOTED.
4. WHERE NEW PAVING MEETS EXISTING PAVING, MEET LINE AND GRADE OF EXISTING
PAVING WITH SMOOTH TRANSITION BETWEEN NEW AND EXISTING SURFACES.
5. GRADES WITHIN HANDICAP PARKING SPACES AND MANEUVERING AREAS SHALL NOT
EXCEED 1.5% IN ANY DIRECTION.
6. CROSS SLOPES OF PEDESTRIAN WALK WAYS SHALL NOT EXCEED 1.5% UNLESS
NOTED.
7. RUNNING SLOPES OF ALL PEDESTRIAN WALKWAYS SHALL NOT EXCEED 4.5%
UNLESS NOTED.
8. THE CONTRACTOR SHALL VERIFY EXISTING GRADES IN THE FIELD AND REPORT ANY
DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO COMMENCING
CONSTRUCTION.
9. REFER TO THE EARTHWORK SECTION OF THE SPECIFICATIONS FOR BACKFILL AND
GRADING PROCEDURES.
10 EXCESS MATERIALS SHALL NOT BE REMOVED FROM THE SITE UNLESS DIRECTED BY
THE GOVERNMENT. SEE EARTHWORK SPECIFICATIONS FOR DETAILS
ROADWAY & PATHWAY NOTES
1. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAY(S) & PATHWAY(S) UNLESS
OTHERWISE NOTES
2. THE CONTRACTOR SHALL PREPARE THE SUBGRADE PER SPECIFICATION SECTION
204.
3. ROADWAYS SHALL NOT BE CONSTUCTED UNTIL ALL CULVERTS, STORM DRAIN, &
UNDERGROUND UTILITIES HAVE BEEN INSTALLED AND ACCEPTED BY THE
GOVERNMENT.
4. IT SHALL BE THE RESPONSIBILTY OF THE CONTRACTOR TO SUPERVISE AND
CERTIFY THAT PROPER COMPACTION HAS BEEN OBTAINED.
5 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACT TO ADJUST ALL UTILITY
ACCESS COVERS TO PROPOSED GRADES.
6. BEFORE THE PLACEMENT OF ASPHALT AND CONCRETE, THE SUBGRADE SHALL
RECEIVE A GROUND STERILANT APPLIED AT A RATE IN ACCORDANCE WITH THE
MANUFACTURES INSTRUCTIONS.
7. ALL PROPOSED ROADWAYS & PATHWAYS SHALL MEET THE LINE AND GRADE OF
EXISTING ADJACENT ROADWAY SURFACES.
8. WHEN IT IS REQUIRED TO MATCH EXISTING PAVEMENT, EXISTING PAVEMENT SHALL
BE SAW CUT IN A MANNER TO PROVIDE A SMOOTH AND STRAIGHT CUT VERTICAL
EDGE FREE OF DEFECTS.
9. ALL SAWCUT EDGES OF EXISTING PAVEMENT SHALL BE CLEANED AND COATED WITH
A TACK COAT PRIOR TO PLACING NEW PAVEMENT ADJACENT TO THE EXISTING
PAVEMENT.
DEMOLITION NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES TO REMAIN IN PLACE
DURING DEMOLITION.
2. THE CONTRACTOR IS REQUIRED TO PRESERVE THE NATURAL LANDSCAPE AND
PROTECT EXISTING VEGETATION NOT REQUIRED OR OTHERWISE AUTHORIZED TO
BE REMOVED. CONTRACTOR TO REFERENCE PLAN FOR EXCAVATION AND REMOVAL
LIMITS.
3. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED
TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.
4. EXCAVATION AND FINISH GRADE AREAS, TO BE COVERED BY EMBANKMENTS, SHALL
BE THOROUGHLY CLEARED AND STRIPPED OF VEGETATIVE MATTER, BRUSH, TREES,
STUMPS, ROOTS, AND ROCK AS INDICATED ON THE PLAN. CLEARING AND GRUBBING
MATERIAL SHALL BE WASTED IN DESIGNATED AREAS IDENTIFIED ON THE PLAN OR
ON SITE PER THE GOVERNMENTS DIRECTIONS.
5. EXCAVATION MATERIAL NOT USED FOR THE CONSTRUCTION OF EMBANKMENTS
SHALL BE WASTED IN DESIGNATED WASTE AREA(S) AS IDENTIFIED ON THE PLANS
OR AS DIRECTED BY GOVERNMENT. WASTE MATERIAL SHALL BE SHAPED AND
BLENDED INTO THE SURROUNDING TERRAIN AND SHALL NOT EXCEED 3:1 SLOPES
UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT.
6. CONTRACTOR TO SEPARATE ANY SALVAGEABLE TOPSOIL AND USE MATERIAL TO
CAP WASTE SITE DURING EXCAVATION AND CLEARING.
7. ALL ROCK REMOVAL CONSIDERED INCIDENTAL TO SITE GRADING AND MAY BE
CONSERVED ON SITE AS RIP RAP MATERIAL.
8. EXISTING SURFACE MATERIAL INCLUDING GRANITE CURB, ASPHALT, CONCRETE,
SHRUBS, ETC. SHALL BE REMOVED AND DISPOSED OF UNLESS OTHERWISE NOTED.
9. CONTRACTOR SHALL SUPPLY AND MAINTAIN, FOR THE DURATION OF DEMOLITION,
ALL NECESSARY DEVICES FOR EROSION, SEDIMENT, AND DUST CONTROL, AND
DEWATERING WHEN REQUIRED.
10. CARE SHOULD BE TAKEN IN ALL EXCAVATION DUE TO POSSIBLE EXISTENCE OF
UNRECORED UTILITIES.
11. CONSULT ALL DRAWING AND SPECIFICATIONS FOR COORDINATION PRIOR TO
COMMENCING DEMOLITION.
EROSION CONTROL
ITEM QUANTITY UNIT
RIP RAP (24" - 36") 50 CY
DEMOLITION
ITEM QUANTITY UNIT
TREE REMOVAL 10 EA
ESTIMATED QUANTITIES [2]
ROADWAY
ITEM QUANTITY UNIT
CHIP SEAL 6.2 MILES
M C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
GENERAL NOTES
PREPARE AND INSTALL
" CHIPSEAL (FP-14 SPECIFICATION SECTION TABLE
407-1 TYPE 1C) ACCORDING TO FP-14 SPECIFICATION SECTION 407 FOR 6.2
MILES OF ASPHALT PAVEMENT. ASPHALT SECTION PROFILES DEPICTED IN
SHEET 4. INSTALL MILE MARKER SIGNS PROVIDED BY GOVERNMENT ALONG
FIRST 6.2 MILES OF ROADWAY.
2 PREPARE AND RECONDITION ALL DAY USE AND CAMPGROUND SURFACES
PER SPECIFICATION 303 (GRADE, WATER, AND COMPACT) AND INSTALL 4"
LIFT OF SURFACE COURSE AGGREGATE (FP-14 SPECIFICATION SECTION
703.05(C)) ON EXISTING DAY USE AND CAMPGROUND SITE ROADS ALONG THE
DEPICTED JOHNSRUD/MACNAMARA ROADWAYS (SHEETS C5-C7)
3 PREPARE AND RECONDITION WHITAKER BRIDGE DAY USE PARKING AREA
PER SPECIFICATION SECTION 303. INSTALL SURFACE COURSE (FP-14
SPECIFICATION SECTION 703.05(C)). INSTALL PARKING DELINEATION AND
DRAINAGE FEATURES AT WHITAKER BRIDGE OVERFLOW PARKING LOT.
REFER TO DETAILS ON SHEETS 4 & 5.
4 TRAFFIC CONTROL MUST BE PROVIDED BY CONTRACTOR TO ALLOW FOR
PUBLIC ACCESS TO ALL PUBLIC LANDS DURING CONSTRUCTION. ALL LANE
CLOSURES SHALL BE COORDINATED WITH THE BLM, FLAGGED, AND
MONITORED FOR THE DURATION OF WORK.
5 CONTRACTORS MUST ADHERE TO ALL GUIDELINES AND PROVISIONS AS
MENTIONED IN THE BLM NATIONAL NEPA REGISTER DOCUMENT
DOI-BLM-MT-B010-2022-0016-CX
PRIVATE
MESSINA DR. (CHIP STORAGE LOCATION)
DARREL SALL MEMORIAL (CHIP STORAGE LOCATION)
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
C H
P
S
A
L
S
E C
T I O
N
D
E T
A I L S
M C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
CHIP SEAL SECTION NOTES
1 CROSS SECTIONS ARE SHOWN FROM FEDERAL
HIGHWAYS MCNAMARA/JOHNSRUD PAVING PROJECT
COMPLETED IN 2022 AS REFERENCE FOR CHIP
SEALING OPERATIONS. NO OTHER WORK IS TO BE
COMPLETED IN THIS CONTRACT ON EXISTING
ASPHALT SURFACES.
2. ASSUME ANY ROAD SECTIONS AS TYPICAL SECTION 1
IF NOT NOTED IN STATIONING.
3534.688
3533.849
3536.000
3535.080
3533.864
M C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N 0 40 80
FULL SCALE (22" X 34") 1 IN . = 40 FT.
HALF SCALE (11" X 17") 1 IN . = 80 FT.
CONSTRUCTION NOTES
1 DELINEATE AND ADD GRAVEL ROAD BASE TO ALL VEHICLE SURFACES
CALLED OUT IN PLANS. PARKING AREAS SHALL BE DESIGNATED WITH 30'
SECTIONS OF 6" SCH. 40 PIPE AS SHOWN ON SHEET 5.
2 PARKING AREA EARTHWORK TO BE DONE IN ACCORDANCE WITH ON-SITE
STAKING PROVIDED BY BLM ENGINEERING
3 ALL EQUIPMENT AND MATERIALS USED FOR CONSTRUCTION SHALL
REMAIN ON PREVIOUSLY DISTURBED ROADWAYS AND STAGING AREAS
SPECIFIED BY THE GOVERNMENT.
4 OVERFLOW AND TRAILER PARKING SHALL BE DIRECTED CLOCKWISE TO
ALLOW FOR PULL-IN PARKING AND IMPROVED FLOW OF TRAFFIC.
5 IMPROVED PARKING AREA CONSISTS OF 23 TRAILER PARKING SPACES
DELINEATED BY STEEL PIPE.
OVERFLOW PARKING
PROPOSED LAYOUT
WHITAKER OVERFLOW MATERIAL QUANTITIES
MATERIAL TYPE QUANTITY UNIT
SURFACE COURSE
(703.05.C)
1000 CCY
PARKING BOUNDARY
BOULDERS (24" -36" DIA)
50 CY
6" DIA SCH. 40 PIPE
(709.09)
660 LF
B
L
A
C
K
F
O
T
V
E
R
B
L
A
C
K
F
O
V
E
R
DEMOLITION NOTES
1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES TO REMAIN
IN PLACE DURING DEMOLITION.
2. THE CONTRACTOR IS REQUIRED TO PRESERVE THE NATURAL
LANDSCAPE AND PROTECT EXISTING VEGETATION NOT REQUIRED OR
OTHERWISE AUTHORIZED TO BE REMOVED. CONTRACTOR TO
REFERENCE PLAN FOR EXCAVATION AND REMOVAL LIMITS.
3. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE
RESTORED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO
THE GOVERNMENT.
4. EXCAVATION AND FINISH GRADE AREAS, TO BE COVERED BY
EMBANKMENTS, SHALL BE THOROUGHLY CLEARED AND STRIPPED OF
VEGETATIVE MATTER, BRUSH, TREES, STUMPS, ROOTS, AND ROCK AS
INDICATED ON THE PLAN. CLEARING AND GRUBBING MATERIAL SHALL BE
WASTED IN DESIGNATED AREAS IDENTIFIED ON THE PLAN OR ON SITE
PER THE GOVERNMENTS DIRECTIONS.
5. ALL ROCK REMOVAL CONSIDERED INCIDENTAL TO SITE GRADING.
6. CONTRACTOR SHALL SUPPLY AND MAINTAIN, FOR THE DURATION OF
DEMOLITION, ALL NECESSARY DEVICES FOR EROSION, SEDIMENT, AND
DUST CONTROL, AND DEWATERING WHEN REQUIRED.
7. CONSULT ALL DRAWING AND SPECIFICATIONS FOR COORDINATION
PRIOR TO COMMENCING DEMOLITION.
WHITAKER OVERFLOW DEMOLITON QUANTITIES
MATERIAL TYPE QUANTITY UNIT
TREES (202.07) 10 EA - DISPOSAL
SITE GRADING -
EXCAVATION (204.01)
350 CY
OVERFLOW PARKING
EXISTING LAYOUT
EXISTING IMPACT BOUNDARY - GRAY HATCH
APPROXIMATE PARKING LOCATIONS
(NO DILINEATION)
TREES TO BE REMOVED
(8"-24" PONDEROSA)
EXISTING RIP RAP DRAIN (PROTECT IN PLACE)
EXISTING VEGETATION CORRIDOR (PROTECT IN PLACE)
EXISTING VEGETATION CORRIDOR
(PROTECT IN PLACE)
EXISTING RIP RAP DRAIN
DITCH/FLOW LINE
CUT/FILL BOUNDARY
PARKING BOUNDARY
BOULDERS - 24"-36" Ø
PARKING DELINEATION
(6" Ø SCH. 40 PIPE - 30' LENGTH)
EXISTING VEGETATION
EXISTING VEGETATION
(PROTECT IN PLACE)
NATURAL SURFACE -
GRASS/COMPACTED EARTH
W H
I T
A K
B
I D
G
V E
R F
L O
W
P
A R
K I N
G
A R
E A
LEGEND
EXISTING PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
EXISTING VAULT TOILET
WHITAKER SMALL
VEHICLE PARKING
EXISTING VAULT TOILET
WHITAKER SMALL
VEHICLE PARKING
(SHEET 6)
EDGE OF EXISTING AGGREGATE BASE
TIE-IN SURFACE COURSE
TO EXISTING GRADE
SCALE: 1" = 40'
SCALE: 1" = 40'
30'
TYP.
230'
M C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N 0 40 80
FULL SCALE (22" X 34") 1 IN . = 40 FT.
HALF SCALE (11" X 17") 1 IN . = 80 FT.
CONSTRUCTION NOTES
1 DELINEATE AND ADD GRAVEL ROAD BASE TO ALL VEHICLE SURFACES
CALLED OUT IN PLANS. PARKING AREAS SHALL BE DESIGNATED WITH 8'
SECTIONS OF PIPE.
2 PARKING AREA EARTHWORK TO BE DONE IN ACCORDANCE WITH ON-SITE
STAKING PROVIDED BY BLM ENGINEERING
3 ALL EQUIPMENT AND MATERIALS USED FOR CONSTRUCTION SHALL
REMAIN ON PREVIOUSLY DISTURBED ROADWAYS AND STAGING AREAS
SPECIFIED BY THE GOVERNMENT.
4 OVERFLOW AND TRAILER PARKING SHALL BE DIRECTED CLOCKWISE TO
ALLOW FOR PULL-IN PARKING AND IMPROVED FLOW OF TRAFFIC.
5 IMPROVED PARKING AREA CONSISTS OF 10 DESIGNATED SMALL VEHICLE
PARKING SPACES.
SMALL VEHICLE PARKING
PROPOSED LAYOUT
WHITAKER SMALL VEHICLE PARKING MATERIAL
QUANTITIES
MATERIAL TYPE QUANTITY UNIT
6" DIA SCH. 40 PIPE
(709.09)
80 LF
B
L
A
C
K
F
O
V
E
R
B
L
A
C
K
F
O
V
E
R
SMALL VEHICLE PARKING
EXISTING LAYOUT
EXISTING TOILET. PROTECT IN PLACE.
EXISTING SMALL VEHICLE PARKING
(NO DELINEATION)
EXISTING BOAT RAMP.
PROTECT IN PLACE
PROTECT TOILET AND ALL STRUCTURES
CONCRETE PIN-DOWN
TOP OF CUT
W H
I T
A K
B
I D
G
A
L L
V
E H
I C
L E
P A
R K
I N
G
A
R E
A
LEGEND
EXISTING PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
SPOT ELEVATION
SCALE: 1" = 40'
SCALE: 1" = 40'
POST AND RAIL FENCE
EXISTING SIGN. PROTECT IN PLACE.
TIE IN SURFACE COURSE TO EXISTING GRADE.
STEEL PIPE DELINEATION DETAIL
NO SCALE
#4 REBAR - 8' SPACING MAX.
INSTALL THROUGH OR AROUND
PIPE AS APPROVED BY GOV - 24" MIN BURY
TOP OF FINISH GRADE
≈ 3"
6" DIAMETER, SCHEDULE 40, STEEL PIPE
WELD STEEL PLATE EACH END, GRIND SMOOTH
PREPARED AND COMPACTED SUBGRADE
C
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N
THIBIDEAU CAMPGROUND
B L A
C K
F O
O
T
R
I V
E R
J O
H N
S R
C N
A M
A R
A
R
O A
D
THIBIDEAU RAPIDS DAY USE AREA
JOHNSRUD / M
CNAMARA ROAD
BLACKFOOT RIVER
N
DAY USE PARKING AREA
CAMPSITE TYP.
VAULT TOILET
QUANTITIES
THIBIDEAU RAPIDS DAY
USE
80 CCY
THIBIDEAU
CAMPGROUND
630 CCY
D A
Y
U
E
A S
CONSTRUCTION NOTES
1 PREPARE ALL EXISTING SITE ROADS PER FP-14 SPECIFICATION SECTION
301 WITH APPROPRIATE EQUIPMENT TO RECONDITION ALL DITCHES,
SHOULDERS, ROADBEDS AND AGGREGATE SURFACES. REMOVE ALL
DELETERIOUS MATERIAL PRIOR TO RECONDITIONING
2 EXISTING ROADWAY SHALL BE WATERED, PROCESSED AND COMPACTED
PER SPECIFICATION SECTION 301 PRIOR TO FINISH GRADE MATERIAL
FP-14 SPECIFICATION SECTION 703.05(C) OR APPROVED EQUAL BEING
INSTALLED
3 INSTALL 4" LIFT OF SURFACE COURSE AGGREGATE MATERIAL ON ALL
VEHICULAR SURFACES (SITE ROADS, CAMPSITES, AND PARKING AREAS).
CREATE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT 2%
SLOPE TYPICAL
4 COMPACT SURFACE COURSE MATERIAL PER SPECIFICATION SECTION
301.05, 1-IN, COMPACTION METHOD C OR AS APPROVED BY THE BLM.
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N
SHEEP FLATS DAY USE AREA
B
L
A
C
K
F
O
V
E
R
JOHNSRUD / MCNAMARA ROAD
N
DAIGLE'S EDDY DAY USE AREA
JOHNSRUD / M
CNAMARA ROAD
BLACKFOOT RIVER
QUANTITIES
SHEEP FLATS DAY USE 170 CCY
DAIGLE'S EDDY DAY USE 560 CCY
DIAGLE'S EDDY DAY USE PARKING
SHEEP FLATS
WASTE PIT
SHEEP FLATS RIVER ACCESS PARKING AREA
D A
Y
U
E
A S
CONSTRUCTION NOTES
1 PREPARE ALL EXISTING SITE ROADS PER FP-14 SPECIFICATION SECTION
301 WITH APPROPRIATE EQUIPMENT TO RECONDITION ALL DITCHES,
SHOULDERS, ROADBEDS AND AGGREGATE SURFACES. REMOVE ALL
DELETERIOUS MATERIAL PRIOR TO RECONDITIONING
2 EXISTING ROADWAY SHALL BE WATERED, PROCESSED AND COMPACTED
PER SPECIFICATION SECTION 301 PRIOR TO FINISH GRADE MATERIAL
FP-14 SPECIFICATION SECTION 703.05(C) OR APPROVED EQUAL BEING
INSTALLED
3 INSTALL 4" LIFT OF SURFACE COURSE AGGREGATE MATERIAL ON ALL
VEHICULAR SURFACES (SITE ROADS, CAMPSITES, AND PARKING AREAS).
CREATE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT 2%
SLOPE TYPICAL
4 COMPACT SURFACE COURSE MATERIAL PER SPECIFICATION SECTION
301.05, 1-IN, COMPACTION METHOD C OR AS APPROVED BY THE BLM.
N A
M A
R A
J O
H N
S R
A
D
C
H I P
S E
A L
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: GJA DRAWN BY: GJA CHECKED BY: KM APPROVED BY: EC)
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
C
O N
S T
R U
C T
I O
N
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
M I S
S O
U
E
F
I C
E
N
RIVER BEND DAY USE
N
I
N
E
M
I
A
I
R
A
D
N
BELMONT CREEK DAY USE
N
I
N
E
M
I
A
I
R
A
D
BLACKFOOT RIVER
QUANTITIES
BELMONT CREEK DAY
USE AREA
130 CCY
RIVER BEND DAY USE 290 CCY
BELMONT CREEK DAY USE PARKING
RIVER BEND DAY USE PARKING
CONSTRUCTION NOTES
1 PREPARE ALL EXISTING SITE ROADS PER FP-14 SPECIFICATION SECTION
301 WITH APPROPRIATE EQUIPMENT TO RECONDITION ALL DITCHES,
SHOULDERS, ROADBEDS AND AGGREGATE SURFACES. REMOVE ALL
DELETERIOUS…
This is the start of the file's text. The full file is on GovTribe.