Attachment 2_ELIN Price Schedule_W912PB25RA016.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- W912PB25RA016
About this file
The file "Attachment 2_ELIN Price Schedule_W912PB25RA016.xlsx" appears to be a pricing schedule related to a solicitation for Snow and Ice Control Services at U.S. Army Garrison Bavaria in Vilseck and Grafenwoehr, Germany. The solicitation (W912PB25RA016) is issued by the 409th Contracting Command, 928th Contracting Battalion, with an expected contract start date of 1 November 2025. The contract will be a firm fixed price (FFP) requirements-type contract with a base period of one year and four additional one-year option periods.
Key details include a low-price technically acceptable evaluation method, with proposals to be submitted electronically via email to specified Army contacts. Offerors must be registered in the SAM system, download the RFP from SAM.gov, and monitor for amendments. The contract is being procured by the Department of the Army Materiel Command Army Contracting Command, with proposals required to include complete solicitation documentation, technical specifications, and compliance certifications. No bidders list will be maintained, and telephone or fax requests for the RFP package will not be accepted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic Year
| ELIN Sheet, Basic Option Year - Rose Barracks, Vilseck & Tower Barracks Grafenwoehr |
| POP: 01 November 2025 thru 31 October 2026 (FY26) |
| Snow & Ice Removal |
Basic Option Year
| Rose Barracks Vilseck | ||||||
| Group | Item | Description, CDC, SAS, CYS, Teen Center | Qty/EA | Unit | Unit € | Total € |
| Group A | A001 | Snow & ice removal at area Bldg # 2234, Hand work total 1,160 sqm per call | 130 | 1,160 m² | ||
| A002 | Snow & ice removal at area Bldg # 2234, Equipment total 1,850 sqm per call | 130 | 1,850 m² | |||
| A003 | Snow & ice removal at area Bldg # 2237, Hand work total 250 sqm per call | 130 | 250 m² | |||
| A004 | Snow & ice removal at area Bldg # 2237, Equipment total 1,565 sqm per call | 130 | 1,565 m² | |||
| A005 | Snow & ice removal at area Bldg # 224, Hand work total 215 sqm per call | 130 | 215 m² | |||
| A006 | Snow removal at area Bldg # 224, Equipment total 180 sqm per call | 130 | 180 m² | |||
| A007 | Snow & ice removal at area Bldg # 1706, Hand work total 90 sqm per call | 130 | 90 m² | |||
| A008 | Snow & ice removal at area Bldg # 1706, Equipment total 500 sqm per call | 130 | 500 m² | |||
| A009 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,810 m² | |||
| A010 | Standby Lump Sum: Provide supply, equipment and manpower for Group A during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, HSG Area Vilseck Fitzthum Village | Qty/EA | Unit | Unit € | Total € |
| Group B | B001 | Snow & ice removal at Fitzthum Village | 130 | 735 m² | ||
| Walkways incl. stairs | ||||||
| Hand work total 735 sqm per call | ||||||
| B002 | Snow & ice removal at Fitzthum Village | 130 | 245 m² | |||
| Waste container locations | ||||||
| Hand work total 245 sqm per call | ||||||
| B003 | Snow & ice removal at Fitzthum Village | 130 | 1,315 m² | |||
| Side roads | ||||||
| Equipment work total 1,315 sqm per call | ||||||
| Group B | B004 | Snow & ice removal at Fitzthum Village | 130 | 1,660 m² | ||
| Walkways | ||||||
| Equipment work total 1,660 sqm per call | ||||||
| B005 | Snow & ice removal at Fitzthum Village | 130 | 1,995 m² | |||
| Parking lots | ||||||
| Equipment work total 1,995 sqm per call | ||||||
| B006 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,950 m² | |||
| B007 | Standby Lump Sum: Provide supply, equipment and manpower for Group B during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, MEDDAC Buildings | Qty/EA | Unit | Unit € | Total € |
| Group C | C001 | Snow & ice removal at MEDDAC Buildings | 130 | 900 m² | ||
| Sidewalk incl. stairs, Bldg # 700 | ||||||
| Hand work total 900 sqm per call | ||||||
| C002 | Snow & ice removal at MEDDAC Buildings | 130 | 7,350 m² | |||
| Parking lots, Bldg # 700 | ||||||
| Equipment work total 7,350 sqm per call | ||||||
| C003 | Snow & ice removal at MEDDAC Buildings | 130 | 300 m² | |||
| Sidewalk incl. stairs, Bldg # 701 | ||||||
| Equipment work total 300 sqm per call | ||||||
| C004 | Snow & ice removal at MEDDAC Buildings | 130 | 1,250 m² | |||
| Parking lots, Bldg # 701 | ||||||
| Equipment work total 1,250 sqm per call | ||||||
| C005 | Snow & ice removal at MEDDAC Buildings | 130 | 1,300 m² | |||
| Sidewalk incl. stairs, Bldg # 250 | ||||||
| Equipment work total 1,300 sqm per call | ||||||
| C006 | Snow & ice removal at MEDDAC Buildings | 130 | 8,100 m² | |||
| Exit Road & Parking lots, Bldg # 250 | ||||||
| Equipment work total 8,100 sqm per call | ||||||
| C007 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 19,200 m² | |||
| C008 | Standby Lump Sum: Provide supply, equipment and manpower for Group C during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks Grafenwoehr | ||||||
| Airfield Grafenwoehr | ||||||
| Group | Item | Description, Airfield Grafenwoehr | Qty/EA | Unit | Unit € | Total € |
| Group E | E001 | Remove snow of berms above 50 cm height along the runway and taxiways at the airfield with a length of approx. 2,600 linm and in a width of approx. 3 m as a lump sum job | 2 | 1 Job | ||
| E002 | Snow & ice removal at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E005. | 40 | 5,000 m² | |||
| E003 | Ice control services at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E005. | 332 | 5,000 m² | |||
| E004 | Delivery and storage of a mixture of solid - liquid de-icing material according to PWS of Performance Work Statement after contract award only for use at Army Airfield Grafenwoehr | 35 | TN | |||
| E005 | Standby Lump Sum: Provide on-call supply, equipment and manpower for Group E during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg Village Center | ||||||
| Group | Item | Description, Netzaberg Traffic Areas | Qty/EA | Unit | Unit € | Total € |
| Group F | F001 | Snow & ice removal at Traffic Areas, asphalt roads | 50 | 19,800 m² | ||
| F002 | Snow & ice removal, parking lots | 50 | 11,000 m² | |||
| F003 | Snow & ice removal, walkways, hand work required as descript in 5.4 | 50 | 13,500 m² | |||
| F004 | Ice removal at Traffic Areas, asphalt roads | 150 | 19,800 m² | |||
| F005 | Ice removal, parking lots | 150 | 11,000 m² | |||
| F006 | Ice removal, walkways | 150 | 13,500 m² | |||
| F007 | Standby Lump Sum: Provide supply, equipment and manpower for Group F during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg TA - 1 Road | ||||||
| Group | Item | Description, Netzaberg Road & Walkway | Qty/EA | Unit | Unit € | Total € |
| Group G | G001 | Snow & ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 50 | 22,500 m² | ||
| G002 | Snow & ice removal, asphalt walkway along "TA - 1 Road" | 50 | 6,500 m² | |||
| G003 | Ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 150 | 22,500 m² | |||
| G004 | Ice removal, asphalt walkway along "TA - 1 Road" | 150 | 6,500 m² | |||
| G005 | Standby Lump Sum: Provide supply, equipment and manpower for Group G during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks & Rose Barracks - Main Post & Field Camps | ||||||
| Group | Item | Description, Areas will be identified with the Task Order | Qty/EA | Unit | Unit € | Total € |
| Group H | H001 | Snow & ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 40 | 5,000 m² | ||
| 5,000 sqm per service | ||||||
| H002 | Snow & ice removal, walkways | 40 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H003 | Ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 70 | 5,000 m² | |||
| 5,000 sqm per service | ||||||
| H004 | Ice removal, walkways | 70 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H005 | Standby Lump Sum: Provide supply, equipment and manpower for Group H during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Chancellorsville Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group J | J001 | Snow & ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 49,500 m² | ||
| J002 | Snow & ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 5 | 8,200 m² | |||
| J003 | Ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 49,500 m² | |||
| J004 | Ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 7 | 8,200 m² | |||
| J005 | Standby Lump Sum: Provide supply, equipment and manpower for Group J during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| One Community Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group K | K001 | Snow & ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 74,500 m² | ||
| K002 | Snow & ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 5 | 80,200 m² | |||
| K003 | Snow & ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 5 | 29,000 m² | |||
| K004 | Snow & ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| Group K | K005 | Ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 74,500 m² | ||
| K006 | Ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 7 | 80,200 m² | |||
| K007 | Ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 7 | 29,000 m² | |||
| K008 | Ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| K009 | Standby Lump Sum: Provide supply, equipment and manpower for Group K during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Gate 6 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group L | L001 | Snow & ice removal, Gate 6 including in- and outbound lanes | 5 | 25,000 m² | ||
| L002 | Ice removal, Gate 6 including in- and outbound lanes | 7 | 25,000 m² | |||
| L003 | Standby Lump Sum: Provide supply, equipment and manpower only for Group L during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| Washrack # 10 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group M | M001 | Snow & ice removal, washrack # 10 | 6 | 26,000 m² | ||
| M002 | Ice removal, washrack # 10 | 8 | 26,000 m² | |||
| M003 | Standby Lump Sum: Provide supply, equipment and manpower only for Group M during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| CLIN 0001 Total | Euro |
&"-,Bold"&12FOR OFFICIAL USE ONLY
&"-,Bold"&14FOR OFFICIAL USE ONLY&"-,Regular"&12 &P of &N
1st Option Year
| ELIN Sheet, 1st Option Year - Rose Barracks, Vilseck & Tower Barracks Grafenwoehr |
| POP: 01 November 2026 thru 31 October 2027 (FY27) |
| Snow & Ice Removal |
1st Option Year
| Rose Barracks Vilseck | ||||||
| Group | Item | Description, CDC, SAS, CYS, Teen Center | Qty/EA | Unit | Unit € | Total € |
| Group A | A101 | Snow & ice removal at area Bldg # 2234, Hand work total 1,160 sqm per call | 130 | 1,160 m² | ||
| A102 | Snow & ice removal at area Bldg # 2234, Equipment total 1,850 sqm per call | 130 | 1,850 m² | |||
| A103 | Snow & ice removal at area Bldg # 2237, Hand work total 250 sqm per call | 130 | 250 m² | |||
| A104 | Snow & ice removal at area Bldg # 2237, Equipment total 1,565 sqm per call | 130 | 1,565 m² | |||
| A105 | Snow & ice removal at area Bldg # 224, Hand work total 215 sqm per call | 130 | 215 m² | |||
| A106 | Snow removal at area Bldg # 224, Equipment total 180 sqm per call | 130 | 180 m² | |||
| A107 | Snow & ice removal at area Bldg # 1706, Hand work total 90 sqm per call | 130 | 90 m² | |||
| A108 | Snow & ice removal at area Bldg # 1706, Equipment total 500 sqm per call | 130 | 500 m² | |||
| A109 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,810 m² | |||
| A110 | Standby Lump Sum: Provide supply, equipment and manpower for Group A during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, HSG Area Vilseck Fitzthum Village | Qty/EA | Unit | Unit € | Total € |
| Group B | B101 | Snow & ice removal at Fitzthum Village | 130 | 735 m² | ||
| Walkways incl. stairs | ||||||
| Hand work total 735 sqm per call | ||||||
| B102 | Snow & ice removal at Fitzthum Village | 130 | 245 m² | |||
| Waste container locations | ||||||
| Hand work total 245 sqm per call | ||||||
| B103 | Snow & ice removal at Fitzthum Village | 130 | 1,315 m² | |||
| Side roads | ||||||
| Equipment work total 1,315 sqm per call | ||||||
| Group B | B104 | Snow & ice removal at Fitzthum Village | 130 | 1,660 m² | ||
| Walkways | ||||||
| Equipment work total 1,660 sqm per call | ||||||
| B105 | Snow & ice removal at Fitzthum Village | 130 | 1,995 m² | |||
| Parking lots | ||||||
| Equipment work total 1,995 sqm per call | ||||||
| B106 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,950 m² | |||
| B107 | Standby Lump Sum: Provide supply, equipment and manpower for Group B during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, MEDDAC Buildings | Qty/EA | Unit | Unit € | Total € |
| Group C | C101 | Snow & ice removal at MEDDAC Buildings | 130 | 900 m² | ||
| Sidewalk incl. stairs, Bldg # 700 | ||||||
| Hand work total 900 sqm per call | ||||||
| C102 | Snow & ice removal at MEDDAC Buildings | 130 | 7,350 m² | |||
| Parking lots, Bldg # 700 | ||||||
| Equipment work total 7,350 sqm per call | ||||||
| C103 | Snow & ice removal at MEDDAC Buildings | 130 | 300 m² | |||
| Sidewalk incl. stairs, Bldg # 701 | ||||||
| Equipment work total 300 sqm per call | ||||||
| C104 | Snow & ice removal at MEDDAC Buildings | 130 | 1,250 m² | |||
| Parking lots, Bldg # 701 | ||||||
| Equipment work total 1,250 sqm per call | ||||||
| C105 | Snow & ice removal at MEDDAC Buildings | 130 | 1,300 m² | |||
| Sidewalk incl. stairs, Bldg # 250 | ||||||
| Equipment work total 1,300 sqm per call | ||||||
| C106 | Snow & ice removal at MEDDAC Buildings | 130 | 8,100 m² | |||
| Exit Road & Parking lots, Bldg # 250 | ||||||
| Equipment work total 8,100 sqm per call | ||||||
| C107 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 19,200 m² | |||
| C108 | Standby Lump Sum: Provide supply, equipment and manpower for Group C during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks Grafenwoehr | ||||||
| Airfield Grafenwoehr | ||||||
| Group | Item | Description, Airfield Grafenwoehr | Qty/EA | Unit | Unit € | Total € |
| Group E | E101 | Remove snow of berms above 50 cm height along the runway and taxiways at the airfield with a length of approx. 2,600 linm and in a width of approx. 3 m as a lump sum job | 2 | 1 Job | ||
| E102 | Snow & ice removal at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E105. | 40 | 5,000 m² | |||
| E103 | Ice control services at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E105. | 332 | 5,000 m² | |||
| E104 | Delivery and storage of a mixture of solid - liquid de-icing material according to PWS of Performance Work Statement after contract award only for use at Army Airfield Grafenwoehr | 35 | TN | |||
| E105 | Standby Lump Sum: Provide supply, equipment and manpower for Group E during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg Village Center | ||||||
| Group | Item | Description, Netzaberg Traffic Areas | Qty/EA | Unit | Unit € | Total € |
| Group F | F101 | Snow & ice removal at Traffic Areas, asphalt roads | 50 | 19,800 m² | ||
| F102 | Snow & ice removal, parking lots | 50 | 11,000 m² | |||
| F103 | Snow & ice removal, walkways, hand work required as descript in 5.4 | 50 | 13,500 m² | |||
| F104 | Ice removal at Traffic Areas, asphalt roads | 150 | 19,800 m² | |||
| F105 | Ice removal, parking lots | 150 | 11,000 m² | |||
| F106 | Ice removal, walkways | 150 | 13,500 m² | |||
| F107 | Standby Lump Sum: Provide supply, equipment and manpower for Group F during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg TA - 1 Road | ||||||
| Group | Item | Description, Netzaberg Road & Walkway | Qty/EA | Unit | Unit € | Total € |
| Group G | G101 | Snow & ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 50 | 22,500 m² | ||
| G102 | Snow & ice removal, asphalt walkway along "TA - 1 Road" | 50 | 6,500 m² | |||
| G103 | Ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 150 | 22,500 m² | |||
| G104 | Ice removal, asphalt walkway along "TA - 1 Road" | 150 | 6,500 m² | |||
| G105 | Standby Lump Sum: Provide supply, equipment and manpower for Group G during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks & Rose Barracks - Main Post & Field Camps | ||||||
| Group | Item | Description, Areas will be identified with the Task Order | Qty/EA | Unit | Unit € | Total € |
| Group H | H101 | Snow & ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 40 | 5,000 m² | ||
| 5,000 sqm per service | ||||||
| H102 | Snow & ice removal, walkways | 40 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H103 | Ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 70 | 5,000 m² | |||
| 5,000 sqm per service | ||||||
| H104 | Ice removal, walkways | 70 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H105 | Standby Lump Sum: Provide supply, equipment and manpower for Group H during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Chancellorsville Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group J | J101 | Snow & ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 49,500 m² | ||
| J102 | Snow & ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 5 | 8,200 m² | |||
| J103 | Ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 49,500 m² | |||
| J104 | Ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 7 | 8,200 m² | |||
| J105 | Standby Lump Sum: Provide supply, equipment and manpower for Group J during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| One Community Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group K | K101 | Snow & ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 74,500 m² | ||
| K102 | Snow & ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 5 | 80,200 m² | |||
| K103 | Snow & ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 5 | 29,000 m² | |||
| K104 | Snow & ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| Group K | K105 | Ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 74,500 m² | ||
| K106 | Ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 7 | 80,200 m² | |||
| K107 | Ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 7 | 29,000 m² | |||
| K108 | Ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| K109 | Standby Lump Sum: Provide supply, equipment and manpower for Group K during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Gate 6 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group L | L101 | Snow & ice removal, Gate 6 including in- and outbound lanes | 5 | 25,000 m² | ||
| L102 | Ice removal, Gate 6 including in- and outbound lanes | 7 | 25,000 m² | |||
| L103 | Standby Lump Sum: Provide supply, equipment and manpower only for Group L during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| Washrack # 10 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group M | M101 | Snow & ice removal, washrack # 10 | 6 | 26,000 m² | ||
| M102 | Ice removal, washrack # 10 | 8 | 26,000 m² | |||
| M103 | Standby Lump Sum: Provide supply, equipment and manpower only for Group M during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| CLIN 1001 Total | Euro |
&"-,Bold"&12FOR OFFICIAL USE ONLY
&"-,Bold"&12FOR OFFICIAL USE ONLY&"-,Regular"&11 &P of &N
2nd Option Year
| ELIN Sheet, 2nd Option Year - Rose Barracks, Vilseck & Tower Barracks Grafenwoehr |
| POP: 01 November 2027 thru 31 October 2028 (FY28) |
| Snow & Ice Removal |
2nd Option Year
| Rose Barracks Vilseck | ||||||
| Group | Item | Description, CDC, SAS, CYS, Teen Center | Qty/EA | Unit | Unit € | Total € |
| Group A | A201 | Snow & ice removal at area Bldg # 2234, Hand work total 1,160 sqm per call | 130 | 1,160 m² | ||
| A202 | Snow & ice removal at area Bldg # 2234, Equipment total 1,850 sqm per call | 130 | 1,850 m² | |||
| A203 | Snow & ice removal at area Bldg # 2237, Hand work total 250 sqm per call | 130 | 250 m² | |||
| A204 | Snow & ice removal at area Bldg # 2237, Equipment total 1,565 sqm per call | 130 | 1,565 m² | |||
| A205 | Snow & ice removal at area Bldg # 224, Hand work total 215 sqm per call | 130 | 215 m² | |||
| A206 | Snow removal at area Bldg # 224, Equipment total 180 sqm per call | 130 | 180 m² | |||
| A207 | Snow & ice removal at area Bldg # 1706, Hand work total 90 sqm per call | 130 | 90 m² | |||
| A208 | Snow & ice removal at area Bldg # 1706, Equipment total 500 sqm per call | 130 | 500 m² | |||
| A209 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,810 m² | |||
| A210 | Standby Lump Sum: Provide supply, equipment and manpower for Group A during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, HSG Area Vilseck Fitzthum Village | Qty/EA | Unit | Unit € | Total € |
| Group B | B201 | Snow & ice removal at Fitzthum Village | 130 | 735 m² | ||
| Walkways incl. stairs | ||||||
| Hand work total 735 sqm per call | ||||||
| B202 | Snow & ice removal at Fitzthum Village | 130 | 245 m² | |||
| Waste container locations | ||||||
| Hand work total 245 sqm per call | ||||||
| B203 | Snow & ice removal at Fitzthum Village | 130 | 1,315 m² | |||
| Side roads | ||||||
| Equipment work total 1,315 sqm per call | ||||||
| Group B | B204 | Snow & ice removal at Fitzthum Village | 130 | 1,660 m² | ||
| Walkways | ||||||
| Equipment work total 1,660 sqm per call | ||||||
| B205 | Snow & ice removal at Fitzthum Village | 130 | 1,995 m² | |||
| Parking lots | ||||||
| Equipment work total 1,995 sqm per call | ||||||
| B206 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,950 m² | |||
| B207 | Standby Lump Sum: Provide supply, equipment and manpower for Group B during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, MEDDAC Buildings | Qty/EA | Unit | Unit € | Total € |
| Group C | C201 | Snow & ice removal at MEDDAC Buildings | 130 | 900 m² | ||
| Sidewalk incl. stairs, Bldg # 700 | ||||||
| Hand work total 900 sqm per call | ||||||
| C202 | Snow & ice removal at MEDDAC Buildings | 130 | 7,350 m² | |||
| Parking lots, Bldg # 700 | ||||||
| Equipment work total 7,350 sqm per call | ||||||
| C203 | Snow & ice removal at MEDDAC Buildings | 130 | 300 m² | |||
| Sidewalk incl. stairs, Bldg # 701 | ||||||
| Equipment work total 300 sqm per call | ||||||
| C204 | Snow & ice removal at MEDDAC Buildings | 130 | 1,250 m² | |||
| Parking lots, Bldg # 701 | ||||||
| Equipment work total 1,250 sqm per call | ||||||
| C205 | Snow & ice removal at MEDDAC Buildings | 130 | 1,300 m² | |||
| Sidewalk incl. stairs, Bldg # 250 | ||||||
| Equipment work total 1,300 sqm per call | ||||||
| C206 | Snow & ice removal at MEDDAC Buildings | 130 | 8,100 m² | |||
| Exit Road & Parking lots, Bldg # 250 | ||||||
| Equipment work total 8,100 sqm per call | ||||||
| C207 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 19,200 m² | |||
| C208 | Standby Lump Sum: Provide supply, equipment and manpower for Group C during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks Grafenwoehr | ||||||
| Airfield Grafenwoehr | ||||||
| Group | Item | Description, Airfield Grafenwoehr | Qty/EA | Unit | Unit € | Total € |
| Group E | E201 | Remove snow of berms above 50 cm height along the runway and taxiways at the airfield with a length of approx. 2,600 linm and in a width of approx. 3 m as a lump sum job | 2 | 1 Job | ||
| E202 | Snow & ice removal at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E205. | 40 | 5,000 m² | |||
| E203 | Ice control services at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E205. | 332 | 5,000 m² | |||
| E204 | Delivery and storage of a mixture of solid - liquid de-icing material according to PWS of Performance Work Statement after contract award only for use at Army Airfield Grafenwoehr | 35 | TN | |||
| E205 | Standby Lump Sum: Provide supply, equipment and manpower for Group E during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg Village Center | ||||||
| Group | Item | Description, Netzaberg Traffic Areas | Qty/EA | Unit | Unit € | Total € |
| Group F | F201 | Snow & ice removal at Traffic Areas, asphalt roads | 50 | 19,800 m² | ||
| F202 | Snow & ice removal, parking lots | 50 | 11,000 m² | |||
| F203 | Snow & ice removal, walkways, hand work required as descript in 5.4 | 50 | 13,500 m² | |||
| F204 | Ice removal at Traffic Areas, asphalt roads | 150 | 19,800 m² | |||
| F205 | Ice removal, parking lots | 150 | 11,000 m² | |||
| F206 | Ice removal, walkways | 150 | 13,500 m² | |||
| F207 | Standby Lump Sum: Provide supply, equipment and manpower for Group F during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg TA - 1 Road | ||||||
| Group | Item | Description, Netzaberg Road & Walkway | Qty/EA | Unit | Unit € | Total € |
| Group G | G201 | Snow & ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 50 | 22,500 m² | ||
| G202 | Snow & ice removal, asphalt walkway along "TA - 1 Road" | 50 | 6,500 m² | |||
| G203 | Ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 150 | 22,500 m² | |||
| G204 | Ice removal, asphalt walkway along "TA - 1 Road" | 150 | 6,500 m² | |||
| G205 | Standby Lump Sum: Provide supply, equipment and manpower for Group G during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks & Rose Barracks - Main Post & Field Camps | ||||||
| Group | Item | Description, Areas will be identified with the Task Order | Qty/EA | Unit | Unit € | Total € |
| Group H | H201 | Snow & ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 40 | 5,000 m² | ||
| 5,000 sqm per service | ||||||
| H202 | Snow & ice removal, walkways | 40 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H203 | Ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 70 | 5,000 m² | |||
| 5,000 sqm per service | ||||||
| H204 | Ice removal, walkways | 70 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H205 | Standby Lump Sum: Provide supply, equipment and manpower for Group H during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Chancellorsville Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group J | J201 | Snow & ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 49,500 m² | ||
| J202 | Snow & ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 5 | 8,200 m² | |||
| J203 | Ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 49,500 m² | |||
| J204 | Ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 7 | 8,200 m² | |||
| J205 | Standby Lump Sum: Provide supply, equipment and manpower for Group J during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| One Community Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group K | K201 | Snow & ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 74,500 m² | ||
| K202 | Snow & ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 5 | 80,200 m² | |||
| K203 | Snow & ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 5 | 29,000 m² | |||
| K204 | Snow & ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| Group K | K205 | Ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 74,500 m² | ||
| K206 | Ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 7 | 80,200 m² | |||
| K207 | Ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 7 | 29,000 m² | |||
| K208 | Ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| K209 | Standby Lump Sum: Provide supply, equipment and manpower for Group K during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Gate 6 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group L | L201 | Snow & ice removal, Gate 6 including in- and outbound lanes | 5 | 25,000 m² | ||
| L202 | Ice removal, Gate 6 including in- and outbound lanes | 7 | 25,000 m² | |||
| L203 | Standby Lump Sum: Provide supply, equipment and manpower only for Group L during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| Washrack # 10 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group M | M201 | Snow & ice removal, washrack # 10 | 6 | 26,000 m² | ||
| M202 | Ice removal, washrack # 10 | 8 | 26,000 m² | |||
| M203 | Standby Lump Sum: Provide supply, equipment and manpower only for Group M during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| CLIN 2001 Total | Euro |
&"-,Bold"&12FOR OFFICIAL USE ONLY
&P of &N
3rd Option Year
| ELIN Sheet, 3rd Option Year - Rose Barracks, Vilseck & Tower Barracks Grafenwoehr |
| POP: 01 November 2028 thru 31 October 2029 (FY29) |
| Snow & Ice Removal |
3rd Option Year
| Rose Barracks Vilseck | ||||||
| Group | Item | Description, CDC, SAS, CYS, Teen Center | Qty/EA | Unit | Unit € | Total € |
| Group A | A301 | Snow & ice removal at area Bldg # 2234, Hand work total 1,160 sqm per call | 130 | 1,160 m² | ||
| A302 | Snow & ice removal at area Bldg # 2234, Equipment total 1,850 sqm per call | 130 | 1,850 m² | |||
| A303 | Snow & ice removal at area Bldg # 2237, Hand work total 250 sqm per call | 130 | 250 m² | |||
| A304 | Snow & ice removal at area Bldg # 2237, Equipment total 1,565 sqm per call | 130 | 1,565 m² | |||
| A305 | Snow & ice removal at area Bldg # 224, Hand work total 215 sqm per call | 130 | 215 m² | |||
| A306 | Snow removal at area Bldg # 224, Equipment total 180 sqm per call | 130 | 180 m² | |||
| A307 | Snow & ice removal at area Bldg # 1706, Hand work total 90 sqm per call | 130 | 90 m² | |||
| A308 | Snow & ice removal at area Bldg # 1706, Equipment total 500 sqm per call | 130 | 500 m² | |||
| A309 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,810 m² | |||
| A310 | Standby Lump Sum: Provide supply, equipment and manpower for Group A during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, HSG Area Vilseck Fitzthum Village | Qty/EA | Unit | Unit € | Total € |
| Group B | B301 | Snow & ice removal at Fitzthum Village | 130 | 735 m² | ||
| Walkways incl. stairs | ||||||
| Hand work total 735 sqm per call | ||||||
| B302 | Snow & ice removal at Fitzthum Village | 130 | 245 m² | |||
| Waste container locations | ||||||
| Hand work total 245 sqm per call | ||||||
| B303 | Snow & ice removal at Fitzthum Village | 130 | 1,315 m² | |||
| Side roads | ||||||
| Equipment work total 1,315 sqm per call | ||||||
| Group B | B304 | Snow & ice removal at Fitzthum Village | 130 | 1,660 m² | ||
| Walkways | ||||||
| Equipment work total 1,660 sqm per call | ||||||
| B305 | Snow & ice removal at Fitzthum Village | 130 | 1,995 m² | |||
| Parking lots | ||||||
| Equipment work total 1,995 sqm per call | ||||||
| B306 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,950 m² | |||
| B307 | Standby Lump Sum: Provide supply, equipment and manpower for Group B during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, MEDDAC Buildings | Qty/EA | Unit | Unit € | Total € |
| Group C | C301 | Snow & ice removal at MEDDAC Buildings | 130 | 900 m² | ||
| Sidewalk incl. stairs, Bldg # 700 | ||||||
| Hand work total 900 sqm per call | ||||||
| C302 | Snow & ice removal at MEDDAC Buildings | 130 | 7,350 m² | |||
| Parking lots, Bldg # 700 | ||||||
| Equipment work total 7,350 sqm per call | ||||||
| C303 | Snow & ice removal at MEDDAC Buildings | 130 | 300 m² | |||
| Sidewalk incl. stairs, Bldg # 701 | ||||||
| Equipment work total 300 sqm per call | ||||||
| C304 | Snow & ice removal at MEDDAC Buildings | 130 | 1,250 m² | |||
| Parking lots, Bldg # 701 | ||||||
| Equipment work total 1,250 sqm per call | ||||||
| C305 | Snow & ice removal at MEDDAC Buildings | 130 | 1,300 m² | |||
| Sidewalk incl. stairs, Bldg # 250 | ||||||
| Equipment work total 1,300 sqm per call | ||||||
| C306 | Snow & ice removal at MEDDAC Buildings | 130 | 8,100 m² | |||
| Exit Road & Parking lots, Bldg # 250 | ||||||
| Equipment work total 8,100 sqm per call | ||||||
| C307 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 19,200 m² | |||
| C308 | Standby Lump Sum: Provide supply, equipment and manpower for Group C during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks Grafenwoehr | ||||||
| Airfield Grafenwoehr | ||||||
| Group | Item | Description, Airfield Grafenwoehr | Qty/EA | Unit | Unit € | Total € |
| Group E | E301 | Remove snow of berms above 50 cm height along the runway and taxiways at the airfield with a length of approx. 2,600 linm and in a width of approx. 3 m as a lump sum job | 2 | 1 Job | ||
| E302 | Snow & ice removal at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E305. | 40 | 5,000 m² | |||
| E303 | Ice control services at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E305. | 332 | 5,000 m² | |||
| E304 | Delivery and storage of a mixture of solid - liquid de-icing material according to PWS of Performance Work Statement after contract award only for use at Army Airfield Grafenwoehr | 35 | TN | |||
| E305 | Standby Lump Sum: Provide supply, equipment and manpower for Group E during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg Village Center | ||||||
| Group | Item | Description, Netzaberg Traffic Areas | Qty/EA | Unit | Unit € | Total € |
| Group F | F301 | Snow & ice removal at Traffic Areas, asphalt roads | 50 | 19,800 m² | ||
| F302 | Snow & ice removal, parking lots | 50 | 11,000 m² | |||
| F303 | Snow & ice removal, walkways, hand work required as descript in 5.4 | 50 | 13,500 m² | |||
| F304 | Ice removal at Traffic Areas, asphalt roads | 150 | 19,800 m² | |||
| F305 | Ice removal, parking lots | 150 | 11,000 m² | |||
| F306 | Ice removal, walkways | 150 | 13,500 m² | |||
| F307 | Standby Lump Sum: Provide supply, equipment and manpower for Group F during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg TA - 1 Road | ||||||
| Group | Item | Description, Netzaberg Road & Walkway | Qty/EA | Unit | Unit € | Total € |
| Group G | G301 | Snow & ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 50 | 22,500 m² | ||
| G302 | Snow & ice removal, asphalt walkway along "TA - 1 Road" | 50 | 6,500 m² | |||
| G303 | Ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 150 | 22,500 m² | |||
| G304 | Ice removal, asphalt walkway along "TA - 1 Road" | 150 | 6,500 m² | |||
| G305 | Standby Lump Sum: Provide supply, equipment and manpower for Group G during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks & Rose Barracks - Main Post & Field Camps | ||||||
| Group | Item | Description, Areas will be identified with the Task Order | Qty/EA | Unit | Unit € | Total € |
| Group H | H301 | Snow & ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 40 | 5,000 m² | ||
| 5,000 sqm per service | ||||||
| H302 | Snow & ice removal, walkways | 40 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H303 | Ice removal, roads at the Main Post, Field Camps and Tank Roads, one Community Road | 70 | 5,000 m² | |||
| 5,000 sqm per service | ||||||
| H304 | Ice removal, walkways | 70 | 1,000 m² | |||
| 1,000 sqm per service | ||||||
| H305 | Standby Lump Sum: Provide supply, equipment and manpower for Group H during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Chancellorsville Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group J | J301 | Snow & ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 49,500 m² | ||
| J0302 | Snow & ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 5 | 8,200 m² | |||
| J0303 | Ice removal, Chancellorsville Road (Alte Amberger Strasse), road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 49,500 m² | |||
| J0304 | Ice removal, Gate 4 thru intersection B299 road (Tanzfleck), including in- and outbound lanes | 7 | 8,200 m² | |||
| J305 | Standby Lump Sum: Provide supply, equipment and manpower for Group J during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| One Community Road | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group K | K301 | Snow & ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 5 | 74,500 m² | ||
| K302 | Snow & ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 5 | 80,200 m² | |||
| K303 | Snow & ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 5 | 29,000 m² | |||
| K304 | Snow & ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| Group K | K305 | Ice removal, tank road from Gate 9 Tower Barracks thru Gate 4 Tanzfleck | 7 | 74,500 m² | ||
| K306 | Ice removal, One Community Road form Gate 4 Tower Barracks thru Gate 2 Rose Barracks Vilseck, including in- and outboud lanes Gate 5 access thru Gressenwoehr | 7 | 80,200 m² | |||
| K307 | Ice removal, tank Road from Gate 2 Rose Barracks to the end from the paved tank road near Travel Camp, including in- and outbound lanes Bldg 5000 | 7 | 29,000 m² | |||
| K308 | Ice removal, Gate 9, including in- and outbound lanes | 7 | 3,500 m² | |||
| K309 | Standby Lump Sum: Provide supply, equipment and manpower for Group K during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Gate 6 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group L | L301 | Snow & ice removal, Gate 6 including in- and outbound lanes | 5 | 25,000 m² | ||
| L302 | Ice removal, Gate 6 including in- and outbound lanes | 7 | 25,000 m² | |||
| L303 | Standby Lump Sum: Provide supply, equipment and manpower only for Group L during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| Washrack # 10 | ||||||
| Group | Item | Description | Qty/EA | Unit | Unit € | Total € |
| Group M | M301 | Snow & ice removal, washrack # 10 | 6 | 26,000 m² | ||
| M302 | Ice removal, washrack # 10 | 8 | 26,000 m² | |||
| M303 | Standby Lump Sum: Provide supply, equipment and manpower only for Group M during contract performance of snow and ice control services at Tower Barracks Grafenwoehr inclusive calculation proof in accordance with Performance Work Statement | 5 | 1 Job | |||
| CLIN 3001 Total | Euro |
&"-,Bold"&12FOR OFFICIAL USE ONLY
&P of &N
4th Option Year
| ELIN Sheet, 4th Option Year - Rose Barracks, Vilseck & Tower Barracks Grafenwoehr |
| POP: 01 November 2029 thru 31 October 2030 (FY30) |
| Snow & Ice Removal |
4th Option Year
| Rose Barracks Vilseck | ||||||
| Group | Item | Description, CDC, SAS, CYS, Teen Center | Qty/EA | Unit | Unit € | Total € |
| Group A | A401 | Snow & ice removal at area Bldg # 2234, Hand work total 1,160 sqm per call | 130 | 1,160 m² | ||
| A402 | Snow & ice removal at area Bldg # 2234, Equipment total 1,850 sqm per call | 130 | 1,850 m² | |||
| A403 | Snow & ice removal at area Bldg # 2237, Hand work total 250 sqm per call | 130 | 250 m² | |||
| A404 | Snow & ice removal at area Bldg # 2237, Equipment total 1,565 sqm per call | 130 | 1,565 m² | |||
| A405 | Snow & ice removal at area Bldg # 224, Hand work total 215 sqm per call | 130 | 215 m² | |||
| A406 | Snow removal at area Bldg # 224, Equipment total 180 sqm per call | 130 | 180 m² | |||
| A407 | Snow & ice removal at area Bldg # 1706, Hand work total 90 sqm per call | 130 | 90 m² | |||
| A408 | Snow & ice removal at area Bldg # 1706, Equipment total 500 sqm per call | 130 | 500 m² | |||
| A409 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,810 m² | |||
| A410 | Standby Lump Sum: Provide supply, equipment and manpower for Group A during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, HSG Area Vilseck Fitzthum Village | Qty/EA | Unit | Unit € | Total € |
| Group B | B401 | Snow & ice removal at Fitzthum Village | 130 | 735 m² | ||
| Walkways incl. stairs | ||||||
| Hand work total 735 sqm per call | ||||||
| B402 | Snow & ice removal at Fitzthum Village | 130 | 245 m² | |||
| Waste container locations | ||||||
| Hand work total 245 sqm per call | ||||||
| B403 | Snow & ice removal at Fitzthum Village | 130 | 1,315 m² | |||
| Side roads | ||||||
| Equipment work total 1,315 sqm per call | ||||||
| Group B | B404 | Snow & ice removal at Fitzthum Village | 130 | 1,660 m² | ||
| Walkways | ||||||
| Equipment work total 1,660 sqm per call | ||||||
| B405 | Snow & ice removal at Fitzthum Village | 130 | 1,995 m² | |||
| Parking lots | ||||||
| Equipment work total 1,995 sqm per call | ||||||
| B406 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 5,950 m² | |||
| B407 | Standby Lump Sum: Provide supply, equipment and manpower for Group B during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Group | Item | Description, MEDDAC Buildings | Qty/EA | Unit | Unit € | Total € |
| Group C | C401 | Snow & ice removal at MEDDAC Buildings | 130 | 900 m² | ||
| Sidewalk incl. stairs, Bldg # 700 | ||||||
| Hand work total 900 sqm per call | ||||||
| C402 | Snow & ice removal at MEDDAC Buildings | 130 | 7,350 m² | |||
| Parking lots, Bldg # 700 | ||||||
| Equipment work total 7,350 sqm per call | ||||||
| C403 | Snow & ice removal at MEDDAC Buildings | 130 | 300 m² | |||
| Sidewalk incl. stairs, Bldg # 701 | ||||||
| Equipment work total 300 sqm per call | ||||||
| C404 | Snow & ice removal at MEDDAC Buildings | 130 | 1,250 m² | |||
| Parking lots, Bldg # 701 | ||||||
| Equipment work total 1,250 sqm per call | ||||||
| C405 | Snow & ice removal at MEDDAC Buildings | 130 | 1,300 m² | |||
| Sidewalk incl. stairs, Bldg # 250 | ||||||
| Equipment work total 1,300 sqm per call | ||||||
| C406 | Snow & ice removal at MEDDAC Buildings | 130 | 8,100 m² | |||
| Exit Road & Parking lots, Bldg # 250 | ||||||
| Equipment work total 8,100 sqm per call | ||||||
| C407 | Clean up and dispose of all sand / abrasives generated during the performance of contract from the access roads, sidwalks and parking lots, as well as adjacent grass areas | 1 | 19,200 m² | |||
| C408 | Standby Lump Sum: Provide supply, equipment and manpower for Group C during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Tower Barracks Grafenwoehr | ||||||
| Airfield Grafenwoehr | ||||||
| Group | Item | Description, Airfield Grafenwoehr | Qty/EA | Unit | Unit € | Total € |
| Group E | E401 | Remove snow of berms above 50 cm height along the runway and taxiways at the airfield with a length of approx. 2,600 linm and in a width of approx. 3 m as a lump sum job | 2 | 1 Job | ||
| E402 | Snow & ice removal at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E405. | 40 | 5,000 m² | |||
| E403 | Ice control services at traffic areas with a mixture of solid - liquid according to PWS; strewing amount 35 g/sqm above 10,000 sqm total area per call; unit size is 5,000 sqm = 1 job minimum 5,000 sqm per call = 1 job; maximum above 10,000 sqm per call = 40 jobs Please note: Applied material will be charged against item E405. | 332 | 5,000 m² | |||
| E404 | Delivery and storage of a mixture of solid - liquid de-icing material according to PWS of Performance Work Statement after contract award only for use at Army Airfield Grafenwoehr | 35 | TN | |||
| E405 | Standby Lump Sum: Provide supply, equipment and manpower for Group E during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg Village Center | ||||||
| Group | Item | Description, Netzaberg Traffic Areas | Qty/EA | Unit | Unit € | Total € |
| Group F | F401 | Snow & ice removal at Traffic Areas, asphalt roads | 50 | 19,800 m² | ||
| F402 | Snow & ice removal, parking lots | 50 | 11,000 m² | |||
| F403 | Snow & ice removal, walkways, hand work required as descript in 5.4 | 50 | 13,500 m² | |||
| F404 | Ice removal at Traffic Areas, asphalt roads | 150 | 19,800 m² | |||
| F405 | Ice removal, parking lots | 150 | 11,000 m² | |||
| F406 | Ice removal, walkways | 150 | 13,500 m² | |||
| F407 | Standby Lump Sum: Provide supply, equipment and manpower for Group F during contract performance of snow and ice control services at Rose Barracks Vilseck inclusive calculation proof in accordance with Performance Work Statement | 5 | Month | |||
| Netzaberg TA - 1 Road | ||||||
| Group | Item | Description, Netzaberg Road & Walkway | Qty/EA | Unit | Unit € | Total € |
| Group G | G401 | Snow & ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 50 | 22,500 m² | ||
| G402 | Snow & ice removal, asphalt walkway along "TA - 1 Road" | 50 | 6,500 m² | |||
| G403 | Ice removal, asphalt roads "TA - 1 Road" including ACP Area Gate # 20 | 150 | 22,500 m² | |||
| G404 | Ice removal, asphalt walkway along "TA - 1 Road" | 150 | 6,500 m² |