This is a set of mechanical, electrical and fire alarm system drawings for HVAC equipment replacement and refurbishment in Building 101 at NIST's Gaithersburg, MD campus. The drawings detail the replacement of six air conditioning units (ACU-A-1 through ACU-A-6) and associated return/exhaust fans located in the Mezzanine A mechanical equipment room.
The drawings include demolition and new work plans showing HVAC equipment layouts, ductwork, piping, controls, electrical power distribution through motor control centers MCC-A1 and MCC-A2, and fire alarm system modifications. Detailed specifications cover air handling unit components like cooling coils, heating coils, filters, humidifiers, and variable frequency drives. The work requires careful phasing since only one air handling system can be taken offline at a time over weekends. New duct smoke detectors will replace existing firestats, and the fire alarm system will be modified accordingly while maintaining system operation. The drawings provide comprehensive details for mechanical, electrical, and fire protection contractors to execute the HVAC renovation work.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 101
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/1
/2
A
P
N
IS
T
B L
D G
R E
P L
A C
E
R E
F U
R B
IS
H
H V
A C
E Q
U
IP
M E
N T
SHEET
IDENTIFICATION
SHEET OF YX
M E
Z Z
A N
IN
E
A
S
U B
M
IS
S
IO
N
/0
/2
K
G
STRUCTURAL ENGINEERING CONSULTANT:
3423 OLNEY-LAYTONSVILLE RD.
SUITE 6
OLNEY, MD 20832
p: 301-570-1460
PROJECT #20-022
S U
B M
IS
S
IO
N
/1
/2
K G
C O
V E
R S
H E
E T
101-1262
CFR DWG # NIST DWG#
GENERAL
G001 101-1262 COVER SHEET - GENERAL
STRUCTURAL
S-001 101-1263 GENERAL NOTES - STRUCTURAL
S-101 101-1264 PARTIAL MEZZANINE LEVEL FRAMING PLAN - STRUCTURAL
MECHANICAL
M-001 101-1265 COVER SHEET - MECHANICAL
MD-101 101-1266 DEMOLITION FLOOR PLAN - MECHANICAL
MD-201 101-1267 DEMOLITION FLOOR PLAN - MECHANICAL
M-101 101-1268 NEW WORK FLOOR PLAN - MECHANICAL
M-201 101-1269 NEW WORK FLOOR PLAN - MECHANICAL
M-501 101-1270 DETAILS - MECHANICAL
M-502 101-1271 DETAILS - MECHANICAL
M-503 101-1272 DETAILS - MECHANICAL
M-601 101-1273 SCHEDULES - MECHANICAL
M-602 101-1274 SCHEDULES - MECHANICAL
M-603 101-1275 SCHEDULES - MECHANICAL
M-701 101-1276 CONTROLS - MECHANICAL
M-702 101-1277 CONTROLS - MECHANICAL
M-703 101-1278 CONTROLS - MECHANICAL
M-801 101-1279 AIR FLOW DIAGRAMS - MECHANICAL
ELECTRICAL
E-001 101-1280 COVER SHEET - ELECTRICAL
ED-100 101-1281 DEMOLITION FLOOR PLAN - ELECTRICAL
E-101 101-1282 NEW WORK FLOOR PLAN - ELECTRICAL
E-600 101-1283 DIAGRAMS AND SCHEDULES - ELECTRICAL
E-601 101-1284 MOTOR CONTROL CENTER ELEVATIONS
FIRE ALARM
FA-100 101-1285 PARTIAL ONE LINE - FIRE ALARM
FA-101 101-1286 INPUT/OUTPUT MATRIX - FIRE ALARM
G-001
AutoCAD SHX Text
DRAWING LIST
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
NORTH
AutoCAD SHX Text JUNE 10th, 2022
AutoCAD SHX Text
100%%% SUBMISSION
AutoCAD SHX Text Gaithersburg
AutoCAD SHX Text Rockville
AutoCAD SHX Text Aspen Hill
AutoCAD SHX Text Silver Spring
AutoCAD SHX Text Bethesda
AutoCAD SHX Text Washington
AutoCAD SHX Text Arlington
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Oakton
AutoCAD SHX Text Coral Hills
AutoCAD SHX Text Annandale
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text Diamond Avenue
AutoCAD SHX Text Muddy Branch Road
AutoCAD SHX Text Quince Orchard Road
AutoCAD SHX Text
BUILDING 101 - REPLACE HVAC EQUIPMENT
AutoCAD SHX Text UNITED STATES DEPARTMENT OF COMMERCE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY GAITHERSBURG, MD
AutoCAD SHX Text
STACK
AutoCAD SHX Text
WEST
AutoCAD SHX Text I-270
AutoCAD SHX Text I-270
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
PIKE
AutoCAD SHX Text
MUDDY
AutoCAD SHX Text
BRANCH
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
BUREAU DR.
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
WEST DRIVE
AutoCAD SHX Text
SOUTH DRIVE
AutoCAD SHX Text
EAST DRIVE
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
HALCYON
AutoCAD SHX Text
BLUE RIBBON
AutoCAD SHX Text
COURT
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
DIAMOND
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
QUINCE
AutoCAD SHX Text
ORCHARD
AutoCAD SHX Text
SERVICE DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
GATE "F"
AutoCAD SHX Text
GATE "E"
AutoCAD SHX Text
GATE "A"
AutoCAD SHX Text
GATE "B"
AutoCAD SHX Text
GATE "C"
AutoCAD SHX Text
GATE "D"
AutoCAD SHX Text
TO GAITHERSBURG
AutoCAD SHX Text
AND ROUTE 355
AutoCAD SHX Text
TO WASHINGTON
AutoCAD SHX Text
CLOPPER ROAD
AutoCAD SHX Text
TO GAITHERSBURG AND ROUTE 355
AutoCAD SHX Text
TO FREDERICK
AutoCAD SHX Text
TO GAITHERSBURG
AutoCAD SHX Text
AND ROUTE 355
AutoCAD SHX Text
STATE ROAD 124
AutoCAD SHX Text
TO STATE ROAD 28
AutoCAD SHX Text
TO STATE ROAD 28
AutoCAD SHX Text 101B
AutoCAD SHX Text 101A
AutoCAD SHX Text 225A
AutoCAD SHX Text 225B
AutoCAD SHX Text 222B
AutoCAD SHX Text 222A
AutoCAD SHX Text 220B
AutoCAD SHX Text 220A
AutoCAD SHX Text 226A
AutoCAD SHX Text 226B
AutoCAD SHX Text 224B
AutoCAD SHX Text 224A
AutoCAD SHX Text 233A
AutoCAD SHX Text 301A
AutoCAD SHX Text
AutoCAD SHX Text 309A
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
SHED
AutoCAD SHX Text 302A
AutoCAD SHX Text 302B
AutoCAD SHX Text
ELEC.
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 223A
AutoCAD SHX Text 223B
AutoCAD SHX Text 221A
AutoCAD SHX Text 221B
AutoCAD SHX Text 219A
AutoCAD SHX Text 231A
AutoCAD SHX Text 230A
AutoCAD SHX Text 231B
AutoCAD SHX Text 230B
AutoCAD SHX Text 202A
AutoCAD SHX Text 245A
AutoCAD SHX Text 245B
AutoCAD SHX Text
ISOTOPE
AutoCAD SHX Text
SEPARATOR
AutoCAD SHX Text 235A
AutoCAD SHX Text 237A
AutoCAD SHX Text
COOLING TOWER
AutoCAD SHX Text
CHEMICAL
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 205A
AutoCAD SHX Text
AutoCAD SHX Text 206A
AutoCAD SHX Text 236A
AutoCAD SHX Text 236B
AutoCAD SHX Text 102A
AutoCAD SHX Text
PEPCO
AutoCAD SHX Text
SUBSTATION
AutoCAD SHX Text
EXPOSURE
AutoCAD SHX Text
SITE (GRAVEL)
AutoCAD SHX Text
NIST SIGN
AutoCAD SHX Text
AutoCAD SHX Text 101C
AutoCAD SHX Text 205B
AutoCAD SHX Text 308A
AutoCAD SHX Text 308B
AutoCAD SHX Text W.E. 420.2
AutoCAD SHX Text W.E. 428.1
AutoCAD SHX Text W.E 411.2
AutoCAD SHX Text 366.1
AutoCAD SHX Text W.E. 352.7
AutoCAD SHX Text 227A
AutoCAD SHX Text 227B
AutoCAD SHX Text
AutoCAD SHX Text
WEST
AutoCAD SHX Text
METROLOGY
AutoCAD SHX Text
(BELOW)
AutoCAD SHX Text
LABS
AutoCAD SHX Text
WEST
AutoCAD SHX Text
INSTRUMENT
AutoCAD SHX Text
CLEAN ROOM
AutoCAD SHX Text
LABS
AutoCAD SHX Text
(BELOW)
AutoCAD SHX Text
EAST
AutoCAD SHX Text
METROLOGY
AutoCAD SHX Text
INSTRUMENT
AutoCAD SHX Text
EAST
AutoCAD SHX Text
LABS
AutoCAD SHX Text
STORM WATER
AutoCAD SHX Text
MANAGEMENT POND
AutoCAD SHX Text 132.00
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RESEARCH DRIVE
AutoCAD SHX Text
CENTER DRIVE
AutoCAD SHX Text
STEAM DRIVE
AutoCAD SHX Text
RESEARCH DRIVE
AutoCAD SHX Text
POND DRAIN
AutoCAD SHX Text
POND DRAIN
AutoCAD SHX Text
SUBSTATION
AutoCAD SHX Text
PAD
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
VEHICLE GATE
AutoCAD SHX Text
PERSONNEL GATE
AutoCAD SHX Text
PERSONNEL GATE
AutoCAD SHX Text
VEHICLE GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
AutoCAD SHX Text 205E
AutoCAD SHX Text 205M
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
WATER - GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 426 & 427
AutoCAD SHX Text
AutoCAD SHX Text 235C
AutoCAD SHX Text
SUBSTATION
AutoCAD SHX Text 235P
AutoCAD SHX Text
AutoCAD SHX Text
MECH EQUIP RM
GENERAL MECHANICAL PROJECT NOTES GENERAL MECHANICAL NOTES
NEW WORK PLAN NOTE IDENTIFICATION
MECHANICAL SYMBOLS MECHANICAL ABBREVIATIONS
DEMOLITION PLAN NOTE IDENTIFICATION
POINT OF CONNECTION TO EXISTING
POINT OF DISCONNECTION.
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW WORK
PIPE TURN DOWN OR AWAY
PIPE TURN UP OR TOWARDS
ABV
ADJ
ACU
AFF
BAS
BHP
BLDG
BLW
BMS
BTU/H
CC
CD
CFH
CHWR
CHWS
CONT.
COR
COV
CP
CS
CV
DP
DS
(E)
EA
EAT
EFF
EL
EPO
EWT
F
FA
FAP
FAS
FD
FFSG
FLA
FPT
FT
GA
GPM
HC
HD
HL
HWS/R
HX
HZ
IL
IN
L
LAT
LD
LPC
LPS
LWT
MBH
MCA
MOCP
NC
NIST
NO
OA
OED
P
PBO
PFC
PHC
PID
PVT
(R)
RA
RPM
RS/L
RU
SA
SAT
SCADA
SOV
SS
ST
TDH
TYP.
UH
VFD
VIF
WMS
(X)
ABOVE
ADJUSTABLE
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
BUILDING AUTOMATION SYSTEM
BRAKE HORSE POWER
BUILDING
BELOW
BUILDING MANAGEMENT SYSTEM
BRITISH THERMAL UNITS PER HOUR
COOLING COIL
CONDENSATE DRAIN
CUBIC FEET PER HOUR
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONTINUE
CONTRACTING OFFICER REPRESENTATIVE
CHANGE OF VALUE
CONDENSATE PUMP
CLEAN STEAM
CONTROL VALVE
DIFFERENTIAL PRESSURE
DISCONNECT SWITCH
EXISTING TO REMAIN
EXHAUST AIR
ENTERING AIR TEMPERATURE
EFFICIENCY
EXHAUST LOUVER
EMERGENCY POWER OFF
ENTERING WATER TEMPERATURE
FILTER
FIRE ALARM
FIRE ALARM PANEL
FIRE ALARM SYSTEM
FLOOR DRAIN
FIRE AND FACILITIES SAFETY GROUP
FULL LOAD AMPS
FUNCTIONAL PERFORMANCE TESTS
FEET
GAUGE
GALLONS PER MINUTE
HEATING COIL
HEAD
HIGH LIMIT
HEATING WATER SUPPLY / RETURN
HEAT EXCHANGER
HERTZ
INTAKE LOUVER
INCH
LOUVER
LEAVING AIR TEMPERATURE
LEAK DETECTION
LOW PRESSURE STEAM CONDENSATE
LOW PRESSURE STEAM
LEAVING WATER TEMPERATURE
BTU/H X 1000
MINIMUM CIRCUIT AMPACITY
MAXIMUM OVER CURRENT PROTECTION
NORMALLY CLOSED
NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY
NORMALLY OPEN
OUTSIDE AIR
OPEN ENDED DUCT
PUMP
PROVIDE BY OTHERS
PREFUNCTIONAL CHECKLISTS
PRE-HEAT COIL
PROPORTIONAL-INTEGRAL-DERIVATIVE
PERFORMANCE VERIFICATION TESTS
RELOCATE(D)
RETURN AIR
REVOLUTIONS PER MINUTE
REFRIGERANT SUCTION/ LIQUID
REFRIGERANT UNIT
SUPPLY AIR
SUPPLY AIR TEMPERATURE
SUPERVISORY CONTROL AND DATA ACQUISITION
SHUT OFF VALVE
STAINLESS STEEL
STORM
TOTAL DYNAMIC HEAD
TYPICAL
UNIT HEATER
VARIABLE FREQUENCY DRIVE
VERIFY IN FIELD
WIRE MESH SCREEN
EXISTING TO BE REMOVED
AREA OF WORK
PIPE CAPPED
ROOM TAG
DETAIL/VIEW TITLE
DETAIL/VIEW SCALE
DETAIL/VIEW INDENTIFICATION
NEW EQUIPMENT IDENTIFICATION
SHUT-OFF VALVE
TWO-WAY CONTROL VALVE
STRAINER
FLEXIBLE PIPE CONNECTION
CHECK VALVE
BALANCING VALVES
UNION
CONCENTRIC PIPE REDUCER
DRAIN VALVE
TEST PORT
AIR VENT
ACU-1
SUPPLY PIPING
RETURN PIPING
PIPING OR DUCTWORK HIDDEN/BELOW
1. SCOPE: PROVIDE AND INSTALL ALL WORK, EQUIPMENT, AND MATERIALS AS INDICATED ON THE PROJECT DRAWINGS AND IN THE SPECIFICATIONS TO PROVIDE A COMPLETELY OPERATIONAL SYSTEM. THE DRAWINGS DO NOT INDICATE EVERY FITTING, ELBOW, OFFSET, VALVE, PULL BOX OR SIMILAR COMPONENTS WHICH ARE REQUIRED TO COMPLETE THE PROJECT WORK. PREPARE FIELD CONSTRUCTION DRAWINGS IF NECESSARY FOR, OR AS REQUIRED TO, INSURE PROPER INSTALLATION. PROVIDE ALL NECESSARY OFFSETS, FITTINGS, AND AUXILIARY ITEMS SUCH AS RELAYS, CONTROL MODULES, CABINETS, ETC. TO INSTALL THE SYSTEMS AS
DIAGRAMMED AT NO ADDITIONAL COST.
2. APPLICABLE CODES AND REGULATIONS: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING CODES, REFERENCES AND REGULATIONS. THE CONTRACTOR SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES, AND REGULATIONS OF ALL GOVERNMENTAL AUTHORITIES HAVING JURISDICTION AND OF THE PUBLIC UTILITIES HAVING JURISDICTION OVER ANY OF THE
SYSTEMS HEREIN SPECIFIED.
a. INTERNATIONAL BUILDING CODE 2021
b. INTERNATIONAL MECHANICAL CODE 2021
c. INTERNATIONAL PLUMBING CODE 2021
d. INTERNATIONAL FIRE CODE 2021
e. NATIONAL FIRE PROTECTION ASSOCIATION 70, 90A, 101
f. NATIONAL ELECTRIC CODE
g. APPLICABLE REGULATIONS WSSC AND/OR WASA
3. SITE VISITS AND COORDINATION: THE CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND SHALL CONFIRM AND EVALUATE EXISTING CONDITIONS AND INSTALLED EQUIPMENT, DUCTWORK, PIPING, FINISHES, ETC. PRIOR TO START OF WORK. THE CONTRACTOR IS FULLY RESPONSIBLE FOR COORDINATING HIS/HER WORK WITH THE OTHER TRADES AND EXISTING CONDITIONS. ANY DISCREPENCIES SHALL BE BROUGHT TO THE COR'S ATTENTION. THE COR SHALL THEN INFORM CFR AS PART OF PCAS. ANY RECOMMENDATION OR CHANGES THAT AFFECT TIME OF COST SHALL NOT PROCEED UNTIL DIRECTED BY THE CO.
4. PROJECT BIDDING: AS THE SITE, LOCATION, SIZE AND ROUTING OF EXISTING SYSTEMS INDICATED TO HAVE NEW CONNECTIONS MADE TO THEM ARE SHOWN AS ACCURATELY AS FIELD CONDITIONS WOULD PERMIT, THE BIDDING CONTRACTORS SHALL VISIT THE SITE AND THOROUGHLY EXAMINE THE CONTRACT DRAWINGS PRIOR TO BID. THE CONTRACTORS SHALL REPORT TO THE THE COR'S REPRESENTATIVE, BEFORE SUBMITTING A BID, ANY CONDITIONS WHICH MIGHT MAKE THE INSTALLATION OF THE REQUIRED EQUIPMENT NOT FEASIBLE. UNFEASIBLE CONDITIONS SHALL BE REPORTED TO THE CO. DIRECTION AT BIDDING SHALL BE BY CO. THE CONTRACTOR'S BIDS SHALL INCLUDE ALL NECESSARY PERMIT FEES REQUIRED TO COMPLETE THE SCOPE OF WORK, UNLESS OTHERWISE DIRECTED BY THE THE COR. COPIES OF ALL PERMITS SHALL BE SUPPLIED TO THE GOVERNMENT PRIOR TO STARTING
CONSTRUCTION.
a. UNLESS OTHERWISE SPECIFIED, THE TERM “PROVIDE” SHALL MEAN THAT THE CONTRACTOR IS REQUIRED TO FURNISH AND
INSTALL SAID EQUIPMENT.
5. EXISTING CONDITIONS: THE ENGINEERING DESIGN DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE NOT CONSIDERED CONSTRUCTION SHOP DRAWINGS. ALL CRITICAL DIMENSIONS SHALL BE CONFIRMED BY THE CONTRACTOR IN THE FIELD. THE LOCATION AND SIZES OF EXISTING EQUIPMENT, PIPING, DUCTWORK, FIXTURES, ETC. ARE APPROXIMATE AND SHALL BE VERIFIED AT THE JOB SITE, BY THE CONTRACTOR. CONNECTION TO, REMOVAL OR RELOCATION OF EXISTING EQUIPMENT, PIPING AND DUCTWORK SHALL BE DONE IN SUCH A MANNER AS NOT TO DAMAGE THE EXISTING FIXTURES OR EQUIPMENT. ANY EQUIPMENT, DUCTWORK, PIPING ETC. DAMAGED DUE TO THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS CONTRACTOR TO THE SATISFACTION OF THE GOVERNMENT, AND AT NO ADDITIONAL COST THE GOVERNMENT.
a. THE CONTRACTOR SHALL PROTECT ALL EXISTING FIRE SUPPRESSION AND FIRE ALARM SYSTEMS AS NECESSARY TO AVOID FALSE ALARMS AND NUISANCE TRIPS. ALL SUCH SYSTEMS SHALL REMAIN OPERATIONAL DURING CONSTRUCTION AS REQUIRED
BY THE FIRE AND FACILITIES SAFETY GROUP.
6. SERVICE INTERRUPTIONS AND WORKING HOURS: PRIOR TO THE START OF WORK, CONTRACTOR SHALL OBTAIN THE PERMISSION OF THE COR FOR INTERRUPTION OF EXISTING SERVICES AND FOR CONNECTION TO THE SAME. CONTRACTOR SHALL COORDINATE THE TIME OF WORK AND INTERRUPTION OF SERVICES IN ACCORDANCE WITH THE INSTRUCTIONS OF THE CONTRACTING OFFICER. ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AS DEFINED BY THE CONTRACTING OFFICER. WORK PERFORMED OUTSIDE OF NORMAL WORKING HOURS SHALL BE NEGOTIATED WITH THE COR PRIOR TO THE CONSTRUCTION PHASE. REQUIRED EXISTING SYSTEM SHUTDOWNS SHALL BE COORDINATED IN WRITING WITH THE CONTRACTING OFFICER'S REPRESENTATIVE A
MINIMUM OF 21 DAYS IN ADVANCE.
7. SCAFFOLDING, RIGGING AND HOISTING: CONTRACTOR SHALL PROVIDE ALL SERVICES REQUIRED FOR INSTALLATION, ERECTION AND DELIVERY OF ALL MATERIALS AND EQUIPMENT TO THE SITE AND FOR REMOVAL OF TRASH, CONSTRUCTION DEBRIS, WASTE, AND
DEMOLISHED ITEMS FROM THE PREMISES.
8. INSTALLATION: INSTALLATION OF EQUIPMENT, PIPING, FIXTURES, WIRING, ETC. SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER, AND SHALL CONFORM TO THE LATEST TRADE PRACTICES. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, UNLESS INDICATED OTHERWISE, AND THE CURRENT MODEL, FOR WHICH REPLACEMENT PARTS IS AVAILABLE. NOTICE OF A SUBSTITUTION SHALL GO TO COR AND CO. THE COR WILL ENGAGE CFR AS PART OF PCAS TO APPROVE OR DISAPPROVE THE SUBSTITUTION. THE CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS, UNLESS INDICATED
OTHERWISE. ALL EQUIPMENT SHALL BE MOUNTED VIBRATION FREE.
b. THE CONTRACTOR SHALL REPAIR ALL OPENINGS IN WALLS, CEILINGS, FLOORS, ETC., WHICH ARE CREATED BY DEMOLITION AND/OR NEW PROJECT WORK. THE REPAIRS SHALL BE WITH MATERIALS AND FINISHED TO MATCH EXISTING. OPENINGS AND PENETRATIONS IN FIRE RATED PARTITIONS SHALL BE SEALED WITH U.L. APPROVED FIRE STOPPING MATERIAL TO MAINTAIN FIRE RESISTANT INTEGRITY. THROUGH PENETRANTS OF FIRE RATED PARTITIONS SHALL BE INSTALLED PER A UL APPROVED DESIGN FOR THE SPECIFIC PENETRATION AND PENETRANT. DUCTWORK AND PIPING SHALL BE CAPPED, SEALED AIR AND WATERTIGHT
AND INSULATED TO MATCH EXISTING.
c. ALL EQUIPMENT AND DEVICES SHALL BE INSTALLED TO PROVIDE THE MANUFACTURER'S REQUIRED SERVICE CLEARANCES, AND ANY AIR AND WATER BALANCING DEVICES SHALL BE ACCESSIBLE FOR ADJUSTMENT. PROVIDE ACCESS DOORS IN DRYWALL CEILINGS AND PARTITIONS AS REQUIRED TO SERVICE EQUIPMENT, BALANCE DIFFUSERS, AND EXPOSED JUNCTION BOXES.
COORDINATE THE EXACT LOCATIONS AND STYLE OF FLANGELESS ACCESS DOORS WITH THE ENGINEER.
d. THE CONTRACTOR SHALL INSTALL ALL DUCTWORK, PIPING, RACEWAYS, CIRCUITRY, CONDUIT, ETC., AS HIGH AS POSSIBLE TO
MAXIMIZE HEADROOM.
9. PROJECT CLEANING: ALL MATERIAL NOT TO BE USED SHALL BE REMOVED FROM THE SITE AND ALL DEBRIS SHALL BE CLEARED. THE AREA OF WORK SHALL BE LEFT IN CLEAN CONDITION PRIOR TO TURNOVER TO THE CONTRACTING OFFICER REPRESENTATIVE (COR).
UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO WASHING AND/OR REPAIRING GLASS, REMOVING SPOTS AND STAINS, CLEANING ALL FIXTURES AND WASHING ALL FLOORS, WALLS AND CEILINGS IF APPROPRIATE. THE CONTRACTOR SHALL
REMOVE DEBRIS EACH DAY AND/OR AT THE DIRECTION OF THE COR.
10. PROJECT CLOSEOUT, COMMISSIONING, AND PUNCH LISTS: UPON COMPLETING APPROXIMATELY 95% OF THE REQUIRED WORK, THE CONTRACTOR SHALL NOTIFY THE COR IN ORDER TO SCHEDULE A PRE-FINAL REVIEW OF CONSTRUCTION. NO WORK SHALL BE CONCEALED BY CEILINGS, WALLS, ETC UNTIL INSPECTED. FINAL REVIEW SHALL BE SCHEDULED AT 100% COMPLETION OF CONSTRUCTION. ALL PUNCH LIST ITEMS MUST BE ACCOMPLISHED PRIOR TO FINAL ACCEPTANCE.
a. ALL EQUIPMENT WARRANTIES AND OPERATIONS AND MAINTENANCE MANUALS SHALL BE FULLY TRANSFERRED TO THE COR PRIOR TO FINAL ACCEPTANCE. ALL EQUIPMENT, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED IN FULL FROM DEFECT
FOR ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THIS WORK BY THE COR.
b. UNLESS OTHERWISE SPECIFIED IN THE COMMISSIONING SPECIFICATIONS (PBO), THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND DEMONSTRATE TO THE COR ITS PROPER OPERATION(S).
c. PROVIDE THREE (3) OPERATION AND MAINTENANCE MANUALS IN 3-RING BINDER, WITH SUBJECT INDEX AND TABS. LIST ALL DESIGN FIRMS, CONTRACTORS AND PRIMARY SUPPLIERS; PROVIDE A POINT OF CONTACT WITH PHONE NUMBER AND E-MAIL ADDRESS FOR EACH FIRM. INCLUDE WARRANTY STATEMENTS, COPY OF APPROVED SUBMITTAL AND OPERATION AND MAINTENANCE PROCEDURES FOR EACH PIECE OF EQUIPMENT. INCLUDE A COPY OF THE FINAL, APPROVED WATER AND AIR
BALANCE REPORT.
d. PROVIDE PREVENTATIVE MAINTENANCE MANUALS SEPARATE FROM OPERATION AND MAINTENANCE MANUALS. PREVENTATIVE
MAINTENANCE MANUALS SHALL BE TURNED OVER TO THE COR.
11. PROJECT WARRANTY: ALL WORK SHALL BE FULLY WARRANTED FOR A PERIOD OF ONE YEAR UNLESS SPECIFICALLY NOTED OTHERWISE. DURING THE CORRECTION PERIOD, THE CONTRACTOR SHALL CORRECT ANY WORK FOUND NOT TO BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS BY REPAIRING OR REPLACING THE DEFECTIVE WORK AT NO ADDITION TO THE CONTRACT SUM. ALL MANUFACTURE EQUIPMENT WARRANTIES SHALL BE TRANSFERRED TO THE COR UPON SUBSTANTIAL COMPLETION. THE WARRANTY
SHALL BEGIN AT SUBSTANTIAL PROJECT COMPLETION.
TITLE
1/4" = 1' - 0"
DETAIL OR ENLARGED PLAN CALLOUT
M-101
SHUT-OFF VALVE IN VERTICAL
THREE-WAY CONTROL VALVE
MECHANICAL PHASING NOTES
1. THE CONTRACTOR SHALL PROVIDE NIST COR WITH A CONSTRUCTION AND PHASING SCHEDULE FOR APPROVAL PRIOR TO THE START
OF DEMOLITION.
2. PRIOR TO DEMOLITION, A PRELIMINARY TAB REPORT SHALL BE PERFORMED FOR ALL EQUIPMENT IN-SCOPE. REFER TO GENERAL
MECHANICAL NOTE D ON THIS DRAWING FOR ADDITIONAL INFORMATION.
3. THE CONTRACTOR SHALL REMOVE, REPLACE AND INSTALL ONE (1) AIR CONDITIONING UNIT AND ASSOCIATED RETURN FAN AT A TIME.
4. ONLY ONE (1) AIR CONDITIONING UNIT SYSTEM SHALL BE TAKEN OFFLINE AT A TIME.
5. THE CONTRACTOR SHALL COMPLETE THE REPLACEMENT OF ONE (1) AIR CONDITIONING SYSTEM AND ASSOCIATED RETURN FAN WORK
OVER THE COURSE OF ONE (1) WEEKEND.
A. THE ACU SYSTEM TO BE DEMOLISHED SHALL BE TAKEN OFF LINE AT 5 PM ET ON FRIDAY
B. THE NEW ACU SYSTEM SHALL BE INSTALLED, STARTED UP, OPERATIONAL AND HAVE COMPLETED A PRELIMINARY AIR
AND WATER TAB TO WITHIN 10% OF DESIGN BY 11:59 PM ET ON SUNDAY.
C. CONTROLS AND MONITORING OF THE NEW EQUIPMENT AT A LOCAL LEVEL SHALL BE COMPLETE. GLOBAL CONTROLS CAN
TAKE PLACE OVER THE COURSE OF THE FOLLOWING WEEKS.
D. ALL NEW EQUIPMENT AND WORK SHALL BE PROTECTED IN PLACE DURING SUBSEQUENT PHASES OF CONSTRUCTION.
6. OVER THE FOLLOWING WEEKENDS, THE AIR CONDITIONING UNIT AND RETURN FAN SHALL BE FINAL BALANCED, TESTED AND HAVE PRE-FUNCTIONAL CHECKLISTS (PFC) AND PERFORMANCE VERIFICATION TESTS (PVT) COMPLETED.
7. THE INSTALLATION, START-UP, TAB, CONTROLS, PFC AND PVT SHALL BE SUBSTANTIALLY COMPLETE AND SIGNED OFF BY THE
CONTRACTOR, OWNER AND CXA, PRIOR TO THE NEXT PHASE OF CONSTRUCTION.
8. SIMILAR PROCEDURE SHALL BE PROVIDED FOR THE REMAINING FIVE (5) AIR CONDITIONING UNITS AND RETURN FANS. EACH
OCCURRING ON SEPARATE WEEKENDS.
9. THE CONTRACTOR SHALL PROVIDE FUNCTIONAL PERFORMANCE TESTING (FPT) FOR ALL NEW EQUIPMENT AFTER ALL PHASES OF
CONSTRUCTION ARE COMPLETE.
A. PROVIDE FIRE STOPPING FOR ALL PIPE PENETRATIONS THROUGH WALLS AND FIRE-RATED WALLS AND FLOOR SLABS. PIPES PENETRATING RATED WALLS, PARTITIONS, CEILINGS, AND FLOOR SLABS SHALL BE FIRE STOPPED AT RATED OUTER SURFACES.
INSULATION ENDS SHALL BE SEALED VAPORTIGHT. ALL PENETRATIONS SEALED/CAULKED BY FM CERTIFIED INSTALLER. THROUGH PENETRANTS OF RATED CONSTRUCTION SHALL BE INSTALLED PER A UL APPROVED DESIGN FOR THE SPECIFIC PENETRATION AND PENETRANT BEARING A SPECIFIC UL IDENTIFIER. THE UL APPROVED DESIGN SHALL BE REVIEWED BY NIST FIRE AND FACILITIES SAFETY
GROUP (FFSG) DURING THE SUBMITTAL PROCESS.
B. INSULATION FLAME/SMOKE RATING: PROVIDE COMPOSITE MECHANICAL INSULATION JACKETS, COVERINGS, SEALERS, MASTIC, AND ADHESIVES WITH FLAME-SPREAD INDEX OF 25 OR LESS AND SMOKE DEVELOPED INDEX OF 50 OR LESS AS TESTED BY ASTM E4 AND THE
APPROVED METHOD OF NFPA 255. INSULATION MUST BE U.L. LISTED AND LABELED.
C. PIPING PASSING THROUGH AREAS OF RENOVATION AND SERVING ADJACENT SPACES SHALL BE PROTECTED IN PLACE. WHERE IT IS DETERMINED THAT THESE DUCTWORK AND PIPING MUST BE RELOCATED, CONTRACTOR SHALL REROUTE AND RESTORE SERVICES WITH
MINIMAL DISRUPTION. COORDINATE WORK WITH THE GOVERNMENT AND APPROPRIATE USERS.
D. BALANCING: SYSTEM SHALL BE BALANCED TO DELIVER AIR AND WATER QUANTITIES INDICATED ON DRAWINGS. WORK SHALL BE PERFORMED BY FIRM(S) CERTIFIED BY THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). MECHANICAL CONTRACTOR SHALL PROVIDE ALL NECESSARY BALANCING DAMPERS AND VALVES TO ACHIEVE AIR AND WATER QUANTITIES INDICATED ON DRAWINGS. AIR AND WATER BALANCE SHALL BE PERFORMED PRIOR TO HEATING SEASON. THE CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED FOR THE TESTS.
a. CONTRACTOR SHALL TEST AND BALANCE THE TOTAL PRE-DEMO AND NEW WORK SUPPLY, EXHAUST, RETURN, AND OUTSIDE AIR AND CHILLED WATER AND STEAM FLOW RATES FOR EACH AIR HANDLING UNIT'S SUPPLY AND RETURN FANS, AND COOLING AND HEATING COILS. MEASUREMENTS SHALL BE TAKEN PRIOR TO ANY BRANCH TAKE-OFFS AND SHALL BE CONSISTENT BETWEEN PRE-DEMO AND
NEW WORK.
E. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS PUBLISHED INSTALLATION LITERATURE.
F. PROVIDE ALL WORK, EQUIPMENT, AND MATERIALS INDICATED. PROVIDE ALL INTERLOCKS, RELAYS, CONTROLS, ETC., FOR A FULLY
FUNCTIONAL SYSTEM.
G. SUPPORT FANS WITH VIBRATION ISOLATORS.
H. PROVIDE DIELECTRIC COUPLINGS AT ALL FERROUS TO NON-FERROUS PIPE CONNECTIONS AND FLANGE UNION ISOLATING JOINTS TO PREVENT ANY ELECTROLYTIC ACTION BETWEEN DISSIMILAR METAL. DIELECTRIC FITTINGS SHALL BE EQUAL TO EPCO SALES, INC. ALL CONNECTIONS TO STEEL PIPES SHALL BE MADE WITH WELDING FITTINGS. BRONZE VALVES ARE NOT ACCEPTABLE AS A DIELECTRIC
COUPLING OR BREAK.
I. PROVIDE MANUAL AIR VENTS AT HIGH POINTS AND DRAIN VALVES AT LOW POINTS IN HYDRONIC CLOSED SYSTEMS. PROVIDE UNIONS AT
PIPE CONNECTIONS TO EQUIPMENT TO FACILITATE REMOVAL OF EQUIPMENT.
J. ALL PIPING SHALL BE IDENTIFIED AS TO SERVICE (SUPPLY OR RETURN, MAKEUP OR DRAIN, ETC) AND DIRECTION OF FLOW. SELF ADHESIVE TYPE IDENTIFICATION SHALL BE APPLIED TO PIPE INSULATION AT REGULAR INTERVALS, MAXIMUM 20 FEET BETWEEN MARKERS, OR WHEN PIPING ENTERS/EXITS ROOM, OR FOR CONVENIENCE FOR FACILITY ENGINEERS. PIPES SHALL HAVE IDENTIFICATION LABELS WITH BACKGROUND COLOR THAT CONTRASTS BOTH THE COLOR OF PAINT AND LETTERING. FLOW DIRECTIONAL ARROWS SHALL MATCH PIPE IDENTIFICATION. REFER TO SPECIFICATION SECTION 23 05 53 FOR ADDITIONAL INFORMATION.
K. INSULATE ALL HVAC WATER, DRAIN, AND COLD WATER PIPING. INSULATED PIPING WITHIN 2FT OF THE FLOOR SHALL BE COVERED WITH PVC JACKETING. REFER TO SPECIFICATION SECTION 23 07 00 FOR ADDITIONAL INFORMATION.
L. COORDINATE HOURS OF ALL WELDING AND HOT WORK WITH THE GOVERNMENT. TEMPORARY POWER REQUIREMENTS MUST BE COORDINATED WITH ELECTRICAL CONTRACTOR. ALL WELDING REQUIRES A BURN PERMIT FROM THE NIST FIRE DEPARTMENT.
M. ALL PIPING JOINTS SHALL BE LEAK TESTED PRIOR TO BEING PUT IN SERVICE. ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED, TO NOT LESS THAN 1.5 TIMES THE MAXIMUM SYSTEM OPERATING PRESSURE FOR FOUR (4) HOURS MINIMUM, AND FLUSHED PRIOR TO SYSTEM STARTUP. REPAIR LEAKS AND RETURN TO SERVICE. MAKE REPAIRS WITH NEW MATERIALS. REPLACE LEAKING MATERIALS, DO NOT REPAIR BY PATCHING. REFER TO SPECIFICATION SECTION 23 21 13 FOR REQUIREMENTS AND ADDITIONAL INFORMATION.
N. PROVIDE VALVE IDENTIFICATION TAGS FOR ALL NEW VALVES. REFER TO BOOK SPECIFICATIONS FOR ADDITIONAL INFORMATION.
O. SUPPORT ALL NEW PIPING FROM EXISTING BUILDING STRUCTURE AT A MAXIMUM OF 8'-0" INTERVALS OR AS REQUIRED TO PREVENT
SAGGING.
P. ALL NEW CONSTRUCTION SHALL MATCH BUILDING STANDARD (MATERIALS, INSTALLATION METHODS AND QUALITY). ANY MAJOR DEVIATIONS SHALL REQUIRE APPROVAL OF THE ENGINEER AND/OR BUILDING GOVERNMENT PRIOR TO PROCEEDING. AT MINIMUM, NEW
WORK SHOULD MATCH EXISTING FOR MATERIAL, INSTALLATION AND QUALITY.
Q. ALL NEW CONSTRUCTION SHALL ADHERE TO THE LATEST EDITION OF THE GOVERNMENT REQUIREMENTS. ANY DEVIATIONS FROM MATERIALS, METHODS AND FACILITY STANDARDS FROM GOVERNMENT REQUIREMENTS AND/OR CONSTRUCTION DOCUMENTS WILL
REQUIRE APPROVAL FROM GOVERNMENT BEFORE PROCEEDING.
R. ALL WORK AND MATERIAL SHALL BE PROVIDED TO ACCOMPLISH THE INTENT OF THE PLANS. WORK INDICATED HAVING MINOR DETAILS
NOT SHOWN SHALL BE PROVIDED COMPLETELY TO PERFORM THE FUNCTIONS INTENDED.
S. ALL SPRINKLER HEADS AND PIPING SHALL BE RELOCATED AS NECESSARY TO PROVIDE THE REQUIRED SCOPE OF WORK. APPROVAL FROM NIST FIRE AND FACILITIES SAFETY GROUP (FFSG) SHALL BE OBTAINED PRIOR TO ANY WORK.
T. ALL SOURCES OF HAZARDOUS ENERGY MUST BE LOCKED OUT/TAGGED OUT PRIOR TO WORKING ON THE SYSTEM (INCLUDES:
ELECTRICAL, WATER, STEAM, GAS , ETC).
U. BUILDING 101 SHALL REMAIN IN OPERATION DURING ALL PHASES OF CONSTRUCTION.
SECTION VIEW CALLOUT
M-301
DUCTWORK (20" IS VISIBLE DIMENSION,
SUPPLY AIR DUCTWORK TURNS UP OR TOWARDS
EXHAUST AIR DUCTWORK TURNS UP OR TOWARDS
SUPPLY AIR DUCTWORK TURNS DOWN OR AWAY
EXHAUST AIR DUCTWORK TURNS DOWN OR AWAY
MANUAL VOLUME DAMPER
DROP/OFFSET IN DUCTWORK
20"x12"
TRANSITION FITTING
SQUARE TO ROUND DUCTWORK TRANSITION FITTING
SQUARE ELBOW WITH TURNING VAVES
SHORT RAIDUS ELBOW
ACCESS DOOR OR PANEL
AIRFLOW DIRECTION
PARALLEL BLADE CONTROL DAMPER
OPPOSED BLADE CONTROL DAMPER
12" IS THE DIMENSION INTO THE PAGE)
ANGLE VALVE
PUMP
DP
S
T
SWITCH
REFRIGERANT SENSOR
TEMPERATURE SENSOR
DIFFERENTIAL PRESSURE SENSOR
R
SD SMOKE DETECTOR
MOTORIZED DAMPER
RETURN AIR DUCTWORK TURNS DOWN OR AWAY
DOUBLE LINE PIPING
BACK FLOW PREVENTOR
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/1
/2
A
P
N
IS
T
B L
D G
R E
P L
A C
E
R E
F U
R B
IS
H
H V
A C
E Q
U
IP
M E
N T
SHEET
IDENTIFICATION
SHEET OF YX
M E
Z Z
A N
IN
E
A
S
U B
M
IS
S
IO
N
/0
/2
K
G
STRUCTURAL ENGINEERING CONSULTANT:
3423 OLNEY-LAYTONSVILLE RD.
SUITE 6
OLNEY, MD 20832
p: 301-570-1460
PROJECT #20-022
S U
B M
IS
S
IO
N
/1
/2
K G
C O
V E
R S
H E
E T
M
E C
H A
N
IC
A L
101-1265 M-001
ACU-A-1(X)
E-A-1(X)
T
ACU-A-3(X)
ACU-A-2(X)
E-A-4(X)
(E)
ACU-A-4(X)
E-A-5(X)
T(E)
L(E) L(E) L(E) L(E) L(E) L(E)L(E) L(E)
L(E)L(E)
T (E)
L(E) L(E)
ACU-A-6(X)
T (E)
UH(E)
CP(E)
UH(E)
UH(E)
UH(E)
L(E) (TYP OF 6) L(E) (TYP OF 10) L(E) (TYP OF 13) L(E)
60"x24"
RA(E)
56"x20" SA(E)
60"x24"
RA(E)
DEMOLITION WORK GENERAL NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM
RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT
INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT
EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR
PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE NIST COR IN
WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION
OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS
PROVIDED
2. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING
REMOVED THROUGH EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER,
THE CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING
& VERIFY ALL REMOVALS, AS SOME DIFFERENCES MAY EXIST.
3. REMOVE ALL MECHANICAL SYSTEMS SHOWN AS BEING DEMOLISHED AND ALL
ASSOCIATED COMPONENTS.
4. CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED
TO COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK
TO MATCH EXISTING CONDITION.
6. CONTRACTOR SHALL VERIFY IN FIELD ALL CRITICAL DIMENSIONS FOR ALL AIR
HANDLERS AND ASSOCIATED PIPING, DUCTWORK AND COMPONENTS. THE
CONTRACTOR SHALL NOTIFY NIST AND A/E PRIOR TO COMMENCING WORK IF THE
EXISTING CONDITIONS PREVENT THE EXECUTION OF THE INTENDED WORK.
7. CONTRACTOR SHALL PROVIDE PRE-DEMOLITION AIR BALANCE OF THE ENTIRE HVAC
SYSTEM PRIOR TO ANY DEMOLITION WORK BEING PERFORMED BASED ON AS-IS
CONDITIONS.
8. DUCTWORK OPENINGS SHALL BE SEALED AND PROTECTED AFTER DISCONNECTION.
9. THE DDC GLOBAL CONTROLLER FOR THE MEZZANINE AREA, LOCATED IN THE DDC
PANEL MOUNTED ON ACU-A4, SHALL REMAIN ONLINE DURING DEMOLITION/NEW WORK
ACTIVITIES ASSOCIATED WITH ACU-A4.
DEMOLITION WORK PLAN NOTES
1. REMOVE AIR CONDITIONING UNIT. HOUSE KEEPING PAD IS EXISTING TO REMAIN.
CONTRACTOR SHALL VERIFY IN FIELD THE CONDITION OF THE PAD AND NOTIFY THE
NIST COR OF THEIR FINDINGS. CONTRACTOR SHALL REMOVE SALVAGE AND
RELOCATE THE EXISTING CONDUITS MOUNTED ON ALL ACU CASINGS PRIOR TO THE
WEEKEND THAT THE ACU REPLACEMENT SCHEDULED.
2. REMOVE EXHAUST FAN AND INERTIA PAD. HOUSE KEEPING PAD IS EXISTING TO
REMAIN. CONTRACTOR SHALL VERIFY IN FIELD THE CONDITION OF THE PAD AND
NOTIFY THE NIST COR OF THEIR FINDINGS.
3. EXISTING TO REMAIN LOUVER. REMOVE BLANK OFF PANEL AND INSECT SCREEN.
REFER TO NEW WORK PLAN FOR ADDITIONAL INFORMATION.
4. DISCONNECT EXISTING DUCTWORK AT LOCATION INDICATED.
5. REMOVE EXISTING DDC CONTROL PANEL AND DISCONNECT FROM BAS.
6. THE EXISTING GLOBAL DDC CONTROLLERS FOR THE MEZZANINE AREA SHALL
MAINTAIN COMMUNICATION WITH ALL OTHER UNITS AND SHALL REMAIN ONLINE
THROUGHOUT DEMOLITION AND CONSTRUCTION.
7. EXISTING TO REMAIN LOUVER. DISCONNECT LOUVER FROM AIR HANDLING UNIT.
REMOVE MOTORIZED INTAKE DAMPER, ACTUATOR AND INSECT SCREEN. REFER TO
NEW WORK PLAN FOR ADDITIONAL INFORMATION.
8. REMOVE LEAK DETECTION IN EACH SECTION OF THE AIR CONDITIONING UNIT. REFER
TO NEW WORK PLANS FOR ADDITIONAL INFORMATION.
9. PROTECT EXISTING TO REMAIN CONDUIT PENETRATIONS DURING REMOVABLE AND
REPLACEMENT OF BLANK OFF PANELS FOR EACH LOUVER.
X
7 7
60"x30" RA(E)
"x
" R
A (E
60"x30" RA(E)
40"x32"
SA(E)
65"x30"
RA (E)
"x
" S
A (E
48"x36"
RA(X)
"x
R A
(E
"x
" R
A (E
60"x26" RA DN(E)
40"x35" SA(E)
56"x20"
SA(E)
7 7 7 7 7 7 7 7
7 7
11"x11" DN (E)
10"x10" RA (E)
UH(E)
MECH EQUIP RM
A150
UH(E) ACU-A-5(X) 1
E-A-7(X)2
UH(E)
E-A-2(X) 250 "x
" R
A (E
4 4
E-A-13(X)2
"x
" R
A (E
L(E) (TYP OF 14)3 L(E) (TYP OF 16)3 L(E) (TYP OF 4)3
3 3 3
CP(E)
CP(E)
E-A-6(X) 2
E-A-3(X)
E-A-8(X) 2
L(E) (TYP OF 3)3
DDC-1(X)
5DDC-3(X)
9 9
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/1
/2
A
P
N
IS
T
B L
D G
R E
P L
A C
E
R E
F U
R B
IS
H
H V
A C
E Q
U
IP
M E
N T
SCALE: 1/8" = 1'-0"
8 8 16
SHEET
IDENTIFICATION
SHEET OF YX
M E
Z Z
A N
IN
E
A
S
U B
M
IS
S
IO
N
/0
/2
K
G
STRUCTURAL ENGINEERING CONSULTANT:
3423 OLNEY-LAYTONSVILLE RD.
SUITE 6
OLNEY, MD 20832
p: 301-570-1460
PROJECT #20-022
S U
B M
IS
S
IO
N
/1
/2
K G
D E
M O
L
IT
IO
N
F L
O O
R P
L A
N
M E
C H
A N
IC
A
L
101-1266
MD-101
AutoCAD SHX Text
NN
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
NN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
UP
AutoCAD SHX Text %%UBUILDING 101 - MEZZANINE MECHANICAL ROOM DEMOLITION PLAN - MECHANICAL DUCTWORK
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
NORTH
ACU-A-1(X)
ACU-A-3(X) ACU-A-4(X)
UH(E)
CP(E)
UH(E)
UH(E)
UH(E)
8" CHWS(E)
8" CHWR(E)
DEMOLITION WORK GENERAL NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM
RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT
INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT
EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR
PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE NIST COR IN
WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION
OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS
PROVIDED
2. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING
REMOVED THROUGH EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER,
THE CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING
& VERIFY ALL REMOVALS, AS SOME DIFFERENCES MAY EXIST.
3. REMOVE ALL MECHANICAL SYSTEMS SHOWN AS BEING DEMOLISHED AND ALL
ASSOCIATED COMPONENTS.
4. CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED
TO COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK
TO MATCH EXISTING CONDITION.
6. CONTRACTOR SHALL VERIFY IN FIELD ALL CRITICAL DIMENSIONS FOR ALL AIR
HANDLERS AND ASSOCIATED PIPING, DUCTWORK AND COMPONENTS. THE
CONTRACTOR SHALL NOTIFY NIST AND A/E PRIOR TO COMMENCING WORK IF THE
EXISTING CONDITIONS PREVENT THE EXECUTION OF THE INTENDED WORK.
7. CONTRACTOR SHALL PROVIDE PRE-DEMOLITION AIR BALANCE OF THE ENTIRE HVAC
SYSTEM PRIOR TO ANY DEMOLITION WORK BEING PERFORMED BASED ON AS-IS
CONDITIONS.
8. ALL EXISTING UNIT HEATERS ARE SERVED BY THE EXISTING HEATING HOT WATER
SYSTEM.
DEMOLITION WORK PLAN NOTES
1. REMOVE AIR CONDITIONING UNIT. HOUSE KEEPING PAD IS EXISTING TO REMAIN.
CONTRACTOR SHALL VERIFY IN FIELD THE CONDITION OF THE PAD AND NOTIFY THE
NIST COR OF THEIR FINDINGS.
2. REMOVE PIPING BACK TO LOCATION INDICATED, AT EXISTING MAIN.
3. REMOVE CONDENSATE PIPING, WHERE APPLICABLE . FLOOR DRAIN IS EXISTING TO
REMAIN. REMOVE LEAK DETECTOR AND REFER TO NEW WORK PLANS FOR
ADDITIONAL INFORMATION. CONTRACTOR SHALL VERIFY PROPER FUNCTIONALITY OF
EXISTING FLOOR DRAIN BY USE OF SEWER SCOPE. CONTRACTOR SHALL DIAGNOSE
ANY POTENTIAL ISSUES AND PROPOSE A SOLUTION TO NIST COR.
X
5" CHWS(E)5" CHWS(E)
5" CHWR(E)
4" LPS(E)
2-1/2"LPC(E)
2" LPC(E)
3" LPS(E)
UH(E)
8" CHWS(E)
8" CHWR(E)
8" LPS(E)
2" LPC(E)
2" LPC(E)
ACU-A-5(X) 1
CP(E)
2 2
ACU-A-6(X) 1
ACU-A-2(X) 1
5" CHWR(E)
5" LPC(E)
5" L
P C
(E
8" C
H W
S (E
8" C
H W
S (E
6" CHWS/R(X)
UH(E)
2 2
4" L
P S
(E
CP(E)
8" L
P S
(E
3" CHWS/R(X)
3 3
LPS(X)
LPC(X)LPC(X) LPC(X)
LPC(X)
LPC(X)
CHWS/R(X) CHWR(X)
LPS(X)
4" DCW(E) DN
4" DCW(E) UP
FD(E) (TYP)
FD(E)(TYP)
FD(E) (TYP)
FD(E)
FD(E)
FD(E)
FD(E)
FD
(E
FD(E)
3 3
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/1
/2
A
P
N
IS
T
B L
D G
R E
P L
A C
E
R E
F U
R B
IS
H
H V
A C
E Q
U
IP
M E
N T
SCALE: 1/8" = 1'-0"
8 8 16
SHEET
IDENTIFICATION
SHEET OF YX
M E
Z Z
A N
IN
E
A
S
U B
M
IS
S
IO
N
/0
/2
K
G
STRUCTURAL ENGINEERING CONSULTANT:
3423 OLNEY-LAYTONSVILLE RD.
SUITE 6
OLNEY, MD 20832
p: 301-570-1460
PROJECT #20-022
S U
B M
IS
S
IO
N
/1
/2
K G
D E
M O
L
IT
IO
N
F L
O O
R P
L A
N
M E
C H
A N
IC
A
L
101-1267
MD-201
AutoCAD SHX Text
NN
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
NN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
UP
AutoCAD SHX Text
%%UBUILDING 101 - MEZZANINE MECHANICAL ROOM DEMOLITION PLAN - MECHANICAL PIPING
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
(E)(E)
(E)
(E)
UH(E)
CP(E)
UH(E)
UH(E)
UH(E)
56"x20" SA(E) 60"x24"
RA(E)
1. PROVIDE AIR CONDITIONING UNIT ON EXISTING HOUSEKEEPING PAD AS SHOWN.
2. PROVIDE EXHAUST FAN AND INERTIA PAD ON EXISTING HOUSEKEEPING PAD.
3. EXISTING TO REMAIN LOUVER. PROVIDE INSECT SCREEN AND BLANK OFF PANEL.
4. PROVIDE DUCTWORK AS NEEDED AND CONNECT TO EXISTING AT LOCATION
INDICATED. CONTRACTOR SHALL MATCH EXISTING DUCTWORK CONNECTION SIZE
AND LOCATION.
5. PROVIDE DDC PANEL, AT LOCATION INDICATED, WITH FREE STANDING UNI-STRUT
FRAME. DO NOT MOUNT DDC PANEL TO ACU CASING. REFER TO CONTROLS
DRAWINGS FOR ADDITIONAL INFORMATION.
6. EXISTING TO REMAIN LOUVER. CONNECT LOUVER TO AIR HANDLING UNIT. PROVIDE
WITH MOTORIZED INTAKE DAMPER, ACTUATOR AND INSECT SCREEN.
7. PROVIDE LEAK DETECTION IN EACH SECTION OF THE AIR CONDITIONING UNIT. REFER
TO CONTROLS DRAWINGS FOR ADDITIONAL INFORMATION.
8. REMOVE EXISTING CONDUITS AND SALVAGE IF POSSIBLE DURING THE REPLACEMENT
OF BLANK OFF PANELS FOR EACH LOUVER. REINSTALL CONDUITS AFTER BLANK OFF
PANEL IS INSTALLED.
60"x30" RA(E)
"x
" R
A (E
60"x30" RA(E)
40"x32"
SA(E)
65"x30"
RA (E)
"x
" S
A (E
48"x36"
RA
"x
R A
(E
"x
" R
A (E
60"x26" RA DN(E)
40"x35" SA(E)
56"x20"
SA(E)
11"x11" DN (E)
10"x10" RA (E)
UH(E)
MECH EQUIP RM
A150
UH(E)
UH(E)
"x
" R
A (E
"x
" R
A (E
TT
T
T
ACU-A-1
E-A-1
ACU-A-3
E-A-3
ACU-A-2
E-A-4 ACU-A-4
ACU-A-5
E-A-5
L(E) L(E) L(E) L(E) L(E) L(E)L(E) L(E)
L(E)L(E)
L(E) L(E)
L(E) (TYP OF 6) L(E) (TYP OF 10) L(E) (TYP OF 13) L(E)
L(E) (TYP OF 14) L(E) (TYP OF 16) L(E) (TYP OF 4)
E-A-6
E-A-7
E-A-13
E-A-2
E-A-8
6 6 6 6 6 6 6 6 6 6
6 6
3 3
1 2 1
4 4
CP(E)
NEW WORK GENERAL NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM
RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT
INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT
EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR
PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE COR IN
WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION
OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS
PROVIDED.
2. DUCTWORK AND PIPING SHALL NOT BE LOCATED ABOVE ELECTRICAL PANELS OR
EQUIPMENT.
3. CONTRACTOR SHALL VERIFY IN FIELD ALL CRITICAL DIMENSIONS FOR ALL AIR
CONDITIONING UNITS AND ASSOCIATED PIPING AND DUCTWORK. THE CONTRACTOR
SHALL NOTIFY THE COR AND A/E PRIOR TO COMMENCING WORK IF THE EXISTING
CONDITIONS PREVENT THE EXECUTION OF THE INTENDED WORK.
NEW WORK PLAN NOTES X
M-501
M-501
M-501
M-501
M-501
M-501
ACU-A-61
CP(E)
H-A-3
L(E) (TYP OF 3)3
8 8
DDC-1
DDC-3
60"x24"
RA(E)
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/1
/2
A
P
N
IS
T
B L
D G
R E
P L
A C
E
R E
F U
R B
IS
H
H V
A C
E Q
U
IP
M E
N T
SCALE: 1/8" = 1'-0"
8 8 16
SHEET
IDENTIFICATION
SHEET OF YX
M E
Z Z
A N
IN
E
A
S
U B
M
IS
S
IO
N
/0
/2
K
G
STRUCTURAL ENGINEERING CONSULTANT:
3423 OLNEY-LAYTONSVILLE RD.
SUITE 6
OLNEY, MD 20832
p: 301-570-1460
PROJECT #20-022
S U
B M
IS
S
IO
N
/1
/2
K G
N E
W W
O R
K F
L O
O R
P L
A N
M
E C
H A
N
IC
A L
101-1268 M-101
AutoCAD SHX Text
NN
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
NN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
UP
AutoCAD SHX Text
%%UBUILDING 101 - MEZZANINE MECHANICAL ROOM NEW WORK PLAN - MECHANICAL DUCTWORK
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
6" CHWS/R
ACU-A-1
ACU-A-3 ACU-A-4
UH(E)
CP(E)
UH(E)
UH(E)
UH(E)
8" CHWS(E)
8" CHWR(E)
1. PROVIDE AIR CONDITIONING UNIT.
2. PROVIDE PIPING TO LOCATION INDICATED AND CONNECT TO EXISTING PIPING MAIN.
3. PROVIDE 1" DCW PIPING AND ROUTE TO HUMIDIFIER GENERATOR H-A-3. PROVIDE
WITH WATER FILTER, WATER SOFTENER AND BACKFLOW PREVENTER. REFER TO
MECHANICAL DETAILS AND SCHEDULES FOR ADDITIONAL INFORMATION.
4. PROVIDE 1" DRAIN PIPE FROM HUMIDIFIER AND PROVIDE WITH DRAIN COOLER, AND
ROUTE TO EXISTING FLOOR DRAIN AS INDICATED.
5. PROVIDE LEAK DETECTION AT LOCATION INDICATED. REFER TO CONTROL DRAWINGS
FOR ADDITIONAL INFORMATION.
6. PROVIDE LOW PRESSURE CONDENSATE PIPING AND ROUTE THROUGH ACU CASING IN
BULKHEAD SO THAT PIPE IS NOT WITHIN THE AIR STREAM.
5" CHWS(E)5" CHWS(E)
5" CHWR(E)
4" LPS(E)
2-1/2" LPC (E)
3" LPS(E)
UH(E)
8" CHWS(E)
8" CHWR(E)
8" LPS(E)
2" LPC(E)
2" LPC(E)
ACU-A-5
CP(E)
ACU-A-6
ACU-A-2
5" CHWR(E)
5" LPC(E)
5" L
P C
(E
3" LPS
2" LPC
2" CD
3" CHWR
3" CHWS
2" LPC(E)
4" C
H W
S
4" C
H W
R
NEW WORK GENERAL NOTES
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM
RECORD DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT
INDICATE ACTUAL EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE
CONTRACTOR IS STRONGLY ENCOURAGED TO VISIT THE SITE AND VERIFY EXACT
EXISTING CONDITIONS PRIOR TO THE FABRICATION OR ORDER OF EQUIPMENT OR
PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE COR IN
WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT THE EXECUTION
OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION IS
PROVIDED.
2. DUCTWORK AND PIPING SHALL NOT BE LOCATED ABOVE ELECTRICAL PANELS OR
EQUIPMENT.
3. CONTRACTOR SHALL VERIFY IN FIELD ALL CRITICAL DIMENSIONS FOR ALL AIR
HANDLERS UNITS AND ASSOCIATED PIPING AND DUCTWORK. THE CONTRACTOR
SHALL NOTIFY THE COR AND A/E PRIOR TO COMMENCING WORK IF THE EXISTING
CONDITIONS PREVENT THE EXECUTION OF THE INTENDED WORK.
NEW WORK PLAN NOTES X
2 2" LPC
2" C
D
8" L
P S
(E
8" C
H W
S (E
8" C
H W
S (E
4" C
H W
S
4" C
H W
R
2 2" LPC
8" LPS(E)
24" LPS
2" C
D 4"
C H
W S
4"CHWR
22" LPC
2" C
D
4" C
H W
S
4" C
H W
S
2" C
D
2 2" LPC
24" LPS
4" L
P S
(E
23" LPS
2 3" CHWS/R
UH(E)
2 2" LPC
2" CD
CP(E)
24" LPS
3" CS
H-A-3
1-1/2"LPC
1" LPS
4" L
P S
4" DCW(E) DN
4" DCW(E) UP
31" DCW TO
H-A-3
1" DCW
FD(E)(TYP)
FD(E) (TYP)
FD(E)
FD(E)
FD(E)
FD(E)
FD
(E
FD(E)
FD(E)
UH(E)
1" D 4
5 5
FD(E)
2" L
P C
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/1
/2
A
P
N
IS
T
B L
D G
R E
P L
A C
E
R E
F U
R B
IS
H
H V
A C
E Q
U
IP
M E
N T
SCALE: 1/8" = 1'-0"
8 8 16
SHEET
IDENTIFICATION
SHEET OF YX
M E
Z Z
A N
IN
E
A
S
U B
M
IS
S
IO
N
/0
/2
K
G
STRUCTURAL ENGINEERING CONSULTANT:
3423 OLNEY-LAYTONSVILLE RD.
SUITE 6
OLNEY, MD 20832
p: 301-570-1460
PROJECT #20-022
S U
B M
IS
S
IO
N
/1
/2
K G
N E
W W
O R
K F
L O
O R
P L
A N
M
E C
H A
N
IC
A L
101-1269 M-201
AutoCAD SHX Text
NN
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LL
AutoCAD SHX Text
SS
AutoCAD SHX Text
AutoCAD SHX Text
NN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
UP
AutoCAD SHX Text
%%UBUILDING 101 - MEZZANINE MECHANICAL ROOM NEW WORK PLAN - MECHANICAL PIPING
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
AutoCAD SHX Text
PLAN VIEW
PLAN VIEW
7' -7
3'-11"
ELEVATION
SUPPLY FAN
C O
O
LI
N G
C O
IL
S
H E
A
TI
N G
C O
IL
S
RA(E)
HOUSE KEEPING PAD
8"
FLEX CONNECTION
(TYP.)
56"x20" SA (E) 60"x24" RA (E)
2" LPC (E)
2" LPC
3" LPS
3" LPS
3" CHWS 3" CHWR
9' -2
30'-8"
OUTSIDE AIR
RETURN AIR
MIXING
ST
EA
M C
O
IL
S
PR
EF
IL
TE
R
FI
LT
ER
ACCESS DOOR(TYP)
PR
EF
IL
TE
R
FI
LT
ER
8' -4
9' -1
1"
PLAN VIEW
ELEVATION
29'-71 16"
C H
IL
LE
D W
AT
ER
C O
IL
S
OUTSIDE AIR
RETURN AIR
MIXING
ST
EA
M C
O
IL
S
FI
LT
ER
PR
EF
IL
TE
R
60"x25" RA(E)
PR
EF
IL
TE
R
FI
LT
ER
SUPPLY FAN
SUPPLY FAN
50"x30"
SA (E)
C H
IL
LE
D W
AT
ER
C O
IL
S
ST
EA
M C
O
IL
S
2" LPC5" LPC (E)
3" CHWS
3" CHWR
3" LPS
8' -7
PLAN VIEW
ELEVATION
33'-103 16"
C H
IL
LE
D W
AT
ER
C O
IL
S
'-1
0"
ST
EA
M C
O
IL
S
PR
EF
IL
TE
R
FI
LT
ER
56"x20" SA (E)
65"x30" RA (E)
FI
LT
E R
S
P R
E
FI
LT
E
R S
SUPPLY FAN
4" CHWR
4" CHWS
4" LPS
2" LPC (E) 2" LPC (E)
C H
IL
LE
D W
AT
ER
C O
IL
S
ST
EA
M C
O
IL
S
8' -4
'-3
31'-113 16"
31'-113 16"
C H
IL
LE
D W
AT
ER
C O
IL
S
OUTSIDE AIR
RETURN AIR
MIXING
ST
EA
M C
O
IL
S
PR
EF
IL
TE
R
FI
LT
ER
8' -1
0"
'-6
ELEVATION
30'-0"
C H
IL
LE
D W
AT
ER
C O
IL
S
OUTSIDE AIR
RETURN AIR
MIXING
ST
EA
M C
O
IL
S
FI
LT
ER
PR
EF
IL
TE
R
7' -1
0"
'-5
32'-6"
32'-6"
C H
IL
LE
D W
AT
ER
C O
IL
S
OUTSIDE AIR
RETURN AIR
MIXING
ST
EA
M C
O
IL
S
PR
EF
IL
TE
R
FI
LT
ER
SUPPLY FAN
C H
IL
LE
D W
AT
ER
C O
IL
S
ST
EA
M C
O
IL
S
PR
EF
IL
TE
R
FI
LT
ER
OUTSIDE AIR
RETURN AIR
MIXING
SA (E)
4" CHWS 4" CHWR
4" LPS
2" LPC THROUGH
UNIT CASING IN
BULKHEAD
SUPPLY FAN
PLAN VIEW
ELEVATION
SUPPLY FAN
SUPPLY FAN
11'-2"
60"x30"
RA (E)
PLAN VIEW
ELEVATION
4" CHWS
4" CHWS
4" CHWR
C H
IL
LE
D W
AT
ER
C O
IL
S
ST
EA
M C
O
IL
S
FI
LT
ER
PR
EF
IL
TE
R
2" LPC
4" LPS
SUPPLY FAN
SUPPLY FAN
C H
IL
LE
D W
AT
ER
C O
IL
S
ST
EA
M C
O
IL
S
PR
EF
IL
TE
R
FI
LT
ER
40"x32" SA (E) 60"x30" RA (E)
4" CHWR
4" CHWS
2" LPC
4" LPS
REMOVABLE
PANEL (TYP)
OUTSIDE AIR
RETURN AIR
MIXING
40"x35" SA (E)
SA (E)
60"x30"
RA (E)
H U
M
ID
IF
IE
R
3" CS
L(E)
L(E)
L(E)
L(E)
24'-8"
H U
M
ID
IF
IE
R
8"8"
8"8"8"
A C
C E
S S
D O
O R
1 AIR CONDITIONING UNIT (ACU-1) DETAIL
SCALE: 1/4" = 1' - 0"
5 AIR CONDITIONING UNIT (ACU-5) DETAIL
SCALE: 1/4" = 1' - 0"
3 AIR CONDITIONING UNIT (ACU-3) DETAIL
SCALE: 1/4" = 1' - 0"
6 AIR CONDITIONING UNIT (ACU-6) DETAIL
SCALE: 1/4" = 1' - 0"
4 AIR CONDITIONING UNIT (ACU-4) DETAIL
SCALE: 1/4" = 1' - 0"
2 AIR CONDITIONING UNIT (ACU-2) DETAIL
SCALE: 1/4" = 1' - 0"
25'-3"
26'-8"
L(E)
L(E) L(E)L(E)
L(E)L(E)L(E)L(E)
25'-0"
C O
O
LI
N G
C O
IL
S
2" CDFD (E) 2" CDFD (E)
2" CD
FD (E)
2" CDFD (E)
2" CD
FD (E)
2" CDFD (E)
21'-43 4"
21'-33 4"
ACCESS DOOR(TYP)
REMOVABLE
PANEL (TYP)
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E B
G
S
U B
M
IS
S
IO
N
/1
/2
A
P
N
IS
T
B L
D G
R E
P L
A C
E
R E
F U
R B
IS
H
H V
A C
E Q
U
IP
M E
N T
2 0
SCALE: 1/4" = 1'-0"
4 4 8
SHEET
IDENTIFICATION
SHEET OF YX
M E
Z Z
A N
IN
E
A
S
U B
M
IS
S
IO
N
/0
/2
K
G
STRUCTURAL ENGINEERING CONSULTANT:
3423 OLNEY-LAYTONSVILLE RD.
SUITE 6
OLNEY, MD 20832
p: 301-570-1460
PROJECT #20-022
S U
B M
IS
S
IO
N
/1
/2
K G
D E
T A
IL
S
M
E C
H A
N
IC
A L
101-1270 M-501
1 TYPICAL RETURN FAN DETAIL
SCALE: NOT TO SCALE
FAN WHEEL
ISOLATION BASE RAIL
NOTES:
(1) CONTRACTOR SHALL COORDINATE THE FAN ORIENTATION, CONFIGURATION, MOTOR POSITION
AND SUPPORTS WITH MANUFACTURER, MECHANICAL SCHEDULES AND EXISTING CONDITIONS.
FAN DISCHARGE
FAN MOTOR
BELT GUARD
FAN INLET
FAN MOTOR
FAN SHAFT
FRONT VIEW SIDE VIEW ISOMETRIC VIEW
"A"
SECTION "A"
2 VIBRATION ISOLATION DETAIL
SCALE: NOT TO SCALE
SET ANCHOR BOLTS
PER EQUIPMENT
REQUIREMENTS
8" THICK REINFORCED
CONCRETE BLOCK
(4000 PSI)
2" OPERATING
CLEARANCE
EQUIPMENT BASE
6" BEYOND EQUIPMENT
IN EACH DIRECTION
UNHOUSED SPRING
MOUNTED w/ HEIGHT
SAVING BRACKET
5/8"Ø REBARS
NON-SKID NEOPRENE
ACOUSTIC ISOLATION PAD
BLOCK CONFIGURATION
TO SUIT EQUIPMENT AS
REQUIRED
EXISTING HOUSE
KEEPING PAD
NUMBER OF RECESSES AS
RECOMMENDED BY
EQUIPMENT MANUFACTURER
BELT AND GUARD
FAN DISCHARGE
BASE RAIL
INERTIA PAD
VIBRATION ISOLATORS
EXISTING HOUSE
KEEPING PAD
ACCESS DOOR
CAULK BY GC
WALL
PROVIDE ANGLES AT TOP AND SIDES
CONTINUOUS SEAL, AIR & WATER TIGHT
CAULK BY GC
(NOTE 3)
NOTES:
1. PLENUM CONNECTION TO LOUVER IS SIMILAR.
2. BOTTOM OF DUCT TO BE COMPLETELY OVERLAPPED WITH TURN-UP. DRILL TURN-UP PRIOR TO
INSTALLING SELF TAPPING SCREW TO ENSURE DUCT IS DRAWN TIGHT TO TURN-UP.
3. MINIMUM 4" SCREW CONNECTION CLEARANCE.
4. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
SILL/FLASHING
WITH 2" TURN-UP,
END DAMS AND
DRIP BY GC
1/4" THICK PLASTIC SIM OR
SPACER BY GC
(NON-CONTINUOUS TO
ALLOW MOISTURE WEEP)
LOUVER AND
BIRD SCREEN
BY GC
CONNECTION
TYPICAL FOR
TOP AND SIDES
SCREWS TO BE
12" ON CENTER
DAMPER WHERE SPECIFIED
STAINLESS STEEL SELF TAPPING SCREWS AT 12" MAX. ON CENTER.
FIRST AND LAST SCREWS TO BE 3" FROM END. (SEE NOTE 2)
3 DUCT CONNECTION TO LOUVER DETAIL
SCALE: NOT TO SCALE
MOTOR ACTUATOR OUTSIDE OF DUCTWORK
4 MOTOR OPERATED DAMPER DETAIL
SCALE: NTS
NOTES:
1. MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE
STRICTLY ADHERED TO.
2. MECHANICAL LINKAGE TO OPERATE DAMPER BLADES ARE
INTERNAL TO DAMPER AND THEREFORE NOT SHOWN.
DAMPER BLADE, WITH NEOPRENE GASKETING
FOR NO LEAK RATING
ACCESS DOOR (SIDE OR BOTTOM
LOCATION AS REQUIRED)
MEP CONSULTANTS
20251 Century Blvd #120
Germantown MD 20874 p: 877-871-4229 F: 301-560-6336
INFO@cfrengineering.com
PROJECT #20078
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K A
P P
R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T
E D
B Y
P L O
T S
C A
L E
IS
S U
E D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
D A
T E
A P
P R
N
IS
T
O F
P M
G A
IT
H
E R
S B
U R
G
M D
C F
R E
N G
IN
E
E R
IN
G
C
E N
T U
R Y
B L
V D
S
U
IT
E
G E
R M
A N
T O
W N
M
D
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
N D
D N
B
N /A
/0
/2
M M
/P T
S
/0
/2
A N
S I
E
:1M
M
IT
T A
L
K C
/E B
G
K C
/E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .