Government RFI Responses - 1333ND24RNB190036.pdf

PDF 89 KB Posted

Attached to
Building 101 HVAC Tower Renovation Federal contract opportunity
Solicitation number
1333ND24RNB190036
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Questions and Answers (RFI Responses) document for solicitation 1333ND24RNB190036, a Building 101 Tower HVAC Renovation project at NIST Gaithersburg. The document contains 114 questions and government responses regarding technical requirements, scheduling, and contract terms.

Key details from the responses: The project involves replacing six Air Conditioning Units (ACUs) with an estimated value between $5M-$10M. Only one ACU can be offline at a time, with a maximum outage of 72 working hours per unit. The basis of design requires units to be replaced over weekends (Friday 5pm to Monday 6am). Either Siemens or Alberio are acceptable DDC contractors. The project includes asbestos abatement work. The building is considered historic, so no modifications to the exterior are allowed. The contract includes two pricing options - normal business hours (6am-6pm M-F) and after-hours work. Proposals are due by 1:00 pm ET on March 11, 2025. The period of performance is 365 calendar days after Notice to Proceed.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B302 Major Equipment Upgrades RFI Responses RFP - 1333ND22QNB190072

# ----------- RFI Comment ----------- ------ RFI Answer ------- 1 The specification for this project calls out that all controls will be existing to remain, with modifications made as necessary. Are you able to confirm that the control panels being modified for these units are Alerton panels?

They are Alerton panels. See 230923 NIST Specific DDC Specification.

2 What is the order of magnitude for this project? The rough order of magnitude is between $5M and $10M.

3 Reference Drawing M-703 or 101-1287. Points list, general note #1 states “all points are existing to remain and shown for reference only”. During the site walk on 2/13, the AC units utilize a lot of pneumatic controls and aging end devices. Is the intent to provide new controls and replace the pneumatic control devices for each unit?

Use existing points, but replace pneumatic with digital controls

4 Reference NIST Specific DDC Specifications 230923-10. Please confirm if Siemens is an acceptable BAS controls bidder for the NIST Gaithersburg Building 101 HVAC

Replacement _ Mezzanine A Wing? Siemens is performing control work in building

101 now and the new Siemens ACU controllers for the A Wing will tie into the existing

Siemens system on the NIST campus wide DDC network.

Either Siemens or Alberio are acceptable DDC contractor

5 When the existing ACUs are demoed/removed, the existing water leak detection system and conduits attached to the units will also need to be removed. Do you require new water leak detectors for each unit or make safe and re-use the existing water leak detectors?

Reuse and salvage, if damaged during demo contractor required to replace in-kind

6 Project forms, such as Attachments 6 and 8, are set outside the required one-inch margins for this submission. Are these forms exempt from the margin limitation? Is the required 11x17 schedule required for Factor 4 also exempt from the margin limitation

– as schedules typically don’t not apply to this limitation and typically will not display as well with a one-inch margin requirement?

Government provided forms (ex. Attachments 5 and 8) and offeror schedules submitted for Factor 4 are exempt from the one-inch margin limitation.

7 There are Louvers that could potentially be removed along with a CMU column that divides the louvers to create an opening for demolition activities as well as bringing in new pieces of equipment. Can the CMU columns between the Louvers be removed for easier access to the space?

Louvers can be removed. Louvers are historic and must be replaced with existing.

CMU columns are not to be removed. Basis of design unit was sized for bringing all pieces through the elevator, and building on site. All modifications to exterior profile must meet historic requirements 8 The existing piping does not fully match the printed set of drawings. Is there an As-Built set of drawings that captures the correct routing and valve placements that can be provided?

See attached.

9 Seeing the condition and location of the piping and valves, there may need to be other shutdowns to move sections of piping, relocating valves, and replacing valves. Most of the valves are Gate Valves from the original project. Is it know if these valves will hold pressure?

NIST cannot confirm, but will work during project to assist in the shutdown of building utilities if needed.

10 A second walk (Full Day) would be needed to create an actual plan for this work and identify what other mechanical equipment may need to be touched that is not in the scope. Can a second longer site visit be provided?

No.

11 On the North and South side of the Mezzanine Mechanical room there is a roof (Partial roof on North side). If the Louvers and CMU columns can be removed, what is the weight rating of the roof structure?

Loads are found on drawing 101-1263. A contractor supplied structural engineer will be required to sign off on. CMU Columns are not to be removed as they are historic and structurally significant

12 If the weight rating of the roof is not sufficient can a platform that is structurally designed be installed to get old equipment out and new equipment in safely?

See above

13 There looks to be possible Asbestos Insulation used on the piping, as well as Lead paint on the original AHU’s. Please confirm if this is accurate. If it is please confirm if the abatement scope should be priced as part of the project.

Abatement is listed in SOW and is in the specs.

14 Because of the aggressive phasing needs, tight working conditions, and minimal shut down period.. consecutive day and night shifts will be needed for each AHU and associated return fan. (Drawing 101-1265, Mechanical Phasing Notes: Line 5. A, B, C, D)

Not a question

15 All new piping will most likely need to be fabricated on-site. Not a question

16 There are some removable doors/panels that could be removed as well that lead out to the roof. Dimensions are: 104” Height X 42” Width

Not a question

17 Does the CHW System Contain Glycol? No

18 Can more than one or all AHUs be shut down on any specific days of the year? NIST prefers to have only one unit down at a time, but nights, weekends, and holidays are opportunities for limited shutdowns of multiple units

19 It will be impossible to remove and existing air handler giving the tight spaces / existing conditions and reinstall a new custom air handler including all sections and associated electrical scope over one weekend. A more accurate phasing plan needs to be developed with accurate durations. Based upon our onsite observations each air handler will need to be down for approximately one week at least (pending final schedule). Please advise if this will be acceptable.

The basis of design was for one weekend and manufacturer confirmed units can be built in one weekend. Prep work and minor demo can be done prior to the weekend to assist with schedule crunch.

20 Please advise if a bid extension can be provided. Due date is extended to 1:00 pm ET, March 11, 2025.

Government RFI Responses

1333ND24RNB190036

Building 101 Tower HVAC Renovation

Printed Date: 3/6/2025 11:24 AM Page 1 of 6 Government RFI Responses - 1333ND24RNB1900036.xlsx

21 Give the extremely tight spaces is there an adjacent space the new air handlers could be located in lieu of the current locations? If so, this could help to dramatically reduce any downtime as all utilities could be piped prior to cutover to the new ahu locations.

Minor outages and utility work can occur be scheduled prior to taking units fully offline.

22 Please provide a point of contact for the existing fire alarm system manufacturer and maintenance provider.

Simplex/JCI

23 Please provide the manufacturer for motor control center A1 and motor control center

A2.

We will look

24 Is it anticipated that Sprinkler Modifications will be required to accommodate the

HVAC Equipment.

Not planned, but will be accommodated if needed.

25 Reference Work Order #883. Work order notes ductwork/piping insulation as possible

ACM. As well as plaster and other materials. The GC will provide a qualified professional to sample and test for ACM and remove in accordance. We will not know the extent of our asbestos removal until an accurate report has been generated of all areas. Please confirm.

See attached.

26 We have received completed Government past performance questionnaires from recent similar projects and proposals. Will NIST please allow these previously completed Government past performance questionnaires to be submitted to meet the requirements in Evaluation Factor 3:Past Performance in lieu of completing the NIST provided Past Performance Questionnaire?

The Government will review an Offeror's following submissions:

1. CPARS reports for projects completed for the Federal Government, and;

2. Customer completed Past Performance Questionnaires for project where no

CPARS is available.

27 The MCC is very outdated, during the walk our contractors were not able to see any model numbers for the buckets to be replaced, or the amperages for the exhaust fans of buckets being retro fitted. Is it possible for someone to provide this information?

Check design documents, plan to switch all HVAC to VFD.

28 Our suppliers are concerned about the MCC and the ability to find retro kits. Is a total

MCC replacement possible?

Check design documents, plan to switch all HVAC to VFD.

29 The Mechanical Phasing Notes on sheet 101-1265 outline a schedule in which one whole unit and all its components needs to be demolished and replaced so that it is fully operational between Friday at 5pm and Sunday at midnight. After discussion with our mechanical contractors it was determined this would be near impossible to meet.

Major reasons include: Space limitations making loading and unloading material a challenge, as well as limiting man power capabilities. Pouring and curing the concrete for inertia pads as outlined with detail 2 on 101-1271. The ACU's will have to be assembled inside due to space limitations. Asbestos containing material. Etc. Is an alternate phasing schedule possible?

The basis of design was for one weekend and manufacturer confirmed units can be built in one weekend. Prep work and minor demo /abatement can be done prior to the weekend to assist with schedule crunch.

30 The way the Contract Line Items read. It looks as though we are to provide one price for performing the entirety of the project during normal work hours. Then another price to complete the project after hours. I assume this after hour pricing is to be in accordance with the mechanical phasing notes on sheet 101-1265. Please confirm we are in accordance with how you expect pricing. One price to perform the job normally, one price in accordance with phasing requirements (although per RFI 6 we are noting this phasing requirements are unlikely to be achieved. If an alternate phasing is possible, we would price these CLIN' in accordance with new phasing)

Yes. One set of CLINs is price for normal business hours 6-6 (M-F) for the majority of unit down time, some out of hours may still be required. Second set of CLINs is pricing per design drawing phasing.

31 In statement of work it says the design scope is to replace/ refurbish and preserve the ACUs shell and replace the internal components and update the DDC systems to interconnect to with the facility DDC systems. In the drawings and included schedules, the ACU's are to be replaced. Please confirm we are replacing entire ACU's and not just replacing internal components. If we are replacing internal components, we will need as built drawings / submittals that have make and model of old ACU's

Design decision was to replace the units in total. That language in the Design SOW is no longer relevant

32 Is there an existing controls contractor for the building or person that has the facility DDC system? If so, who is this person.

Siemens/Alberio

The project references a temporary heating and cooling system. Please confirm this is for the entirety of building areas that will be shutdown due to our replacement work if we perform the job during normal hours.

Only one unit at a time can be shutdown during normal business, units supply sections of the building. Scheduling and phasing to be determined with awarded contractor. Building areas will not be shutdown during working hours. Temp units will be needed, NIST will allow and suggest using ACU A2 as the temp unit as that unit does not supply an office or continuously occupied area and can be used to temporarily supply the other areas 34 The plan to stage equipment and load into the mezzanine area is to build a crib on the low roof beside the mezzanine area, then knock down a wall/vents (most likely north wall near

ACU-A1 due to spacing constraints) to build a temporary entryway. Please confirm this is acceptable or provide alternative.

Alternatives can be discussed with awarded contractor.

35 Reference Work Order #883. Noted in work order is " All work over 80 DBA must occur after hours". A handheld drill typical operates at 80-90 dba. This will make a huge portion of the demolition and replacement non-performable during normal operating hours. Please confirm for our normal operating hours CLIN we are not to consider this factor.

Contractor to mitigate sound. NIST will provide notice to occupants of work occurring during normal working hours.

36 Is there an asbestos survey for this project? See attached.

Printed Date: 3/6/2025 11:24 AM Page 2 of 6 Government RFI Responses - 1333ND24RNB1900036.xlsx

37 Reference: RFP, Page 46, 2.b.i “Offeror shall submit a maximum of five projects”.

Question: Please clarify if there is a minimum number of projects that are required to be submitted, since the maximum number of projects that will be accepted is five.

The Government will evaluate a maximum of five projects. An Offeror with more relevant experience will be evaluated more favorably than Offerors with less relevant experience.

38 Reference: RFP, Page 46, 2.b.ii.1 “Project completed within the previous five (5) years from the date of this solicitation, exclusive of the warranty period.”

Question: Will the Government consider extending the time of projects to six years from the date of the solicitation instead of five?

No.

39 Reference: RFP, Page 46, 2.b.ii.1 “Project completed within the previous five (5) years from the date of this solicitation, exclusive of the warranty period.”

Question: Will the Government consider extending the time of projects to seven years from the date of the solicitation instead of five?

No.

40 Reference: RFP, Page 46, 2.b.ii.4) “Offeror must have performed as either the prime or subcontractor.”

Question: Will Joint Venture offerors submitting projects performed under a previous

Joint Venture held by the two Joint Venture partners be acceptable?

Offerors must have performed as either the prime or subcontractor. All experience must have been performed by the Offeror.

41 Reference: RFP Page 48, d.ii “Offeror shall submit a preliminary schedule highlighting the tasks for completing the project. The schedule shall show the duration of tasks in days.”

Question: Please clarify whether the days featured in the schedule are calendar days or workdays.

Calendar days

42 Reference: Site Conditions

Question: Can we be provided with Structural and MEP as-built drawings.

Attached

43 Reference: Personnel

Question: Please confirm that the Site Superintendent can also be a QCM and Site

Safety Office (Triple Hat).

Site superintendent must be a dedicated position. QCM and Safety officer can be combined but separate from superintendent.

44 Reference: Personnel

Question: Please confirm that the government will only need 1 group of personnel on site.

Please clarify

45 Reference: General

Question: Is the contractor allowed to work in multiple locations concurrently or does it need to be by phase?

Contractor is allowed to work in multiple locations on prep tasks, but the taking offline of the AHUs must be phased.

46 Reference: Period of Performance – Statement of Work Page 7

Question: Paragraph 9.2 says “Period of Performance for this SOW shall be 365 days after notice to proceed but no later than January 01, 2026.” Please confirm that the

Period of Performance is 365 calendar days from NTP and nullify the January 01, 2026, as mandatory finish date.

The period of performance is 365 calendar days after issuance of Notice to Proceed.

47 Reference: Third Party Testing & Inspection

Question: Please confirm that third party testing & inspection is not required.

Contractor is responsible for TAB, NIST will provide a Commissioning Agent.

Contractor is responsible for assisting with commissioning per Specs.

48 Reference: Toilet

Question: Will NIST allow the workers/staff/personnel to use the public toilet facilities?

All Contractors are allowed to use the bathrooms on the first floor and basement of

B101. Certain badges will be required for access to other bathroom locations

49 Reference: Hazmat Testing & Abatement

Question: Please confirm that any Hazmat testing & abatement, if required, is by others and not the responsibility of the awarded contractor.

Abatement is listed in SOW and is in the specs.

50 Reference: Noise

Question: Is there any noise requirement for this project?

See RFI 35

51 Reference: Citizenship

Question: Please confirm that non-US Citizen but legal workers/green card holders can work for this project?

Permanent residents are allowed

52 Reference: Temporary Field Office/Trailer

Question: Does the government require a Temporary Field Office?

There is no requirement from the government.

53 Reference: Parking

Question: Will parking be available for the superintendent free of charge? Please advise

Parking lots are free throughout the Gaithersburg campus

54 Reference: Laydown & Staging

Question: Will the government provide space for laydown & staging area?

Space to be determined with awarded contractor. Please refer to updated contractor Guidelines documents

55 Reference: 101-1266 – Note 3

Question: Can we remove existing louvers to use as access? If yes, can we be provided with dimensions of existing louvers?

Yes, louvers are roughly 4'x9'

56 Reference: General

Question: Do the workers need to get escorted during the period of performance?

Yes. Workers on certain badges types will require an escort. Contractors are encourage to obtain badges that allow for unescorted work. Comply with updated guidelines

57 Reference: General

Question: Please confirm that escorts, if needed, are free of charge to the awarded contractor.

Contractor is responsible for escorts. Contractors may take escort training to act as an escort at NIST. This is encouraged for all key personnel for the contractor. This training is free of charge, online, and takes about an hour

Printed Date: 3/6/2025 11:24 AM Page 3 of 6 Government RFI Responses - 1333ND24RNB1900036.xlsx

58 Reference: General

Question: Will the room be operational/occupied during the period of performance?

The mechanical room is not an occupied space. NIST maintenance employees may sparingly entering the space to work on other equipment.

59 Reference: 101-1266

Question: How long (max. time) exhaust fan/s could stay not operational?

Coordinate with AHU outages.

60 Reference: General

Question: Will the project duration and liquidated damages, if any, be extended due to global supply chain issues that are outside of contractor’s control?

Yes. Per FAR 52.249-10 Default (Fixed-Price Construction), The Contractor’s right to proceed shall not be terminated nor the Contractor charged with damages under this clause, if delays of subcontractors or suppliers at any tier arise from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and the subcontractors or suppliers.

61 Reference: General

Question: Can we be provided with a complete number of rooms/locations/total area where each AHU is serving to?

A1=Basement security office Approx. 15,500Sqft A2= 1st floor lobby and awing hallway approx. 17,000sqft A3=West end of tower 2-11 floors Approx. 23,000 Sq ft

A4= North side of tower 2-11 floor approx. 18,700 sqft A5=south side of tower and hallway 2-11 approx. 23,500 sqft. A6= East end of tower floors 2-11 approx. 23,500 sq ft 62 Reference: 101-1265 – Note 4

Question: Please affirm that we can only replace one AHU at a time.

Only one AHU can be offline at time. But AHU A2 can be used a temp unit or swing unit to supply air in substitution to the unit being replaced

63 Reference: 101-1265

Question: Mechanical Phasing Note 5 says “The contractor shall complete the replacement of one (1) air conditioning system and associated return fan work over the course of one (1) weekend.” Given the existing conditions, we believe this is not achievable as demo and abatement alone could take a minimum of 21 calendar days.

Can we be provided with a more feasible and acceptable outage duration?

Basis of design phasing plan is the plan for construction is over one weekend. Minor demo, prep work, and abatement can be scheduled and completed prior to complete demo and replacement weekend

64 Reference: Controls Vendor

Question: Please provide the name and contact information of the existing controls vendor.

Siemens/Alberio

65 Reference: Commissioning Agent

Question: Please confirm that hiring a Commissioning Agent is responsibility of the government.

Yes.

66 Reference: General

Question: Will there be room available for connex placement? If yes, please provide the location.

Site coordination plan will need to be approved after contract award. Space to be determined, may not be adjacent to B101. See updated guidelines

67 Reference: 101-1268

Question: The existing units, piping, and ducting are painted. Do the new units need to be painted to match? What is the color code? There are many areas where paint is deteriorated, will this need to be refinished?

No. Manufacturers finishes are required.

68 Reference: 101-1268

Question: Can there be any modifications made to the exterior of the building to allow for access to bring in the new equipment? If yes, can we be provided with location and the type or configuration of the existing wall?

No. Modifications can not be made as building is considered historic

69 Reference: Attachment 1, Page 30; Attachment 2, Pg 8, 1.4.A

Question: Attachment 1, Page 30, states “the design scope is to replace/refurbish fans and preserve the ACU’s shell and replace all the internal components and update the

DDC system” Attachment 3, Page 8 states “Replacement of ACU’s serving Bldg. 101 located in the mezzanine level of A wing”. Which of these are correct?

Design decision was to replace the units in total. That language in the Design SOW is no longer relevant

70 Reference: General

Question: In statement of work it says the design scope is to replace/ refurbish and preserve the ACUs shell and replace the internal components and update the DDC systems to interconnect to with the facility DDC systems

Are we just replacing the internal components or are these to be new units as noted in schedule?

If these are to be refurbished, can we get the as-builts drawings that should have the make and model or are there any old submittals that we can get?

Design decision was to replace the units in total. That language in the Design SOW is no longer relevant

71 Reference: General

Question: Who is the control contactor for the building or person that has the facility

DDC system?

See above

72 Reference: General

Question: It’s unclear on how we are to bid this project

CLIN#1-#6 are to be regular hours, 5 days a week (40 hour week), correct?

CLIN#7-#12 wants off-hours, is that to have a unit done in that time frame or is that just for working onsite on off-hours?

Yes. One set of CLINs is price for normal business hours 6-6 (M-F) for the majority of unit down time, some out of hours may still be required 40 hours is the minimum.

Second set of CLINs is pricing per design drawing phasing, units are only allowed to be down in the overnight/weekend, other prep work with unit running can be done during working hours

73 Reference: General

Question: The time frame for this project doesn’t look to be enough time, can this be changed?

No

Printed Date: 3/6/2025 11:24 AM Page 4 of 6 Government RFI Responses - 1333ND24RNB1900036.xlsx

74 Reference: : General

Question: Will the areas affected by the ACU being down for a length of time be unoccupied or is some sort of temporary system needed?

Areas will be occupied. Temporary units will be required for anytime a unit is down.

NIST suggests and will allow AHU-A2 to be used as the temporary unit as that supplies an area that is not a work space.

75 Reference Drawing M-703 or 101-1287. Points list, general note #1 states “all points are existing to remain and shown for reference only”. During the site walk on 2/13, the AC units utilize a lot of pneumatic controls and aging end devices. Is the intent to provide new controls and replace the pneumatic control devices for each unit?

Repeat see above

76 Reference NIST Specific DDC Specifications 230923-10. Please confirm if Siemens is an acceptable BAS controls bidder for the NIST Gaithersburg Building 101 HVAC

Replacement _ Mezzanine A Wing? Siemens is performing control work in building

101 now and the new Siemens ACU controllers will tie into the existing Siemens system on the NIST campus wide DDC network.

Repeat see above

77 When the existing ACUs are demoed/removed, the existing water leak detection system and conduits attached to the units will also need to be removed. Do you require new water leak detectors for each unit or make safe and re-use the existing water leak detectors?

Repeat see above

78 Reference: RFP, Page 46, 2.b.i “Offeror shall submit a maximum of five projects”.

Question: Please clarify if there is a minimum number of projects that are required to be submitted, since the maximum number of projects that will be accepted is five.

Repeat see above

79 Reference: RFP, Page 46, 2.b.ii.1 “Project completed within the previous five (5) years from the date of this solicitation, exclusive of the warranty period.”

Question: Will the Government consider extending the time of projects to six years from the date of the solicitation instead of five?

Repeat see above

80 Reference: RFP, Page 46, 2.b.ii.1 “Project completed within the previous five (5) years from the date of this solicitation, exclusive of the warranty period.”

Question: Will the Government consider extending the time of projects to seven years from the date of the solicitation instead of five?

Repeat see above

81 Reference: RFP, Page 46, 2.b.ii.4) “Offeror must have performed as either the prime or subcontractor.”

Question: Will Joint Venture offerors submitting projects performed under a previous

Joint Venture held by the two Joint Venture partners be acceptable?

Repeat see above

82 Reference: RFP Page 48, d.ii “Offeror shall submit a preliminary schedule highlighting the tasks for completing the project. The schedule shall show the duration of tasks in days.”

Question: Please clarify whether the days featured in the schedule are calendar days or workdays.

Repeat see above

83 Reference: Hazmat Survey

Question: Please provide Hazmat Survey.

Attached

84 Is there an asbestos survey for this project? Attached

85 Factor 3 Past Performance- We have some projects that we intend on using to demonstrate our Past Performance that do not do CPARS evaluations and our POC has retired & isn't available to complete the Past Performance Questionnaire. Can you please confirm how this would be rated if can't get a PPQ completed?

See RFP Section M.1 - Evaluation of Offerors and Basis for Award, Evaluation of

Factor 3 - Past Performance.

86 Per CLIN's 0007- 0012 Is the intent to work around the clock during the weekend? Yes. Friday 5pm to Monday 6am, 24/7 access will be coordinated for rotating crews

87 Can the Site Superintendent be the SSHO and QCM? See Above

88 Is the contract duration for the Off Hours CLIN's 0007- 0012 the same as normal hour contract time 365 days?

Yes

89 Please confirm the sequence of work, is the first CLIN 0001/ AHU-A3 to be completed first prior to moving on to the next CLIN's ?

Contractor to determine sequence of work on award CLIN, within restriction of only one unit being down at a time.

90 Submittal procedures: In regard to multiple hard copies being requested, would be able to be reviewed to reduce to 1 hard copy?

Electronic submittals preferred

91 What is the maximum amount of time that one ACU can be offline at a time? Anticipated 72 working hours. With use of temporary cooling or ACU A2 as a supplement, this time can be planned for longer as needed.

92 Is there a need for temporary utilities during the down time while one unit is being demolished and reassembled?

Please clarify. Means and Methods. NIST will allow and suggests using AHU A2 as a temporary unit, running temporary duct work from A2 to the other units while they are being replaced.

93 What is the weight capacity of the penthouse elevator? 3000 pounds, size 5'x6'x7.5'

94 Can provisions be made by NIST to make use of the penthouse elevator solely for construction use during the period of performance?

Yes, can be restricted to construction and NIST Maintenance

95 The Basis of Design document from 2020 references re-using the shell of the ACUs and replacing all of the interior components, please confirm that the intent of this project is a full demolition and replacement of the existing ACUs in their entirety

Design decision was to replace the units in total. That language in the Design SOW is no longer relevant

96 Which CLINs should the Exhaust Fans E-A-7, E-A-8, and E-A-13 be carried under? It is not clear which ACUs these are part of. The SF1442 bid breakdown includes a separate

CLIN for each of the ACUs but there is no reference to the Exhaust Fans.

Base clin that is awarded for all.

Printed Date: 3/6/2025 11:24 AM Page 5 of 6 Government RFI Responses - 1333ND24RNB1900036.xlsx

97 Which CLIN should Steam Trap ST-A be carried under? It is not clear which ACU this is part of.

Base clin that is awarded

98 Confirm work for Humidifier H-A-3 and Steam Trap ST-H-3 is to be include in the relevant CLINs for ACU-A-3.

Yes

99 Are CLINs 7-12 for night shift and weekend work price difference meant to also include work typically performed during those time periods, such as demolition? Are the base

CLINs 1-6 meant to carry demolition during typical occupied day shift?

See above.

100 Is the general contractor meant to carry any abatement scope in their base pricing?

Part 3 of the SOW states that construction services are to include abatement, but specification section 011000-1.8.C states that no asbestos containing material is expected to be encountered by the contractor on this project and that suspicious hazardous material will be handled via change order to the contract. Does the building have any existing conditions assessments or reports regarding potential hazard materials that can be shared with the contractor?

Abatement is listed in SOW and is in the specs.

101 How many ACUs can be down at once? How many phases does the building and design team anticipate for the work?

Only one AHU can be offline at time. Maximum of 6 phases for AHUs. The exhaust fans can be phased separately, with coordination of AHU operation.

102 What kind of protection will be required between the loading dock and penthouse elevator, and can this protection remain in place continuously for the duration of the contract?

Ramboard on floors and elevator

103 Who is the current building FA vendor? Please provide contact information. Simplex/JCI

104 Who is the current building BMS vendor? Please provide contract information. Siemens/Alberio

105 Does the fire alarm installation contractor specifically need to be licensed in the state of Maryland?

Yes

106 Can there be any modifications made to the exterior of the building to allow for access to bring in the new equipment?

No. Building is historic no modifications allowed.

107 Attachment 1, Page 30, states “the design scope is to replace/refurbish fans and preserve the ACU’s shell and replace all the internal components and update the DDC system”.

Attachment 3, Page 8, states “Replacement of ACU’s serving Bldg. 101 located in the mezzanine level of A wing”.

Which of these is correct?

Design decision was to replace the units in total. That language in the Design SOW is no longer relevant

108 The existing units, piping, and ducting are painted.

1) Do the new units need to be painted to match?

2) What is the color code?

There are many areas where paint is deteriorated.

1) Will this need to be refinished?

No. See above

109 Spec 220500 3.6 A - No Division 09 Sections were provided. Does the Government intend to provide?

No

110 Will the Contractor be allowed to use the roof above the Lobby level for lay-down storage?

No

111 Will there be room available for Sea Can placement? See above

112 Spec 028213 - Does the Government have an estimate for the effective area requiring asbestos abatement?

See attached.

113 During construction, can the Contractor temporarily remove the building section

(including the façade) and between existing louvers (Demo Work Plan Note 3) on the

Mezzanine floor?

Historical standards must be kept for any temporary modifications, and most be restored to historical standards including materials.

114 Will the Government share the historical standards for the building? Exterior elevation, sightlines, roofs, louvers.

Printed Date: 3/6/2025 11:24 AM Page 6 of 6 Government RFI Responses - 1333ND24RNB1900036.xlsx