This document appears to be an attachment, titled "ATTACHMENT 2.3 WST 1 M-102.pdf", that provides technical details and architectural notes related to a federal contract opportunity for the WST Security Upgrades project at the Rickenbacker Air National Guard Base in Ohio.

The key details are: The project involves upgrading the security arrangement for the Aircrew Training System (ATS) Facility, including controlled access into the ATS Bay, constructing a separate classified briefing area, and installing ductwork security grilles. The contract duration is anticipated to be 120 calendar days. The solicitation is set aside for small businesses, with a NAICS code of 236220 and a size standard of $45,000,000 average annual revenue. The magnitude of the project is between $25,000 and $100,000. The solicitation documents and plans/specifications will be available only from the SAM website, and interested offerors must be registered in SAM.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE: N.T.S.

E1

TYPICAL SECURITY BARS IN WALL OPENINGS

DUCT WIDTH (VARIES)

DUCT HEIGHT

VARIES

3" CHANNEL

6" C TO C MAX

" STEEL RODS

WELD

" RODS TO CHANNEL FRAME

(TYPICAL)

MITER CHANNEL AND WELD CORNERS

CONTINUOUSLY INSIDE AND OUTSIDE. GRIND

OUTSIDE WELDS SMOOTH (TYPICAL 4

PLACES)

NOTES:

1. SECURITY GRILLE TO BE INSTALLED IN DUCT WITH

" BOLTS SPACED AT MAX OF 12" CENTER TO

CENTER ( INSTALL A MIN. OF 2 BOLTS PER SIDE OF GRILLE)

2. MAXIMUM DISTANCE FROM EDGE OF DUCT TO ROD IS 6"

3. A MINIMUM OF 1 ROD MUST BE INSTALLED IN ALL DUCTS REQUIRING SECURITY GRILLES.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

C O

N T

R A

C T

N

O

S O

L I C

I T

A T

I O

N

N

O

I S

S U

E

D

A T

E

S I Z

E

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SHEET ID

S

T

C

I V

I L

E

N G

I N

E E

R

S

Q U

A D

R O

N

S

T

A

I R

E F

U E

L I N

G

W

I N

G

R I C

K E

N B

A C

K E

R

A

A T

I O

N A

L

G

U A

D

B

S

E

M

I N

U T

E M

W

Y

C

L U

M B

U S

O

H

X X

X

X X

X X

X

A N

S I

D

R I C

K E

N B

A C

K E

R

A

T

I O

N A

L

G

U A

D

B

S

E

O

H I O

N L Z

G

W

T S

S

E C

U R

I T

Y

U

P G

R A

D E

S

B U

I L D

I N

G

M

H

I S

S O

M

S

P

R I C

E

M

H

I S

S O

M

S

P

R I C

E

F L O

P

L A

N

M

U L T

I D

I S

C I P

L I N

E

M-102

A

T

I O

N A

L

G

U A

R D

PLAN

NORTH

1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION

WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.

2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS

PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/

ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR

UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.

3. REPAIR / PATCH NEW OPENINGS IN WALLS, PARTITIONS, FLOORS AND

CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT

SURFACE FINISHES.

4. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION

ACTIVITIES AT ALL TIMES.

5. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE

DURATION OF CONSTRUCTION.

6. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF

EACH WORK DAY.

GENERAL ARCHITECTUAL NOTES

ARCHITECTURAL KEYNOTES

1. INSTALL SECURITY BARS IN WALL AS SHOWN. SECURITY BARS INSTALLED

SHALL BE CONSTRUCTED WITH TOOL RESISTANT STEEL.

0 2' 4'1'

Sheets and Views
M-101

File details come from the government source that posted it. Updated .