ATTACHMENT 2.1 WST 1 A-101.pdf
PDF 147 KB Posted
- Attached to
- WST Security Upgrades Federal contract opportunity
- Solicitation number
- W50S8P24B0002
- Issued by
- Department of the Army National Guard
About this file
This document appears to be a set of architectural floor plans for a security upgrade project at the Rickenbacker Air National Guard Base in Columbus, Ohio. The project, titled "WST Security Upgrades Building 888", includes the following key details:
The 121st Air Refueling Wing is integrating the KC-135R Aircrew Training System (ATS) into the Distributed Training Center Network, which requires upgrading the security arrangement for the ATS Facility. Specific upgrades include: installing a controlled access door and frame to accommodate Advantor controls, constructing a separate classified briefing area in the Maintenance/Parts Storage Area, adding HVAC supply and return, and a new fire strobe. The project also includes installing the MAF DMO Equipment in the Computer Room and providing a dedicated 20-amp 120VAC power circuit. Ductwork larger than 96 sq. in. will have grille systems installed to prevent intrusion. The anticipated construction/contract duration is 120 calendar days. This project will be solicited as a competitive Small Business Set-aside with a NAICS code of 236220 and a size standard of $45 million average annual revenue. The magnitude of the project is between $25,000 and $100,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Absract of Offers - OF_1419.pdf | ||
| ATTACHMENT 1 SOW for NLZG242009 WST Security Upgrades REV1 4_16_24.docx | DOCX document | |
| ATTACHMENT 2.1 WST 1 A-101 REV1 4_10_24.pdf | ||
| Site Walk Sign-In 9-Apr-2024.pdf | ||
| Pre-Award RFIs 24-2009 WST.docx | DOCX document | |
| W50S8P24B00020001_Amend.pdf | ||
| ATTACHMENT 1 SOW for NLZG242009 WST Security Upgrades.docx | DOCX document | |
| ATTACHMENT 2.3 WST 1 M-102.pdf | ||
| ATTACHMENT 3 RFI.docx | DOCX document | |
| ATTACHMENT 4 SFS Form 3_EAL Request.pdf | ||
| W50S8P24B0002.pdf | ||
| ATTACHMENT 2.2 WST 1 M-101.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTORS
DEBRIEF B
DEBRIEF A
SIM BAY
COMM
BREAK AREA
CORRIDOR
SITE MANAGER
TOILET
MAINT / PARTS STORAGE
COMPUTER ROOM
HPU ROOM
VESTIBULE
BRIEF / DEBRIEF
181B
UPS
1,3,5
A
FINISH CEILING
WHERE OCCURS
MTL. STUD
FRAMING @ 1'-4"
O.C.
RUNNER TRACK
(1) LAYER 5/8"
GWB (EACH SIDE)
6" MTL. STUD PARTITION
BRACING
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
C T
N
O
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
I R
E F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
A T
I O
N A
L
G
U A
D
B
S
E
M
I N
U T
E M
W
Y
C
L U
M B
U S
O
H
X X
X
X X
X X
X
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
D
B
S
E
O
H I O
N L Z
G
W
T S
S
E C
U R
I T
Y
U
P G
R A
D E
S
B U
I L D
I N
G
M
H
I S
S O
M
S
P
R I C
E
M
H
I S
S O
M
S
P
R I C
E
F L O
P
L A
N
M
U L T
I D
I S
C I P
L I N
E
A-101
A
T
I O
N A
L
G
U A
R D
SCALE: 3/16" = 1'-0 '
MULTIDISCIPLINE FLOOR PLAN
D1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR / PATCH NEW OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
5. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
6. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
GENERAL ARCHITECTUAL NOTES
ARCHITECTURAL KEYNOTES
1. REMOVE AND REPLACE INTERIOR DOOR AND FRAME, INSTALLATION OF NEW
METAL HOLLOW DOOR AND FRAME SHALL BE A MODEL AND TYPE
COMPATIBLE WITH ADVANTOR EQUIPMENT.
2. ADD 120V SINGLE PHASE 20AMP FEED, POWER FEED FROM UPS PANEL 1,3,5
THROUGH RAISED FLOOR TO IN FLOOR OUTLET AS SHOWN IN ROOM 182.
CONTRACTOR TO FIELD VERIFY OUTLET CONDUIT ROUTING AND LOCATION
WITH CUSTOMER.
3. ADD A NEW 24" X 12" RETURN DUCT, AREA TO BE FIELD VERIFIED. TIE INTO
EXISTING RETURN LINE.
4. ADD NEW FIRE STROBE, CEILING MOUNTED. POWER FEED TO EXISTING
CONTROL PANEL.
5. RELOCATE EXISTING AIR DEVICE 24" X 24" SUPPLY DUCT TO NEW LOCATION,
AREA TO BE FIELD VERIFIED.
6. ADD SINGLE DOOR AND FRAME OPENING MATCHING EXISTING STUD
INTERVALS, INSTALL
GDW ON BOTH SIDES, MATCH OVERHEAD SHEETING
LINE.
0 2' 4'1'
| Sheets and Views |
| A-101 |
File details come from the government source that posted it. Updated .