This document is a Bill of Quantities (BoQ) for a floor replacement project at the MSB Mezzanine Holy See Offices. The scope of work includes removals and demolitions (existing baseboard and carpet/floor tiles removal), civil works (installing a new three-layer American walnut wooden floor covering approximately 130 sqm), and safety and cleaning services. Specific requirements include a floating parquet installation with D3 vinyl glue, four-sided beveling, and UV matte oil varnishing. The contractor must submit samples to the Embassy's Contracting Officer's Representative (C.O.R.) and is responsible for managing furniture relocation and site preparation. Safety costs are explicitly outlined at €2,000, covering professional services, documentation, technical precautions, scaffolding, and safety systems in compliance with Legislative Decree 81/08.

View the file

Other files for this federal contract opportunity

Other files attached to Carpet Floor Replacement, newest first.
File Type Posted
Questions and Answers 191T7025Q0027.pdf PDF
SF-1442 - 191T7025Q0027.docx DOCX document
Attachment 1 - Techincal Specifications.pdf PDF
Attachment 3 - Drawings.pdf PDF
RFQ 191T7025Q0027.docx DOCX document
Cover Letter.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. DESCRIPTION UNIT COST

TOTAL COST

REMOVALS AND DEMOLITIONS

1 Removal of existing baseboard (approx. 110 lm) lump sum 1 2 Removal of existing carpet tiles and floor tiles lump sum 1

Loading and transport to authorized landfills and / or plants including loading, round trip and unloading including landfill charges at authorized facilities lump sum 1

Preparation of the work site, movement of existing furniture, store it and reinstall it at the end of the work lump sum 1

CIVIL WORKS

Supply and install new wooden floor (approx. 130 sqm) of three-layer American walnut:

first layer in 3.5mm solid walnut, the second layer is in fir wood. The third layer is in rotary-cut veneer. Four-sided beveling. Brushed, UV matte oil varnished. Tongue/groove on all four sides. Commercial first grade(classic). Installation of floating parquet with D3 vinyl glue between the tongues. Where the new floor result too hight, will be Contractor’s responsibility to mill it. All samples shall be submitted to Embassy C.O.R.

lump sum 1

Supply and install teak veneered baseboards, installed with sealing (approx. 110 lm). All samples shall be submitted to Embassy C.O.R. All samples shall be submitted to Embassy C.O.R.

lump sum 1

Safety and Cleaning 8 Professional deep cleaning of the site lump sum 1

Safety Costs (The fee includes all professional and labor services, required documentation, technical precautions, scaffolding, staging, safety systems of any kind, and anything else necessary as provided by Legislative Decree 81/08 and subsequent amendments, with reference to the contracted works) lump sum 1 € 2,000.00

MSB MEZZANINE HOLY SEE OFFICES FLOOR REPLACEMENT

Total

SENSITIVE BUT UNCLASSIFIED

IGCE

File details come from the government source that posted it. Updated .