Attachment 2 - Bill of Quantities.pdf
PDF 927 KB Posted
- Attached to
- USUN Floor Renovation Federal contract opportunity
- Solicitation number
- 191T7025Q0026
- Issued by
- Department of State
About this file
This document is a Bill of Quantities (BoQ) for the USUN 1st Floor Offices Floor Renovation project at the U.S. Embassy in Rome, Italy. The BoQ details a comprehensive renovation scope divided into three main categories: Removals and Demolitions, Civil Works, and Safety and Cleaning. Specific tasks include removing existing textile floor covering (approximately 110 sqm), removing baseboards (approximately 120 linear meters), transporting debris to authorized facilities, and preparing the work site. The civil works portion involves installing new Stone Plastic Composite (SPC) flooring sized 1800x228x6mm (approximately 160 sqm) and new solid wood baseboards, with careful attention to existing wooden hallway flooring and switch/faincoil placement. Safety costs are explicitly outlined at €2,000.00, covering all required professional services, documentation, technical precautions, scaffolding, and safety systems as specified by Legislative Decree 81/08.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 191T7025Q0026.pdf | ||
| RFQ 191T7025Q0026.docx | DOCX document | |
| Attachment 3 -Drawings.pdf | ||
| SF-1442 - 191T7025Q0026.docx | DOCX document | |
| Cover Letter.pdf | ||
| Attachment 1 - Techincal Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. DESCRIPTION UNIT COST
TOTAL COST
REMOVALS AND DEMOLITIONS
Removal by hand of existing textile floor covering all around the rooms, below the faincoil included (approx. 110 sqm). except by the hallway. Removal the current glue and debris by the floor and proceed to prepare the surface for the wooden installation. The surface must be free from dust, wax, loose parts, oil residues, paints, etc.
lump sum 1
2 Removal of existing baseboard (approx. 120 lm) lump sum 1
Loading and transport to authorized landfills and / or plants including loading, round trip and unloading including landfill charges at authorized facilities lump sum 1
Preparation of the work site, movement of existing furniture, store it and reinstall it at the end of the work lump sum 1
CIVIL WORKS
Supply and install new realistic wood surfaces in SPC (Stone Plastic Composite) flooring.
Size 1800x228x6mm (Approx. 160 Sqm). Including vapor barrier sheet. By the hallway:
the existing wooden floor will remain in place. The new floor will be installed directly on top of it. All samples shall be submitted to the C.O.R.
lump sum 1
Supply and install new Solid Wood Baseboard type Ducale white of 120mm height and 13mm thickness (approx. 120 lm). All the switches present along the baseboard way, shall cut in place. As the pieces below the windows and the faincoils. All samples shall be submitted to Embassy C.O.R.
lump sum 1
Safety and Cleaning 8 General and deep cleaning of the premise lump sum 1
Safety costs (The fee includes all professional and labor services, required documentation, technical precautions, scaffolding, staging, safety systems of any kind, and anything else necessary as provided by Legislative Decree 81/08 and subsequent amendments, with reference to the contracted works) lump sum 1 2,000.00 €
Total
USUN 1st FLOOR - OFFICES FLOOR RENOVATION
SENSITIVE BUT UNCLASSIFIED
Table 1
File details come from the government source that posted it. Updated .