Attachment 2_ADA Technical Specifications_1 page.pdf

PDF 676 KB Posted

Attached to
Amendment - ADA Shower and Restroom Trailers Federal contract opportunity
Solicitation number
FA301620U0216
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Amendment - ADA Shower and Restroom Trailers, newest first.
File Type Posted
Q and A 12-16.pdf PDF
Q and A 6-11.pdf PDF
Q and A 4-5.pdf PDF
Attachment 1_Statement of Work - Addendum 1.pdf PDF
Q and A 1-3.pdf PDF
Q and A Sheet.docx DOCX document
Attachment 1_Statement of Work_7 August 2020_2 pages.pdf PDF
RFQ.pdf PDF
Attachment 3_Placement Overhead View.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

502 CONS/JBKAE FA301620U0216

JBSA Lackland, TX 78236 Shower Trailers

ADA Mobile Shower/Trailer shall adhere to current ADA requirements and include the following:

1. No more than a total of 500 Sq Feet.

2. Shall be ADA compliant

3. Shall meet all Commercial Electrical, Plumbing, and other applicable Building codes.

4. Ramp for both wheelchair and crutch access

5. Full-flushing porcelain toilets

6. Fully operational sinks with running water

7. Hand towel holder and hand soap dispenser

8. Air conditioning and heat

9. Low-level outdoor lighting

10. Occupancy light indicators

11. Dual Handrails

12. Mirror above each sink

13. Power/water supply hookups

14. Rubberized/non-slip flooring

15. Lockable/securable access to all restrooms and maintenance room/space

16. Fencing to secure exterior equipment as required (not required if equipment is stored within trailer)

17. Male and female signage/graphic

18. Serial number/equipment ID as required

19. Fire hydrant – fittings/connections for Water

20. Frame skirts (as necessary, e.g. if trailer is >12 off ground or similar)

21. Pending trailer height, ramp/platform for crutch access

22. HVAC/ventilation system

23. Vendor installation, setup,

24. Maintenance guide/documentation and warranty standard to commercial market or better.

25. 4x 110 plugs per trailer that are feeding 20 amp circuits

RFQ Attachment 2

File details come from the government source that posted it. Updated .