Attachment 2 - 668-22-104 - SPS DRAWINGS REV01 20250521.pdf
PDF 22 MB Posted
- Solicitation number
- 36C26025R0067
About this file
These are architectural and engineering design drawings for a renovation project at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The project involves renovating approximately 1,200 square feet of the Sterile Processing Department (SPS) and associated lab spaces in Building 1E, with a focus on repairing mechanical, plumbing, and electrical deficiencies. Specific scope items include sink fixture replacement, plumbing wall box relocation, mechanical system upgrades, light fixture replacements, architectural upgrades like a new wall and door, new ceilings, and refinishing two shower areas. The renovation is comprehensively documented across multiple discipline-specific drawing sets including architectural, mechanical, plumbing, and electrical plans, with detailed demolition, phasing, and infection control requirements. The project is designed to minimize disruption to hospital operations, with work to be completed primarily during off-hours (7 PM-5 AM weekdays and weekends).
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
RENOVATE SPS AND LAB SPACE
Location:
ISSUE FOR CONSTRUCTION
MAY 2, 2025
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
668-22-104
Mann Grandstaff VA Medical Center 4815 N Assembly St, Spokane, WA 99205
AESUS
1E
1E
G.002
PROJECT INFORMATION
DX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
NOTE: IN ADDITION TO THE FOLLOWING INFECTION CONTROL MEASURES OF ICRA
CLASS & PERMIT LEVEL IV, THE CONTRACTOR SHALL REVIEW THE VA SAFETY-QUALITY
CONTROL-INFECTION CONTROL DOCUMENTS IN THE SPECIFICATIONS. THE AE WILL
PROVIDE A FORM FOR THE CONTRACTOR TO FILL OUT
DURING CONSTRUCTION:
A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
B. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC,
TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS. PROVIDE NEGATIVE AIR PRESSURE
MONITOR.
D. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
E. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
F. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY A SAFETY OFFICER AND INFECTION CONTROL
COORDINATOR AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL
MANAGEMENT SERVICES.
UPON COMPLETION OF PROJECT:
A. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
C. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
D. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
E. WET MOP AREA WITH DISINFECTANT.
F. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
EQ-X
CPT1
W-X
E
EA EACH
E EAST
EWC ELECTRIC WATER COOLER
ELEC ELECTRIC (AL)
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ETR EXISTING TO REMAIN
EXP EXPANSION
EXP BT EXPANSION BOLT
EJ EXPANSION JOINT
EXP EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
F
FWC FABRIC WALL COVERING
FT FEET, FOOT
FGL FIBERGLASS
FIN FINISH
FIN GR FINISH GRADE
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FP FIREPROOF
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDTN FOUNDATION
FRMG FRAMING
FURN FURNACE, FURNITURE
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GL GLASS
GL BLK GLASS BLOCK
GB GRAB BAR
GR GRADE
GRAN GRANITE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GUT GUTTER
GYP BD GYPSUM BOARD
H
HNDRL HANDRAIL
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AIR CONDITIONING
HT HEIGHT
HPT HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HR HOUR
I
IN INCH
INFO INFORMATION
ID INSIDE DIAMETER
INSUL INSULATED,INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KPL KICKPLATE
KIT KITCHEN
KB KNEE BRACE
L
LAB LABORATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LV LAVATORY
LT LIGHT
LD LINEAR DIFFUSER
L CL LINEN CLOSET
LL LIVE LOAD
LLV LONG LEG VERTICAL
LPT LOW POINT
M
MACH MACHINE
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MRB MARBLE BASE
MRF MARBLE FLOOR
MKR BD MARKER BOARD
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MC MEDICINE CABINET
MEMB MEMBRANE
MTL METAL
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
N
NAT FIN NATURAL FINISH
NOM NOMINAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
ORCH ORCHESTRA
ORN ORNAMENTAL
OD OUTSIDE DIAMETER
OH OVERHANG, OVERHEAD
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
O OXYGEN
P
P PAINT
PR PAIR
PNL PANEL
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PERF PERFORATED
PC PIECE
PLAM PLASTIC LAMINATE
PLAS PLASTIC, PLASTER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PCC PRECAST CONCRETE
PREFAB PREFABRICATE
PREFIN PREFINISH
PROD PRODUCTION
Q
QTY QUANTITY
QT QUARRY TILE
A
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
APC ACOUSTICAL PANEL CEILING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
AL ANGLE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
B
BALC BALCONY
BSMT BASEMENT
BM BEAM, BENCHMARK
BR BEDROOM
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BRKT BRACKET
BRK BRICK
B CL BROOM CLOSET
BLDG BUILDING
BLT IN BUILT-IN
BUR BUILT-UP ROOFING
C
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEANOUT, CASED OPENING
CLR CLEAR, COLOR
CLO CLOSET
COL COLUMN
CMPST COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COTR CONTRACTING OFFICER
CJ CONTROL JOINT
COP COPING
CU COPPER
CG CORNER GUARD
CORR CORRIDOR
CNTR COUNTER
CSK COUNTER SUNK
D
DMPF DAMPPROOFING
DL DEAD LOAD
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DR DOOR, DRAIN
DH DOUBLE HUNG
DN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
DUPL DUPLICATE
R
R RADIUS, RISER
RWD REDWOOD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RB RESILIENT BASE
RF RESILIENT FLOORING
RA RETURN AIR
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
S
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHV SHELVING
SIM SIMILAR
S SOUTH
SP FIN SPECIAL FINISH
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FEET
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
S4S SURFACED FOUR SIDES
SUSP SUSPEND
SW SWITCH
SYMM SYMMETRICAL
T
TK BD TACKBOARD
TEL TELEPHONE
TV TELEVISION
TMPD TEMPERED
TEMP TEMPORARY
TER TERRAZZO
THK THICKNESS
TPD TOILET PAPER DISPENSER
T&G TONGUE AND GROOVE
TOS TOP OF SLAB, STEEL
T TREAD
TYP TYPICAL
U
UC UNDERCUT
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
V
VAC VACUUM
VR VAPOR RETARDER
VNR VENEER
VP VENEER PLASTER
VIF VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W
W CAB WALL CABINETS
WC WALL COVERING, WATER CLOSET
WP WATERPROOFING, WEATHER
WT WEIGHT
WWF WELDED WIRE FABRIC
W WEST
WF WIDE FLANGE
WDW WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
WDP WOOD PANELING
4815 ASSEMBLY ST.
Department of Veterans Affairs
KEYED NOTE
WALL TYPE
X
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL SPOKANE VA MEDICAL CENTER
Project No: 668-22-104
SPOKANE, WA 99205-6197
DESIGN TEAM
ABBREVIATIONS OWNER
CODE REFERENCES
BUILDING CODE:
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2021 INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2021 INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2020 NATIONAL ELECTRICAL CODE
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
THIS IS AN EXISTING EIGHT-STORY BUILDING.
GENERAL NOTES
VICINITY MAP
INFECTION CONTROL MEASURES
THE SCOPE OF WORK SHALL INCLUDE 1200 SF OF MINOR RENOVATIONS OF AN
EXISTING STERILE PROCESSING DEPARTMENT. THE PRIMARY SCOPE OF THIS
PROJECT IS TO REPAIR THE MECHANICAL, PLUMBING, AND ELECTRICAL
DEFICIENCIES FROM THE PREVIOUS PROJECT INCLUDING BUT NOT LIMITED TO SINK
FIXTURE REPLACEMENT, PLUMBING WALL BOX RELOCATION, UPGRADED
MECHANICAL, AND REPLACEMENT OF LIGHT FIXTURES. THERE ARE MINOR
ARCHITECTURAL UPGRADES, INCLUDING A NEW WALL, A NEW DOOR, NEW
CEILINGS, AND REFINISHING OF TWO SHOWERS.
THIS WORK SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL, MECHANICAL,
PLUMBING, & ELECTRICAL.
ALTERNATES
DESCRIPTIONSYMBOL
MANN-GRANDSTAFF VA MEDICAL CENTER
DEPARTMENT OF VETERANS AFFAIRS
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Orlando Gonzales (ogonzales@aesusdesign.com)
480-454-2861
David Combs (dcombs@aesusdesign.com)
480-454-2861
Structural Engineers
NORTH
BUILDING OCCUPANCY:
GROUP I-2; HEALTHCARE
CONSTRUCTION TYPE:
EXISTING = TYPE 1A
FIRE RESISTANCE IN ACCORDANCE WITH IBC TABLES 601 & 602
EXISTING = FULLY AUTOMATIC SPRINKLERED
FLOORS =2 HOUR FIRE RATED
STORAGE /MACHINE RM = 1 HR FIRE RATED
SHAFTS = 2 HR FIRE RATED
BUILDING AREA:
EXISTING TO REMAIN
(ALLOWABLE UNLIMITED)
BUILDING HEIGHT:
EXISTING TO REMAIN
(ALLOWABLE UNLIMITED, ACTUAL 113.5 FT)
OCCUPANCY LOAD:
EXISTING UNCHANGED
MINIMUM NUMBER OF EXITS (TABLE 1006.3.2)
OCCUPANT LOAD PER STORY MIN EXITS PER STORY
1-500 2
EXIT ACCESS TRAVEL DISTANCE (TABLE 1017.2)
I-2 OCCUPANCY WITH SPRINKLERS = 200 FEET
DEAD END CORRIDORS (IBC 1020.4)
I-2 OCCUPANCY WITH SPRINKLERS = 20 FEET
PROJECT SITE
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
NFPA 900 (OSHA)
NFPA 70
MANN-GRANDSTAFF
A. ANY CHANGES MUST BE APPROVED BY THE CONTRACTING OFFICE
(CO) BEFORE DOING ANY ADDITIONAL WORK. REFER TO PHASING
FOR WORK HOURS. ALL NIGHT AND WEEKEND WORK REQUIRES
APPROVAL AND COORDINATION WITH COR.
B. LAYDOWN / STORAGE AREAS MAY BE PROVIDED BY COR PENDING
AVAILABILITY OF SPACE ON A NON-INTERFERENCE BASIS.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2017-7715
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7703 OCCUPATIONAL SAFETY MANAGEMENT SYSTEMS IN
VHA, 19HEF.
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH THIS PROJECT'S CONSTRUCTION
SPECIFICATIONS
G. NOT ALL KEYNOTES ARE ON ALL SHEETS.
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
David Combs (dcombs@aesusdesign.com)
480-454-2861
RENOVATE SPS AND LAB SPACE BUILDING 1E
DEDUCTIVE ALTERNATE #1: EXISTING WALL TILE TO REMAIN IN MALE AND FEMALE
LOCKER SHOWERS. PATCH AND REPAIR AS NECESSARY TO CUT IN NEW FLOOR TILE
AND RELOCATE SHOWER HEAD.
DEDUCTIVE ALTERNATE #2: EXISTING EXHAUST GRILLS TO REMAIN ABOVE
STERILIZERS in E235. THE 3 HOODS ARE REMOVED FROM SCOPE. THIS DOES NOT
INCLUDE REMOVAL OF VAV SCOPE.
ISSUED SHEETS
Sheet Number Sheet Name
GENERAL
G.002 PROJECT INFORMATION
G.100 SCOPE OF WORK - FOR REFERENCE ONLY
ARCHITECTURE
AD100 DEMOLITION PLANS
AD101 DEMOLITION PLANS
A102 PHASING PLANS
A103 ICRA DETAILS
A104 ICRA REQUIREMENTS
A200 BASEMENT FLOOR PLAN
A201 PROPOSED FLOOR PLANS
A202 ROOF PLAN & DETAILS
A301 DETAILS & SCHEDULES
A302 PARTITION FRAMING DETAILS
A401 CEILING PLANS & DETAILS
A601 SHOWER PLANS, ELEVATIONS & DETAILS
MECHANICAL
M001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND NOTES
MD101 MECHANICAL DEMOLITION BASEMENT PLAN
MD103 MECHANICAL DEMOLITION SECOND FLOOR PLAN
MD104 MECHANICAL DEMOLITION ROOF PLAN
M101 MECHANICAL BASEMENT PLAN
M103 MECHANICAL SECOND FLOOR PLAN
M104 MECHANICAL ROOF PLAN
MP101 MECHANICAL PIPING BASEMENT PLAN
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES + CONTROL DIAGRAMS
PLUMBING
P001 PLUMBING SYMBOLS, ABBREVIATIONS, AND NOTES
PD101 PLUMBING DEMOLITION BASEMENT PLAN
PD102 PLUMBING DEMOLITION FIRST FLOOR PLAN
PD103 PLUMBING DEMOLITION SECOND FLOOR PLAN
P101 PLUMBING BASEMENT PLAN
P102 PLUMBING FIRST FLOOR PLAN
ISSUED SHEETS
Sheet Number Sheet Name
P103 PLUMBING SECOND FLOOR PLAN
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P503 PLUMBING DETAILS
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, ABBREVIATIONS, &
SYMBOLS
ED-100 ELECTRICAL DEMOLITION PLAN - BASEMENT
ED-101 ELECTRICAL DEMOLITION PLAN - 2ND FLOOR
ED-102 ELECTRICAL DEMOLITION PLAN - ROOF
EP-100 ELECTRICAL POWER PLAN - BASEMENT
EP-101 ELECTRICAL POWER PLAN - 2ND FLOOR
EP-102 ELECTRICAL POWER PLAN - ROOF
EL-100 LIGHTING PLAN - 2ND FLOOR
E-400 ELECTRICAL DETAILS
EP-600 PARTIAL ONE-LINE DIAGRAM & CALCULATIONS
EP-601 ELECTRICAL PANELBOARD SCHEDULES
PH100 ELECTRICAL PHOTOMETRIC PLAN
PH-101 PHOTOMETRIC PLAN - LIFE SAFETY
STARC OR APPROVED EQUAL ARE PERMITTED.
G. AT THE END OF EACH WORK SHIFT, EVERYTHING MUST BE CLEANED AND
SANITIZED BY THE CONTRACTOR IN ALL AFFECTED AREAS.
NO. DESCRIPTION DATE
1 REV 1 - VA COMMENTS 05/02/2025
R A
M P
D N
E007B
E
A
E007
EXISTING
UNFINISHED
BASEMENT
STAIR
ROOM
SPRINKLER
ROOM
COMM
MECHANICAL
ROOM
ELEC
STORAGEJANITOR
DISHWASHER
LOCKER
MENS
ROOM
MECH
TOILET
KITCHEN
MAIN
CL
HSKPG
FOOD SERVICE
NUTRITION
SUPERVISOR
ELEC
ELEC
STAIRWELL
RESOURCE CENTER
LEARNING
FOREMAN
M&O
LOCKSMITH
ROOM
MECH
WEST
E036
E034B
SE-1
E034A
E034
50 SF
54 SF
492 SF
1508 SF
E007B
E007A E007
ELEVATOR
MACHINE RM
ELEVATOR
VESTIBULE
EXISTING PHARMACY
STORAGE
MECH
SPACE
EDS
UNEXCAVATED
(SLAB ABOVE)
R A
M P
D N
BID OPTION #1
E007B
E
A
E007
E
F
H
STERILE SUPPLY/
EQUIP STORAGE
E226
1195 SF
SCOPE
CLEANING
E231
WOMENS
LOCKER ROOM
E219
MENS
LOCKER ROOM
E222A
82 SF
DECONTAM
E233
PREP/STERILE
ANTE ROOM
E233B
A200A
A236 A234 A232 C204 C206
C2-C2
C208K
C208H C208G
C208M
C208J C208F
C208D
C208C
C208B
C208 C208A C216
A239A
A239 C211
C213
C217
C211A C215
C213A
C207A
C209C207
S2-A1A200E
S3
A237
237A
A200
A200B A200D
A200C
A240B
A240A
A240C
A238A
A240
A238
C208L
A201
MICROBIOLOGY
LAB
VASCULAR
LAB
ECHO
WAITING
DIAG
STOR
ECHO
PROCEDURE
ECHO
PROCEDURE
COOLER
ROOM
OFFICE
RADIOLOGY
HOT
LAB
NUCLEAR
MEDICINE
STAFF
REST ROOM STAIR 1
TOILET
CONFERENCE
ROOM
TOILET
ULTRASONIC
PROCEDURE
CT SCAN
CT SCAN
PROCEDURE
ROOM
SUPERVISOR DIAG
IMAGE SERVICE
XRAY
PROCEDURE
XRAY
PROCEDURE
CHIEF DIAG
IMAGE SERVICE
RADIOLOGIST
OFFICE
XRAY
PROCEDURE
TOILET
TOILET
RADIOLOGIST
XRAY
PROCEDURE
XRAY
PROCEDURE
XRAY
FILE ROOM
CHANGING
ROOMS
DIAGNOSTIC
RECEPTION
DIAGNOSTIC
WAITING
MENS
TOILET
WOMENS
TOILET
CARDIAC
STRESS TEST
LAB
CARDIAC
STRESS TEST
WOMENS
TOILET
MENS
TOILET
DIAGNOSTIC
WAITING
DIAGNOSTIC
RECEPTION
XRAY
FILE ROOM
XRAY
PROCEDURE
XRAY
PROCEDURE
RADIOLOGIST
TOILET
TOILET
XRAY
PROCEDURE
RADIOLOGIST
OFFICE
CHIEF DIAG
IMAGE SERVICE
XRAY
PROCEDURE
XRAY
PROCEDURE
SUPERVISOR DIAG
IMAGE SERVICE
PROCEDURE
ROOM CT SCAN
CT SCAN
ULTRASONIC
PROCEDURE
TOILET
CONFERENCE
ROOM
TOILET
STAIR 1
STAFF
REST ROOM
NUCLEAR
MEDICINE
HOT
LAB
RADIOLOGY
OFFICE
MICROBIOLOGY
COOLER
ROOM
ECHO
PROCEDURE
ECHO
PROCEDURE
DIAG
STOR
ECHO
WAITING
VASCULAR
LAB
PRE-POST BAYS/
NURSE STATION
EAST
STAIR
PROCEDURE 3
W/FLUORO
PROCEDURE 4
STAFF
TOILET
STAFF BREAK/
LOCKER
TOILETTOILET
PRE-OP 1
EQUIP
STORAGE
PROCEDURE 2
PROCEDURE 1
SOILED HOLD
RECEPTION
WAITING
MECHANICAL
IMAGING
STORAGE
LAB
STORAGE
WALK-IN
LAB COOLER
ELECTRICAL
LAB 4
OFFICE
LAB 3
OFFICE
WEST
STAIR
CONSULT/
EXAM
CART
LIFT
JANITOR
SPD/LAB
BREAK ROOM
CORRIDOR
CORRIDOR
HALL
CORRIDOR
CORRIDOR
CORRIDOR
HALL
CORRIDOR
BLOOD
RECEIVING
ELECTRICAL
HALL
LINEN
STORAGE
CORRIDOR
IMAGING
OFFICE
HALL
MANUAL
EQUIP WASH
EQUIPMENT
STORAGE
STERILE SUPPLY
ANTE ROOM
MENS
TOILET
PASS-THRU
CART WASH
LAB 2
OFFICE
LAB 1
OFFICE
SPD
OFFICE
SPD
OFFICE
SPD RECEIVING
BREAKOUT
LAB
MEETING/LOCKER
G.I.P.
STORAGE
ETO
STERILIZER
PREP/STERILE
STERILIZERS
CLEAN SCOPE
STORAGE
BLOOD
SUPPLY
HSKPG
CLOSET
CORRIDOR
ELEVATOR
VESTIBULE
DECONTAM
ANTE RM
D209 S2D1
D214
D216
D218
D217
D211D215
D207
D206
D210
D208
D204 D203
D201
E207
E206
E208
E209
E211
E210
E212
S2E1
D200
E200
E202
E227
C2D2
C2D5
C2D1
C2E1
C2E4
C2E6
C2E3
C2E5
E201A
D205
C2D3
D212
C2D4
E204 C2E2
E228A E228
E224
E222
E233A
E214
E216
E218
E220
E225
E223
E213
E235A
E235
E226A
D204A
E201B
A202
C2A1
C2E6A
D208A
E229
E221
W7W1 W2 W3 W4 W5 W6
WA
WB
WC
WD
WE
WF
WG
WH
WI
WJ
WK
A5 A6 A7 A8 A9
EF
EE
ED
EC
EB
EA
E1 E2 E3 E4 E5 E6 E7 E8 E9 E10C1 C2 C3
CD
CC
CB
CA
EG
AD
AC
/A200 1
W7W1 W2 W3 W4 W5 W6
WA
WB
WC
WD
WE
WF
WG
WH
WI
WJ
WK
B1
B2
B3
B4
B5
B6
A1
A2
A5 A6 A7 A8 A9
EF
EE
ED
EC
EB
EA
E0 E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11C1 C2 C3 C4 C5 C6
CD
CC
CB
CA
EG
BD
BC
BB
BA
AD
AC
STERILE SUPPLY
E226B
/A201 1
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
RENOVATE SPS AND LAB SPACE
Location:
ISSUE FOR CONSTRUCTION
MAY 2, 2025
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
668-22-104
Mann Grandstaff VA Medical Center 4815 N Assembly St, Spokane, WA 99205
AESUS
1E
1E
G.100
SCOPE OF WORK - FOR REFERENCE
ONLY
1/16" = 1'-0"1 LEVEL 00 - OVERALL FLOORPLAN
1/16" = 1'-0"2 LEVEL O2 - OVERALL FLOOR PLAN
S
DEMOLITION SYMBOL LEGEND
GENERAL DEMOLITION NOTES
HATCH INDICATES DEMOLITION AREA TO
BE COVERED BY NOTES LOCATED WITHIN
A. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON
THE DRAWINGS: COORDINATE DEMOLITION WITH
ARCHITECTURAL DRAWINGS AND REQUIREMENTS SHOWN ON
ALL MECHANICAL PLUMBING AND ELECTRICAL, AND
STRUCTURAL DRAWINGS
B. EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
OWNER OF ANY DISCREPENCIES.
C. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH
ADJACENT BUILDING AREAS
D. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH
MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE
HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR
TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO
SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN
PROCEDURES.
E. PROTECT EXISTING MATERIALS AND EQUIPMENT WHICH ARE
NOT TO BE DEMOLISHED. CONTRACTOR TO PROTECT FROM
DAMAGE ALL EXISTING FLOORS, WALLS, CEILINGS, ETC.
CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS,
ETC. IF AREAS NEED TO BE REPAIRED, FINISHES ARE TO
MATCH EXISTING.
F. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK.
ALSO MAINTAIN REQUIRED EGRESS AROUND TEMPORARY
PARTITIONS.
G. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS
AND ABOVE CEILINGS.
H. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF
ANY SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE
OWNER TO REMOVE PERSONAL BELONGINGS AND DESIGNATE
ALL MEDICAL EQUIPMENT, FURNITURE, AND OTHER ITEMS TO
BE SALVAGED AND STORED BY THE CONTRACTOR. ALL ITEMS
NOT DESIGNATED AS "SALVAGED" BY THE OWNER AFTER THIS
TIME SHALL BE DISPOSED OF BY THE CONTRACTOR. REFER TO
SPECIFICATION FOR NOTIFICATION REQUIREMENTS.
I. COORDINATE EXTENT OF DEMOLITION OF EXISTING ITEMS TO
BE PARTIALLY DEMOLISHED WITH THE FLOOR PLAN AND
REFLECTED CEILING PLAN.
J. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-
SITE WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED,
OR BECOME THE PROPERTY OF THE OWNER.
K. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE
INSTALLATION OF CONSTRUCTION TUNNEL AND BARRICADES.
RELOCATE CONSTRUCTION BARRICADES AS NECESSARY FOR
CONSTRUCTION WORK AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
L. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS
TO VA FOR REVIEW AND APPROVAL PRIOR TO THE
INSTALLATION.
M. CONTRACTOR TO PROVIDE CONSTRUCTION BARRICADE IN ALL
OCCUPIED AREAS AS REQUIRED AND/OR AS DIRECTED BY VA
AT NO ADDITIONAL COST TO VA.
N. CONTRACTOR TO PROVIDE TEMPORARY EXIT SIGNS AND
ILLUMINATION LEVELS PER THE IBC AND VA GUIDELINES. ALL
EGRESS PATHS SHALL REMAIN CLEAR AT ALL TIMES.
O. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL
MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING
WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS
SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE TO
THE PUBLIC.
P. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
Q. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT
COMPLETION OF EACH PHASE AND EACH PROJECT'S
CONSTRUCTION WORK, U.O.N.
R. DO NOT PENETRATE THE FLOOR SLAB WITHOUT
COORDINATING WITH STRUCTURAL REQUIREMENTS.
S. CONTRACTOR TO DOCUMENT EXISTING CONDITION OF ALL
FLOORS, CEILINGS, AND WALL SURFACES WITHIN ALL
DEMOLITION/CONSTRUCTION AREAS. PHOTOGRAPHIC
DOCUMENTATION TO BE PROVIDED TO COR BEFORE ANY
DEMOLITION/CONSTRUCTION COMMENCES.
T. REMOVAL OF CEILING TILES CAN RENDER THE EXISTING
SPRINKLERS INEFFECTIVE DUE TO HEAT BYPASSING THE
SPRINKLERS
CEILING TILES AT THE END OF THE WORK SHIFT. (IF CEILING
TILES MUST BE LEFT OUT,MAINTAINING SPRINKLER OPERATION
WOULD REQUIRE INSTALLATION OF TEMPORARY UPRIGHT
SPRINKLERS.) (NFPA 241 (2019), PARAGRAPH 8.6.2)
DASH LINE INDICATES LIGHTS, CEILINGS,
FIXTURES TO BE REMOVED
W7W1 W2 W3 W4 W5 W6
WA
WB
WC
WD
WE
WF
WG
WH
WI
WJ
WK
REMOVE CEILING TILE AS
REQUIRED FOR PLUMBING
WORK. PATCH AND REPLACE
AS NECESSARY TO MATCH
EXISTING.
REMOVE CEILING TILE AS
REQUIRED FOR PLUMBING
WORK. PATCH AND REPLACE
AS NECESSARY TO MATCH
EXISTING.
COORDINATE WITH COR FOR ACCESS TO
PROCEDURE ROOM AREA. REMOVE CEILING TILES
AND REQUIRED FOR PLUMBING WORK. USE
VISQUEEN PLASTIC AND TAPE TO SEAL AREA OF
WORK BETWEEN SHIFTS. PATH AND REPLACE
CEILING TILES AS NECESSARY TO MATCH EXISTING
REMOVE CEILING TILE AS
REQUIRED FOR PLUMBING
WORK. PATCH AND REPLACE
AS NECESSARY TO MATCH
EXISTING.
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
RENOVATE SPS AND LAB SPACE
Location:
ISSUE FOR CONSTRUCTION
MAY 2, 2025
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
668-22-104
Mann Grandstaff VA Medical Center 4815 N Assembly St, Spokane, WA 99205
AESUS
1E
1E
AD100
DEMOLITION PLANS
1/8" = 1'-0"1 LEVEL 01 - RCP DEMOLITION
. CONTRACTOR REQUIRED TO REINSTALL
STERILE SUPPLY/
EQUIP STORAGE
E226
1195 SF
SCOPE
CLEANING
E231
WOMENS
LOCKER ROOM
E219
MENS
LOCKER ROOM
E222A
82 SF
DECONTAM
E233
PREP/STERILE
ANTE ROOM
E233B
WEST
STAIR
SPD/LAB
BREAK ROOM
CORRIDOR
CORRIDOR
MANUAL
EQUIP WASH
EQUIPMENT
STORAGE
STERILE SUPPLY
ANTE ROOM
MENS
TOILET
PASS-THRU
CART WASH
SPD
OFFICE
SPD
OFFICE
SPD RECEIVING
BREAKOUT
LAB
MEETING/LOCKER
ETO
STERILIZER
PREP/STERILE
STERILIZERS
ELEVATOR
VESTIBULE
DECONTAM
ANTE RM
S2E1
E227
C2E6
C2E5 E228A E228
E224
E222
E233A
E218
E220
E225
E235A
E235
E226A
C2E6A
E229
E221
OPTION #1
RE235
RE231
E A
E226
E A
E B
E222
E220
E218
E
E228A
E228B
E A
A
E A
E B
E A
S E
C2E6B
E
E
E A
C E
C2E6A
E228C
SOILED
CART
PARKING
COMPACT
SHELVING
120LF
T E
L C
O M
P U
N C
H B
L O
C K
S
T E
L C
O M
E Q
U
IP
R A
C K
W A
L L -M
T D
N U
R S
E C
A L L C
A B
P A
G
IN
G A
M P
F
IR
E A
L A
R M
SINK/EYE WASH
U L T
R A
S O
N
IC
C A
R T
REPROCESSOR
DUAL
P P
E S
T O
R A
G E
CART
CART
CART
SINK/EYE WASH
AUTOCLAVES
HIGH WINDOWS ABOVE
REPROCESSOR
DUAL
STORAGE
RACK
SS SHELVES OFOI
LOTS OF OUTLETS
CART
P P
E S
T O
R A
G E
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART WASH
MECH
STAINLESS
SHELVES
KEY
PAD
18x38
CLR
REPROCESSOR
DUAL
DISTILLED
WATER & AIR
HOPPER
ON BASE
DRAIN @
WALL BOX
BACKFLOW PREVENTERS
SS
CLOSURES
BY GC
2-HR
CHASE
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
MANUAL
PASS-THRU
DRAIN @
WALL BOX
WORK
COUNTER
COUNTER
SCOPE
CLEANING
E231
149 SF
STERILE SUPPLY/
EQUIP STORAGE
E226
1195 SF
DECONTAM
E233
1195 SF
PREP/STERILE
ANTE ROOM
E233B
1195 SF
WEST
STAIR
SPD/LAB
BREAK ROOM
CORRIDOR
CORRIDOR
DECONTAM
ANTE RM
MANUAL
EQUIP WASH
EQUIPMENT
STORAGE
STERILE SUPPLY
ANTE ROOM
MENS
TOILET
PASS-THRU
CART WASH
SPD
OFFICE
SPD
OFFICE
SPD RECEIVING
BREAKOUT
LAB
MEETING/LOCKER
WOMENS
LOCKER ROOM
MENS
LOCKER ROOM
PREP/STERILE
ELEVATOR
VESTIBULE
S2E1
E227
C2E6
C2E5
E229 E228A
E228
E224
E222
E233A
E218
E220
E225
E219
E222A
E235
C2E6A
E221
S
S
S
SS
S
H
S
S
S
S
S
OPTION #1
RE235
RE231
E A
E226
E A
E B
E222
E220
E218
E
E228A
E228B
E A
A
E A
E B
E A
S E
C2E6B
E
E
E A
C E
C2E6A
E228C
SOILED
CART
PARKING
COMPACT
SHELVING
120LF
T E
L C
O M
P U
N C
H B
L O
C K
S
T E
L C
O M
E Q
U
IP
R A
C K
W A
L L -M
T D
N U
R S
E C
A L L C
A B
P A
G
IN
G A
M P
F
IR
E A
L A
R M
SINK/EYE WASH
U L T
R A
S O
N
IC
C A
R T
REPROCESSOR
DUAL
P P
E S
T O
R A
G E
CART
CART
CART
SINK/EYE WASH
AUTOCLAVES
HIGH WINDOWS ABOVE
REPROCESSOR
DUAL
STORAGE
RACK
SS SHELVES OFOI
LOTS OF OUTLETS
CART
P P
E S
T O
R A
G E
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART WASH
MECH
STAINLESS
SHELVES
KEY
PAD
18x38
CLR
REPROCESSOR
DUAL
DISTILLED
WATER & AIR
HOPPER
ON BASE
DRAIN @
WALL BOX
BACKFLOW PREVENTERS
SS
CLOSURES
BY GC
2-HR
CHASE
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
MANUAL
PASS-THRU
DRAIN @
WALL BOX
WORK
COUNTER
COUNTER
S2E1
E227
C2E6
C2E5 E228A E228
E224
E222
E233A
E218
E220
E225
E223
E235A
E235
E226A
C2E6A
E229
E221
OPTION #1
RE235
RE231
E A
E226
E A
E B
E222
E220
E218
E
E228A
E228B
E A
A
E A
E B
E A
S E
C2E6B
E
E
E A
C E
C2E6A
E228C
SOILED
CART
PARKING
COMPACT
SHELVING
120LF
T E
L C
O M
P U
N C
H B
L O
C K
S
T E
L C
O M
E Q
U
IP
R A
C K
W A
L L -M
T D
N U
R S
E C
A L L C
A B
P A
G
IN
G A
M P
F
IR
E A
L A
R M
SINK/EYE WASH
U L T
R A
S O
N
IC
C A
R T
REPROCESSOR
DUAL
P P
E S
T O
R A
G E
CART
CART
CART
SINK/EYE WASH
AUTOCLAVES
HIGH WINDOWS ABOVE
REPROCESSOR
DUAL
STORAGE
RACK
SS SHELVES OFOI
LOTS OF OUTLETS
CART
P P
E S
T O
R A
G E
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART WASH
MECH
STAINLESS
SHELVES
KEY
PAD
18x38
CLR
REPROCESSOR
DUAL
DISTILLED
WATER & AIR
HOPPER
ON BASE
DRAIN @
WALL BOX
BACKFLOW PREVENTERS
SS
CLOSURES
BY GC
2-HR
CHASE
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
MANUAL
PASS-THRU
DRAIN @
WALL BOX
WORK
COUNTER
COUNTER
S2E1
E227
C2E6
C2E5 E228A E228
E224
E222
E233A
E218
E220
E225
E223
E235A
E235
E226A
C2E6A
E229
E221
OPTION #1
RE235
RE231
E A
E226
E A
E B
E222
E220
E218
E
E228A
E228B
E A
A
E A
E B
E A
S E
C2E6B
E
E
E A
C E
C2E6A
E228C
SOILED
CART
PARKING
COMPACT
SHELVING
120LF
T E
L C
O M
P U
N C
H B
L O
C K
S
T E
L C
O M
E Q
U
IP
R A
C K
W A
L L -M
T D
N U
R S
E C
A L L C
A B
P A
G
IN
G A
M P
F
IR
E A
L A
R M
SINK/EYE WASH
U L T
R A
S O
N
IC
C A
R T
REPROCESSOR
DUAL
P P
E S
T O
R A
G E
CART
CART
CART
SINK/EYE WASH
AUTOCLAVES
HIGH WINDOWS ABOVE
REPROCESSOR
DUAL
STORAGE
RACK
SS SHELVES OFOI
LOTS OF OUTLETS
CART
P P
E S
T O
R A
G E
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART
CART WASH
MECH
STAINLESS
SHELVES
KEY
PAD
18x38
CLR
REPROCESSOR
DUAL
DISTILLED
WATER & AIR
HOPPER
ON BASE
DRAIN @
WALL BOX
BACKFLOW PREVENTERS
SS
CLOSURES
BY GC
2-HR
CHASE
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
PREP/PACK WORKSTATION
MANUAL
PASS-THRU
DRAIN @
WALL BOX
WORK
COUNTER
COUNTER
W7W1 W2 W3 W4 W5 W6
WA
WB
WC
WD
WE
WF
REMOVE EXISTING SHOWER
PAN, SHOWER VALVES, AND
SHOWER HEAD. REMOVE
ADJACENT RUBBER
FLOORING AS REQUIRED TO
FLOAT UP TO NEW SHOWER
EDGE. REMOVE EXISTING
WALL TILE AS REQUIRED
FOR NEW SHOWER PAN.
REMOVE EXISTING
SHOWER PAN AND
SHOWER VALVES, HEAD.
REMOVE ADJACENT
RUBBER FLOORING AS
REQUIRED TO FLOAT UP
TO NEW SHOWER EDGE.
REMOVE EXISTING WALL
TILE AS REQUIRED FOR
NEW SHOWER PAN.
DEMOLISH (2) EXISTING
WALL DRAIN BOXES.
DEMOLISH TEMPORARY
DRAIN PIPES
DEMOLISH (3) EXISTING
WALL DRAIN BOXES.
DEMOLISH TEMPORARY
DRAIN PIPES
REMOVE EXISTING
EYEWASH.
REMOVE EXISTING
EYEWASH.
REMOVE EXISTING
EYEWASH.
DEMOLISH WALL TEMPORARILY
FOR TEMPORARY DOOR
DEMOLISH
EXISTING SINKS
W7W1 W2 W3 W4 W5 W6
WA
WB
WC
WD
WE
WF
REMOVE AND DEMOLISH
EXISTING LIGHT FIXTURES.
EXISTING CEILING AND
DIFFUSERS, SPRINKLERS, AND
HATCHES TO REMAIN.
REMOVE AND DEMOLISH
EXISTING LIGHT FIXTURES.
EXISTING CEILING DIFFUSERS,
SPRINKLERS, AND HATCHES
TO REMAIN. MINIMALLY CUT
EXISTING CEILING AS
REQUIRED FOR NEW LIGHT
INSTALLATION.
REMOVE AND SALVAGE FOR
RE-INSTALLATION ALL CEILING
MOUNTED LIGHTS, SIGNS, AND
HATCHES. CUT AND REMOVE
EXISTING CEILING AS
REQUIRED FOR MECHANICAL
WORK. REFER TO MECHANICAL
DRAWINGS.
CUT AND REMOVE EXISTING
CEILING AS REQUIRED FOR
MECHANICAL WORK. REFER TO
MECHANICAL DRAWINGS.
MINIMALLY CUT AND REMOVE
EXISTING CEILING AS REQUIRED
FOR MECHANICAL WORK. REFER
TO MECHANICAL DRAWINGS. ALL
LIGHTS, SPRINKLERS AND
EQUIPMENT ARE EXISTING TO
REMAIN.
REMOVE AND SALVAGE
EXISTING LIGHT FIXTURES AND
DIFFUSERS. MINIMALLY CUT
CEILING AS REQUIRED. EXISTING
SPRINKLERS, SIGNAGE AND
OTHER EQUIPMENT TO REMAIN.
REMOVE AND SALVAGE FOR
RE-INSTALLATION MINIMAL
EXISTING ACOUSTIC CEILING
TO PERFORM MECHANICAL
WORK. ALL LIGHTS,
SPRINKLERS AND EQUIPMENT
ARE EXISTING TO REMAIN
EXISTING LIGHTING, HATCHES,
AND CEILING MOUNTED MISC.
EQUIPMENT TO REMAIN.
DEMOLITION SYMBOL LEGEND
GENERAL DEMOLITION NOTES
HATCH INDICATES DEMOLITION AREA TO
BE COVERED BY NOTES LOCATED WITHIN
A. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON
THE DRAWINGS: COORDINATE DEMOLITION WITH
ARCHITECTURAL DRAWINGS AND REQUIREMENTS SHOWN ON
ALL MECHANICAL PLUMBING AND ELECTRICAL, AND
STRUCTURAL DRAWINGS
B. EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
OWNER OF ANY DISCREPENCIES.
C. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH
ADJACENT BUILDING AREAS
D. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH
MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE
HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR
TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO
SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN
PROCEDURES.
E. PROTECT EXISTING MATERIALS AND EQUIPMENT WHICH ARE
NOT TO BE DEMOLISHED. CONTRACTOR TO PROTECT FROM
DAMAGE ALL EXISTING FLOORS, WALLS, CEILINGS, ETC.
CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS,
ETC. IF AREAS NEED TO BE REPAIRED, FINISHES ARE TO
MATCH EXISTING.
F. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK.
ALSO MAINTAIN REQUIRED EGRESS AROUND TEMPORARY
PARTITIONS.
G. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS
AND ABOVE CEILINGS.
H. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF
ANY SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE
OWNER TO REMOVE PERSONAL BELONGINGS AND DESIGNATE
ALL MEDICAL EQUIPMENT, FURNITURE, AND OTHER ITEMS TO
BE SALVAGED AND STORED BY THE CONTRACTOR. ALL ITEMS
NOT DESIGNATED AS "SALVAGED" BY THE OWNER AFTER THIS
TIME SHALL BE DISPOSED OF BY THE CONTRACTOR. REFER TO
SPECIFICATION FOR NOTIFICATION REQUIREMENTS.
I. COORDINATE EXTENT OF DEMOLITION OF EXISTING ITEMS TO
BE PARTIALLY DEMOLISHED WITH THE FLOOR PLAN AND
REFLECTED CEILING PLAN.
J. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-
SITE WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED,
OR BECOME THE PROPERTY OF THE OWNER.
K. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE
INSTALLATION OF CONSTRUCTION TUNNEL AND BARRICADES.
RELOCATE CONSTRUCTION BARRICADES AS NECESSARY FOR
CONSTRUCTION WORK AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
L. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS
TO VA FOR REVIEW AND APPROVAL PRIOR TO THE
INSTALLATION.
M. CONTRACTOR TO PROVIDE CONSTRUCTION BARRICADE IN ALL
OCCUPIED AREAS AS REQUIRED AND/OR AS DIRECTED BY VA
AT NO ADDITIONAL COST TO VA.
N. CONTRACTOR TO PROVIDE TEMPORARY EXIT SIGNS AND
ILLUMINATION LEVELS PER THE IBC AND VA GUIDELINES. ALL
EGRESS PATHS SHALL REMAIN CLEAR AT ALL TIMES.
O. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL
MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING
WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS
SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE TO
THE PUBLIC.
P. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
Q. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT
COMPLETION OF EACH PHASE AND EACH PROJECT'S
CONSTRUCTION WORK, U.O.N.
R. DO NOT PENETRATE THE FLOOR SLAB WITHOUT
COORDINATING WITH STRUCTURAL REQUIREMENTS.
S. CONTRACTOR TO DOCUMENT EXISTING CONDITION OF ALL
FLOORS, CEILINGS, AND WALL SURFACES WITHIN ALL
DEMOLITION/CONSTRUCTION AREAS. PHOTOGRAPHIC
DOCUMENTATION TO BE PROVIDED TO COR BEFORE ANY
DEMOLITION/CONSTRUCTION COMMENCES.
T. REMOVAL OF CEILING TILES CAN RENDER THE EXISTING
SPRINKLERS INEFFECTIVE DUE TO HEAT BYPASSING THE
SPRINKLERS SO ADD NOTES REQUIRING REINSTALLATION OF
CEILING TILES AT THE END OF THE WORK SHIFT. (IF CEILING
TILES MUST BE LEFT OUT,MAINTAINING SPRINKLER OPERATION
WOULD REQUIRE INSTALLATION OF TEMPORARY UPRIGHT
SPRINKLERS.) (NFPA 241 (2019), PARAGRAPH 8.6.2)
DASH LINE INDICATES LIGHTS, CEILINGS,
FIXTURES TO BE REMOVED
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
RENOVATE SPS AND LAB SPACE
Location:
ISSUE FOR CONSTRUCTION
MAY 2, 2025
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
668-22-104
Mann Grandstaff VA Medical Center 4815 N Assembly St, Spokane, WA 99205
AESUS
1E
1E
AD101
DEMOLITION PLANS
1/8" = 1'-0"1 LEVEL 02 - Demolition 1/8" = 1'-0"2 LEVEL 02 - Ceiling Demolition
NO. DESCRIPTION DATE
REMOVAL OF CEILING TILES CAN RENDER THE EXISTING
SPRINKLERS INEFFECTIVE DUE TO HEAT BYPASSING THE
SPRINKLERS
CEILING TILES AT THE END OF THE WORK SHIFT. (IF CEILING
TILES MUST BE LEFT OUT,MAINTAINING SPRINKLER OPERATION
WOULD REQUIRE INSTALLATION OF TEMPORARY UPRIGHT
SPRINKLERS.) (NFPA 241 (2019), PARAGRAPH 8.6.2)
. CONTRACTOR REQUIRED TO REINSTALL
STERILE SUPPLY/
EQUIP STORAGE
E226
1195 SF
SCOPE
CLEANING
E231
WOMENS
LOCKER ROOM
E219
MENS
LOCKER ROOM
E222A
82 SF
DECONTAM
E233
PREP/STERILE
ANTE ROOM
E233B
ELECTRICAL
WEST
STAIR
SPD/LAB
BREAK ROOM
CORRIDOR
CORRIDOR
CORRIDOR
MANUAL
EQUIP WASH
EQUIPMENT
STORAGE
STERILE SUPPLY
ANTE ROOM
MENS
TOILET
PASS-THRU
CART WASH
LAB 2
OFFICE
LAB 1
OFFICE
SPD
OFFICE
SPD
OFFICE
SPD RECEIVING
BREAKOUT
LAB
MEETING/LOCKER
G.I.P.
STORAGE
ETO
STERILIZER
PREP/STERILE
STERILIZERS
ELEVATOR
VESTIBULE
DECONTAM
ANTE RM
S2E1
E227
C2E4
C2E6
C2E5 E228A E228
E224
E222
E233A
E214
E216
E218
E220
E225
E223
E213
E235A
E235
E226A
C2E6A
E229
E221
OPTION #1
OPTION #5
RE235
RE231
E A
E226
E A
E B
E222
E220
E218
E216
E214E213
E
E228A
E228B
E A
A
E A
E B
E A
S E
C2E6B
E
E
E223
E A
E B
C E
C2E6A
E228C
T
FA
W7W1 W2 W3 W4 W5 W6
WA
WB
WC
WD
WE
WF
WG
WH
STERILE SUPPLY
E226B
PHASE 1A
PHASE 1B
PHASE 5
PHASE 2
PHASE 2
PHASE 4
PHASE 3C
PHASE 2
PHASE 3B
PHASE 3A
PHASE 5
PHASE 5B, 5C
ICRA BARRIER
UP TO BOTTOM
OF DECK
ICRA BARRIER
UP TO BOTTOM
OF DECK
ICRA BARRIER
UP TO BOTTOM
OF DECK
ICRA DOOR
ICRA BARRIER UP TO
BOTTOM OF DECK
PHASE 5
PHASE 6
PHASE 3D
E233J
CONTRACTOR ACCESS
DURING PHASE 5
CONSTRUCTION ONLY
C
C
D
A
A
C
D
C
D
C
D D
A
B
A
C
D
ICRA DOOR
A
PHASE 7
GENERAL DEMOLITION NOTES
A. PHASES 1-6 ARE TO BE COMPLETED OUTSIDE OF SPS
WORKING HOURS. CONSTRUCTION MAY TAKE PLACE BETWEEN
7PM-5AM M-F AND ON WEEKENDS.
B. FOR WORK TO BE DONE WITHOUT TEMPORARY ICRA BARRIER
WALLS, CONDUCT DEMOLITION TO MINIMIZE DUST AND UTILIZE
VISQUEEN PLASTIC AND TAPE TO CONTAIN WORK AREA AS
DIRECTED BY THE VA INFECTION CONTROL TEAM. REFER TO
LEGEND AND DRAWING FOR REQUIRED LOCATIONS.
C. REFER TO SPECIFICATION 01 00 00 FOR MAJOR AND MINOR
SHUTDOWN PROCEDURES.
D. PROTECT EXISTING MATERIALS AND EQUIPMENT WHICH ARE
NOT TO BE DEMOLISHED. CONTRACTOR TO PROTECT FROM
DAMAGE ALL EXISTING FLOORS, WALLS, CEILINGS, ETC.
CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS,
ETC. IF AREAS NEED TO BE REPAIRED, FINISHES ARE TO
MATCH EXISTING. ALL REQUIRED CONTRACTOR REPAIRS TO
MATCH DOCUMENTED EXISTING CONDITIONS.
E. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK.
ALSO MAINTAIN REQUIRED EGRESS AROUND TEMPORARY
PARTITIONS.
F. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE
INSTALLATION OF INFECTION CONTROL APPROVED ICRA
BARRIERS.
G. RELOCATE ICRA BARRIERS AS NECESSARY FOR
CONSTRUCTION WORK AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
H. CONTRACTOR TO SUBMIT ICRA DRAWINGS TO VA FOR REVIEW
AND APPROVAL PRIOR TO THE INSTALLATION. TO BE BASED ON
PROVIDED PHASING DRAWINGS.
I. CONTRACTOR TO PROVIDE ICRA BARRIERS IN ALL OCCUPIED
AREAS AS REQUIRED AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
J. CONTRACTOR TO PROVIDE TEMPORARY EXIT SIGNS AND
ILLUMINATION LEVELS PER THE IBC AND VA GUIDELINES. ALL
EGRESS PATHS SHALL REMAIN CLEAR AT ALL TIMES.
K. ALL ICRA BARRIER FIRE-RATING SHALL MAINTAIN FIRE RATING
CONTINUITY OF THE SURROUNDING WALLS. FIRE-RATING OF
CONSTRUCTION ACCESS DOORS SHALL BE APPROPRIATE FOR
THE FIRE-RATED WALL TYPES. PAINT ALL TUNNELS AND
BARRICADES ON THE SIDE VISIBLE TO THE PUBLIC.
L. REMOVE ICRA BARRIERS AT COMPLETION OF EACH PHASE
AND EACH PROJECT'S CONSTRUCTION WORK, U.O.N.
PHASING PLAN LEGEND
HARD ICRA BARRIER
REQUIRED HERE
REFER TO A103
VISQUEEN PLASTIC
TO BE USED HERE
2HR FIRE RATING
ICRA BARRIER TYPE,
REFER TO A103
A
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
KEY PLAN NTS NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
RENOVATE SPS AND LAB SPACE
Location:
ISSUE FOR CONSTRUCTION
MAY 2, 2025
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
668-22-104
Mann Grandstaff VA Medical Center 4815 N Assembly St, Spokane, WA 99205
AESUS
1E
1E
A102
PHASING PLANS
3/16" = 1'-0"1 LEVEL 02 - PROPOSED PHASING DIAGRAM
Phase 1A & 1B (187 sqft): The existing showers in the locker rooms should be completed at separate times to allow the women to temporarily store person belongings in E225 while work in women’s lockers are done. Then while the men’s lockers are being done, the men will need to store their personal belongings in E225. The toilet and sink areas will remain accessible and separated by an ICRA barrier. Shutdowns for this work will be roughly 2 weeks. The floor below (ceilings of level 01) will require temporary shutdown to access the pipes for approximately 1 week and will require an ICRA barrier. The occupancy of the 1st floor includes corridor, office, exam space, and a procedure room. Refer to demolition plans for additional information.
Phase 2 (54 sqft): Eye wash fixtures can be replaced over night or over the weekend with the new manufacturer provided fixtures in an independent phase of construction or these can be combined with another phase. This work is minimally invasive and should not require ICRA barriers.
Phase 3 (161 sqft): E233 Decontamination room Phase 3A - Replace sink. Cut in new light fixtures located above this sink. this work can be completed with sealed and taped plastic barriers while sps is closed on weekends.
Phase 3B – Replace L-shaped sink will require cutting into existing drywall for plumbing adjustments for new sink type. Cut in new light fixtures located above L-shaped sinks. this work shall be completed with full height ICRA barriers as shown.
No vestibule is required.
Phase 3C – Shift plumbing for ultrasonic washers. work to be completed over weekend. Goal is to keep one ultrasonic operational at all times. In the event that simultaneously, then the SPS can utilize other equipment, such as table top ultrasonic for temporary cleaning, although this is not preferred. Hard ICRA Barriers are to be used.
Phase 3D – Replace 2X4 lights in existing 2X4 light fixture locations within drywall ceiling. Paint entire ceiling of room. Goal to minimally cut ceiling. Work to be completed on weekend. Visqueen Plastic and tape can be used to seal off work to allow for operations in the Decontam E233 to occur during weekdays if work cannot be completed in a single weekend.
Phase 4 (72 sqft): E231 Scope Washer Room will require temporary shutdown of one piece of equipment at a time. There must remain a scope washer in operation at all times. Weekend work may allow for this to be completed in a single phase but there is high risk that it cannot be completed and visqueen shall be used to divide off the back scope cleaner area first.
Phase 4 pre-phase – Install new exhaust fan on roof. Install ductwork to 2nd floor.
Remove existing exhaust fan on roof.
Phase 4A – Relocate the wall drain box for the scope washer furthest from the door and Visqueen plastic and tape to divide the area for night and weekend work. No tunnel for construction work to be performed during normal SPS operating hours.
Phase 4B – Completion of the second wall drain box for the second scope cleaner to be completed at night or over the weekend. Contractor to use Visqueen plastic and tape to enclose area of construction.
Phase 4C – Completion of the third wall drain box for the third scope cleaner to be completed at night or over the weekend. Contractor to use Visqueen plastic and tape to enclose area of construction.
Phase 4D – Completion of the ceiling work will require complete shut down of the entire room. duration of cutting drywall ceiling, installing mechanical equipment, and repairing ceiling and painting entire ceiling will need to be discussed with va prior to commencement.
PHASES OF CONSTRUCTION
Phase 5 (490 sqft): Pre/Sterile E235 shall be completed after SPS working hours.
Night and weekend work will be required. Contractor to use a full height ICRA barrier as well as Visqueen plastic to complete Phase 5. A ICRA tunnel to the exit cannot be created. However, a temp door from E233 can be created. When installing new door, seal off existing E233 to prevent contamination. When preforming work inside E235 and E235A, seal off existing doors E226 and E226A to prevent contamination.
Phase 5 pre-phase – Install new exhaust fan on roof. Install ductwork to 2nd floor.
Remove existing exhaust fan on roof.
Phase 5A – Create a full height ICRA barrier in area of AFCV work and the first sterilizer. Workstations to be temporarily relocated to the Sterile Supply Room E226.
Phase 5B – Use Visqueen plastic and tape to seal off work around second sterilizer to encapsulate the area and ensure no contamination of nearby areas.
Phase 5C – Use Visqeen plastic and tape to seal off work around smallest sterilizer to encapsulate the area and ensure no contamination of nearby areas.
Note: If 5B & C are combined into a single phase, hard ICRA barrier is required.
Phase 6 (145 sqft): Add HAC room, completely seal off doors E228A & E228B during construction and confirm existing walls are sealed up to deck during construction.
Phase 7 (278 sqft): Level 00 work per plumbing drawings. Level 01 work per plumbing drawings to use visqueen plastic and tape. Level 02 R.O. and hot water shutdown for upgrades and replacements requires work over weekend to shut down cart washer and access the shaft with use of visqueen plastic and tape.
OUTSIDE OF
BUILDING EXISTING DECK- V.I.F.
FIRE RATED
PLYWOOD (REFER
TO ELEVATION)
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS WITH FIRE RATED PLASTIC
SHEETINGAND SECURE WITH DUCT TAPE.
NEW WALL
PARTITION. REFER
TO INFECTION
CONTROL PLAN
FOR PARTITION
TYPE.
EXISTING FIRE SPRINKLER
MONTHLY
CHANGED HEPA
FILTER
SUPPLY DUCTS TO BE COVERED
WITH FIRE RATED PLASTIC
SHEETING AND SECURE WITH
DUCT TAPE TO KEEP DUST OUT.
SYSTEM
*MODIFICATION OF SPRINKLER
SYSTEM AS OUTLINED IN THE
SCOPE OF WORK CAN COMMENCE
UPON INSPECTION AND APPROVAL
OF CONSTRUCTION BARRIERS BY
VA
FUSIBLE 1-HR FIRE DAMPER
HEPA NEGATIVE AIR
UNIT
TYPE
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE-FILTER TAPE ALL SERVICES TO
PROTECT AGAINST
CONTAMINATION
A
O
V
TYPE B
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
PROTECTED
OR COVERED WITH ROSEN PAPER/FIRE
RATED PLYWOOD.
PLASTIC WINDOW
(ON ALL SIDES)
HEPA NEGATIVE AIR UNIT
HEATED
DETECTOR
CUT-OFF
A
EXHAUST DUCTS
(COVER THE GRATES
AND THE DIFFUSERS)
E
EXISTING EXTERIOR WALL
A
FLEX
DUCT HEPA NEGATIVE AIR UNIT
ZIPPER SIDE ENTRY
EXISTING AIR PLENUM
FLEX DUCT
NEW WALL OVER
EXISTING WALL.
VIF EXISTING WALL.
REFER TO
INFECTION
CONTROL PLAN
FOR WALL
PARTITION TYPE.
MOBILE CONTAINMENT
CART WITH CANVAS/
1-1/4" SQAURE STEEL
TUBULAR FRAME
SWIVEL CASTERS
ABC TYPE FIRE EXTINGUISHER
ON PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE THAN
ONE OR WALL MOUNTED). NEED
INSPECTION TAG AND MONTHLY
INSPECTION). (INITIALS/DATED).
THIS IS A
TYPE B
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY), IF NOT VERIFY ALL OPENING SUCH
AS DOORS ARE CLOSED AND/OR CHANGE OUT
NEGATIVE AIR PRE-FILTER. (TYPICAL REGULATOR
INSTALLATION).
ELEVATION
HARD
BARRIER TEMP. ANTE ROOM
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
(REFER TO
ELEV. DETAIL)
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE
TO PUBLIC
ICRA, ILSM
FIRE WATCH
MISC. FORMS
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
BLUE CORE
LOCKSET
(LOCKED AT
ALL TIMES)
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN
CLEANLINESS).
TYPICAL IDEAL CONSTRUCTION LAYOUT
1/2" = 1'-0"
BOTTOM OF METAL DECK
EXISTING FLOOR/ROOF DECK
QUICK SET FIRE STOP QUICK SET FIRE STOP
ANTE ROOM ELEVATION
1/2" = 1'-0"
4 7/8" BOTTOM OF METAL DECK
EXISTING FLOOR/ROOF DECK
PAPER
CADDY
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
INDICATOR
(REFER TO
PLAN &
ELEVATION)
CONST. SUPERVISOR
NAME AND CELL
PHONE
CHILLER PLANT AFTER HOURS
CALL (VA PROVIDED #)
IN-HOUSE PHONE (VA #) FIRE EMERGENCY DIAL
RESTRICTED AREA
AREA UNDER
CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!!
-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY-
CROSS SECTION 'A-A'
1/2" = 1'-0"
MOBILE CONTAINMENT CART (CONST. BARRIER TYPES)
1/2" = 1'-0"
2' X 4' SUSPENDED
ACOUSTICAL CEILING AS
SCHEDULED ON FLOOR
PLAN.
CEILING AS SCHEDULED
ON FLOOR PLAN
3 5/8" INSULATED WALL WITH
16 GA. METAL STUDS AT 16"
O.C. WITH 2 LAYERS 5/8"
GYPSUM BOARD ONE SIDE
(CONSTRUCTION SIDE) WALL
TO EXTEND TO ROOF METAL
DECKING
3 5/8" INSULATED WALL WITH 16 GA.
METAL STUDS AT 16" O.C. WITH 5/8"
GYPSUM BOARD EACH SIDE. WALL
TO EXTEND TO ROOF METAL
DECKING
3 5/8" 16 GA. METAL STUDS AT 16"
O.C. WITH 5/8" GYPSUM BOARD
EACH SIDE.
EXISTING FINISH CEILING TO
REMAIN
4 7/8"
TYPE A UL DESIGN NO. 419
NOTE: 1. ALL TEMPORARY CONSTRUCTION BARRIERS TO BE 1 -HOUR RATED.
2. STAC CLASS IV ICRA RATED BARRIERS, OR EQUAL, MAY BE USED IF
PRE-APPROVED AND EXTENDED UP TO DECK.
WALL CONSTRUCTION TYPES (DETAILS)
1/2" = 1'-0"
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE B
4 7/8"
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE C UL DESIGN NO. 497
EXISTING WALL TO REMAIN
W A
L L H
E
IG
H T
V A
R
IE
S
C E
IL
IN
G H
E
IG
H T
F
IE
L D
V E
R
IF
Y
F L E
X D
U C
T
F
IE
L D
V E
R
IF
Y W
A L L H
E
IG
H T
V A
R
IE
S
C E
IL
IN
G H
E
IG
H T
W A
L L H
E
IG
H T
V A
R
IE
S
F
IE
L D
V E
R
IF
Y
C E
IL
IN
G H
E
IG
H T
T O
R E
M A
IN
E X
IS
T
IN
G
W A
L L T
O R
E M
A
IN
V
.I .F
A P
P R
O X
A .F
.F
A D
J U
S T
A B
L E
H E
IG
H
T
A D
J U
S T
A B
L E
H E
IG
H
T
OPTIONAL DUCT ROUTING
UP THROUGH CEILING AND
OUT TO NEAREST
EXISTING EXTERIOR WALL
EXISTING CEILING
CEILING
EXISTING WALL
TYPE D
4 7/8"
EXISTING FLOOR AND BASE
F
IE
L D
V E
R
IF
Y W
A L L H
E
IG
H T
V A
R
IE
S
C E
IL
IN
G H
E
IG
H T
BOTTOM OF DECK
VISQUEEN PLASTIC TAPED AND SEALED
BOTTOM OF METAL DECK
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities ManagementLocation:
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
AESUS
RENOVATE SPS AND LAB SPACE
100% Submission
May 2 , 2025
668-22-104
Mann Grandstaff VA Medical Center 4815 N Assembly St, Spokane, WA 99205
1E
A103
ICRA DETAILS
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities ManagementLocation:
o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
AESUS
RENOVATE SPS AND LAB SPACE
100% Submission
May 2 , 2025
668-22-104
Mann Grandstaff VA Medical Center 4815 N Assembly St, Spokane, WA 99205
1E
A104
ICRA REQUIREMENTS
• THIS PROJECT IS TYPE D, GROUP HIGHEST RISK, CLASS IV
• SUBMITT EMERGENCY PROCEDURES TO BE POSTED POST PCRA AND
APPROPRIATE CONSTRUCTION SIGNAGE FOR LIMITED ACCESS AND PROPER
PPE IN WORK AREA.
• CONTRACTOR TO NOTIFY SPOKANE VA MEDICAL CENTER, COR, POLICE
AND SAFETY OFFICE IF A FEDERAL OR STATE REGULATOR ARRIVE ONSITE
TO INSPECT JOBSITE.
• NO EATING, DRINKING OR SMOKING ON THE JOBSITE.
1. SIGNITURE OF RECORD ALL ONSITE CONSTRUCTION WORKERS FOR REVIEW
OF FIRE AND LIFE SAFETY PROCEDURES AT MANN GRANDSTAFF VA MEDICAL CENTER.
2. REVIEW OF INFECTION PREVENTION TRAINING AND CONSTRUCTION SAFETY
CHECK LIST.
3. MAINTAIN MANPOWER AND EQUIPMENT INCLUDING DUST MOPS, WET MOPS,
BROOMS, BUCKETS, AND CLEAN WIPING RAGS FOR CLEANING FINE DUST
FROM FLOORS WITHIN THE WORK AREA (WHEN APPROPRIATE) AND
ADJACENT OCCUPIED AREAS.
4. CONTAIN WORK AREAS OUTSIDE OF CONSTRUCTION BARRIERS, INCLUDING
SPACES ABOVE CEILINGS, WITH FULL HEIGHT POLYETHYLENE SHEET
BARRIER THAT WILL BE EXTENDED TO THE DECK OF THE SPACE AND WILL
BE TIGHTLY TAPED.
5. CLEAN UP DUST TRACKED OUTSIDE OF CONSTRUCTION AREA IMMEDIATELY.
6. TEMPORARY CONSTRUCTION BARRIERS AND CLOSURES ABOVE CEILING
MUST BE SEALED AS DESCRIBED IN #4 ABOVE
7. REMOVAL OF DEBRIS MUST BE IN COVERED CONTAINERS.
8. INTERMEDIATE JOBS THAT CREATE A MODERATE AMOUNT OF DUST INSIDE
ROOM AND IS MADE NEGATIVE BY USE OF HEPA-EQUIPPED UNIT WITH
MINIMUM 10 ACH, AND ALL AIR DISCHARGED OUTSIDE, HEPA UNIT MUST RUN
2 HOURS AFTER COMPLETION OF JOB AND HOUSEKEEPING MUST CLEAN
ROOM BEFORE UNIT IS REMOVED FROM ROOM. ALL WORK AND USE OF
HEPA UNIT MUST BE DOCUMENTED AND COPY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .