Attachment 10 - 668-22-104 - Price Schedule Division Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1DA--CON-NRM-668-22-104 Renovate SPS and Lab Space Building 1
Solicitation number
36C26025R0067
Issued by

About this file

This file is a Price Schedule Breakdown document for a VA construction project at the Mann-Grandstaff Medical Center in Spokane, Washington. The solicitation (36C26025R0067) is for renovating SPS and Lab Space in Building 1, with a price schedule template that includes multiple construction divisions such as General Requirements, Demolitions, Structural, Architectural, Fire Protection, Plumbing, HVAC, and Electrical. The document provides a framework for pricing, with current line items showing $0.00, indicating this is likely a preliminary or template pricing document. The pricing is specified as fixed price, with provisions for overhead rates, subcontract markup, and profit rates to be determined by the offeror, though no specific percentages are currently filled in.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Offeror is responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary.
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Price Schedule 668-22-104

PRICE SCHEDULE BREAKDOWN
Request For Proposal No.: 36C26025R0067

Project Number / Title: Construction Project 668-22-104, Renovate SPS and Lab Space Bldg 1 Project Location: VA Mann-Grandstaff Medical Center, Spokane, WA

RatesBase Item
Price
Division 1 General RequirementsN/A$0.00
Division 2 Temporary WorksN/A$0.00
Division 3 DemolitionsN/A$0.00
Division 4 StructuralN/A$0.00
Division 6 ArchitecturalN/A$0.00
Division 21 Fire ProtectionN/A$0.00
Division 22 PlumbingN/A$0.00
Division 23 HVACN/A$0.00
Division 26 ElectricalN/A$0.00

SubTotals N/A $0.00

Period of Performance (FAR 52.211-10) ________ days

Mobilization / DemobilizationN/A$0.00
Insurance / BondsN/A$0.00
Taxes / Other Fees (provide itemized list)N/A$0.00
O&M Manuals and Red Line DrawingsN/A$0.00
OverheadRate _______%N/A
Overhead (daily rate)Per Day $0.00N/A
SubContract Mark-UpRate _______%N/A
ProfitRate _______%N/A
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS $0.00

File details come from the government source that posted it. Updated .